Post Operational Readiness Confirmation Post Operations ... - Eirgrid
Post Operational Readiness Confirmation Post Operations ... - Eirgrid
Post Operational Readiness Confirmation Post Operations ... - Eirgrid
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Daily PM – What is monitored<br />
‣Dispatch Instructions<br />
•Required to control system<br />
frequency<br />
• To control power flows /<br />
contingencies on system<br />
•SEM Settlement and<br />
Constraint Payments<br />
(VPTGs)<br />
‣Availability<br />
• Required for<br />
Constraints/Curtailment in<br />
Wind Dispatch Tool<br />
• Required for Availability<br />
Reporting<br />
• SEM Settlement and<br />
Capacity Payments