Post Operational Readiness Confirmation Post Operations ... - Eirgrid
Post Operational Readiness Confirmation Post Operations ... - Eirgrid
Post Operational Readiness Confirmation Post Operations ... - Eirgrid
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Daily Non-Compliances for Category<br />
(ii) WFPS<br />
From 1 st February 2013 all Category (ii) will be<br />
assessed on a daily basis for the following:<br />
1. Dispatch Instructions (DIs)<br />
– Failure to accurately follow instruction by wind dispatch tool<br />
2. Available Active Power (AAP)<br />
– Signal is stuck on a particular value/zero/freezes<br />
‣ Where non-compliance is found IPP is given 10WDs<br />
to resolve/rectify the issue otherwise be moved to<br />
Category (i)