21.01.2015 Views

Post Operational Readiness Confirmation Post Operations ... - Eirgrid

Post Operational Readiness Confirmation Post Operations ... - Eirgrid

Post Operational Readiness Confirmation Post Operations ... - Eirgrid

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Daily PM – What is monitored<br />

‣Dispatch Instructions<br />

•Required to control system<br />

frequency<br />

• To control power flows /<br />

contingencies on system<br />

•SEM Settlement and<br />

Constraint Payments<br />

(VPTGs)<br />

‣Availability<br />

• Required for<br />

Constraints/Curtailment in<br />

Wind Dispatch Tool<br />

• Required for Availability<br />

Reporting<br />

• SEM Settlement and<br />

Capacity Payments

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!