April 2, 2<strong>013</strong><br />
Mr. Duane Jones<br />
<strong>Lord</strong> & <strong>Son</strong> <strong>Construction</strong><br />
19 David Street<br />
Fort Walton Beach, FL 32547<br />
PROJECT NO.: 12‐126<br />
PROJECT NAME: City of FWB Recreational Complex<br />
RE:<br />
Response to <strong>RFI</strong>s <strong>002</strong>, <strong>008</strong> <strong>and</strong> <strong>013</strong> through<br />
<strong>RFI</strong> <strong>002</strong><br />
There are redundant Backflow Preventers indicated on the drawings, one DC BFP located in the system<br />
Riser (RP‐101 item #11), <strong>and</strong> one RPZ BFP (S‐2) located outside on the underground supply line. Please<br />
clarify.<br />
Response: See Attachments FP‐101‐A, P‐001‐A, P‐105‐A, P‐301‐A, P‐500‐A, <strong>and</strong> P‐501‐A.<br />
<strong>RFI</strong> <strong>008</strong><br />
Pkg A, Drawing E6.3 Communications Systems Conduit Riser: (Note 4) How far south are we to take this<br />
conduit Just outside the property line All the way to Hollywood Blvd Please clarify extent.<br />
Response: Added note to E2.0 <strong>and</strong> indicated conduit leaving building with pull box. This conduit will go<br />
all the way to the front of the building on Hollywood (all City property). Approximate distance is 1,400<br />
ft. The drainage creek on south side of Rec Complex site may require directional bore to cross.<br />
Pkg B, Drawing E4.0: There is sound equipment shown in concession building, but the sound equipment<br />
for the ballfields has not been specified as far as we can tell. Please clarify.<br />
Response: Sound equipment amplifier <strong>and</strong> loudspeakers have been specified: Electro‐voice PA1250T<br />
amp <strong>and</strong> CFID 32‐T loudspeakers.<br />
Pkg B, Drawing E4.0: Note 4 says to “Provide speaker cables in 1” c to pole identified on sheet E2.0”. This<br />
information is not shown on Sheet E2.0. Please clarify.<br />
Response: Pole locations have been identified ‐ (3) total.<br />
<strong>RFI</strong> <strong>013</strong><br />
3. Dugout drawings on A1.2 show a gate going into the dugout but do not show a gate going from<br />
the dugout to the field. I would assume they would want to go out of the dugout to the field.<br />
Please clarify.<br />
Response: Add gate from dugout to field as shown in Attachment A1.2‐A.<br />
<strong>RFI</strong> 014<br />
Specification Section 11 66 23 – Athletic Equipment<br />
1. 1.1 B‐1 calls for forward folding backstops, equipment schedule on A 1.3 calls for rear folding<br />
backstops <strong>and</strong> 2.2 C calls for fixed, stationary backstops. Please advise which method is<br />
required. Looks like all to be rear folding.<br />
Response:<br />
a. 1.1, B.1., shall read – Basketball Goal, ceiling suspended, rear‐folding with electric winches,<br />
glass backboards, new units for cross‐court play, adjustable height goal, suspension system<br />
<strong>and</strong> hardware.<br />
139 Beal Parkway SE, Suite 101 - Fort Walton Beach, Florida 32548<br />
dchavez@dcarchitectsinc.com ph. 850-226-8565 fax 850-362-6570
. 1.1, B.2., shall read – Basketball Goal, ceiling suspended, fixed position, glass backboards,<br />
new units for full‐court competition play, adjustable height goal, suspension system <strong>and</strong><br />
hardware.<br />
2. 2.4 calls for wall pads to be used with 8 ea. Existing wall pads. (Last plan revision called for a<br />
total of 14 ea. New 2’x6’ wall pads.) Current A1.2 shows ONLY 4 ea. New wall pads at South end<br />
of gym. Please advise what quantity of new wall pads are required.<br />
Response: 2.4, B., shall read – qty. (4) at locations indicated on plan.<br />
3. A1.2 calls for scoreboards by others; however, they are still included in Section 11 66 23. Please<br />
confirm that there are NO scoreboards required with this section.<br />
Response: ‘BY OTHERS’ was indicative that they are to be donated, but still included in specifications<br />
for coordination purposes.<br />
4. 2.5 E calls for a center roll gym divider curtain. Plan sheet A1.2 shows this curtain as being<br />
extended from wall to the face of the bleachers in closed position; or approximately, 82’<br />
wide. When in the down position, there will be no access from one side of the gym to the other<br />
if curtain is wall to wall. Recommendation is to provide a 76’ w. curtain allowing for an<br />
approximate 3’ at either end for walk through access.<br />
Response: To accommodate a 3’ walk access curtain shall be 76’ in width.<br />
<strong>RFI</strong> 015<br />
There are several doors <strong>and</strong> side lite frames with glass that are to be 3 hour rated openings in<br />
accordance with the door schedule. We are limited to 100 square inches max size for 3/16” glass to get<br />
the 3 hr ratings. The door elevations called out with 3 hr ratings are a couple of E doors <strong>and</strong> a D door<br />
which exceed the 100 sq inches in glass. Several Firelite product data sheets attached. Please clarify how<br />
to proceed.<br />
Response: Sheet A9.0 Door Schedule: Revised door schedule as shown in Attachment A9.0A <strong>and</strong><br />
Sheet A9.1 Door <strong>and</strong> Window Types: Revised door type ‘J’ as shown in Attachment A9.1A.<br />
<strong>RFI</strong> 016<br />
1. Sheet E3.0 12 pole lighting contactor. Are these contactors mechanically or electrically held<br />
What amperage are these contactors<br />
Response: Electrically held Form C6 control required. Minimum ampacity is 60 amp for softball<br />
<strong>and</strong> soccer fields; 100 amp for baseball fields. Contactor ampacity cannot be less than breaker<br />
ampacity as indicated in panel schedules. 12‐pole contactors are not available at these<br />
ampacities <strong>and</strong> combinations of 4 & 5 pole contactors will have to be used.<br />
2. Sheet E6.1 ‐‐Note 5 requires all fixtures to be in working order before turning over to owner.<br />
Will all fixtures ‘even those not reinstalled at jet stadium, be required to be in working order<br />
Since we have no idea how many may not be working can you give us a qty for bidding<br />
purposes What is the wattage of these fixtures<br />
Response: Use quantity of fixtures to be re‐installed at Jet Stadium only. Any remaining<br />
additional fixtures not being installed on a pole do not have to be reworked. Fixture wattage is<br />
believed to be 1,500, but this has not been verified.<br />
Page 2 of 6
<strong>RFI</strong> 017<br />
1. The height of the columns <strong>and</strong> verification of the size of the foundation <strong>and</strong> pier. If the<br />
information for the concrete shown on the architectural drawings is correct, then Note 03.01<br />
does not need to say “See structural” (the structural drawings do not include these). Also need<br />
size for the through bolts <strong>and</strong> any hanger requirements (simpson joist hanger number) for the<br />
trellis purlins.<br />
Response: Sheet AS1 Architectural Site Plan: Use Simpson Fasteners <strong>and</strong> hurricane clips as shown in<br />
Attachments AS1.0A <strong>and</strong> AS1.0B. The trellis will be 12’‐0” from finished grade to the top of the purlins as<br />
shown in Attachment AS1.0B. Thru bolts will be ½” galvanized steel as noted in Attachment AS1.0A.<br />
<strong>RFI</strong> 018<br />
1. Please confirm the PLENUM cable IS or IS NOT required for Cat UTP cable.<br />
Response: No plenum is required.<br />
2. Please confirm the cable type for the floorboxes is to be OSP (gel‐filled) rated cable.<br />
Response: No gel is required.<br />
<strong>RFI</strong> 019<br />
What is the height of the bottom door rails for the storefront doors The st<strong>and</strong>ard aluminum bottom<br />
door rails is 6½”. Detail 14 on sheet A9.2 scale out as a 10” bottom rail plus the height of the glass stops.<br />
Response: Door bottom rails shall be optional 10”.<br />
<strong>RFI</strong> 020<br />
1. Drawing A1.1 has NOTE 10.03 stating floor mounted ballet bars @ 25'‐8" in length, but they are in<br />
equipment spec <strong>and</strong> call for wall mounted @ 5'‐0" in length. Can you clarify the length <strong>and</strong><br />
attachment required<br />
Response: Double ballet barre to be wall mounted (as indicated in specs), full length wall (35’‐0”±),<br />
supports at 5’‐0” o.c.<br />
2. Side goals, call for fan shape backboards in specs, but drawings show rectangular...do you want<br />
rectangular or fan<br />
Response: Cross‐court goals to have rectangular glass backboards.<br />
3. Specs call for key switch operation for the divider curtain, but the TSCX2000X Control Pad is<br />
specified for the backstops, do you want a separate key switch for the divider curtain or have it<br />
operated by the control pad as well<br />
Response: Gymnasium Divider Curtain to be control pad operated.<br />
<strong>RFI</strong> 021<br />
Detail 10, entitled Bollard Detail is blank. Please clarify.<br />
Response: Bollards are detailed in Civil. ‘BOLLARD DETAIL – 10/A5.1’ is a leftover view title with no<br />
references.<br />
<strong>RFI</strong> 022<br />
Masonry thru wall flashing – Need to know if there is a spec to use. Section 04 80 10 said to see section<br />
07 27 00 but there is none.<br />
Response: Specification Section 07 27 00 added.<br />
Page 3 of 6
Page A8.5 keynote 07.05 self adhering bituminous flashing tape. Page A9.2 keynote 07.05 copper<br />
flashing.<br />
Response: Specification Section 07 62 00 added.<br />
<strong>RFI</strong> 023<br />
1. Counter shutter type H in room 142 on Sheet A1.1 is in a fire rated the partition type (other<br />
shutter type G in same room not). Please verify fire rated requirements as the specs do not<br />
mention fire ratings.<br />
Response: Shutter type ‘H’ is to be fire rated – 45 min. See Attachment A9.1‐B.<br />
2. Pkg B: Counter shutter in small concession bldg. on Sheet A1.1 shows a Type A shutter which is<br />
scheduled to be 8’ wide, but is dimensioned at 5’ wide. Please clarify.<br />
Counter shutter in large concession bldg. on Sheet A1.0 is labeled as a window type B. Please<br />
verify this is a counter shutter Type A.<br />
Response: Shutter type ‘A’ modified; shutter type ‘B’ added. See Attachment A3.0‐A.<br />
<strong>RFI</strong> 024<br />
Specification section 05 51 00 STEEL FRAMED STAIRS, Paragraph 2.4 states that stairs are to be provided<br />
by one of the follow:<br />
1. Alfab, inc.<br />
2. American Stair, Inc.<br />
3. Sharon Companies Ltd<br />
4. Equivalent<br />
Would you please clarify that it is not your intent to limit the manufacturers of steel framed stairs to<br />
these 3 companies <strong>and</strong> that it is acceptable for Contractors Steel Supply, Inc. to manufacture the steel<br />
framed stairs<br />
Response: Section 05 51 00 Steel Framed Stairs, Paragraph 2.4.5: Add ‘Contractors Steel Supply Inc.’ to<br />
approved manufacturer list.<br />
<strong>RFI</strong> 025<br />
E7.0 states that projectors are owner furnished, but specification section 27 41 00 is in the equipment<br />
list to provide them. Are these owner furnished or to be provide by the AV contractor <strong>and</strong> if owner<br />
furnished are we to install them<br />
Response: See revised E7.0 attached.<br />
<strong>RFI</strong> 026<br />
Specification Section 09 65 19 – Resilient Flooring <strong>and</strong> Base lists two different sheet vinyl floorings. Part<br />
2.2 is for Resilient Flooring – Sheet Vinyl 2.4 is for Slip Retardant Flooring – Sheet Vinyl. The slip resistant<br />
is twice the price of the st<strong>and</strong>ard sheet vinyl. Please clarify which sheet vinyl is to be used as the Room<br />
Finish Schedule on Sheet A9.0 only indicates an SHV‐Resilient Vinyl Sheet Flooring. It appears all of it<br />
would be the products specified under Part 2.2 of the specifications. But we want to make sure.<br />
Response: Slip‐Retardant Sheet Vinyl was changed to EPOXY flooring in the room finish schedule for the<br />
90%, this must be a leftover.<br />
Page 4 of 6
<strong>RFI</strong> 028<br />
The suspended cloud ceiling in Specification section 09 51 23, Paragraph 2.4‐A, Item #12 indicates 14”<br />
Axiom trim for the edge trim at the cloud. Twelve inches is the largest produced for use in curved<br />
conditions. Please advise how you wish to proceed.<br />
Response: Axiom Classic 12” Trim Channel to be used.<br />
<strong>RFI</strong> 029<br />
The following is an excerpt from specification section 11 52 13 – Projection Screens<br />
3.3 SCHEDULE<br />
A. Design Criteria Package “A”: Provide a total of three (3) screens for the building facility; one for<br />
large multi‐purpose, one for small multi‐purpose <strong>and</strong> one for staff conference room. Owner to<br />
verify installation locations.<br />
Please note that only 3 projection screens are called out. Sheet E7.0 – Floor Plan – Audio‐Visual ‐<br />
indicates 2 each in the Large Multi‐purpose Room, 1 each in the Game Room <strong>and</strong> 1 each in the<br />
conference room for a total of 4 units.<br />
Please clarify.<br />
Response: Section 11 52 13 Projection Screens Paragraph 3.3.A revised to read ‘Design Criteria Package<br />
“A”: Provide a total of five (5) screens for the building facility; two for large multi-purpose, one for small<br />
multi-purpose, one for game room <strong>and</strong> one for conference room. Owner to verify installation locations.’<br />
<strong>RFI</strong> <strong>030</strong><br />
Reference Package B – Sheet A1.0 <strong>and</strong> A1.1 – Door Schedules for the large concessions <strong>and</strong> the small<br />
concession/restroom building –<br />
1. No hardware sets reference numbers have been provided in the door schedules. Please review<br />
<strong>and</strong> provide finish hardware set numbers. .<br />
Response: Door Schedule hardware information added. See attachments A1.0‐A <strong>and</strong> A1.1‐A.<br />
2. The door numbers for hardware sets noted in specification section 08 71 00 – Group 21 & 22 do<br />
not match the current door number for the buildings.<br />
Response: Specification section 08 71 00 was revised to add hardware set #23.<br />
Prepared by, Dennis Chavez, Architect<br />
Attachments:<br />
Section 07 27 00 – Air & Vapor Barrier System<br />
Section 07 62 00 – Sheet Metal Flashing & Trim<br />
Section 08 71 00 – Door Hardware<br />
S‐2‐A/U‐2‐A<br />
ASI1.0A<br />
ASI1.0B<br />
A1.2‐A<br />
A9.0A<br />
A9.0‐B<br />
A9.1A<br />
A9.1B<br />
Page 5 of 6
A1.0‐A<br />
A1.1‐A<br />
A1.2‐A<br />
A3.0‐A<br />
FP‐101‐A<br />
P‐001‐A<br />
P‐105‐A<br />
P‐301‐A<br />
P‐500‐A<br />
P‐501‐A<br />
Revised Electrical Drawings:<br />
Package A<br />
Package B<br />
E2.0 E1.0<br />
E4.1 E2.0<br />
E4.3 E2.1<br />
E6.1 E2.2<br />
E6.2 E3.0<br />
E6.3 E7.1<br />
E6.4<br />
E7.0<br />
E8.1<br />
E9.0<br />
Page 6 of 6
SECTION 07 27 00 – AIR & VAPOR BARRIER SYSTEM<br />
PART 1 – GENERAL<br />
1.1 SUMMARY<br />
A. The work of this section includes, but is not limited to, the following:<br />
1. Materials <strong>and</strong> installation methods for fluid applied air <strong>and</strong> vapor barrier membrane<br />
system located in the non-accessible part of the wall.<br />
2. Materials <strong>and</strong> installation methods to bridge <strong>and</strong> seal air leakage pathways in roof <strong>and</strong><br />
foundation junctions, window <strong>and</strong> door openings, control <strong>and</strong> expansion joints, masonry<br />
ties, piping <strong>and</strong> other penetrations through the wall assembly.<br />
1.2 PERFORMANCE REQUIREMENTS<br />
A. Provide an air <strong>and</strong> vapor barrier system to perform as a continuous barrier to air infiltration/exfiltration<br />
<strong>and</strong> water vapor transmission <strong>and</strong> to act as a liquid water drainage plane flashed to<br />
discharge any incidental condensation or water penetration.<br />
B. The intent of this specification is to require compliance with the following regarding air leakage:<br />
The building envelope shall be designed <strong>and</strong> constructed with a continuous air barrier to control<br />
air leakage into, or out of the conditioned space. An air barrier shall also be provided for interior<br />
partitions between conditioned space <strong>and</strong> space designed to maintain temperature or humidity<br />
levels which differ from those in the conditioned space by more than 50% of the difference<br />
between the conditioned space <strong>and</strong> design ambient conditions. The air barrier shall have the<br />
following characteristics:<br />
1. It shall be continuous, with all joints made airtight.<br />
2. It shall have an air permeability not to exceed 0.004 cfm/ft2 under a pressure differential<br />
of 0.3 in. water (1.57 psf.) (equal to 0.02L/s/m2 @ 75 Pa.).<br />
3. It shall be capable of withst<strong>and</strong>ing positive <strong>and</strong> negative combined design wind, fan <strong>and</strong><br />
stack pressures on the envelope without damage or displacement, <strong>and</strong> shall transfer the<br />
load to the structure. It shall not displace adjacent materials under full load.<br />
4. It shall be durable or maintainable.<br />
5. The air barrier shall be joined in an airtight <strong>and</strong> flexible manner to the air barrier material<br />
of adjacent systems, allowing for the relative movement of systems due to thermal <strong>and</strong><br />
moisture variations <strong>and</strong> creep. Connection shall be made between:<br />
a. Walls <strong>and</strong> windows, doors or louvers.<br />
b. Different wall systems.<br />
c. Wall <strong>and</strong> roof.<br />
d. Wall <strong>and</strong> roof over unconditioned space.<br />
e. Walls, floor <strong>and</strong> roof across construction, interior control <strong>and</strong> expansion joints.<br />
f. Walls, floors <strong>and</strong> roof to utility, pipe <strong>and</strong> duct penetrations.<br />
C. Air barrier penetrations:<br />
All penetrations of the air barrier <strong>and</strong> paths of air infiltration/exfiltration shall be made airtight.<br />
1.3 REFERENCES<br />
A. The following st<strong>and</strong>ards <strong>and</strong> publications are applicable to the extent referenced in the text.<br />
The most recent version of these st<strong>and</strong>ards is implied unless otherwise stated.<br />
City of Fort Walton Beach Air & Vapor Barrier System 07 27 00 – 1<br />
Recreational Complex
B. American Society for Testing <strong>and</strong> Materials (ASTM)<br />
1. C 836 St<strong>and</strong>ard Specification for High Solids, Cold Liquid-Applied Elastomeric<br />
Waterproofing Membrane for Use with Separate Wearing Course<br />
2. D 412-87 St<strong>and</strong>ard Test Methods for Rubber Properties in Tension<br />
3. D 903-83 St<strong>and</strong>ard Test Method for Peel or Stripping Strength of Adhesive Bonds<br />
4. D 1644-93 Test Methods for Non-volatile Content of Varnishes<br />
5. D 1970-94 St<strong>and</strong>ard Specification for Self-Adhering Polymer Modified Bituminous<br />
Sheet Materials Used as Steep Roofing Underlayment for Ice Dam<br />
Protection<br />
6. D 4541-02 St<strong>and</strong>ard Test Method for Pull-Off Strength of Coatings Using Portable<br />
Adhesion Testers<br />
7. D 3767-92 St<strong>and</strong>ard Practice for Rubber - Measurements of Dimensions<br />
8. E 96-95 Test Methods for Water Vapor Transmission of Materials<br />
9. E 2178-01 St<strong>and</strong>ard Test Method for Air Permeance of Building Materials<br />
10. E 283-91 St<strong>and</strong>ard Test Method for Determining the Rate of Air Leakage Through<br />
Exterior Windows, Curtain Walls, <strong>and</strong> Doors Under Specified Pressure<br />
Differences Across the Specimen<br />
1.4 SUBMITTALS<br />
A. Product Data: Submit manufacturer’s product data, installation instructions, use limitations <strong>and</strong><br />
substrate preparation recommendations.<br />
B. Shop drawings showing locations <strong>and</strong> extent of air <strong>and</strong> vapor barrier system including details<br />
for terminations flashings, penetrations, window <strong>and</strong> door openings <strong>and</strong> treatment of substrate<br />
joints <strong>and</strong> cracks.<br />
C. Written documentation demonstrating installers qualifications under the "Quality Assurance"<br />
article including reference projects of a similar scope.<br />
D. Samples: Submit representative samples of the following for approval:<br />
1. Fluid applied membrane<br />
2. Transition tape<br />
3. Through Wall Flashing<br />
E. Warranty: Submit a sample warranty identifying the terms <strong>and</strong> conditions stated in Paragraph<br />
1.8–A. – “WARRANTY”.<br />
1.5 QUALITY ASSURANCE<br />
A. Manufacturer: Air <strong>and</strong> vapor barrier systems shall be manufactured <strong>and</strong> marketed by a firm<br />
with a minimum of 20 years experience in the production <strong>and</strong> sales of waterproofing.<br />
Manufacturers proposed for use, but not named in these specifications shall submit evidence of<br />
ability to meet all requirements specified, <strong>and</strong> include a list of projects of similar design <strong>and</strong><br />
complexity completed within the past five years.<br />
B. Installer: The installer shall demonstrate qualifications to perform the work of this Section by<br />
submitting the following:<br />
1. List of at least three (3) projects contracted within the past five (5) years of similar scope<br />
<strong>and</strong> complexity to this project carried out by the firm <strong>and</strong> site supervisor.<br />
2. Installer must show evidence of adequate equipment <strong>and</strong> trained field personnel to<br />
successfully complete the project in a timely manner.<br />
City of Fort Walton Beach Air & Vapor Barrier System 07 27 00 – 2<br />
Recreational Complex
C. Materials: Fluid applied air <strong>and</strong> vapor barrier material shall be two part synthetic rubber based<br />
systems free of solvents, isocyanates <strong>and</strong> bitumen. For each type of material required for the<br />
work of this section, provide primary materials that are the products of one manufacturer.<br />
D. Mock-up:<br />
1. Prior to installation of the air <strong>and</strong> vapor barrier system a field-constructed mock-up shall<br />
be provided under the provisions of Section [<strong>013</strong>40 – Shop Drawings, Product Data,<br />
Samples <strong>and</strong> Mock-ups] to verify details <strong>and</strong> tie-ins <strong>and</strong> to demonstrate the required<br />
quality of materials <strong>and</strong> installation.<br />
2. Construct a typical exterior wall section, 5’-0’ feet high <strong>and</strong> 4’-0” feet wide, incorporating<br />
back-up wall, cladding, window <strong>and</strong> doorframe <strong>and</strong> sill, insulation, flashing <strong>and</strong> any other<br />
critical junction (roof, foundation, etc).<br />
3. Allow 24 hours for inspection <strong>and</strong> testing of mock-up before proceeding with air <strong>and</strong><br />
vapor barrier work.<br />
4. Approved mock-up to be removed from site.<br />
F. Inspection <strong>and</strong> Testing: Cooperate <strong>and</strong> coordinate with the Owner’s inspection <strong>and</strong> testing<br />
agency. Do not cover any installed air <strong>and</strong> vapor barrier membrane until it has been inspected,<br />
tested <strong>and</strong> approved.<br />
1.7 WARRANTY<br />
A. Submit manufacturer's warranty that air <strong>and</strong> vapor barrier <strong>and</strong> accessories are free of defects at<br />
time of delivery <strong>and</strong> are manufactured to meet manufacturer's published physical properties <strong>and</strong><br />
material specifications.<br />
PART 2 – PRODUCTS<br />
2.1 GENERAL<br />
For each type of material required for the work of this section, provide primary materials that are<br />
the products of one manufacturer.<br />
2.2 TRANSITION TAPE<br />
A. Description: 0.9 mm (36 mils) of self-adhesive rubberized asphalt integrally bonded to 0.1 mm<br />
(4 mil) of cross-laminated, high-density polyethylene film to provide a min. 0.1 mm (40 mil) thick<br />
membrane. Membrane shall be interleaved with disposable silicone-coated release paper until<br />
installed.<br />
B. Performance Requirements:<br />
1. Water Vapor Transmission: ASTM E 96, Method B: 2.9 ng/m2sPa (0.05 perms) max.<br />
2. Air Permeance at 75Pa (0.3 in. water) pressure difference: 0.0006 L/(s.m 2 ) (0.00012<br />
cfm/ft 2 ) max.<br />
3. Puncture Resistance: ASTM E 154: 178 N (40 lbs.) min.<br />
4. Lap Adhesion at –4°C (25°F): ASTM D 1876: 880 N/m (5.0 lbs./in.) of width min.<br />
5. Low Temperature Flexibility ASTM D 1970: Unaffected to –43°C (-45°F).<br />
6. Tensile Strength: ASTM D 412, Die C Modified: min. 2.7 MPa (400 psi)<br />
7. Elongation, Ultimate Failure of Rubberized Asphalt: ASTM D 412 Die C: min. 200%<br />
C. Acceptable Materials:<br />
City of Fort Walton Beach Air & Vapor Barrier System 07 27 00 – 3<br />
Recreational Complex
Perm-A-Barrier Wall Membrane manufactured by Grace <strong>Construction</strong> Products.<br />
2.3 FLEXIBLE MEMBRANE WALL FLASHING<br />
A. Description: 0.8 mm (32 mils) of self-adhesive rubberized asphalt integrally bonded to 0.2 mm<br />
(8 mil) of cross-laminated, high-density polyethylene film to provide a min. 1.0 mm (40 mil) thick<br />
membrane. Membrane shall be interleaved with disposable silicone-coated release paper until<br />
installed.<br />
B. Performance Requirements:<br />
1. Water Vapor Transmission: ASTM E 96, Method B: 2.9 ng/m2sPa (0.05 perms) max.<br />
2. Water Absorption: ASTM D 570: max. 0.1% by weight<br />
3. Puncture Resistance: ASTM E 154: 356 N (80 lbs.) min.<br />
4. Tear Resistance<br />
a. Initiation ASTM D 1004: min. 58 N (13.0 lbs.) M.D.<br />
b. Propagation ASTM D 1938: min. 40 N (9.0 lbs.) M.D.<br />
5. Lap Adhesion at -4ºC (25ºF): ASTM D 1876: 880 N/m (5.0 lbs./in.) of width<br />
6. Low Temperature Flexibility ASTM D 1970: Unaffected to -43ºC (-45ºF)<br />
7. Tensile Strength: ASTM D 412, Die C Modified: min. 5.5 MPa (800 psi)<br />
8. Elongation, Ultimate Failure of Rubberized Asphalt: ASTM D412, Die C: min. 200%<br />
C. Acceptable Materials:<br />
Perm-A-Barrier Wall Flashing manufactured by Grace <strong>Construction</strong> Products.<br />
2.4 AIR & VAPOR BARRIER ACCESSORIES<br />
A. Description: Water-based primer which imparts an aggressive, high tack finish on the treated<br />
substrate<br />
1. Flash Point: No flash to boiling point<br />
2. Solvent Type: Water<br />
3. VOC Content: Not to exceed 10 g/l<br />
4. Application Temperature: -4°C (25°F) <strong>and</strong> above<br />
5. Freezing point (as packaged): -7°C (21°F)<br />
Product: Perm-A-Barrier WB Primer manufactured by Grace <strong>Construction</strong> Products.<br />
B. Description: two part, elastomeric, trowel grade material designed for use with self-adhered<br />
membranes <strong>and</strong> tapes. 10 g/l max. VOC Content.<br />
Product: Bituthene ® Liquid Membrane manufactured by Grace <strong>Construction</strong> Products.<br />
C. Optional Primers:<br />
1. Description: High tack water based primer. 10 g/l max. VOC content.<br />
Product: Perm-A-Barrier Liquid Part B manufactured by Grace <strong>Construction</strong> Products.<br />
2. Description: High tack solvent based primer. 440 g/l max. VOC content.<br />
Product: Bituthene Primer B2 manufactured by Grace <strong>Construction</strong> Products.<br />
PART 3 – EXECUTION<br />
3.1 EXAMINATION<br />
City of Fort Walton Beach Air & Vapor Barrier System 07 27 00 – 4<br />
Recreational Complex
A. The installer shall examine conditions of substrates <strong>and</strong> other conditions under which this work<br />
is to be performed <strong>and</strong> notify the contractor, in writing, of circumstances detrimental to the<br />
proper completion of the work. Do not proceed with work until unsatisfactory conditions are<br />
corrected.<br />
3.2 PREPARATION<br />
A. Refer to manufacturer’s literature for requirements for preparation of substrates. Surfaces shall<br />
be sound <strong>and</strong> free of voids, spalled areas, loose aggregate <strong>and</strong> sharp protrusions. Remove<br />
contaminants such as grease, oil <strong>and</strong> wax from exposed surfaces. Remove dust, dirt, loose<br />
stone <strong>and</strong> debris. Use repair materials <strong>and</strong> methods that are acceptable to manufacturer of the<br />
fluid-applied waterproofing.<br />
B. Exterior sheathing panels: Ensure that the boards are sufficiently stabilized with corners <strong>and</strong><br />
edges fastened with appropriate screws. Pre-treat all board joints with 50 - 75mm (2-3 in.)<br />
wide, reinforced self-adhesive tape or fiberglass mesh style wallboard tape. Gaps greater than<br />
6mm (1/4 in.) should be filled with mastic or caulk, allowing sufficient time to fully cure before<br />
application of the tape <strong>and</strong> fluid applied membrane.<br />
C. Masonry Substrates: Apply air <strong>and</strong> vapor barrier over concrete block <strong>and</strong> brick with smooth<br />
flush mortar joints. Fill all voids <strong>and</strong> holes, particularly in the mortar joints, with a lean mortar<br />
mix, non-shrinking grout or parge coat.<br />
D. Related Materials: Treat construction joints <strong>and</strong> install flashing as recommended by<br />
manufacturer.<br />
3.3 INSTALLATION<br />
A. Refer to manufacturer’s literature for recommendations on installation<br />
B. Application of Transition Membrane<br />
1. After allowing the Fluid Applied Membrane to cure to tack-free, apply transition<br />
membrane with a minimum overlap of 3 in. onto each surface at all beams, columns <strong>and</strong><br />
joints as indicated in detail drawings.<br />
2. Tie in to window <strong>and</strong> door frames, sp<strong>and</strong>rel panels, roof <strong>and</strong> floor intersections <strong>and</strong><br />
changes in substrate.<br />
3. Use pre-cut, easily h<strong>and</strong>led lengths for each location.<br />
4. Remove silicone-coated release paper <strong>and</strong> position membrane flashing carefully before<br />
placing it against the surface.<br />
5. When properly positioned, place against surface by pressing firmly into place by h<strong>and</strong><br />
roller.<br />
6. Overlap adjacent pieces 50 mm ( 2 in.) <strong>and</strong> roll all seams with a h<strong>and</strong> roller.<br />
7. Seal top edge of flashing with termination mastic.<br />
8. When transition flashing is pre-installed prior to application of Fluid Applied Membrane,<br />
apply transition flashing as above. Spray or trowel a continuous uniform film of Fluid<br />
Membrane at min. 60 mils (1.5 mm or .060 in.) dry film thickness using multiple,<br />
overlapping passes, with a minimum overlap of 75 mm (3 in.) onto transition flashing. For<br />
sill condition, spray or trowel Fluid Membrane onto pre-installed sill flashing <strong>and</strong> onto<br />
horizontal section of sill.<br />
C. Application of Flexible Membrane Wall Flashing<br />
1. Precut pieces of flashing to easily h<strong>and</strong>led lengths for each location.<br />
City of Fort Walton Beach Air & Vapor Barrier System 07 27 00 – 5<br />
Recreational Complex
2. Remove silicone-coated release paper <strong>and</strong> position flashing carefully before placing it<br />
against the surface.<br />
3. When properly positioned, place against surface by pressing firmly into place by h<strong>and</strong><br />
roller. Fully adhere flashing to substrate to prevent water from migrating under flashing.<br />
4. Overlap adjacent pieces 2 in. <strong>and</strong> roll all seams with a h<strong>and</strong> roller.<br />
5. Trim bottom edge 1/2 in back from exposed face of the wall. Flashing shall not be<br />
permanently exposed to sunlight.<br />
6. At heads, sills <strong>and</strong> all flashing terminations, turn up ends a minimum of 4 in. <strong>and</strong> make<br />
careful folds to form an end dam, with the seams sealed.<br />
7. Seal top edge of flashing with termination mastic.<br />
8. Do not allow the rubberized asphalt surface of the flashing membrane to come in contact<br />
with poly-sulfide sealants, creosote, uncured coal tar products or EPDM.<br />
3.4 PROTECTION AND CLEANING<br />
A. Remove any masking materials after installation. Clean any stains on materials that would be<br />
exposed in the completed work using procedures as recommended by manufacturer.<br />
B. Specified material is not suitable for permanent exposure <strong>and</strong> should be protected from the<br />
effects of sunlight.<br />
C. Schedule work to ensure that the specified material is covered as soon as possible after<br />
installation. Protect specified material from damage during subsequent operations. If the<br />
specified material cannot be covered within 60 days after installation, apply temporary UV<br />
protection such as dark plastic sheet or tarpaulins.<br />
END OF SECTION 07 27 00<br />
City of Fort Walton Beach Air & Vapor Barrier System 07 27 00 – 6<br />
Recreational Complex
SECTION 07 62 00 - SHEET METAL FLASHING AND TRIM<br />
1.1 QUALITY ASSURANCE<br />
A. Quality St<strong>and</strong>ard(s): SMACNA's "Architectural Sheet Metal Manual" <strong>and</strong> CDA's<br />
"Copper in Architecture H<strong>and</strong>book".<br />
1.2 WARRANTY<br />
A. Special Warranty on Painted Finishes: Manufacturer's st<strong>and</strong>ard form in which<br />
manufacturer agrees to repair finish or replace roof specialties that show evidence of<br />
deterioration of factory-applied finishes within specified warranty period.<br />
1. Fluoropolymer Finish: Deterioration includes, but is not limited to, the following:<br />
a. Color fading more than 5 Hunter units when tested according to<br />
ASTM D 2244.<br />
b. Chalking in excess of a No. 8 rating when tested according to<br />
ASTM D 4214.<br />
c. Cracking, checking, peeling, or failure of paint to adhere to bare metal.<br />
2. Finish Warranty Period: 10 years from date of Substantial Completion.<br />
1.3 MATERIALS<br />
A. Sheet Metals:<br />
1. Copper Sheet: Non-patinated mill finish.<br />
B. Exposed Metals:<br />
1. Hot dipped galvanized steel sheets, as st<strong>and</strong>ard with manufacturer for finish<br />
required, with temper to suit forming operations <strong>and</strong> performance required.<br />
a. Surface: Smooth, flat finish.<br />
b. Exposed Coil-Coated Finishes: Prepare, pretreat, <strong>and</strong> apply coating to<br />
exposed metal surfaces to comply with coating <strong>and</strong> resin manufacturers'<br />
written instructions.<br />
1) Three-Coat Fluoropolymer: AAMA 620. System consisting of primer,<br />
fluoropolymer color coat, <strong>and</strong> clear fluoropolymer topcoat, with both color<br />
coat <strong>and</strong> clear topcoat containing not less than 70 percent PVDF resin by<br />
weight.<br />
1.4 PRODUCTS<br />
A. Manufactured Flashing <strong>and</strong> Trim:<br />
1. Reglets <strong>and</strong> Counterflashing: Galvanized steel.<br />
a. Type: Masonry.<br />
City of Fort Walton Beach Sheet Metal Flashing <strong>and</strong> Trim 07 62 00 – 1<br />
Recreational Complex
. Accessories: Counterflashing wind-restraint clips.<br />
END OF SECTION 07 62 00<br />
City of Fort Walton Beach Sheet Metal Flashing <strong>and</strong> Trim 07 62 00 – 2<br />
Recreational Complex
SECTION 08 71 00 – DOOR HARDWARE<br />
PART 1 – GENERAL<br />
1.01 SECTION INCLUDES<br />
A. All items known commercially as Finish or Door Hardware.<br />
B. Thresholds <strong>and</strong> Weatherstripping/Door Seals.<br />
1.02 REFERENCES<br />
A. BHMA (Builders Hardware Manufacturers Association) A156 series.<br />
B. ANSI/DHI A115.IG – 1994 Installation Guide for Doors <strong>and</strong> Hardware.<br />
C. ANSI A250.6 – 1997 Recommended Practice for Hardware Reinforcing on Steel Doors <strong>and</strong><br />
Frames<br />
D. ANSI A156.115 – 2006 Recommended Hardware Locations for Wood Doors.<br />
E. NFPA – 80 – Fire Doors <strong>and</strong> Windows.<br />
F. NFPA – 101-2000 - Life Safety Code.<br />
G. ADA – Americans with Disabilities Act.<br />
H. ANSI A250.13 Wind Resistant Building Components Testing.<br />
I. All Applicable Local <strong>and</strong> State Codes<br />
1.03 SUBMITTALS<br />
A. Procedures of Division 1, Section <strong>013</strong>30 – Submittal procedures apply to this section.<br />
B. Product Data – Submit two (2) copies of manufacturer’s catalog sheets describing each item<br />
of hardware to be supplied.<br />
C. Schedules – Submit six (6) copies of hardware schedules for Architect’s approval.<br />
Schedules are to include quantity, type, location, finish <strong>and</strong> manufacturer of each item of<br />
hardware for each opening. Schedule may be horizontal or vertical format. No material is<br />
to be ordered until the submittal is approved. After approval, no substitutions will be allowed<br />
without the written approval of the Architect.<br />
D. Samples – If requested by the Architect, submit a sample of each hardware item in the<br />
design <strong>and</strong> finish to be used on the project. Samples may be used on the project provided<br />
they are undamaged during the submittal process.<br />
E. Templates – Furnish template information to the General Contractor for use by other trades<br />
in fabricating related materials.<br />
F. Project Closeout – On completion of the project, furnish one (1) copy of the “as<br />
furnished” hardware schedule along with one (1) copy each of the keying schedule.<br />
manufacturer’s maintenance instructions <strong>and</strong> any special tools which may be required<br />
to maintain or adjust the hardware. In addition, furnish copies of all manufacturer’s<br />
warranties for the owner’s records.<br />
1.04 QUALITY ASSURANCE<br />
A. Manufacturers <strong>and</strong> model numbers listed in the hardware sets portion of this specification<br />
are for the purpose of establishing a st<strong>and</strong>ard of quality. Similar products by approved<br />
City of Fort Walton Beach Door Hardware 08 71 00 – 1<br />
Recreational Complex
manufacturers that are equal in design, function <strong>and</strong> quality will be acceptable upon prior<br />
approval of the Architect provided the required physical samples <strong>and</strong> data are submitted in<br />
accordance with Section 01600.<br />
B. The hardware supplier shall be a firm specializing in finish hardware. The firm shall have<br />
been engaged in this business for a period of not less than five (5) years <strong>and</strong> shall have in<br />
its employ a full time, certified Architectural Hardware Consultant (AHC) or person of<br />
equivalent experience. This person shall be available to the Architect at reasonable times<br />
for consultation regarding this project. This supplier shall be a direct, factory authorized<br />
distributor for the manufacturer of the materials being furnished.<br />
C. The hardware manufacturer shall be a recognized firm regularly engaged in the<br />
manufacture <strong>and</strong> sale of finished hardware items.<br />
D. If required, the hardware supplier shall furnish certification <strong>and</strong> documentation that his<br />
materials meet all physical <strong>and</strong> environmental requirements of the project.<br />
E. As near as possible, obtain each type of hardware (hinges, locks, closers, etc.) from a<br />
single manufacturer.<br />
F. Provide hardware for fire rated openings that complies with the requirements of NFPA 80<br />
<strong>and</strong> authorities having jurisdiction. Provide only items of door hardware that have been<br />
tested <strong>and</strong> listed by UL, FM, Warnock-Hersey or other testing organizations acceptable<br />
to the authorities having jurisdiction.<br />
G. All hardware shall meet the requirements set forth in the Americans with Disabilities Act<br />
(ADA) <strong>and</strong> state <strong>and</strong> local h<strong>and</strong>icapped codes.<br />
1.05 DELIVERY, STORAGE AND PROTECTION<br />
A. Section 01600 pertaining to transportation, h<strong>and</strong>ling <strong>and</strong> storage of project materials<br />
applies to this section.<br />
B. Package each item individually. Label <strong>and</strong> clearly identify each package with item<br />
nomenclature <strong>and</strong> door opening. Correlate all making <strong>and</strong> opening numbers to match<br />
the hardware schedule.<br />
C. The General Contractor is to provide a secure, locked storage area for all items delivered<br />
to the jobsite.<br />
D. The General Contractor shall inventory all items delivered to the jobsite within forty-eight<br />
hours <strong>and</strong> advise the supplier immediately of any shortages.<br />
1.06 PROJECT CONDITIONS<br />
A. The General Contractor will coordinate the work between this supplier <strong>and</strong> other related<br />
sections such as hollow metal <strong>and</strong> wood door suppliers to insure proper manufacturer<br />
<strong>and</strong> fabrication of doors to receive the approved hardware.<br />
1.07 WARRANTY<br />
A. All hardware items are to be warranted for a period of one (1) year from date of substantial<br />
project completion. Door closers are to be warranted for five (5) years.<br />
B. Warranty is to cover failure due to manufacturing defects or material failure only.<br />
It shall not cover abuse, v<strong>and</strong>alism, improper installation or maintenance. Defective<br />
materials are to be replaced at no cost to the owner.<br />
City of Fort Walton Beach Door Hardware 08 71 00 – 2<br />
Recreational Complex
PART 2 – PRODUCTS<br />
2.01 MANUFACTURERS<br />
A. Acceptable products <strong>and</strong> their manufacturers are listed below. Specific information<br />
regarding functions, sizes, mounting <strong>and</strong> types is found in the hardware sets at the<br />
end of the section.<br />
1. Hinges<br />
MFG’R FINISH TYPE/SERIES<br />
a. McKinney 26D/CL<br />
TA2714/T4A3786/TA4895/T4A4795/MCK12HD<br />
b. Stanley 26D/CL<br />
FBB179/FBB168/CB258/CB278/661HD<br />
c. Hager 26D/CL<br />
BB1279/BB1168/BB1261/BB1263/780-112HD<br />
2. Exit Devices<br />
MFG’R FINISH SERIES/DESIGN<br />
a. Cor/Russ 32D ED5000 Series<br />
No Substitute<br />
3. Locks, Latches <strong>and</strong> Dummy Trim<br />
MFG’R FINISH SERIES/DESIGN<br />
a. Cor/Russ 26D ML2000 Series x CSA Trim<br />
No Substitute<br />
4. Cylinders, Deadlocks & Misc. Locks<br />
MFG’R FINISH SERIES/DESIGN<br />
a. Cor/Russ 26D 1080/3080/DL4<strong>013</strong><br />
b. Sargent 26D P 114<br />
No Substitute<br />
5. Closers<br />
MFG’R FINISH SERIES/DESIGN<br />
a. Cor/Russ 689 DC8000 Series<br />
Furnish as specified to match existing<br />
6. Push/Pulls/Kickplates<br />
MFG’R FINISH TYPE/SERIES<br />
a. Rockwood 32D As Specified<br />
b. Hager 32D Equal<br />
c. Ives 32D Equal<br />
7. Overhead Stops<br />
MFG’R FINISH TYPE/SERIES<br />
a. Rockwood 32D 19000/14400 Series<br />
b. G-J 32D 90/450 Series<br />
c. ABH 32D 9000/4400 Series<br />
8. Stops <strong>and</strong> Miscellaneous Items<br />
MFG’R FINISH ITEM<br />
a. Rockwood 32D/26D 409/443<br />
b. Hager 32D/26D 236W/243F<br />
City of Fort Walton Beach Door Hardware 08 71 00 – 3<br />
Recreational Complex
c. Ives 32D/26D W407CCV/FS438<br />
9. Thresholds <strong>and</strong> Weatherstripping<br />
MFG’R FINISH TYPE/ITEM<br />
a. Pemko AL AS SPECIFIED<br />
b. Hager AL EQUAL<br />
c. National Guard AL EQUAL<br />
B. Substitutions – Substitutions from the listed manufacturers <strong>and</strong> products without<br />
prior approval of the architect are not permitted. Suppliers desiring to bid products<br />
not listed must make written application to the architect no less than seven (7)<br />
working days prior to the bid date. Applications must be accompanied by<br />
manufacturers complete literature <strong>and</strong>/or samples to allow the Architect to make<br />
an informed decision. Verbal request will not be considered. Approval of<br />
alternate manufacturers products will be by addendum at least two (2) days<br />
prior to bid date to insure an equitable competitive situation for all bidders.<br />
2.02 MATERIALS AND FABRICATION<br />
A. Base Metals – Produce hardware units of basic metal <strong>and</strong> forming method indicated<br />
using manufacturer’s st<strong>and</strong>ard metal alloy, composition, temper <strong>and</strong> hardness, but<br />
in no case of lesser (commercially recognized) quality than specified for applicable<br />
hardware units for finish designations indicated.<br />
B. Fasteners – Provide hardware manufactured to conform to published templates,<br />
generally prepared for machine screw installation. Do not provide hardware that<br />
has been prepared for self-tapping sheet metal screws, except as specifically<br />
indicated.<br />
C. Furnish screws for installation with each hardware item. Provide Phillips flat-head<br />
screws except as otherwise indicated. Furnish exposed (exposed under any<br />
condition) screws to match hardware finish or if exposed in surfaces of other work,<br />
to match finish of this other work as closely as possible including “prepared for<br />
paint” surfaces to receive painted finish.<br />
D. Provide concealed fasteners for hardware units that are exposed when door is<br />
closed except to the extent no st<strong>and</strong>ard units of type specified are available with<br />
concealed fasteners. Do not use thru-bolts for installation where bolt heads or<br />
nuts are exposed on opposite face unless their use is the only means of adequately<br />
securing the hardware or where required on labeled doors. In no case are<br />
thru-bolts to be used as a substitute for proper reinforcement of doors or frames.<br />
2.03 FINISHES<br />
A. Finishes for all items are as listed in the hardware schedule at the end of this<br />
section.<br />
B. Finish designations are as listed in ANSI/BHMA A156.18 “American St<strong>and</strong>ards<br />
for Materials <strong>and</strong> Finishes: <strong>and</strong> are the industry recognized st<strong>and</strong>ard commercial<br />
finishes.<br />
2.04 KEYING<br />
A. Key all cylinders into the existing Corbin Russwin GMK system as directed. Furnish six (6) or<br />
seven (7) pin cylinders. Meet with owner’s representative to determine exact keying<br />
requirements. Furnish keyed temporary cores for each lock (Cylinder). Send permanent<br />
cores <strong>and</strong> keys direct from factory to Owner. Notify Owner’s Representative when shipment<br />
is made. Return construction cores to distributor for credit.<br />
Furnish keys as follows:<br />
City of Fort Walton Beach Door Hardware 08 71 00 – 4<br />
Recreational Complex
6 Master Keys per new group<br />
6 <strong>Construction</strong> Master Keys<br />
3 Control Keys<br />
3 Keys per cylinder<br />
B. Furnish a key control system including cabinet with a capacity of 100% of key<br />
changes on project plus 25% expansion, tags, envelopes, loan register <strong>and</strong><br />
cards. System to be equal to Key Control Systems, Inc. “PLR” system. Equal<br />
products by Telkee or Lund are acceptable.<br />
PART 3 – EXECUTION<br />
3.01 INSTALLATION<br />
A. Mount hardware units at heights indicated in following applicable publications,<br />
except as specifically indicated or required to comply with governing regulations<br />
<strong>and</strong> except as otherwise directed by architect.<br />
1. “Recommended Locations for Builders Hardware for St<strong>and</strong>ard Steel Doors<br />
<strong>and</strong> Frames” by the DOOR AND HARDWARE INSTITUTE.<br />
a. WDMA Industry St<strong>and</strong>ard I.S. 1.A-97, “Hardware Locations for Wood Flush<br />
Doors.”<br />
B. Install each hardware item in compliance with the manufacturer’s instructions <strong>and</strong><br />
recommendations. Where cutting <strong>and</strong> fitting is required to install hardware onto or<br />
into surfaces that are later to be painted or finished in another way, coordinate removal,<br />
storage, <strong>and</strong> reinstallation or application of surface protection with finishing work<br />
specified in the Division 9. Do not install surface-mounted items until finishes have been<br />
completed on the substrates involved.<br />
C. Set units level, plumb, <strong>and</strong> true to line <strong>and</strong> location. Adjust <strong>and</strong> reinforce the attachment<br />
substrate as necessary for proper installation <strong>and</strong> operation.<br />
D. Drill <strong>and</strong> countersink units that are not factory prepared for anchorage fasteners. Space<br />
fasteners <strong>and</strong> anchors in accordance with industry st<strong>and</strong>ards.<br />
E. Set thresholds in sealant complying with requirements specified in Section 07100 –<br />
Dampproofing <strong>and</strong> Waterproofing.<br />
F. Weatherstripping <strong>and</strong> Seals: Comply with manufacturer’s instructions <strong>and</strong><br />
recommendations to the extent installation requirements are not otherwise indicated.<br />
3.02 JUSTING AND CLEANING<br />
A. Adjust <strong>and</strong> check each operating item of hardware <strong>and</strong> each door to ensure proper<br />
operation or function of every unit. Replace units that cannot be adjusted to operate<br />
freely <strong>and</strong> smoothly or as intended for the application made.<br />
B. Where door hardware is installed more than one month prior to acceptance or occupancy<br />
of a space or area, return to the installation during the week prior to acceptance or<br />
occupancy <strong>and</strong> make final check <strong>and</strong> adjustment of all hardware items in such space or<br />
area. Clean operating items as necessary to restore proper functions <strong>and</strong> finish of hardware<br />
<strong>and</strong> doors. Adjust door control devices to compensate for final operation of heating <strong>and</strong><br />
ventilating equipment.<br />
C. Clean adjacent surfaces soiled by hardware applications.<br />
3.03 HARDWARE SCHEDULE<br />
City of Fort Walton Beach Door Hardware 08 71 00 – 5<br />
Recreational Complex
A. Hardware Sets<br />
Group # 1<br />
EACH TO HAVE:<br />
3 HINGES TA2714 4 1/2 X 4 1/2 26D MC<br />
1 LOCKSET ML2051 CSA CT6R 626 CR<br />
1 CORE 8000 626 CR<br />
1 WALL BUMPER 409 US32D RO<br />
3 DOOR SILENCERS 608 GREY RO<br />
Group # 2<br />
EACH TO HAVE:<br />
3 HINGES TA2714 4 1/2 X 4 1/2 26D MC<br />
1 PRIVACY SET ML2020 CSA 626 CR<br />
1 WALL BUMPER 409 US32D RO<br />
3 DOOR SILENCERS 608 GREY RO<br />
Group # 3<br />
EACH TO HAVE:<br />
1 CONTINUOUS HINGE MCK-12HD 83 QC4 CLEAR MC<br />
1 CORE 8000 626 CR<br />
1 CLOSER DC8210 A4 689 CR<br />
1 PROTECTION PLATE K1050 10" X 34" US32D RO<br />
1 THRESHOLD 2005 AV X 36" PE<br />
1 WEATHER SEAL S88 BL 17' PE<br />
1 DOOR BOTTOM 345 AV X 36" PE<br />
1 RAINDRIP 346 C X 40" PE<br />
Group # 4<br />
EACH TO HAVE:<br />
3 HINGES TA2714 4 1/2 X 4 1/2 26D MC<br />
1 LOCKSET ML2051 CSA CT6R 626 CR<br />
1 CORE 8000 626 CR<br />
1 CLOSER DC8200 689 CR<br />
1 PROTECTION PLATE K1050 10" X 34" US32D RO<br />
1 WALL BUMPER 409 US32D RO<br />
3 DOOR SILENCERS 608 GREY RO<br />
Group # 5<br />
EACH TO HAVE:<br />
1 CYLINDER 3080-178-6 CT6R 626 CR<br />
OR<br />
1 CYLINDER 1080-114-A02-6 626 CR<br />
1 CORE 8000 626 CR<br />
BALANCE OF HARDWARE BY DOOR SUPPLIER<br />
CONTACT DOOR SUPPLIER FOR CYLINDER TYPE AND FINISH<br />
City of Fort Walton Beach Door Hardware 08 71 00 – 6<br />
Recreational Complex
Group # 6<br />
EACH TO HAVE:<br />
6 HINGES T4A3786 4 1/2 X 4 1/2 26D MC<br />
2 FIRE EXIT DEVICE ED5400A X C955 CT6R M55 630 CR<br />
2 CORE 8000 626 CR<br />
2 CLOSER DC8210 A4 689 CR<br />
2 PROTECTION PLATE K1050 10" X 34" US32D RO<br />
2 DOOR SILENCERS 608 GREY RO<br />
Group # 7<br />
EACH TO HAVE:<br />
3 HINGES T4A3786 4 1/2 X 4 1/2 26D MC<br />
1 HOSPITAL LATCH P 114 26D SA<br />
1 CLOSER DC8210 689 CR<br />
1 PROTECTION PLATE K1050 10" X 34" US32D RO<br />
1 DOME STOP 443 US26D RO<br />
3 DOOR SILENCERS 608 GREY RO<br />
Group # 8<br />
EACH TO HAVE:<br />
3 HINGES TA2714 4 1/2 X 4 1/2 26D MC<br />
1 LOCKSET ML2057 CSA CT6R 626 CR<br />
1 CORE 8000 626 CR<br />
1 CLOSER DC8200 689 CR<br />
1 WALL BUMPER 409 US32D RO<br />
3 DOOR SILENCERS 608 GREY RO<br />
Group # 9<br />
EACH TO HAVE:<br />
6 HINGES TA2714 4 1/2 X 4 1/2 26D MC<br />
2 FLUSH BOLTS 555 US26D RO<br />
1 DUST PROOF STRIKE 570 US26D RO<br />
1 LOCKSET ML2057 CSA CT6R 626 CR<br />
1 CORE 8000 626 CR<br />
1 OVERHEAD STOP 14423 US32D RO<br />
1 WALL BUMPER 409 US32D RO<br />
2 DOOR SILENCERS 608 GREY RO<br />
Group # 10<br />
3 HINGES TA4895 4 1/2 26D MC<br />
1 LOCKSET ML2057 CSA CT6R 626 CR<br />
1 CORE 8000 626 CR<br />
1 CLOSER DC8200 689 CR<br />
1 PROTECTION PLATE K1050 10" X 34" US32D RO<br />
1 WALL BUMPER 409 US32D RO<br />
3 DOOR SILENCERS 608 GREY RO<br />
City of Fort Walton Beach Door Hardware 08 71 00 – 7<br />
Recreational Complex
GROUP # 11<br />
EACH TO HAVE<br />
6 HINGES T4A3786 4 ½ X 4 ½ 26D MC<br />
2 FIRE EXIT DEVICE ED5400A X C955 CT6R M55 630 CR<br />
2 CORE 8000 626 CR<br />
2 CLOSER DC8210 A4 689 CR<br />
2 PROTECTION PLATE K1050 10” X 34” US32D RO<br />
2 DOOR SILCENCERS 608 GREY RO<br />
Group # 12<br />
EACH TO HAVE:<br />
3 HINGES T4A4795 4 1/2 26D MC<br />
1 DEADLOCK DL4<strong>013</strong> CT6R 626 CR<br />
1 CORE 8000 626 CR<br />
1 PUSH PLATE 70F 8 X 16 US32DBIO RO<br />
1 DOOR PULL 110 X 70C US32DBIO RO<br />
1 CLOSER DC8200 A1 689 CR<br />
1 PROTECTION PLATE K1050 40" X 34" US32D RO<br />
1 WALL BUMPER 409 US32D RO<br />
3 DOOR SILENCERS 608 GREY RO<br />
Group # 13<br />
3 HINGES T4A4795 4 1/2 26D MC<br />
1 CORE 8000 626 CR<br />
1 CLOSER DC8210 689 CR<br />
1 PROTECTION PLATE K1050 34" X 34" US32D RO<br />
1 WALL BUMPER 409 US32D RO<br />
3 DOOR SILENCERS 608 GREY RO<br />
Group # 14<br />
EACH TO HAVE:<br />
2 CONTINUOUS HINGE MCK-12HD 83 CLEAR MC<br />
2 SURFACE BOLT 585-12 US32D RO<br />
1 LOCKSET ML2059 CSA CT6R 626 CR<br />
1 CORE 8000 626 CR<br />
2 OVERHEAD HOLDER 19<strong>013</strong> US32D RO<br />
1 THRESHOLD 177 AV X 72" PE<br />
1 RAINDRIP 346 C X 76" PE<br />
Group # 15<br />
EACH TO HAVE:<br />
1 CONTINUOUS HINGE MCK-12HD 83 QC4 CLEAR MC<br />
1 EXIT DEVICE ED5200S X T957 CT6R M107 M94 630 CR<br />
1 CORE 8000 626 CR<br />
1 CLOSER DC8210 A4 689 CR<br />
1 PROTECTION PLATE K1050 10" X 34" US32D RO<br />
1 THRESHOLD 2005 AV X 36" PE<br />
1 WEATHER SEAL S88 BL 17' PE<br />
1 DOOR BOTTOM 345 AV X 36" PE<br />
1 RAINDRIP 346 C X 40" PE<br />
City of Fort Walton Beach Door Hardware 08 71 00 – 8<br />
Recreational Complex
Group # 16<br />
1 CONTINUOUS HINGE MCK-12HD 83 CLEAR MC<br />
1 CONTINUOUS HINGE MCK-12HD 83 QC4 CLEAR MC<br />
1 EXIT DEVICE ED5200S X T950 M107 630 CR<br />
1 EXIT DEVICE ED5200S X T957 CT6R M107 M94 630 CR<br />
1 LOCKABLE MULLION WS707AKM CT6R CR<br />
2 CORE 8000 626 CR<br />
2 CLOSER DC8210 A4 689 CR<br />
2 PROTECTION PLATE K1050 10" X 34" US32D RO<br />
1 THRESHOLD 2005 AV X 72" PE<br />
2 WEATHER SEAL S88 BL 17' PE<br />
2 DOOR BOTTOM 345 AV X 36" PE<br />
1 RAINDRIP 346 C X 76" PE<br />
Group # 17<br />
1 CONTINUOUS HINGE MCK-12HD 83 CLEAR MC<br />
1 LOCKSET ML2065 CSA CT6R 626 CR<br />
1 CORE 8000 626 CR<br />
1 CLOSER DC8210 A4 689 CR<br />
1 PROTECTION PLATE K1050 10" X 34" US32D RO<br />
1 THRESHOLD 2005 AV X 36" PE<br />
1 WEATHER SEAL S88 BL 17' PE<br />
1 DOOR BOTTOM 345 AV X 36" PE<br />
1 RAINDRIP 346 C X 40" PE<br />
Group # 18<br />
EACH TO HAVE:<br />
3 HINGES TA2714 4 1/2 X 4 1/2 26D MC<br />
1 PASSAGE SET ML2010 CSA 626 CR<br />
1 CLOSER DC8210 689 CR<br />
1 PROTECTION PLATE K1050 10" X 34" US32D RO<br />
1 WALL BUMPER 409 US32D RO<br />
3 DOOR SILENCERS 608 GREY RO<br />
Group # 19<br />
EACH TO HAVE:<br />
3 HINGES TA2714 4 1/2 X 4 1/2 26D MC<br />
1 PASSAGE SET ML2010 CSA 626 CR<br />
1 WALL BUMPER 409 US32D RO<br />
3 DOOR SILENCERS 608 GREY RO<br />
Group # 20<br />
1 CONTINUOUS HINGE MCK-12HD 83 CLEAR MC<br />
1 CONTINUOUS HINGE MCK-12HD 83 QC4 CLEAR MC<br />
1 EXIT DEVICE ED5200S X T950 M107 630 CR<br />
1 EXIT DEVICE ED5200S X T957 CT6R M107 M94 630 CR<br />
1 LOCKABLE MULLION WS707AKM CT6R CR<br />
2 CORE 8000 626 CR<br />
2 CLOSER DC8210 A4 689 CR<br />
City of Fort Walton Beach Door Hardware 08 71 00 – 9<br />
Recreational Complex
2 PROTECTION PLATE K1050 10" X 34" US32D RO<br />
Group # 21<br />
3 HINGES TA4895 4 1/2 26D MC<br />
1 LOCKSET ML2057 CSA CT6R 626 CR<br />
1 CORE 8000 626 CR<br />
1 CLOSER DC8210 A4 689 CR<br />
1 THRESHOLD 2005 AV X 36" PE<br />
1 WEATHER SEAL S88 BL 17' PE<br />
1 DOOR BOTTOM 345 AV X 36" PE<br />
1 RAINDRIP 346 C X 40" PE<br />
Group # 22<br />
1 CONTINUOUS HINGE MCK-12HD 83 CLEAR MC<br />
1 LOCKSET ML2056 CSA CT6R 626 CR<br />
1 CORE 8000 626 CR<br />
1 CLOSER DC8210 A4 689 CR<br />
1 PROTECTION PLATE K1050 10" X 34" US32D RO<br />
1 THRESHOLD 2005 AV X 36" PE<br />
1 WEATHER SEAL S88 BL 17' PE<br />
1 DOOR BOTTOM 345 AV X 36" PE<br />
1 RAINDRIP 346 C X 40" PE<br />
Group # 23<br />
6 HINGES TA4895 4 1/2 26D MC<br />
1 LOCKSET ML2057 CSA CT6R 626 CR<br />
1 CORE 8000 626 CR<br />
1 FLUSH BULTS 555 US26D RO<br />
1 CLOSER DC8210 A4 689 CR<br />
1 THRESHOLD 2005 AV X 36" PE<br />
1 WEATHER SEAL S88 BL 17' PE<br />
1 DOOR BOTTOM 345 AV X 36" PE<br />
1 RAINDRIP 346 C X 80" PE<br />
NOTES:<br />
1. Mount all closers inside; away from exterior, lobbies, corridors, etc. Furnish brackets for<br />
proper mounting.<br />
2. Furnish proper fasteners for wall bumpers <strong>and</strong> door stops to be compatible with wall or<br />
floor conditions.<br />
3. All exterior items to meet hurricane wind speed requirements coordinated with the door<br />
manufacturer. Submit Florida Product Approval numbers for required item.<br />
END OF SECTION 08 71 00<br />
City of Fort Walton Beach Door Hardware 08 71 00 – 10<br />
Recreational Complex
FWB Recreational Complex Attachment S-2-A / U-2-A Package A / B
<strong>RFI</strong> 17 Attachment AS1.0 B FWB Recreation Complex
GENERAL NOTES:<br />
A. REFER TO CIVIL, STRUCTURAL, MECHANICAL & ELECTRICAL FOR<br />
ADDITIONAL INFORMATION.<br />
B. ENTRY SIDEWALK IS TO TIE INTO EXISTING SIDEWALK ALONG JET DRIVE,<br />
SEE CIVIL.<br />
KEYNOTES:<br />
01 GENERAL<br />
01.01 PROPOSED LOCATION OF RECREATIONAL BUILDING.<br />
03 CONCRETE<br />
03.01 CONCRETE FOOTING, SEE STRUCTURAL.<br />
03.02 3000 PSI MIN. CONCRETE OVER COMPACTED FILL.<br />
03.03 (4) #5 BARS, EA. WAY.<br />
03.04 (4) #5 VERTICAL BARS w/ 6" LEG, 2" HOOK, <strong>and</strong> #3 TIES @ 12" O.C.<br />
04 MASONRY<br />
04.01 8" CMU, PRIME / PAINT, SEE STRUCTURAL.<br />
05 METALS<br />
05.01<br />
1 4 " GALV. STEEL EMBEDDED POST BASE.<br />
05.02<br />
1 2 " GALV. STEEL THRU-BOLTS w/PLUGS.<br />
06 WOOD, PLASTICS & COMPOSITES<br />
06.01 8 x 8 P.T. WOOD POST, STAINED.<br />
06.02 (2) 2 x 10 P.T. WOOD BEAM, STAINED.<br />
06.03 2 x 8 P.T. WOOD PURLINS @ 24" O.C., STAINED.<br />
06.04 SIMPSON STAINLESS STEEL H1 HURRICANE TIES EA. END OF<br />
PURLIN - INSTALL WITH FLANGES FACING INWARD AS SHOWN<br />
06.05 SIMPSON STAINLESS STEEL A44 FASTENER.<br />
10 SPECIALTIES<br />
10.01 35' ht. FLAGPOLE, SET IN PVC SLEEVE w/CONCRETE FOOTING.<br />
12 FURNISHINGS<br />
12.01 (15) SPACE BICYCLE RACK, INSTALL PER MANUFACTURER<br />
INSTRUCTIONS, SEE SPECS.<br />
23 HEATING, VENTILATION & AIR CONDITIONING<br />
23.01 PROPOSED LOCATION OF OUTDOOR MECHANICAL EQUIPMENT.<br />
26 ELECTRICAL<br />
26.01 PROVIDE NEW SITE LIGHTING PER ELECTRICAL DRAWINGS &<br />
SPECIFICATIONS.<br />
26.02 PROPOSED LOCATION OF BACKUP GENERATOR, BY OWNER. SEE<br />
ELECTRICAL.<br />
26.03 PROPOSED LOCATION OF POWER TRANSFORMER, SEE<br />
ELECTRICAL.<br />
31 EARTHWORK<br />
31.01 GRAVEL FILL.<br />
32 EXTERIOR IMPROVEMENTS<br />
32.01 SIDEWALK, SEE CIVIL.<br />
32.02 REFER TO CIVIL DRAWINGS FOR STRIPING AND PARKING LOT<br />
MODIFICATIONS.<br />
32.03 PROVIDE ADA PARKING SIGNAGE IN LOCATIONS SHOWN PER CIVIL<br />
DRAWINGS.<br />
32.04 REFER TO LANDSCAPE DRAWINGS FOR IRRIGATION & PLANTING<br />
PLANS.<br />
32.05 BRICK PAVER SET OVER SAND BED w/FILTER CLOTH, INSTALL PER<br />
MANUFACTURER INSTRUCTIONS.<br />
<strong>RFI</strong> 17 Attachment AS1.0 A FWB Recreaton Complex
11 EQUIPMENT<br />
11.11 BASKETBALL GOAL / CURTAIN CONTROL PANEL & KEYPAD, SEE<br />
ELECTRICAL. MOUNT SIGN (45) DIRECTLY ABOVE KEYPAD.<br />
23.5'<br />
23.5'<br />
23.5'<br />
23.5'<br />
SL<br />
FWB Recreational Complex Attachment A1.2-A Package A
<strong>RFI</strong> 15 Attachment A9.0 A FWB Recreation Complex
SIGNAGE SCHEDULE<br />
SIGNAGE DETAIL<br />
• MOUNT @ 5'-0" ABOVE FINISHED FLOOR TO CENTER LINE OF SIGN.<br />
• LETTERS AND NUMERALS SHALL BE RAISED 1/32", UPPER CASE, SANS SERIF, AND<br />
SHALL BE ACCOMPANIED WITH GRADE 2 BRAILLE.<br />
• COLORS: BACKGROUND FIELD: TO BE SELECTED BY OWNER.<br />
LETTERS, NUMBERS & SYMBOLS: TO BE SELECTED BY OWNER.<br />
• LETTERS AND NUMBERS SHALL HAVE A WIDTH-TO-HEIGHT RATIO OF BETWEEN<br />
3:5 AND 1:1, AND A STROKE-WIDTH-TO-HEIGHT RATIO BETWEEN 1:5 AND 1:10.<br />
8"<br />
4"<br />
<br />
<br />
SIGN 'A'<br />
8"<br />
A<br />
B<br />
8"<br />
SIGN 'B'<br />
5"<br />
8"<br />
<br />
SIGN 'C'<br />
MOUNT ADJACENT<br />
TO DOOR / OPENING<br />
GENERAL NOTES<br />
A. FOR SIGN TYPES, SEE SPECIFICATIONS.<br />
B. PRIOR TO FABRICATION, VERIFY SIGNAGE COPY WITH OWNER.<br />
C. OWNER TO PROVIDE ROOM NUMBERS.<br />
FWB Recreational Complex Attachment A9.0-B Package A
SOLID CORE WOOD PAIR OF DOORS<br />
w/TEMPERED GLASS,<br />
HOLLOW METAL FRAME<br />
w/PAINTED FINISH<br />
<strong>RFI</strong> 15 Attachment A9.1 A FWB Recreation Complex
ROLLING COUNTER SHUTTER<br />
w/SPEC'D FINISH<br />
ROLLING COUNTER SHUTTER<br />
w/SPEC'D FINISH<br />
FIRE RATING - 45 MIN.<br />
FIXED LOUVER SHUTTER<br />
w/SPEC'D FINISH<br />
UNIT INSTALLED TO BE 'REMOVABLE' FOR<br />
MECHANICAL UNIT SERVICE / REPLACEMENT<br />
FWB Recreational Complex Attachment A9.1-B Package A
DOOR SCHEDULE<br />
REMARKS:<br />
FWB Recreational Complex Attachment A1.0-A Package B
DOOR SCHEDULE<br />
REMARKS:<br />
FWB Recreational Complex Attachment A1.1-A Package B
FWB Recreational Complex Attachment A1.2-A Package B
ROLLING COUNTER SHUTTER<br />
w/SPEC'D FINISH<br />
ROLLING COUNTER SHUTTER<br />
w/SPEC'D FINISH<br />
FWB Recreational Complex Attachment A3.0-A Package B
FWB Recreational Complex Attachment P-001-A Package A
FWB Recreational Complex Attachment P-105-A Package A
FWB Recreational Complex Attachment P-301-A Package A
FWB Recreational Complex Attachment P-500-A Package A
FWB Recreational Complex Attachment P-501-A Package A
FWB Recreational Complex Attachment FP-101-A Package A