12.11.2012 Views

In s ta lla tio n , O p e ra tio n a n d M a in te n a n c e In s tru ... - Ventia

In s ta lla tio n , O p e ra tio n a n d M a in te n a n c e In s tru ... - Ventia

In s ta lla tio n , O p e ra tio n a n d M a in te n a n c e In s tru ... - Ventia

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Assembl<strong>in</strong>g and ope<strong>ra</strong><strong>tio</strong>nal <strong>in</strong>s<strong>tru</strong>c<strong>tio</strong>ns Design air cur<strong>ta</strong><strong>in</strong> Arcus-E<br />

6<br />

STAVOKLIMA v.o.s.<br />

5-1-4<br />

Prepar<strong>in</strong>g for electro connec<strong>tio</strong>n, fuse and sett<strong>in</strong>g<br />

Electro <strong>in</strong>vestiga<strong>tio</strong>ns must be performed by a qualified person accord<strong>in</strong>g to ČSN 34 3205 and notice No. 50-<br />

51/1979 law. Electro connec<strong>tio</strong>ns make exactly accord<strong>in</strong>g to the delivered wir<strong>in</strong>g diag<strong>ra</strong>ms. Don´t forget to do the<br />

correspond<strong>in</strong>g pro<strong>te</strong>ctive earth<strong>in</strong>g. Always th<strong>in</strong>k over the sui<strong>ta</strong>bility of recommended cable connec<strong>tio</strong>ns with regard<br />

to fire sec<strong>tio</strong>n of the build<strong>in</strong>g, pro<strong>te</strong>ctive dis<strong>ta</strong>nce, fuse and s<strong>ta</strong>ge of the build<strong>in</strong>g electro <strong>in</strong>s<strong>ta</strong><strong>lla</strong><strong>tio</strong>n.<br />

Af<strong>te</strong>r the mount<strong>in</strong>g check carefully everyth<strong>in</strong>g and do the <strong>in</strong>itial unit revision. Don´t forget also to fill <strong>in</strong><br />

the da<strong>ta</strong> about mount<strong>in</strong>g <strong>in</strong>to the war<strong>ra</strong>nty card. Check the fuse func<strong>tio</strong>n for the <strong>in</strong><strong>te</strong>rnal circuits<br />

(exchang<strong>in</strong>g of the fuse is described hereunder) and sett<strong>in</strong>g of the unit time i<strong>te</strong>m (sett<strong>in</strong>g of the time i<strong>te</strong>m<br />

described hereunder). Do also all prescribed bridges - from prevent<strong>in</strong>g of complica<strong>te</strong>d search<strong>in</strong>g fault<br />

source. Also assure yourself about the func<strong>tio</strong>n of ex<strong>te</strong>rnal elements (accessories), which can have<br />

subs<strong>ta</strong>ntial <strong>in</strong>fluence on the right unit func<strong>tio</strong>n.<br />

Electrical connec<strong>tio</strong>n<br />

Do all connec<strong>tio</strong>ns of prepared cables to the grips accord<strong>in</strong>g to the applied electro documen<strong>ta</strong><strong>tio</strong>n, af<strong>te</strong>rwards<br />

check the connec<strong>tio</strong>ns, earth<strong>in</strong>g and f<strong>in</strong>ally switch<strong>in</strong>g on the power supply.<br />

The electro-holes for cables are always placed by default <strong>in</strong> the lower part of the unit - ancho<strong>ra</strong>ge and slid<strong>in</strong>g<br />

pla<strong>te</strong> (pic.). When do<strong>in</strong>g electrical services it is necessary to open - tip the exchanger and pass through the<br />

cabels <strong>in</strong>to the heat exchanger bush<strong>in</strong>gs. When do<strong>in</strong>g the connec<strong>tio</strong>ns m<strong>in</strong>d the cables can´t be too short and<br />

also too long, as this would s<strong>ta</strong>nd <strong>in</strong> the way to close the exchanger. So see to it that you won´t squeeze the<br />

cable <strong>in</strong>to the exchanger. Electric <strong>te</strong>rm<strong>in</strong>al box is accesible af<strong>te</strong>r open<strong>in</strong>g the suc<strong>tio</strong>n grill and unscrew<strong>in</strong>g the<br />

cover of the electric box (pic.)<br />

passage for all electrical cables<br />

remov<strong>in</strong>g the cover of lower connec<strong>tio</strong>n<br />

lid remov<strong>in</strong>g of<br />

the lower<br />

electricl box<br />

and ma<strong>in</strong><br />

connec<strong>tio</strong>n<br />

grips<br />

posi<strong>tio</strong>n of connect<strong>in</strong>g <strong>te</strong>rm<strong>in</strong>al box<br />

See to it, that the cable won´t be distor<strong>tio</strong>ned or however deformed. The free end<strong>in</strong>gs of sepa<strong>ra</strong><strong>te</strong> cable wires<br />

leave long enough because of easy manipula<strong>tio</strong>n, not before you will be sure the wire is long enough make<br />

the shor<strong>te</strong>n<strong>in</strong>g. The hole for the electro-cable is <strong>in</strong><strong>te</strong>nded as for the power suplly cable entry, but also for all<br />

others controll<strong>in</strong>g cables.<br />

All electrical work should be carried out <strong>in</strong> accordance with current regula<strong>tio</strong>ns <strong>in</strong> given country and accord<strong>in</strong>g<br />

to ČSN 12 2002 and other l<strong>in</strong>ked rules. At any service <strong>in</strong><strong>te</strong>rven<strong>tio</strong>n the unit must be disconnect. Connec<strong>tio</strong>n<br />

and earth<strong>in</strong>g of electric unit or its parts has to correspond especially with ČSN 332190, 332000-5-51, 33 2000-<br />

5-54. All electrical <strong>in</strong>vestiga<strong>tio</strong>ns must be performed by a qualified electrician accord<strong>in</strong>g to the notice §6 ČBU<br />

No.50/78 law.<br />

The producer reserves the right to make changes due<br />

to market<strong>in</strong>g or produc<strong>tio</strong>n rules, without prior notice !<br />

-- 7 -- MPN-ARCUS-E-A-DITRONIC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!