18.01.2015 Views

Restructuring internship - Bureau of Waterworks Tokyo Metropolitan ...

Restructuring internship - Bureau of Waterworks Tokyo Metropolitan ...

Restructuring internship - Bureau of Waterworks Tokyo Metropolitan ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Fig. 4 State <strong>of</strong> acknowledgement <strong>of</strong> instructors (As <strong>of</strong> April 1, 2006)<br />

Job-wise personnel (person)<br />

Clerical field Assistant Section Chief and Chief 28<br />

Clerk class<br />

Chief (Senior) staff class 31<br />

Average age<br />

(years)<br />

37<br />

Technical field<br />

General 21<br />

Assistant Section Chief and Chief 266<br />

Clerk class<br />

Chief staff class 28<br />

General 5<br />

48<br />

2 Making curriculum and textbooks<br />

During the course <strong>of</strong> training, curriculum and textbooks are made as per concerned<br />

subject mainly through group-wise voluntary training. A thorough and comprehensive<br />

study is conducted on the elaborate “clerical and technical” items for succession, and<br />

compilation <strong>of</strong> the contents and methods <strong>of</strong> training for “Beginner Course” into a<br />

manual is promoted as viewed through the eyes <strong>of</strong> a real instructor. In other words, we<br />

are asking the expert staffs to put the “contents in their minds” into documents and<br />

videos to leave them as “something substantial.”<br />

In the first year 2004, some subjects had to be started from the blank, and the<br />

instructors seem to have had a hard time having to do voluntary training 5 or 6 times.<br />

Even in the case <strong>of</strong> the subject that had been available since long and the items that<br />

had so far been taught, a review was made<br />

to check and see if they are really required 3 Operation procedures<br />

at this time for effective succession, before (For replacing a φ25mm saddle snap tap<br />

with a φ25mm saddle tap)<br />

sorting out the minimum required items.<br />

1) Fix the saddle snap tap exchanger base plate to the saddle snap tap<br />

with U-shaped bolts.<br />

As for the contents <strong>of</strong> textbooks, pictures<br />

and illustrations were effectively used in<br />

the textbooks for skill practice in order to<br />

meet with our request <strong>of</strong> a textbook “easy<br />

2) Install the saddle snap tap exchanger top plate onto the saddle snap tap<br />

to understand simply by seeing (reading).”<br />

exchanger base plate.<br />

The examples are shown in Fig. 5.<br />

For the training method also, the debating<br />

style based on case examples was<br />

3) Install the drill adapter (improved type) for saddle snap tap.<br />

preferably adopted than the didactic style.<br />

In the case <strong>of</strong> technical course, the<br />

contents and objectives <strong>of</strong> the training<br />

facility were thoroughly familiarized so as<br />

to make the most effective use <strong>of</strong> the<br />

Fig.5<br />

newly built training facility for skill practice.<br />

Copyright 2007 <strong>Bureau</strong> <strong>of</strong> <strong>Waterworks</strong>, <strong>Tokyo</strong> <strong>Metropolitan</strong> Government. All Rights Reserved<br />

8-1 Nishi-Shinjuku 2-chome, Shinjuku-ku, <strong>Tokyo</strong>, Japan

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!