Architectural Design Criteria
Architectural Design Criteria
Architectural Design Criteria
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Architectural</strong> <strong>Design</strong> <strong>Criteria</strong> : Contents<br />
CONTENTS<br />
Title Rev. Date<br />
Section 1 – Introduction A2 April 11<br />
Section 2 – <strong>Architectural</strong> <strong>Design</strong> Requirements A2 April 11<br />
Section 3 – Rail <strong>Design</strong> Requirements<br />
3.1 NOT AVAILABLE FOR DOWNLOAD - -<br />
Section 4 – Commuter Facilities <strong>Design</strong> Requirements<br />
4.1 Commuter Facilities <strong>Architectural</strong> <strong>Design</strong> Requirements A3 Dec 12<br />
4.2 Commuter Facilities E&M <strong>Design</strong> Requirements A3 Dec 12<br />
4.3 <strong>Architectural</strong> Checklist For Bus Interchange A3 Dec 12<br />
4.4 <strong>Architectural</strong> Checklist For Bus Shelter / Bus Bay A1 July 09<br />
4.5 <strong>Architectural</strong> Checklist For Taxi / Passenger Pick-Up Shelter A1 July 09<br />
4.6 <strong>Architectural</strong> Checklist For Pedestrian Overhead Bridge (POB) A1 July 09<br />
4.7 <strong>Architectural</strong> Checklist For Pedestrian Underpass A1 July 09<br />
4.8 <strong>Architectural</strong> Checklist For Covered Linkway A1 July 09<br />
4.9 <strong>Architectural</strong> Checklist For Covered Walkway A1 July 09<br />
Section 5 – Support <strong>Design</strong> Guidelines<br />
5.1 NOT AVAILABLE FOR DOWNLOAD - -<br />
5.2 Guide to the Layout of The Tactile Guidance System in MRT and A1 July 09<br />
LRT Station<br />
5.3 Glazing <strong>Design</strong> Handbook A1 July 09<br />
Section 6 – Support <strong>Criteria</strong><br />
6.1 Not Used<br />
6.2 <strong>Criteria</strong> for Glazing Systems A1 July 09<br />
6.3 Floor Finishes Checklist A1 July 09<br />
- -<br />
Section 7 – Signage Manuals<br />
Available in hardcopy only<br />
Attached Drawings:<br />
Bus Interchange<br />
Bus Shelter / Bus Bay<br />
Taxi / Passenger Pick-Up Shelter<br />
Pedestrian Overhead Bridge (POB)<br />
Pedestrian Underpass<br />
Commuter Facilities M&E Requirements<br />
L/CFADC/AR/BI/0001-0014<br />
L/CFADC/AR/BS/0001-0005<br />
L/CFADC/AR/TS/0001-0008<br />
L/CFADC/AR/POB/0001-0003<br />
L/CFADC/AR/PU/0001<br />
L/ROAD/MES/SD/1001-2001<br />
Dec 2012<br />
<strong>Architectural</strong> <strong>Design</strong> <strong>Criteria</strong> – Revision A3