Validation Checklist for Application of New VSAT Equipment - MCX
Validation Checklist for Application of New VSAT Equipment - MCX
Validation Checklist for Application of New VSAT Equipment - MCX
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
TVTCM-8<br />
QUESTIONNAIRE FOR <strong>VSAT</strong><br />
DATE : _______________________________<br />
NAME : _______________________________<br />
ADDRESS : _______________________________<br />
_______________________________<br />
_______________________________<br />
CONTACT PERSON : _______________________________<br />
CONTACT NOS. : _______________________________<br />
Sr. No Particulars Member’s Comments<br />
1 Working Days &<br />
Hours at Site<br />
Days :<br />
Timings :<br />
2 No. <strong>of</strong> Floors<br />
Height <strong>of</strong> the Building<br />
Floor on which Trading Workstation<br />
is located<br />
Voltage between Earth & Neutral<br />
(Not exceeding 2 V)<br />
3 Ro<strong>of</strong>top Flat<br />
Inclined<br />
Dimension <strong>of</strong> the door <strong>for</strong> entering<br />
the ro<strong>of</strong>top.<br />
Nearest electrical earth point near<br />
the antenna.<br />
4 <strong>VSAT</strong> Antenna Any restriction to access the site<br />
<strong>VSAT</strong> Antenna to be taken to the<br />
ro<strong>of</strong>top via :<br />
By Elevator<br />
By Staircase<br />
Other mode : Please specify<br />
Provision <strong>of</strong> conducting from the<br />
5 Hardware <strong>for</strong> the<br />
Trader Workstation<br />
antenna to the trading workstation.<br />
Minimum requirement: PIV (2.8Ghz<br />
or above ) processor.<br />
Minimum 1 GB RAM