<strong>Project</strong> Profile<br />
<strong>NGL</strong> FRACTIONATION PLANT – CAMISEA PROJECT (<strong>EPC2</strong>)<br />
Pisco, Perú – PLUSPETROL<br />
Main Facts<br />
• Liquids Processing Capacity:<br />
8,750 m3/d (55,000 bpd).<br />
• Products Storage Capacity:<br />
129,000 m3 (810,000 bbl)<br />
• Schedule: February 2003 – June 2004<br />
(17 months)<br />
Scope<br />
• Basic & Detailed Engineering of Storage,<br />
Dispatching & Utilities<br />
• Completion of <strong>Fractionation</strong> Unit<br />
• Detailed Engineering<br />
• <strong>Plant</strong> Integration & Control System<br />
• Procurement & Construction<br />
• Commissioning Start Up Assistance<br />
Facilities<br />
• <strong>NGL</strong> Storage<br />
• <strong>NGL</strong> <strong>Fractionation</strong><br />
• Product Storage<br />
• Truck & Ship Loading<br />
• Utilities (fire fighting, heating oil, flare<br />
system, etc.)<br />
Highlights<br />
• Tight project schedule<br />
• Stringent environmental regulations<br />
(detailed design of ship loading facilities<br />
and drain systems to minimize chances<br />
of spills due to proximity to an UNESCO<br />
Natural Patrimony Site)<br />
• In-depth analysis of products storage<br />
capacities due to influence of marine<br />
weather conditions on dispatching<br />
possibilities.<br />
JOB# O-03129<br />