21.01.2015 Views

Post Operational Readiness Confirmation Post Operations ... - Eirgrid

Post Operational Readiness Confirmation Post Operations ... - Eirgrid

Post Operational Readiness Confirmation Post Operations ... - Eirgrid

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Daily Non-Compliances for Category<br />

(ii) WFPS<br />

From 1 st February 2013 all Category (ii) will be<br />

assessed on a daily basis for the following:<br />

1. Dispatch Instructions (DIs)<br />

– Failure to accurately follow instruction by wind dispatch tool<br />

2. Available Active Power (AAP)<br />

– Signal is stuck on a particular value/zero/freezes<br />

‣ Where non-compliance is found IPP is given 10WDs<br />

to resolve/rectify the issue otherwise be moved to<br />

Category (i)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!