19.01.2015 Views

Long Point World Biosphere reserve

Long Point World Biosphere reserve

Long Point World Biosphere reserve

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Long</strong> <strong>Point</strong><br />

Causeway Improvement Plan<br />

2 nd Scientific Conference North Vidzeme <strong>Biosphere</strong> Reserve<br />

Valmiera, Latvia 081113<br />

Brian Craig, Geoffrey Gartshore, Gillian Thompson, Charlotte<br />

Cox, Alex Harrington, Martin Scott, Rick Levick and Paula Jongerden


Presentation Outline<br />

Background on <strong>Long</strong> <strong>Point</strong> <strong>Biosphere</strong> Reserve<br />

<strong>Long</strong> <strong>Point</strong> Causeway Issues<br />

Steering Committee formation<br />

Implementation Plan process and<br />

recommendations<br />

Success / Challenges / Lesson Learned – Path<br />

forward<br />

long <strong>Point</strong> Causeway improvement plan<br />

long <strong>Point</strong> Causeway improvement plan


<strong>Long</strong> <strong>Point</strong> <strong>Biosphere</strong><br />

Reserve


<strong>Long</strong> <strong>Point</strong> <strong>World</strong> <strong>Biosphere</strong> <strong>reserve</strong><br />

Volunteer Board of Directors<br />

members representative of the diverse interests<br />

of those living in the community<br />

Business, municipal planner, biologists,<br />

teachers, naturalists, health professionals,<br />

mechanic, hunters, anglers, cottagers<br />

Board members sit on the board in a personal<br />

capacity<br />

long <strong>Point</strong> Causeway improvement plan<br />

long <strong>Point</strong> Causeway improvement plan


<strong>Long</strong> <strong>Point</strong> <strong>World</strong> <strong>Biosphere</strong> <strong>reserve</strong><br />

The <strong>Long</strong> <strong>Point</strong> <strong>World</strong> <strong>Biosphere</strong> Reserve<br />

Foundation promotes research, monitoring,<br />

education and appropriate projects that support the<br />

goals of conservation and sustainable use in the<br />

<strong>Long</strong> <strong>Point</strong> <strong>World</strong> <strong>Biosphere</strong> Reserve<br />

long <strong>Point</strong> Causeway improvement plan<br />

long <strong>Point</strong> Causeway improvement plan


www.longpointbiosphere.org


CONTEXT<br />

Nationally and Globally important wetland –<br />

RAMSAR, Important Bird Area – Birdlife<br />

International, Canadian National Wildlife Area<br />

One of 15 <strong>Biosphere</strong> Reserves in Canada<br />

A habitat oasis in an otherwise fragmented<br />

landscape<br />

Causeway is a vital community and recreational link<br />

Photo: S. Gillingwater<br />

Photo: S. Gillingwater<br />

Photo: S. Gillingwater<br />

long <strong>Point</strong> Causeway improvement plan<br />

long <strong>Point</strong> Causeway improvement plan


CONCERNS<br />

Causeway isolates Big Creek Marsh habitat<br />

from shoreline and nearshore habitat of Inner<br />

Bay<br />

Hinders wildlife movement, fish passage and<br />

reduces hydrological connections (reducing<br />

flow and nutrient exchange)<br />

Photo: Ecoplans<br />

Significant wildlife road mortality including<br />

Species at Risk.<br />

5 th deadliest road in the world for turtles<br />

including Species at Risk<br />

Community concerns include safety of<br />

motorists, residents, pedestrians and cyclists<br />

Photo: S. Gillingwater<br />

long <strong>Point</strong> Causeway improvement plan<br />

long <strong>Point</strong> Causeway improvement plan


Causeway Improvement Stakeholders


Steering Committee<br />

Photo: S. Gillingwater<br />

long <strong>Point</strong> Causeway improvement plan<br />

long <strong>Point</strong> Causeway improvement plan


FEASIBILITY STUDY - PURPOSE<br />

Identify and develop practical solutions to:<br />

Reduce wildlife road mortality<br />

Improve hydrological connection between Big<br />

Creek Marsh and the Inner Bay<br />

Provide for safe wildlife movement between Big<br />

Creek Marsh and Inner Bay<br />

Photo: S. Gillingwater<br />

Beginning of a process – not the end<br />

Subsequent design stages required<br />

Public/agency input to continue in future<br />

Photo: S. Gillingwater<br />

<strong>Long</strong> <strong>Point</strong> Causeway improvement plan<br />

<strong>Long</strong> <strong>Point</strong> Causeway improvement plan


OPPORTUNITIES RELATED TO ROADWAY IMPROVEMENTS<br />

Safer conditions for motorists, pedestrians, cyclists<br />

Enhanced recreational and tourism opportunities (biking,<br />

birding, fishing)<br />

Requires unified vision – joint efforts with Norfolk<br />

County Planning, Transportation, Servicing<br />

Photo: S. Gillingwater<br />

<strong>Long</strong> <strong>Point</strong> Causeway improvement plan<br />

<strong>Long</strong> <strong>Point</strong> Causeway improvement plan


Feasibility Study Process – Developing the Plan<br />

Phase 1 – Understand Problem and Implementation Priorities<br />

Questionnaire survey to local community<br />

Consultations with Steering Committee<br />

August 2007 Informal Public Meeting – Port Rowan<br />

Literature review and case study review<br />

Phase 2– Review Mitigation Options<br />

Consider comments provided through public input<br />

Further review with Steering Committee (fall 2007 and winter 2008)<br />

Finalized list of options prepared for development in the Improvement<br />

Plan<br />

<strong>Long</strong> <strong>Point</strong> Causeway improvement plan<br />

<strong>Long</strong> <strong>Point</strong> Causeway improvement plan


Feasibility Study Process – Developing the Plan<br />

Phase 3 – Develop and Present Improvement Plan<br />

Visual Plan elements and roadway zone descriptions<br />

Fact sheets – technical aspects<br />

Implementation phasing and temporary measures<br />

Preliminary cost estimates<br />

Conformity with general objectives of Draft Lakeshore Special Policy<br />

Area Secondary Plan of our local municipality (Norfolk County)<br />

Final plan presented at public open house<br />

<strong>Long</strong> <strong>Point</strong> Causeway improvement plan<br />

<strong>Long</strong> <strong>Point</strong> Causeway improvement plan


Improvement Plan Recommendations<br />

<br />

Create an Ecopassage System<br />

<br />

Restore Hydraulic Connectivity<br />

<br />

<br />

Wildlife Habitat Enhancement<br />

Enhance the Recreational Experience<br />

Photo: kiroastro.com<br />

<br />

Signs for Awareness<br />

<br />

<br />

Calm Traffic<br />

Provide Temporary Measures<br />

Photo: S. Gillingwater<br />

<br />

Monitor<br />

Photo: S. Gillingwater<br />

Photo: S. Gillingwate<br />

<strong>Long</strong> point causeway improvement Plan<br />

<strong>Long</strong> point causeway improvement Plan


1) Create an Ecopassage System<br />

<br />

A permanent ecopassage system is the cornerstone of the<br />

recommended mitigation strategy. The ecopassage system will<br />

increase road permeability and reconnect habitat east and west<br />

of the causeway.<br />

Photo: eem.pcc.gov.t<br />

<br />

The ecopassage system consists of two elements:<br />

<br />

Series of ecopassages (culverts/bridges) designed for safe<br />

wildlife movement under roadway<br />

<br />

Funnel system (wall or fence) – excludes wildlife from<br />

roadway and directs wildlife to ecopassages<br />

Photo: herp.ne<br />

<strong>Long</strong> point causeway improvement Plan<br />

<strong>Long</strong> point causeway improvement Plan


Concept - Ecopassage and Funnel Wall<br />

<strong>Long</strong> point causeway improvement plan<br />

<strong>Long</strong> point causeway improvement plan


2) Restore Hydraulic Connectivity<br />

<br />

Pre-Causeway: Marsh and Inner Bay shared ebb and flow of water<br />

<br />

Historical outlets under Causeway that provided water circulation were closed<br />

<br />

Currently, only outlet to Inner Bay is Big Creek<br />

<br />

Re-create openings through Causeway that allow for seasonal exchange of<br />

bay water with marsh<br />

Photo: Ecoplans<br />

Photo: S. Gillingwater<br />

Photo: Ecoplans<br />

long point causeway improvement Plan<br />

long point causeway improvement Plan


3) Wildlife Habitat Enhancement<br />

<br />

Indirect role in reducing turtle road mortality<br />

<br />

Safe access to greater variety of habitats not fragmented<br />

by the causeway<br />

<br />

Ideally located near confirmed existing nesting sites and<br />

based on knowledge of local population movement<br />

<br />

Consider substrate, moisture, temperature, ground cover<br />

Photo: S. Gillingwater<br />

Photo: S. Gillingwater<br />

Photo: S. Gillingwater<br />

Photo: S. Gillingwater<br />

long point causeway improvement Plan<br />

long point causeway improvement Plan


4) Enhance the Recreational Experience<br />

<br />

Multi-use trail system – west side<br />

<br />

Connects to points of interest (Big Creek Bridge, Big<br />

Creek Marsh, Canadian Wildlife Service, Inner Bay<br />

observation deck)<br />

<br />

Viewing platforms<br />

<br />

Linked via pedestrian cross walks<br />

<br />

Maintain existing parking facilities – promote trail use<br />

long point causeway improvement Plan<br />

long point causeway improvement Plan


5) Sign for Awareness<br />

Raise profile of <strong>World</strong> <strong>Biosphere</strong> Reserve and Project<br />

<br />

<br />

<br />

Gateway sign/entrance features<br />

Eye catching and attractive, showcase local artisan work<br />

Highlight significance of area and conservation efforts<br />

Raise Driver Awareness<br />

<br />

Seasonal mobile signs with distinct messages<br />

<strong>Long</strong> point causeway improvement plan<br />

<strong>Long</strong> point causeway improvement plan


<strong>Long</strong> <strong>Point</strong> Causeway Signage<br />

<strong>Long</strong> <strong>Point</strong> Causeway improvement plan<br />

<strong>Long</strong> <strong>Point</strong> Causeway improvement plan


<strong>Long</strong> <strong>Point</strong> <strong>World</strong> <strong>Biosphere</strong> Reserve<br />

long <strong>Point</strong> Causeway improvement plan<br />

long <strong>Point</strong> Causeway improvement plan


6) Calm Traffic<br />

<br />

Vehicle speeds and traffic volume have correlation with wildlife<br />

road mortality<br />

<br />

Speed limit management under review by County – Reduction in<br />

Speed Limit passed by County Council last week!<br />

<br />

Digital speed signs – reminder for drivers<br />

<br />

Rumble strips in strategic locations (not at residences)<br />

<strong>Long</strong> point causeway improvement plan<br />

<strong>Long</strong> point causeway improvement plan


7) Provide Temporary Measures<br />

<br />

Temporary wildlife exclusion fencing – south zone of Causeway<br />

(May to Oct 2008)<br />

<br />

Assess wildlife presence, activity, species, numbers, movement<br />

direction<br />

<br />

Provide mortality reduction<br />

Photo: lakejackson.org<br />

<br />

Integrate information in future design<br />

<br />

Volunteer assistance – daily/weekly monitoring<br />

Photo: Ecoplans<br />

<strong>Long</strong> point causeway improvement plan<br />

<strong>Long</strong> point causeway improvement plan


Photo: Ecoplan<br />

8) Monitoring<br />

<br />

Multi-year monitoring of mitigation measures and installed<br />

ecopassages<br />

<br />

<br />

Pre and post-construction road mortality surveys (walking)<br />

Remote camera monitoring of selected installed ecopassages<br />

Photo: Ecoplan<br />

<br />

Monitoring of funnel wall zones – wildlife presence, species<br />

and activity<br />

<br />

Crucial to evaluating success of improvements and directing<br />

any future refinements/improvements<br />

Photo: Ecoplan<br />

<strong>Long</strong> point causeway improvement plan<br />

<strong>Long</strong> point causeway improvement plan


Feasibility Study Process – Developing the Plan<br />

<strong>Long</strong> <strong>Point</strong> Causeway improvement plan<br />

<strong>Long</strong> <strong>Point</strong> Causeway improvement plan


Preliminary Cost Estimates - Summary<br />

Minimum<br />

Typical<br />

Enhanced<br />

Ecopassage<br />

System<br />

(culverts and<br />

funnel wall)<br />

Road<br />

Improvements<br />

Ecopassage<br />

System<br />

(culverts and<br />

funnel wall)<br />

Road<br />

Improvements<br />

Ecopassage<br />

System<br />

(culverts and<br />

funnel wall)<br />

Road<br />

Improvements<br />

Zone 1<br />

$1, 800, 000<br />

$506, 250<br />

$1, 880, 000<br />

$592, 500<br />

$1, 910, 000<br />

$723, 750<br />

Zone 2<br />

$3, 875, 000<br />

$1, 012, 500<br />

$4, 075, 000<br />

$1, 185, 000<br />

$4, 150, 000<br />

$1, 447, 500<br />

Zone 3<br />

$2, 470, 000<br />

$877,500<br />

$2, 575, 000<br />

$1, 027, 000<br />

$2, 635, 000<br />

$1, 254, 500<br />

Subtotal<br />

$8, 145, 000<br />

$2, 396, 250<br />

$8, 530, 000<br />

$2, 804, 500<br />

$8, 695, 000<br />

$3, 425, 750<br />

Combined<br />

Subtotal<br />

$10, 541, 250<br />

$11, 334, 500<br />

$12, 120, 750<br />

Engineering<br />

(15%)<br />

$1, 581, 188<br />

$1, 700, 175<br />

$1, 818, 113<br />

Contingency<br />

(20%)<br />

$ 2, 108, 250<br />

$2, 266, 900<br />

$2, 424, 150<br />

Top layer paving<br />

$150,000<br />

$150,000<br />

$150,000<br />

Total<br />

$14, 380, 688<br />

$15, 451, 575<br />

$16, 513, 013<br />

Rounded<br />

Grand Total<br />

$ 14, 400, 000<br />

$ 15, 500, 000<br />

$ 16, 600, 000<br />

<strong>Long</strong> point causeway improvement plan<br />

<strong>Long</strong> point causeway improvement plan


Conclusions<br />

Causeway setting and wildlife mortality problem of international interest –<br />

project covered in Canadian National Newspapers<br />

<br />

<br />

<br />

<br />

Installation of fencing is reducing road kill – but is it to late - and<br />

temporary fencing does pose problems – annual fall migration from bay to<br />

marsh<br />

Government agencies and non-governmental organizations are united<br />

and seeking a long-term solution<br />

Minister of Environment (federal) and local Member of Parliament have<br />

been given tours of the causeway and both have publically stated a<br />

commitment to the project<br />

Local Municipality - Norfolk County – has endorsed the plan is<br />

incorporating it into their capital plan budget<br />

Some resistance by several local citizens – spreading misinformation –<br />

but have lost credibility with politicians and steering committee<br />

<br />

Engage / Consult / Inform / Engage / Consult / Inform …<br />

<strong>Long</strong> point causeway improvement plan<br />

<strong>Long</strong> point causeway improvement plan


<strong>Long</strong> <strong>Point</strong><br />

Causeway Improvement Plan<br />

2 nd Scientific Conference North Vidzeme <strong>Biosphere</strong> Reserve<br />

Valmiera, Latvia 081113<br />

Brian Craig, Geoffrey Gartshore, Gillian Thompson, Charlotte<br />

Cox, Alex Harrington, Martin Scott, Rick Levick and Paula Jongerden

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!