PRE-SHOW GUIDE - POWER-GEN Asia
PRE-SHOW GUIDE - POWER-GEN Asia
PRE-SHOW GUIDE - POWER-GEN Asia
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>POWER</strong>-<strong>GEN</strong> ASIA 2013 CONFERENCE PROGRAMME<br />
Invited Speakers:<br />
- Dr. Twarath Sutabutr, Deputy Director-General, Department of Alternative Energy Development and Efficiency, Thailand<br />
- Mr. Sutat Patmasiriwat, Governor of Electricity Generating Authority of Thailand, Thailand<br />
- Dr. Piyasvasti Amranand, Chairman, Energy for Environment Foundation, Thailand<br />
- Mr. Markus Lorenzini, Head of Energy Sector, ASEAN-Pacific Cluster, Siemens, Indonesia<br />
Networking Coffee Break<br />
Track 3 - Power Plant Technologies<br />
(Room: Jupiter 12)<br />
SESSION 1: <strong>POWER</strong> PLANT CASES<br />
Session looking at successful power plants examples in Jordan, Hong<br />
Kong, South Korea and Singapore<br />
Session Chair: Roy Daniel, Managing Director, Burns and Roe <strong>Asia</strong>,<br />
Ltd., Thailand<br />
Building the World’s Largest Reciprocating Engine Power Plant in<br />
Jordan, 600 MW<br />
Amani Mohamed Al Azzam, Managing Director Assistant for Operation &<br />
Planning, National Electric Power Company, Jordan<br />
Co-author:<br />
Risto Paldanius, Director, Business Development, Wärtsilä Corporation,<br />
Power Plants, Finland<br />
Posco Energy’s Incheon Combined Cycle Complex- Unit 5&6<br />
Providing Sustainable Energy for Metropolitan Seoul/Incheon<br />
Jin-Won Park, Vice President, Posco Power, Korea (South)<br />
Flexible Fuel Capability for the Single Shaft Frame 9FA Combined<br />
Cycle Gas Turbines at Black Point Power Station<br />
Hong Kiat Chia, Project Manager, WorleyParsons Singapore Pte Ltd,<br />
Singapore<br />
Co-authors:<br />
Kevin Leung, Senior Process Engineer, CLP Power Hong Kong Limited,<br />
Hong Kong<br />
Kavitha Raghavendra, Manager Process and Flow Assurance,<br />
WorleyParsons Singapore Pte Ltd, Singapore<br />
Donald Naude, Senior Principal Consultant, WorleyParsons Services Pty<br />
Ltd, Australia<br />
Efficient Contstruction of the Banyan Combined Cycle Power Plant<br />
Using Modularization Approach<br />
Representative from Sembcorp Industries, Singapore<br />
Track 4 - Operation, Optimization & Servicing<br />
(Room: Jupiter 13)<br />
SESSION 1: MAINTENANCE STRATEGIES<br />
Discussion on employing innovative technologies and analysis tools to<br />
achieve reliable and cost effective power plant maintenance and services.<br />
Session Chair: Suqing Wang, Director of Power Generation Services-<br />
<strong>Asia</strong> Region, Black & Veatch, Thailand<br />
New Service Approach Reducing Planned Down-time to 17 Days<br />
Over 15 Years of the Siemens SGT-600 & 700<br />
Mats Blomstedt, Product Manager, Siemens Industrial Turbomachinery,<br />
Sweden<br />
Co-author:<br />
Elin Tidblom, Portfolio Owner Service R&D, Siemens Industrial<br />
Turbomachinery, Sweden<br />
Deaerator Vessel Inspection, Maintenance and Repair<br />
David Stewart, Engineering Manager, Kansas City Deaerator Co.,<br />
United States<br />
Co-author:<br />
Michael Koontz, President, Kansas City Deaerator Co., United States<br />
An Overview of F Class CCGT Servicing, Inspection & Outage<br />
Management<br />
Ian Kingman, Technical Executive, Parsons Brinckerhoff, Singapore<br />
An Example of the Development and Installation of a Boiler Body<br />
Online-Monitoring System<br />
Minwoo Ko, Staff, KOSEP, Korea (South)<br />
Co-authors:<br />
Yeongsin Kim, KLES Inc., Korea (South)<br />
Woo-sik Kim, General Manager, Korea South East Power Co.Ltd.,<br />
Korea (South)<br />
Delegate Lunch sponsored by<br />
*Invited/to be confirmed<br />
WWW.<strong>POWER</strong><strong>GEN</strong>ASIA.COM / PAGE 15