Validation Checklist for Application of New VSAT Equipment - MCX
Validation Checklist for Application of New VSAT Equipment - MCX
Validation Checklist for Application of New VSAT Equipment - MCX
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
6 Capacity <strong>of</strong> UPS<br />
connected to the PC<br />
– Trader Work<br />
Station<br />
Hard Disk (HDD) 20 GB<br />
CD ROM<br />
Network Card : 10/100 Mbps<br />
Color Monitor – 15”<br />
MS Windows 2000 / MS XP / MS<br />
Vista (with latest service pack)<br />
Recommended: 2 KVA Online UPS<br />
_______ KVA Online UPS<br />
_____________________________<br />
(Signature <strong>of</strong> Authorised Signatory)<br />
(Rubber Stamp)<br />
Note:<br />
1. Necessary permissions / Security pass to be arranged by the Member <strong>for</strong> accessing the ro<strong>of</strong>top<br />
and <strong>of</strong>fice <strong>of</strong> the Member.<br />
2. Enclose a sketch describing the route <strong>of</strong> IFL cable from the <strong>VSAT</strong> Antenna to IDU.<br />
3. Provide any other pertinent in<strong>for</strong>mation about the site that wasn’t asked elsewhere in this <strong>for</strong>m.