EirGrid Roles and Responsibilities<br />

1. Real-Time Operation (NCC)<br />

– Provides running orders and issues dispatch instructions<br />

– Balances the system in real-time to meet demand and reserve requirement<br />

2. Performance Monitoring i (OSP)<br />

– Reviews the performance of all units connected to the system and follows<br />

up on non-compliant units; (PM team)<br />

– Carries out Dispatch Testing/Grid Code Testing (C&T team)<br />

– Assesses trends in unit performance and requests information where a<br />

trend is significant to determine whether testing/derogation g required;<br />

– Carries out studies and detailed investigation is carried out where<br />

necessary<br />

3. EMS Support<br />

– Investigate RTU/telemetry issues<br />

4