16.01.2015 Views

NSRP Update Joint Panel Meeting (SPPT, F&T, BPT & Systems ...

NSRP Update Joint Panel Meeting (SPPT, F&T, BPT & Systems ...

NSRP Update Joint Panel Meeting (SPPT, F&T, BPT & Systems ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>NSRP</strong> <strong>Update</strong><br />

Surface Preparation and Coatings<br />

<strong>Panel</strong> <strong>Meeting</strong><br />

March 24-25, 2009<br />

Atlanta, GA


Anti Trust Rules<br />

• Regarding your company’s and/or your competitors’<br />

products and services<br />

– Do not discuss current or future prices.<br />

– Do not discuss any increase or decrease in price.<br />

– Do not discuss standardizing or stabilizing prices.<br />

– Do not discuss controlling sales or allocating markets for any<br />

product.<br />

– Do not discuss future design or marketing strategies.<br />

• Regarding your company’s and/or your competitors’<br />

selection of their supplier companies:<br />

– Do not discuss refusing to deal with a company because of its<br />

pricing or distribution practices.<br />

– Do not discuss strategies or plans to award business or remove<br />

business from a specific company.<br />

• Regarding your company’s and/or competitors’ trade<br />

secrets:<br />

– Do not discuss trade secrets or confidential information of your<br />

company or any other participant.


<strong>NSRP</strong> SP-3 Shipyard Representatives<br />

Atlantic Marine – Steve Cogswell<br />

Bender - J. W Napper<br />

Bath Iron Works - Mike Ferrell<br />

Electric Boat - Skip Castro<br />

Fleet Rep – John Kern<br />

Ingalls/ Avondale – Keith O’Brien/Terry Hayes<br />

NASSCO - Judie Blakey<br />

Newport News – Arcino Quiero<br />

Todd - TBD<br />

<strong>Panel</strong> Chair – Steve Cogswell- Atlantic Marine Florida<br />

<strong>Panel</strong> Vice-Chair – Judie Blakey<br />

NAVSEA Rep – Beau Brinckerhoff/Mark Ingle


Progress since Last <strong>Meeting</strong> (October, 2008)<br />

• Continue to address US Navy ship preservation cost<br />

drivers<br />

– Collaborate with Cumbersome Work Practices Group<br />

– Participate on Navy Cost of Corrosion Working Group<br />

– MegaRust Working Groups<br />

• Published two reports<br />

– “Fast Track Single Coat Preservation System,” November 2008<br />

– “Inspection Manual of Flash Rust,” January 2009<br />

• Funded two <strong>Panel</strong> Projects for 2009<br />

– Retention of Pre-Construction Primer<br />

– Assessing the Need for 50% Relative Humidity during Tank<br />

Painting


Thanks to all who have participated<br />

• A diverse group of participants made for very productive<br />

meetings<br />

– <strong>NSRP</strong> yards<br />

– NAVSEA 05P23, RMC’s and Public SY’s<br />

– Private Shipyards<br />

– Academia<br />

– Vendors<br />

• All stakeholders are participating, resulting in a very<br />

productive year. Collaboration and information sharing<br />

between <strong>NSRP</strong> SP-3 and Mega Rust objective has been<br />

accomplished. We must continue moving forward


Upcoming <strong>Meeting</strong>s & Events<br />

• <strong>NSRP</strong> SP-3 <strong>Meeting</strong>s<br />

– June, 2009 <strong>NSRP</strong> SP-3 <strong>Meeting</strong> – TBD<br />

– September, 2009 <strong>NSRP</strong> SP-3 <strong>Meeting</strong> – Philadelphia, joint<br />

meeting with most <strong>NSRP</strong> panels<br />

• Other <strong>Meeting</strong>s<br />

– May 18-20, 2009 – International Marine and Offshore<br />

Coatings Conference in Virginia Beach<br />

– June 8-12, 2009 – MegaRust in Norfolk, VA<br />

– July 21-24, 2009 – NAVSEA SSRAC <strong>Meeting</strong> in<br />

Jacksonville, FL<br />

– October 21-23, 2009 – SNAME 2009 Annual <strong>Meeting</strong> and<br />

Expo in Providence, Rhode Island


March, 2009 Agenda<br />

Tuesday, March 24 th<br />

• <strong>NSRP</strong> Program <strong>Update</strong><br />

• NAVSEA 05P23<br />

• ManTech, SBIR <strong>Update</strong><br />

• War on Corrosion <strong>Update</strong><br />

• CQATK, Electronic Paint<br />

Reporting for NAVSEA<br />

• Break for Lunch<br />

• CWP update<br />

• Project updates: Flash Rust &<br />

Retention of PCP<br />

• What’s new with TESTEX Tape<br />

• Surface Profile with hand tools<br />

• Soluble Salts, general discussion<br />

• 50% RH Project <strong>Update</strong> and<br />

Workshop<br />

Wednesday, March 25 th<br />

• RH Workshop Continuation as<br />

required<br />

• SSRAC Process Review<br />

• 009-32 FY 10<br />

• SSRAC Work shop, review<br />

proposals, develop new<br />

proposals<br />

• Lunch Break<br />

• Review and consolidate SSRAC<br />

proposals


SSRAC Proposals from Last Year<br />

Proposal # Description Action Taken<br />

Proposals which were substantially accepted<br />

59 Allow alternative of measuring core temp Accepted as modified<br />

86 12 hour ambient monitoring Change 12 hours prior to 4 hours prior<br />

112 Relax 50% RH for tank parts processed in shop Accepted as modified<br />

Proposals which were accepted with substantial modification<br />

64 Delete more restrictive non-skid storage temp Expanded range slightly<br />

68 Relax touch requirements<br />

QA requirements waived for areas less than 1<br />

sq ft/0.03%<br />

69 Delete certain QA requirements for touch-up<br />

QA requirements waived for areas less than 1<br />

sq ft/0.03%<br />

Proposals which were positively received but action was deferred<br />

54 PCP Retention Defer to next year pending additional data<br />

90 Allow HB 2 1/2 M on hand lance areas Defer to next year pending additional data<br />

91 Allow HB 2 1/2 M on hand lance areas up to 30% Defer to next year pending additional data<br />

Proposals which were not adopted<br />

76 Eliminate CAP sheet requirement Rescinded because paperless is not ready<br />

79 Allow in-house inspector training Not adopted<br />

81 Allow ISO 9000 as alternatiev to QP-1 Not adopted<br />

88<br />

Delete requirement to document manual readings<br />

every 12 hours<br />

Not adopted<br />

111 Relax 50% RH in tanks Not adopted


For More Information<br />

www.nsrp.org<br />

Program info, research announcements,<br />

briefings, project descriptions ...


Questions

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!