Genie Z45-25J Operator Manual - Sunflower Rental
Genie Z45-25J Operator Manual - Sunflower Rental
Genie Z45-25J Operator Manual - Sunflower Rental
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
First Edition · Seventh Printing<br />
<strong>Operator</strong>'s <strong>Manual</strong><br />
MAINTENANCE<br />
Check the Tire Pressure<br />
Bodily injury hazard. An overinflated<br />
tire can explode, which can<br />
result in death or serious injury.<br />
Tip-over hazard. Do not use<br />
temporary flat tire repair products.<br />
This procedure does not need<br />
to be performed on machines<br />
equipped with foam-filled<br />
tires.<br />
To safeguard maximum stability, achieve<br />
optimum machine handling and minimize tire<br />
wear, it is essential to maintain proper pressure<br />
in all air-filled tires.<br />
Scheduled Maintenance<br />
Maintenance performed quarterly, annually and<br />
every two years must be completed by a person<br />
trained and qualified to perform maintenance on this<br />
machine according to the procedures found in the<br />
service manual for this machine.<br />
Machines that have been out of service for more<br />
than three months must receive the quarterly<br />
inspection before they are put back into service.<br />
1 Check each tire with an air pressure gauge and<br />
add air as needed.<br />
Tire specifications 2WD Models 4WD Models<br />
Narrow base models<br />
Industrial tire Foam Filled Only<br />
Standard base models<br />
Rough terrain tire 14-17.5 NHS 14-17.5 NHS<br />
45 psi / 3.1 bar 45 psi / 3.1 bar<br />
Part No. 52421 <strong>Genie</strong> Z-45/25 & <strong>Genie</strong> Z-45/<strong>25J</strong> 15