White papers supporting <strong>the</strong> addendum changes are:<br />
Distance reduction analysis, open and closed loop<br />
what is ETA minmax<br />
ETA uncertainty 95% envelope model in open and closed loop<br />
Meteo error analysis<br />
WG85 input to WG78 (in work)<br />
o Clarify any unclear aspect concerning about functional content <strong>of</strong> <strong>the</strong> 4D trajectory (EPP)<br />
o Propose updates for potential missing info<br />
o Underline EPP requirements with significant impact on nav systems without clear<br />
associated need.<br />
RTA 95% accuracy demonstration methodology<br />
Sylvain indicated that <strong>the</strong> WG85 addendum and papers would be shared with SC<strong>227</strong>.<br />
The SESAR Initial4D validation is a phased approach with three steps planned.<br />
Initial4D airborne prototypes available now by Honeywell and Thales for demonstration aircraft.<br />
Improved RTA performance in descent: +/- 10 seconds with 95% reliability<br />
Improved wea<strong>the</strong>r modeling – additional wind and temperature levels available<br />
ETA min/max computed in FMS and reported over new ADS-C report<br />
Datalink draft standard implemented – CPDLC and ADS-C updates per WG78<br />
Initial4D ground function prototypes are also available now<br />
By Maastrict (Enroute) and NORACON (TMA)<br />
Datalink per WG78 draft standard<br />
Controller working position using new generation HMI<br />
(more on slide 21)<br />
AMAN functionality expanded<br />
A Flight test was conducted in late 2011<br />
Coupled and non-coupled simulators in development for ground-based testing <strong>of</strong> integrated system<br />
Coupled = aircraft simulated at Airbus connected over internet to ATM simulation<br />
Objective <strong>of</strong> simulations is to model operational performance issues and benefits<br />
Proposed way forward with SC<strong>227</strong> – Sylvain that he was just presenting <strong>the</strong> EUROCAE position.<br />
EUROCAE is interested in keeping ED75 & DO236 a common document<br />
But, WG85 scope is not as wide as SC<strong>227</strong><br />
EUROCAE want only one EUROCAE WG to impact ED75 at a time, and WG85 already existed,<br />
so WG85 scope will expand to cover additional RNP aspects<br />
Proposed to have joint WG85/SC<strong>227</strong> activities starting now for RNP and GNSS, but not Initial4D<br />
Concerning keeping Initial4D efforts on track, <strong>the</strong> following ideas were <strong>of</strong>fered.<br />
o Create a dedicated sub-group in WG85 and SC<strong>227</strong><br />
o Start with coordinated (not joined) activities to secure <strong>the</strong> output <strong>of</strong> a final ED75<br />
addendum in mid-2013 by WG85 subgroup<br />
o After mid-2013, transition to joined activities on I4D scope<br />
WG85 scope will grow to match <strong>the</strong> scope <strong>of</strong> SC<strong>227</strong>.<br />
WG85 TOR to be updated and new call for participation for wider participation to cover RNP and GNSS.<br />
Hal Moses (<strong>RTCA</strong>) indicated that due to <strong>the</strong> complicated and slow process for joint committees, <strong>the</strong> best<br />
way to go forward for now is to just work toge<strong>the</strong>r until <strong>the</strong> formalities can be worked out.<br />
Standards <strong>of</strong> Navigation Performance – Ge<strong>of</strong>f Burtenshaw<br />
Ge<strong>of</strong>f Burtenshaw, UK CAA, former Co-Chair <strong>of</strong> Joint SC181/WG-13<br />
8