EirGrid Roles and Responsibilities<br />
1. Real-Time Operation (NCC)<br />
– Provides running orders and issues dispatch instructions<br />
– Balances the system in real-time to meet demand and reserve requirement<br />
2. Performance Monitoring i (OSP)<br />
– Reviews the performance of all units connected to the system and follows<br />
up on non-compliant units; (PM team)<br />
– Carries out Dispatch Testing/Grid Code Testing (C&T team)<br />
– Assesses trends in unit performance and requests information where a<br />
trend is significant to determine whether testing/derogation g required;<br />
– Carries out studies and detailed investigation is carried out where<br />
necessary<br />
3. EMS Support<br />
– Investigate RTU/telemetry issues<br />
4