<strong>Project</strong> Profile<br />

<strong>NGL</strong> FRACTIONATION PLANT – CAMISEA PROJECT (<strong>EPC2</strong>)<br />

Pisco, Perú – PLUSPETROL<br />

Main Facts<br />

• Liquids Processing Capacity:<br />

8,750 m3/d (55,000 bpd).<br />

• Products Storage Capacity:<br />

129,000 m3 (810,000 bbl)<br />

• Schedule: February 2003 – June 2004<br />

(17 months)<br />

Scope<br />

• Basic & Detailed Engineering of Storage,<br />

Dispatching & Utilities<br />

• Completion of <strong>Fractionation</strong> Unit<br />

• Detailed Engineering<br />

• <strong>Plant</strong> Integration & Control System<br />

• Procurement & Construction<br />

• Commissioning Start Up Assistance<br />

Facilities<br />

• <strong>NGL</strong> Storage<br />

• <strong>NGL</strong> <strong>Fractionation</strong><br />

• Product Storage<br />

• Truck & Ship Loading<br />

• Utilities (fire fighting, heating oil, flare<br />

system, etc.)<br />

Highlights<br />

• Tight project schedule<br />

• Stringent environmental regulations<br />

(detailed design of ship loading facilities<br />

and drain systems to minimize chances<br />

of spills due to proximity to an UNESCO<br />

Natural Patrimony Site)<br />

• In-depth analysis of products storage<br />

capacities due to influence of marine<br />

weather conditions on dispatching<br />

possibilities.<br />

JOB# O-03129<br />

www.tecna.com


<strong>NGL</strong> FRACTIONATION PLANT – CAMISEA PROJECT (<strong>EPC2</strong>) - PISCO, PERÚ – PLUSPETROL<br />

www.tecna.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!