30.01.2015 Views

2013 4 29 ROSEMARY BEACH PROJECT MANUAL.pdf

2013 4 29 ROSEMARY BEACH PROJECT MANUAL.pdf

2013 4 29 ROSEMARY BEACH PROJECT MANUAL.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>PROJECT</strong> <strong>MANUAL</strong><br />

<strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

Rosemary Beach, FL.<br />

<strong>PROJECT</strong> NO. 12041<br />

APRIL 26,<strong>2013</strong><br />

DAG ARCHITECTS INC.<br />

1223 Airport Road, Destin, Florida 32541<br />

Telephone: 850.837.8152 Fax: 850.654.4276<br />

www.dagarchitects.com


DAG Architects Inc.<br />

12041 Rosemary Beach Pavilion<br />

Rosemary Beach, FL<br />

This page intentionally left blank.


DAG Architects Inc.<br />

12041 Rosemary Beach Pavilion<br />

Rosemary Beach, FL<br />

<strong>PROJECT</strong> <strong>MANUAL</strong><br />

SECTION / TITLE<br />

DIVISION 00 - BIDDING AND CONTRACT DOCUMENTS<br />

00 11 16 INVITATION TO BID<br />

00 21 13 INSTRUCTIONS TO BIDDERS<br />

00 41 00 BID FORM<br />

00 42 00 PUBLIC ENTITY CRIME STATEMENT<br />

00 42 50 DRUG-FREE WORKPLACE CERTIFICATION<br />

00 52 00 AGREEMENT FORMS<br />

00 61 13 PERFORMANCE BOND AND PAYMENT BOND<br />

00 72 00 GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION<br />

00 73 00 SUPPLEMENTARY CONDITIONS OF THE CONTRACT FOR CONSTRUCTION<br />

00 73 80 WEATHER DELAY LOG<br />

SPECIFICATIONS<br />

DIVISION 01 – GENERAL REQUIREMENTS<br />

01 11 00 PRODUCT EVALUATION AND APPROVAL<br />

01 23 00 ALTERNATES<br />

01 25 00 SUBSTITUTION PROCEDURES<br />

01 26 00 CONTRACT MODIFICATION PROCEDURES<br />

01 <strong>29</strong> 00 PAYMENT PROCEDURES<br />

01 31 00 <strong>PROJECT</strong> MANAGEMENT AND COORDINATION<br />

01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION<br />

01 33 00 SUBMITTAL PROCEDURES<br />

01 40 00 QUALITY REQUIREMENTS<br />

01 42 00 REFERENCES<br />

01 50 00 TEMPORARY FACILITIES AND CONTROLS<br />

01 60 00 PRODUCT REQUIREMENTS<br />

01 73 00 EXECUTION<br />

01 77 00 CLOSEOUT PROCEDURES<br />

01 78 23 OPERATION AND MAINTENANCE DATA<br />

01 78 39 <strong>PROJECT</strong> RECORD DOCUMENTS<br />

01 79 00 DEMONSTRATION AND TRAINING<br />

DIVISIONS 03 - CONCRETE<br />

03 30 00 CAST-IN-PLACE CONCRETE<br />

03 38 16 UNBONDED POST TENSIONING<br />

03 41 00 PRECAST STRUCTURAL CONCRETE<br />

DIVISIONS 04 – MASONRY<br />

04 20 00 CONCRETE MASONRY<br />

04 72 00 CAST STONE<br />

TABLE OF CONTENTS TOC - 1/4


DAG Architects Inc.<br />

12041 Rosemary Owners Center<br />

Rosemary Beach, FL<br />

SECTION / TITLE<br />

DIVISION 05 – METALS<br />

05 40 00 COLD FORMED METAL FRAMING<br />

05 50 00 METAL FABRICATIONS<br />

05 52 13 PIPE AND TUBE RAILINGS<br />

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES<br />

06 10 00 ROUGH CARPENTRY<br />

06 15 16 WOOD ROOF DECKING<br />

06 15 33 WOOD STAGE DECKING<br />

06 16 00 SHEATHING<br />

06 40 23 INTERIOR ARCHITECTURAL WOODWORK<br />

06 48 00 WOOD DOOR FRAMES<br />

DIVISION 07 – THERMAL AND MOISTURE PROTECTION<br />

07 21 00 THERMAL INSULATION<br />

07 42 13.23 FORMED METAL COMPOSITE PANELS<br />

07 54 19 POLYVINYL-CHLORIDE (PVC) ROOFING<br />

07 92 00 JOINT SEALANTS<br />

DIVISION 08 – OPENINGS<br />

08 12 13 HOLLOW METAL FRAMES<br />

08 14 16 FLUSH WOOD DOORS<br />

08 41 13 ALUMINUM FRAMED ENTRANCES AND STOREFRONTS<br />

08 71 00 DOOR HARDWARE<br />

08 80 00 GLAZING<br />

08 90 00 LOUVERS & VENTS<br />

DIVISION 09 – FINISHES<br />

09 22 16 NON STRUCTURAL METAL FRAMING<br />

09 24 00 CEMENT PLASTERING<br />

09 <strong>29</strong> 00 GYPSUM BOARD<br />

09 30 00 TILING<br />

09 91 23 INTERIOR PAINTING<br />

DIVISION 10 – SPECIALTIES<br />

10 21 13.17 PHENOLIC CORE TOILET COMPARTMENTS<br />

10 28 00 TOILET ACCESSORIES<br />

10 44 13 FIRE EXTINGUISHER CABINETS<br />

10 44 16 FIRE EXTINGUISHERS<br />

DIVISION 11 – EQUIPMENT<br />

11 31 00 RESIDENTIAL APPLIANCES<br />

DIVISION 14 – CONVEYING SYSTEMS<br />

14 21 00 ELECTRIC TRACTION ELEVAYORS<br />

TABLE OF CONTENTS TOC - 2/4


DAG Architects Inc.<br />

12041 Rosemary Owners Center<br />

Rosemary Beach, FL<br />

SECTION / TITLE<br />

DIVISION 21<br />

21 13 13 BUILDING SPRINKLER AND STANDPIPE SYSTEM<br />

DIVISION 22<br />

22 01 00 PLUMBING GENERAL<br />

22 05 23 VALVES<br />

22 05 48 SUPPORTS, ANCHORS AND SEALS<br />

22 05 56 ACCESS DOORS<br />

22 05 59 TESTING, CLEANING AND STERILIZATION OF PIPING SYSTEMS<br />

22 05 63 EXCAVATION AND BACKFILL<br />

22 07 00 INSULATION FOR PLUMBING EQUIPMENT AND PIPING<br />

22 11 13 POTABLE WATER SYSTEM<br />

22 11 16 PIPES AND PIPE FITTINGS<br />

22 11 19 PIPING SPECIALTIES<br />

22 13 16 SOIL, WASTE AND VENT SYSTEM<br />

22 14 00 STORM WATER SYSTEM<br />

22 16 00 GAS SYSTEM<br />

22 30 00 PLUMBING FIXTURES<br />

DIVISION 23<br />

23 01 00 MECHANICAL GENERAL<br />

23 05 20 PIPES AND PIPE FITTINGS<br />

23 05 21 PIPING SPECIALTIES<br />

23 05 <strong>29</strong> SUPPORTS, ANCHORS AND SEALS<br />

23 05 53 MECHANICAL IDENTIFICATION<br />

23 05 93 TESTING AND BALANCING OF MECHANICAL SYSTEMS<br />

23 07 13 EXTERIOR INSULATION FOR DUCTWORK<br />

23 31 13 HVAC METAL DUCTWORK<br />

23 33 00 DUCTWORK ACCESSORIES<br />

23 34 00 FANS<br />

23 37 13 GRILLES, REGISTERS AND CEILING DIFFUSERS<br />

23 37 26 WALL LOUVERS<br />

23 81 43 AIR SOURCE UNITARY HEAT PUMPS<br />

23 81 46 WATER TO AIR HEAT PUMPS<br />

DIVISION 26<br />

26 05 00 ELECTRICAL GENERAL REQUIREMENTS<br />

26 05 19 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS<br />

26 05 23 FIRESTOP SYSTEMS AND SLEEVES<br />

26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS<br />

26 05 33 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS<br />

26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS<br />

26 09 33 CENTRAL DIMMING CONTROLS<br />

26 24 16 PANELBOARDS<br />

26 27 26 WIRING DEVICES<br />

26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS<br />

26 43 13 TRANSIENT VOLTAGE SUPPRESSION<br />

26 51 00 INTERIOR LIGHTING<br />

26 56 00 EXTERIOR LIGHTING<br />

TABLE OF CONTENTS TOC - 3/4


DAG Architects Inc.<br />

12041 Rosemary Owners Center<br />

Rosemary Beach, FL<br />

SECTION / TITLE<br />

DIVISION 31 – EARTHWORK<br />

31 31 16 TERMITE CONTROL<br />

END OF TABLE OF CONTENTS<br />

TABLE OF CONTENTS TOC - 4/4


DAG Architects Inc<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>, FLORIDA<br />

SECTION 00 11 16 - INVITATION TO BID<br />

<strong>PROJECT</strong><br />

Rosemary Beach Owners Center<br />

Rosemary Beach, Florida<br />

LOCATION<br />

Rosemary Beach, Florida<br />

OWNER<br />

Rosemary Beach Owners Center<br />

Rosemary Beach, Florida<br />

ARCHITECT<br />

DAG Architects, Inc.<br />

1223 Airport Road<br />

Destin, Florida 32541<br />

Telephone: 850.837.8152<br />

Fax: 850.654.4276<br />

Civil Engineer<br />

Preble-Rish Consulting Engineers<br />

324 Marina Drive<br />

Port St. Joe, Florida 32456<br />

Telephone: 850.277.7200<br />

Fax : 850.227.7215<br />

Contact: Chance Powell (powellc@preble-rish.com)<br />

Structural Engineer<br />

Anderson Engineers<br />

78 Ricker Ave.<br />

Santa Rosa Beach, Florida 32459<br />

Telephone: 850.231.4540<br />

Contact: Terry Anderson (terry@andersonengineers.net.<br />

Plumbing/Mechanical<br />

David Watford, PE<br />

Engineering Inc.<br />

4471 Clinton St.<br />

Marianna, FL 32446<br />

Telephone: 850.526.3447<br />

Contact: David Watford (david@watford-engineering.com)<br />

Electrical Engineer<br />

Humber-Garick Consulting Engineers<br />

207 Ferry Road SE<br />

Fort Walton Beach, Florida<br />

Telephone: 850.243.6723<br />

Fax: 850.664.5420<br />

Contact: Chris Garick (cgarick@h-gce.com)<br />

INVITATION TO BID 00 11 16 - 1


DAG Architects Inc<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>, FLORIDA<br />

Contractors for Rosemary Beach Amphitheater are invited to bid on a General Contract, including New<br />

Construction for an Owners Center at Rosemary Beach, Florida. All bids must be on a lump-sum basis;<br />

segregated bids will not be accepted. All items and conditions below are a part of this request, and no bid<br />

will be accepted unless all these conditions have been complied with.<br />

Rosemary Beach Owners Center will receive sealed bids until 3:00pm Monday May 20, <strong>2013</strong>. Bids may be<br />

hand delivered to DAG Architects Office Destin, Florida. Please note on the exterior of the envelope “Bid<br />

Enclosed, “Rosemary Beach Owners Center” Bid”. Bids may also be sent electronically to Roger Godwin,<br />

AIA, DAG Architects. rgodwin@dagarchitects.com.<br />

A Prebid Meeting is scheduled at the Project site for Monday May6, <strong>2013</strong>. Architect to establish time at later<br />

date.<br />

Bids received after that time will not be accepted. All Bids will be opened privately.<br />

ACCESS TO BIDDING DOCUMENTS<br />

Copies of the Bidding documents will be available at the Architect’s Office and will be emailed to the 3<br />

selected General Contractors.<br />

DAG Architects, Inc.<br />

1223 Airport Road<br />

Destin, Florida 32541<br />

(850) 837-8152<br />

And at F.W. Dodge Corporation, 1311 Executive Center, Suite 108, Tallahassee, Florida.<br />

And at F.W. Dodge Corporation, 201 South “F” Street, Pensacola, Florida<br />

CONTRACT SECURITY<br />

Successful Bidder will be required to furnish a “performance bond” and “labor and material payment bond” in<br />

the amount of 100% of his contract amount.<br />

PROCUREMENT OF BIDDING DOCUMENTS<br />

General Contractors may obtain complete sets of Bidding Documents by reserving through the Bidder<br />

Contact at DAG Architect’s office. General Contractors will be provided documents specs and drawings in<br />

electronic format, <strong>pdf</strong> files on CD.<br />

Bidders shall use complete set of Bidding Documents in preparing bids; neither the Owner nor the Architect<br />

assume any responsibility for errors or misinterpretations resulting from the use of incomplete sets.<br />

Bids will be opened privately and the contractors will be notified at a later date.<br />

In accordance with the Instructions to Bidders, each bid must include:<br />

1. Bid Form<br />

2. Bid Security<br />

3. List of Subcontractors<br />

4. Florida Public Entity Crimes statement.<br />

5. Drug-Free Workplace certification<br />

6. Additional Requirements per Section Instructions To Bidders, 00 21 13, 1.22, Qualifications, Staffing<br />

Outline, and Construction Schedule.<br />

INVITATION TO BID 00 11 16 - 2


DAG Architects Inc<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>, FLORIDA<br />

RIGHTS RESERVED BY OWNER<br />

The owner reserves the right to reject any or all proposals and to waive any irregularities in bidding, or to<br />

accept the lowest responsible proposal that in the opinion of the owner will serve the best interest of the<br />

owner. The owner will not be obligated to accept the lowest proposal. The owner further reserves the right<br />

to approve all subcontractors.<br />

WITHDRAWAL OF PROPOSALS<br />

No proposals may be withdrawn for a period of thirty (30) days after the receipt of proposals.<br />

END OF INVITATION TO BID<br />

“LEFT BLANK”<br />

INVITATION TO BID 00 11 16 - 3


DAG Architects Inc<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>, FLORIDA<br />

INVITATION TO BID 00 11 16 - 4


DAG Architects Inc<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>, FL.<br />

SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. The Drawings and Project Manual cover new construction for the Rosemary Beach Owners<br />

Center, Rosemary Beach, Florida.<br />

1.2 PROCUREMENT OF BIDDING DOCUMENTS<br />

A. Invited General Contractors will be provided electronic files in <strong>pdf</strong> format. These files will be<br />

emailed by way of a download service.<br />

1.3 EXAMINATION OF BIDDING DOCUMENTS AND SITE<br />

A. Prior to submitting a Bid, each bidder shall carefully examine the Bidding Documents. Each<br />

bidder shall fully inform him/herself prior to bidding as to all limitations under which the work is<br />

to be performed and shall include in his/her bid a sum to cover the costs of all items necessary<br />

to perform that work as set forth in the Contract Documents.<br />

B. Bidders are encouraged to visit the construction site at Rosemary Beach, Florida.<br />

C. No allowance will be made to any Bidder because of lack of such examination or knowledge.<br />

The submission of a Bid will be construed as conclusive evidence that the Bidder has made such<br />

an examination.<br />

1.4 INTERPRETATIONS AND ADDENDA<br />

A. The Bidder shall carefully examine and compare the Bidding Documents, site and local<br />

conditions with each other and no later than ten (10) days prior to the date for receipt of Bids,<br />

make a written request to the Architect for interpretation or correction of any errors,<br />

ambiguities or inconsistencies found during his examination.<br />

B. Interpretations, corrections and change to the Bidding Documents will be made by Addendum.<br />

Addendums will be mailed, faxed or emailed to each Bidder of record. The Architect and the<br />

Owner will not be responsible for interpretations, corrections or changes made in any other<br />

manner, and the Bidder shall not rely on them<br />

C. Any item, material, condition, service, etc. that may be alluded to in the drawings or<br />

specifications, and that is not clearly understood by the bidder as to the Architects intent, shall<br />

be clarified by the bidder prior to the Bid. Failure to clarify any ambiguity shall not relieve the<br />

bidder from supplying the intent of the Architect as part of the base contract.<br />

1.5 SUBSTITUTIONS (Prior to bidding)<br />

A. Substitutions will be considered prior to receipt of Bids only if a written request for approval is<br />

submitted to the Architect no later than ten (10) days prior to the date for receipt of Bids. Each<br />

request shall include a complete description of the proposed substitution, along with drawings,<br />

performance and test data, any other information required for a complete evaluation. The<br />

Architect’s decision of approval or disapproval will be final. If the Architect approves the<br />

proposed substitution, such approval will be set forth in addenda. Bidders shall not rely on<br />

approvals made in any other manner.<br />

B. Substitutions will be considered after the Contract award only if they are in compliance with the<br />

conditions set in Division 1 Section “Product Requirements.”<br />

C. Substitution Request Form: Use CSI Form 13.1A.<br />

INSTRUCTIONS TO BIDDERS 00 21 13 -1


DAG Architects Inc<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>, FL.<br />

1.6 FAMILIARITY WITH LAWS<br />

A. The Bidder shall be familiar with all Federal, State and local laws, ordinances, rules and<br />

regulations affecting the Work including all requirements of the Rosemary Beach Community. .<br />

Ignorance of them on the part of Bidder shall in no way relieve the Bidder from responsibility.<br />

1.7 FLORIDA PRODUCTS AND LABORS<br />

A. The Bidder’s attention is called to Section 255.04 of the Florida Statutes which requires that on<br />

public building contracts, Florida products and labor shall be used for public building contracts<br />

whenever price and quality are the same as products and labor specified.<br />

1.8 TIME OF COMPLETION<br />

A. The Owner request you provide a Staffing and Construction Schedule with your proposal.<br />

1.9 PREPARATION AND SUBMISSION OF BIDS<br />

A. All bids shall be submitted on a lump sum basis; segregated Bids will not be accepted. Each<br />

bidder shall copy the Bid Form in duplicate on to the Bidder’s letterhead and indicate the Bid<br />

price, Alternate prices and other required information in the proper spaces. Any interlineations,<br />

alterations, and erasures must be initialed by the signer of the Bid. Bids containing any<br />

conditions or irregularities of any kind may be rejected by the Owner. All bids must be<br />

submitted on the form provided by the Owner and must be signed by an authorized<br />

representative of the company placing the bid.<br />

B. Submit the Bid forms, List of Subcontractors, Bid Security, Florida Public Entity Crime Statement<br />

and Drug-Free Workplace Certification in a sealed opaque envelope addressed to the Owner<br />

and identified with the project name and the Bidder’s name and address. It is the sole<br />

responsibility of the Bidder to see that the bid is received on time.<br />

C. Disclosure Requirement (Florida Statues, Chapter 112): Each bid is subject to the provisions of<br />

Florida Statutes, Chapter 112, providing that all bidders must disclose with the bid submittal the<br />

name of any officer, director or agent who is also a public officer or an employee of the Beach<br />

Community Bank. Further, all bidders must disclose the name of any City officer or employee<br />

who owns, directly or indirectly, an interest of five percent or more in the bidding firm.<br />

1.10 LISTING OF SUBCONTRACTORS<br />

A. In order that the Owner may be assured that only qualified and competent subcontractors will<br />

be employed on this project, each Bidder shall submit with his/her proposal a list of the<br />

subcontractors who will perform the work for each division of the specifications, as indicated by<br />

the “List of Subcontractors” form contained in these specifications. The bidder shall have<br />

determined to his/her own complete satisfaction that a listed subcontractor has been<br />

successfully engaged this particular type of business for a reasonable length of time, has<br />

successfully completed installations comparable to that which is required by this agreement and<br />

is qualified both technically and financially to perform that pertinent phase of work for which he<br />

is listed. Only one subcontractor shall be listed for each phase of work.<br />

B. It is also specified in a Division 1 Section that, in addition to foregoing, The Owner reserves the<br />

right to approve all subcontractors before work is started and that a complete list of all<br />

subcontractors shall be submitted.<br />

1.11 DISQUALIFICATION OF BIDDERS<br />

INSTRUCTIONS TO BIDDERS 00 21 13 -2


DAG Architects Inc<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>, FL.<br />

A. More than one bid from an individual, firm, partnership, corporation or association under the<br />

same or different names will not be considered. Reasonable grounds for believing that the<br />

bidder is interested in more than one bid for the same work will cause rejection of all bids in<br />

which such Bidder is believed to be interested. Bids will be rejected if there is reason to believe<br />

that collusion exists between Bidders. Bids in which the price is obviously unbalanced may be<br />

rejected.<br />

1.12 OPENING OF BIDS<br />

A. Bids will be opened privately. Contractor will be notified at a later time.<br />

1.13 MODIFICATION AND WITHDRAWAL OF BIDS<br />

A. A submitted Bid may be substituted, replaced or withdrawn in its entirety, prior to the date and<br />

time designated for receipt of Bids, by notifying the party receiving the Bids at the place<br />

designated for receipt of Bids. Notification shall be in writing over the signature of the Bidder.<br />

Such notification shall be received by the end of the business day prior to the day designated to<br />

receive bids.<br />

1.14 EVALUATION AND CONSIDERATION OF BIDS<br />

A. It is the intent of the Owner to award the Contract to the lowest responsible Bidder provided<br />

the Bid has been submitted in accordance with the requirements of the Bidding Documents and<br />

does not exceed the funds available. The Owner shall have the right to waive informalities or<br />

irregularities in a Bid received and to accept the Bid, which in the Owner's judgment, is in the<br />

best interest of the Owner.<br />

B. The Owner reserves the right to award to other than the lowest responsible bidder if sufficient<br />

reasons exist that a bidder other than the lowest is more responsive. If the bid is not awarded<br />

to the lowest bidder, a full and complete statement of the reasons for awarding the contract<br />

otherwise shall be prepared by the Owner and filed with documents relating to the bid award.<br />

1.15 REJECTION OF BIDS<br />

A. The Owner reserves the right to waive minor defects in the process, to reject any or all Bids<br />

when such rejection is in the best interest of the Owner, to reject a Bid not accompanied by a<br />

Bid Security, or to reject a bid if not in the best interest of the Owner, or to reject a Bid, which<br />

is in any way irregular or incomplete.<br />

1.16 OWNER’S FINANCIAL CAPACITY<br />

A. The Owner shall furnish evidence that financial arrangements have been made to fulfill the<br />

Owner's obligations under the Contract to the Bidder under consideration for award of Contract,<br />

if requested, no later than seven days prior to the expiration of the time for withdrawal of bids.<br />

If reasonable evidence is not furnished, the Bidder will not be required to execute the<br />

Agreement between the Owner and the Contractor.<br />

1.17 SUBMITTAL<br />

A. The Bidder shall furnish to the Owner through the Architect in writing a designation of work to<br />

be done by his own forces, names of the manufacturers, products and suppliers of principal<br />

items or systems of materials and equipment proposed for the work, names of persons or<br />

entities proposed for the principal portions of the work.<br />

INSTRUCTIONS TO BIDDERS 00 21 13 -3


DAG Architects Inc<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>, FL.<br />

B. Prior to award of the Contract the Architect will notify the Bidder in writing if either the Owner<br />

or the Architect, after due investigation, has reasonable objection to any person or entity<br />

proposed by the Bidder. The Bidder may, at his option, withdraw his bid or submit a substitute<br />

with an adjustment in the Base Bid or Alternate Bid to cover the cost occasioned by the<br />

substitution. The Owner may accept the adjusted price or disqualify the Bidder. In either<br />

event the bid security will not be forfeited.<br />

C. Persons and entities proposed for the work of which the Owner and the Architect have No<br />

objection shall not be changed except with the written consent of the Owner and the Architect.<br />

1.18 BID BOND<br />

A. The Bidder shall furnish a Bid Bond for not less than 5% of the Base Bid sum, nor more than<br />

$10,000.00 payable to the Owner, must be attached to the bid. Bid Bond shall be on bonds in<br />

this State, have power-of-attorney attached, and be dated within 15 days of date of opening.<br />

Bid Bonds of three lowest bidders will be retained until Contract and Bonds are properly<br />

executed by the successful bidder; all others will be returned upon request immediately after<br />

tabulation and checking of bids. The Bid Security shall insure that the bidder will enter into a<br />

contract with the Owner and will furnish the specified Performance and Payment Bonds and<br />

evidence of insurance within 10 days after presentation to him of a contract draft, provided<br />

such presentation is made within 90 days of the Bid Date. The monies represented by the Bid<br />

Security (limited to the difference to the next lower bid) shall be forfeited to the Owner as<br />

proper compensation for any damage resulting from a default of this condition.<br />

1.19 PERFORMANCE BOND AND PAYMENT BOND<br />

A. The Bidder shall execute and deliver to Owner a Performance Bond and a Labor and Materials<br />

Payment Bond with a surety insurer authorized to do business in this state as a surety, each in<br />

the amount of 100% of the Contract Sum in accordance with the General Conditions and<br />

Supplementary Conditions. Before commencing the work, Bidder shall be required to record<br />

the bonds in the public records of Walton County.<br />

1.20 COST BREAKDOWN<br />

A. The successful bidder will be required to submit, at the start of the job, and prior to the first<br />

application for payment, a breakdown of construction costs (Schedule of Values), itemized, to<br />

be used for accounting purposes.<br />

1.21 OWNERS RIGHTS<br />

A. The Owner reserves the right to reject any or all Bids when such rejection is in the best interest<br />

of the Owner, to reject a Bid not accompanied by a Bid Security, to reject a Bid which is in any<br />

way irregular or incomplete, or to withdraw the request for Bids.<br />

1.22 ADDITIONAL REQUIREMENTS<br />

A. The owner request that each bidder provide the following information in a sealed package<br />

separate from the Bid:<br />

1. Submit your qualifications for this project describing similar types of project completed<br />

listing building user contact information if owner desires to contact them.<br />

2. Submit staffing outline for the project including Superintendents, project managers, etc.,<br />

by name identifying, experience, and time with company.<br />

3. Submit Construction Schedule for the project.<br />

END OF SECTION 00 21 13<br />

INSTRUCTIONS TO BIDDERS 00 21 13 -4


DAG Architects Inc<br />

10059 <strong>ROSEMARY</strong> <strong>BEACH</strong> AMPHITHEATER<br />

<strong>ROSEMARY</strong>, FL.<br />

SECTION 00 41 00 - BID FORM<br />

Bidders Name:<br />

Legal Address:<br />

Telephone No.:<br />

Proposal For:<br />

Project Name:<br />

GENERAL CONSTRUCTION WORK<br />

Rosemary Beach Owners Center, Rosemary Beach, Florida<br />

DAG Project No.: 12041<br />

Gentlemen:<br />

I have received the Bidding Documents, consisting of Drawings and Project Manual, entitled Rosemary<br />

Beach Amphitheater, as prepared by DAG Architects Inc., 1223 Airport Road, Destin, Florida 32541. I have<br />

also received Addenda numbers ____________________ and have included their provisions in my Bid. I<br />

have examined both the Bidding Documents and the site and submit the following bid.<br />

In submitting the Bid, I agree:<br />

1. To hold my Bid in full force and effect for a period of thirty (30) calendar days after the date of the<br />

opening of this Bid.<br />

2. To enter into and execute a Contract within fifteen (15) calendar days after said Contract is<br />

delivered to me, if awarded said Contract on the basis of this Bid, and to furnish Performance Bonds<br />

and Labor and Material Payment Bonds in accordance with the General Conditions.<br />

3. To accomplish the work in accordance with the Contract Documents and to commence such work on<br />

or before the date to be specified by the Architect in the written “Notice to Proceed” and to<br />

substantially complete the Project as stated in the Staffing and Construction Schedule I submit with<br />

this Proposal.<br />

I will construct this Project (Base Bid) for the lump sum price as listed:<br />

Base Bid<br />

Dollars<br />

($ ), which amount includes the following addenda:<br />

ALTERNATE NO 1: Bocce Ball Courts<br />

Add/Deduct:___________________________________________________dollars ($__________________).<br />

ALTERNATE NO 2: Dog Park<br />

Add/Deduct:___________________________________________________dollars ($__________________).<br />

ALTERNATE NO 3: Greenwall<br />

Add/Deduct:___________________________________________________dollars ($__________________).<br />

ALTERNATE NO 4:Sliding Doors<br />

Add/Deduct:___________________________________________________dollars ($__________________).<br />

BID FORM 00 41 00 - 1


DAG Architects Inc<br />

10059 <strong>ROSEMARY</strong> <strong>BEACH</strong> AMPHITHEATER<br />

<strong>ROSEMARY</strong>, FL.<br />

The undersigned hereby agrees to complete the work as stated in the attached Staffing and Construction<br />

Schedule I submitted with this proposal.<br />

Florida Construction Industries Licensing Board Certification:<br />

________________________________<br />

(Name of Holder)<br />

_______________________<br />

(Certificate No.)<br />

FIRM: __________________________________________________________<br />

(Name of Firm)<br />

BY:<br />

__________________________________________________________<br />

(Signature of Bidder)<br />

__________________________________________________________<br />

(Name of Bidder)<br />

TITLE: __________________________________________________________<br />

(Title of Bidder)<br />

DATE: __________________________________________________________<br />

ATTACHMENTS:<br />

Bid Form<br />

List of Subcontractors<br />

Bid Bond.<br />

Public Entity Crime Statement<br />

Drug-Free Workplace Certificate<br />

Additional Requirements per Instructions To Bidders, 00 21 13, 1.22, Qualifications, Staffing Outline, and<br />

Construction Schedule.<br />

END OF SECTION 00 41 00<br />

BID FORM 00 41 00 - 2


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 00 42 00 - PUBLIC ENTITY CRIMES STATEMENT<br />

A. The following information is included in these bid documents as required by Florida<br />

Statute.<br />

B. All invitations to bid as defined by Section 287.012(11), Florida Statutes; requests for<br />

proposals as defined by Section 287.012(16), Florida Statutes; and any contract<br />

document described by Section 287.058, Florida Statutes, shall contain a statement<br />

informing persons of the provisions of paragraph (2)(a) of Section 287.133, Florida<br />

Statutes.<br />

C. A copy of the Sworn Statement form is contained herein. The completed form shall be<br />

submitted in the bid submittal along with the other required documents.<br />

PUBLIC ENTITY CRIMES STATEMENT 00 42 00 - 1


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SWORN STATEMENT UNDER SECTION 287.133 (3) (A)<br />

FLORIDA STATUES, ON PUBLIC ENTITY CRIMES<br />

THIS FORM MUST BE SIGNED IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICER<br />

AUTHORIZED TO ADMINISTER OATHS.<br />

1. This sworn statement is submitted with Bid, Proposal or Contract for<br />

2. This sworn statement is submitted by<br />

whose business address is<br />

and (if applicable) Federal Employer Identification Number (FEIN) is<br />

(If the entity has no<br />

FEIN, include the Social Security Number of the individual signing this sworn statement:<br />

3. My name is and my relationship to the entity named above is<br />

4. I understand that a "public entity crime" as defined in Paragraph 287.133 (1) (g). Florida<br />

Statutes, means a violation of any state or federal law by a person with respect to and directly related<br />

to the transaction of business with any public entity or with an agency or political subdivision of any<br />

other state or with the United States, including, but not limited to, any bid or contract for goods or<br />

services to be provided to any public entity or any agency or political subdivision of any other state or of<br />

the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or<br />

material misrepresentation.<br />

5. I understand that "convicted" or "convicted" as defined in paragraph 287.133 (1) (b), Florida<br />

Statutes, means a finding of guilt or a conviction of a public entity crime with or without an adjudication<br />

of guilt, in any federal or state trial court of records relating to charges brought by indictment or<br />

information after July 1, 1989, as a result of a jury verdict, non-jury trial, or entry of a plea of guilty or<br />

nolo contendere.<br />

6. I understand that an "affiliate" as defined in Paragraph 287 .133 (1) (a), Florida Statutes,<br />

means:<br />

1. A predecessor or successor of a person convicted of a public entity crime; or<br />

2. An entity under the control of any natural person who is active in the management of<br />

the entity and who has been convicted of a public entity crime. The term " affiliate" includes those<br />

officers, directors, executives, partners, shareholders, employees, members, and agents who are active<br />

in the management of an affiliate. The ownership by one of shares constituting a controlling income<br />

among persons when not for fair interest in another person, or a pooling of equipment or income<br />

among persons when not for fair market value under an length agreement, shall be a prima facie case<br />

that one person controls another person. A person who knowingly convicted of a public entity crime, in<br />

Florida during the preceding 36 months shall be considered an affiliate.<br />

7. I understand that a "person" as defined in paragraph 287 .133 (1) (e), Florida Statutes, means<br />

any natural person or entity organized under the laws of the state or of the United States with the legal<br />

power to enter into a binding contract provision of goods or services let by a public entity, or which<br />

otherwise transacts or applies to transact business with a public entity. The term "person" includes<br />

those officers, directors, executives, partners, shareholders, employees, members, and agents who are<br />

active in management of an entity.<br />

PUBLIC ENTITY CRIMES STATEMENT 00 42 00 - 2


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

8. Based on information and belief, the statement which I have marked below is true in relation to<br />

the entity submitting this sworn statement. (Please indicate which statement applies)<br />

Neither the entity submitting this sworn statement, nor any officers, directors,<br />

executive, partners, shareholders, employees. member, or agents who are active in management of the<br />

entity, nor affiliate of the entity have been charged with and convicted of a public entity crime<br />

subsequent to July 1, 1989.<br />

The entity submitting this sworn statement, or one or more of the officers, directors,<br />

executives, partners, shareholders, employees, members, or agents who are active in management of<br />

the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime<br />

subsequent to July 1, 1989 And (please attach a copy of the final order)<br />

The person or affiliate was placed on the convicted vendor list. There has been a<br />

subsequent proceeding before a hearing officer of the State of Florida, Division of Administrative<br />

Hearings. The final order entered by the hearing officer determined that it was in public interest to<br />

remove the person or affiliate from the convicted vendor list. (please attach a copy of the final order.)<br />

The person or affiliate has not been placed on the convicted vendor list. (Please<br />

describe any action taken by, or pending with, the department of General Services.)<br />

STATE OF FLORIDA<br />

COUNTY OF<br />

(Signature)<br />

Date:<br />

PERSONALLY APPEARED BEFORE ME, the undersigned authority,<br />

who, after first being sworn by me, affixed his/her signature at the space provided above on this<br />

day of , 20 , and is personally known to me, or has provided _ as<br />

identification.<br />

My Commission expires:<br />

Notary Public<br />

END OF SECTION 00 42 00<br />

PUBLIC ENTITY CRIMES STATEMENT 00 42 00 - 3


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

“LEFT BLANK”<br />

PUBLIC ENTITY CRIMES STATEMENT 00 42 00 - 4


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 00 42 50 – DRUG-FREE WORKPLACE CERTIFICATION 1-3-<strong>2013</strong><br />

A. A copy of the Drug-Free Certification form is contained herein. The completed form<br />

must be submitted in the bid submittal along with the other required documents.<br />

PUBLIC ENTITY CRIMES STATEMENT 00 42 50 - 1


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

DRUG-FREE WORKPLACE CERTIFICATION<br />

The below signed bidder certifies that it has implemented a Drug-Free Workplace Program. In order to<br />

have a Drug-Free Workplace Program, a business shall:<br />

1. Publish a statement notifying employees that the unlawful manufacture, distribution, dispensing,<br />

possession, or use of a controlled substance is prohibited in the workplace and specifying the actions that<br />

will be taken against employees for violations of such prohibition.<br />

2. Inform employees about the dangers of drug abuse in the workplace, the business's policy of<br />

maintaining a drug-free workplace, any available drug counseling rehabilitation and employee assistance<br />

programs and the penalties that may be imposed upon employees for drug abuse violations.<br />

3. Give each employee engaged in providing the commodities or contractual services that are under<br />

proposal a copy of the statement specified in subsection 1.<br />

4. In the statement specified in subsection 1., notify the employees that, as a condition of working<br />

on the commodities or contractual services that are under proposal, the employee will abide by the terms<br />

of the statement and will notify the employer of any conviction of, or plea of guilty or nolo contendere to,<br />

any violation occurring in the workplace no later than five (5) working days after such conviction.<br />

5. Impose a sanction on, or require the satisfactory participation in drug abuse assistance or<br />

rehabilitation program of such is available in the employee's community, by any employee who is<br />

convicted.<br />

6. Make a good faith effort to continue to maintain a drug-free workplace through implementation of<br />

this section.<br />

As the person authorized to sign this statement, I certify that this firm complies fully with the above Drug-<br />

Free Workplace requirements.<br />

DATE: _____________________________<br />

COMPANY: ________________________________________________________<br />

ADDRESS: ________________________________________________________<br />

CITY: _______________________ STATE: ____ ZIP CODE: _________<br />

TELEPHONE: __________________<br />

SIGNATURE: __________________________________ NAME<br />

(PRINTED):____________________________<br />

TITLE: ________________________________________<br />

ND OF SECTION 00 42 50<br />

PUBLIC ENTITY CRIMES STATEMENT 00 42 50 - 2


DAG Architects Inc<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>, FL.<br />

SECTION 00 52 00 – AGREEMENT FORMS<br />

The “Standard Form of Agreement Between Owner and Contractor Where the Basis of Payment is a<br />

Stipulated Sum,” The American Institute of Architects (AIA) Document A101-1997, 1997 Edition, Six (6)<br />

Pages, is reference only. Document shall be issued, as modified, on this Project as the Agreement Form.<br />

Copy upon request.<br />

AGREEMENT FORM 00 52 00 - 1


DAG Architects Inc<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>, FL.<br />

“LEFT BLANK”<br />

AGREEMENT FORM 00 52 00 - 2


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 00 61 13 - PERFORMANCE BOND AND PAYMENT BOND<br />

A. The "Performance Bond and Payment Bond", The American Institute of Architects' (AIA)<br />

Document A312, March 1987 Edition, Seven (7) pages, is reference only. The<br />

documents shall be used on this Project as the Performance Bond and Payment Bond.<br />

Copies upon request.<br />

END OF SECTION 00 61 13<br />

PERFORMANCE BOND AND PAYMENT BOND 00 61 13 -1


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

“LEFT BLANK”<br />

PERFORMANCE BOND AND PAYMENT BOND 00 61 13 -2


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

SECTION 00 72 00 – GENERAL CONDITIONS OF THE CONTRACT FOR<br />

CONSTRUCTION<br />

The “General Conditions of the Contract for Construction”, the American Institute of Architects (AIA)<br />

Document A201-1997, Fifteenth Edition, 1997, forty (40) pages, is referenced only.<br />

GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION 00 72 00 - 1


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

“LEFT BLANK”<br />

GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION 00 72 00 - 2


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS OF THE CONTRACT FOR<br />

CONSTRUCTION A201-1997<br />

PART 1 – STANDARD GENERAL CONDITIONS<br />

A. The “General Conditions of the Contract for Construction” of the American Institute of<br />

Architects, AIA Document No. A201-1997, inclusive, is a part of this Contract, it is incorporated<br />

herein.<br />

B. Additional copies of the “General Conditions” may be purchased from the Florida Association,<br />

The American Institute of Architects, Document Department, P. O. Box 10388, Tallahassee,<br />

Florida, 32302.<br />

C. The Contractor is hereby specifically directed, as a condition of the Contract, to acquaint himself<br />

with the Articles contained therein and to notify and appraise all Subcontractors, Suppliers and<br />

any other parties of the Contract or individuals or agencies engaged in the work as to its<br />

contents.<br />

D. No contractual adjustments shall be due or become exigent as a result of, or failure on the part<br />

of the Contractor to fully acquaint himself and all other parties to the contract with the<br />

conditions of Document A201.<br />

PART 2 – SUPPLEMENTARY CONDITIONS<br />

The following supplements modify, change, delete from or add to the "General Conditions of the Contract for<br />

Construction", AIA Document A201, Fifteenth Edition 1997. Where a portion of the General Conditions is<br />

modified or deleted by these Supplementary Conditions, the unaltered portions of the General Conditions<br />

shall remain in effect. Where any Article of the General Conditions is modified or any Paragraph,<br />

Subparagraph or Clause thereof is modified or deleted by these supplements, the unaltered provisions of<br />

that Article, Paragraph, Subparagraph or clause shall remain in effect.<br />

ARTICLE 1; GENERAL PROVISIONS<br />

1.2 CORRELATION AND INTENT OF THE CONTRACT DOCUMENTS<br />

Add the following Subparagraph 1.2.1.1 to 1.2:<br />

1.2.1.1 In the event of conflicts or discrepancies among the Contract Documents, interpretations will be<br />

based on the following priorities:<br />

1. The Agreement.<br />

2. Addenda, with those of later date having precedence over those of earlier date.<br />

3. The Supplementary Conditions.<br />

4. The General Conditions of the Contract for Construction.<br />

5. Drawings and Specifications.<br />

In the case of an inconsistency between Drawings and Specifications or within either Document not clarified<br />

by addendum, the better quality or greater quantity of Work shall be provided in accordance with the<br />

Architect’s interpretation.<br />

SUPPLEMENTARY CONDITIONS OF THE CONTRACT FOR CONSTRUCTION 00 73 00 -1


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

ARTICLE 2; OWNER<br />

2.2 INFORMATION AND SERVICES REQUIRED OF THE OWNER<br />

Delete Subparagraph 2.2.5 and substitute the following:<br />

2.2.5 The Contractor will be furnished Construction Documents (Drawings and Project Manuals) returned<br />

to the Architects office and PDF,s for the reproduction as required for construction of this project.<br />

All copies are the responsibility of the contractor.<br />

ARTICLE 3; CONTRACTOR<br />

3.2 REVIEW OF CONTRACT DOUCMENTS AND FIELD CONDITIONS BY CONTRACTOR<br />

Add the following to the end of Subparagraph 3.2.2:<br />

Prior to commencing any excavation or grading, the Contractor shall satisfy himself as to the accuracy of all<br />

survey data as indicated in these Drawings and Specifications and/or as provided by Owner. Should the<br />

Contactor discover any inaccuracies, errors, or omissions in the survey data, the Contractor shall immediately<br />

notify the Architect in order that proper adjustments can be anticipated and ordered.<br />

Add the following Subparagraphs 3.2.4, 3.2.5, 3.2.6, and 3.2.7, to 3.2<br />

3.2.4 If, in Contractor’s opinion, any work is indicated on Drawings, or is specified in such as manner as<br />

will make it impossible to produce a generally acceptable piece of work, or should discrepancies<br />

appear between drawings and specifications, he shall refer it to Architect for decision before<br />

proceeding with Work.<br />

3.2.5 If Contractor fails to make such reference, no excuse will thereafter be entertained for failure to<br />

carry our work in satisfactory manner. Should a conflict occur in or between Drawings or<br />

Specifications, Contractor shall be deemed to have estimated on a more expensive way of doing<br />

work unless he shall have asked for and obtained a decision, in writing, from Architect before<br />

submission of proposal as to which method or materials will be required.<br />

3.2.6 Figures govern scale dimensions and large scale drawings govern those of smaller scale. If<br />

drawings and specifications conflict or require any clarification that was not obtained prior to<br />

bidding, the Contractor shall estimate and include in his bid the more expensive method or material.<br />

No deviation shall be made from plans and specifications except upon written order of the<br />

Architect.<br />

3.2.7 Contractor shall, within fifteen (15) days after signing of Contract, file with the Architect, a correct,<br />

complete itemized schedule of materials and subdivisions of work, giving quantities and unit prices<br />

of complete labor and materials.<br />

3.3 SUPERVISION AND CONSTRUCTION PROCEDURES<br />

Add the following Subparagraphs 3.3.4, 3.3.5, 3.3.6, 3.3.7, and 3.3.8 to 3.3:<br />

3.3.4 The Contractor shall furnish sufficient forces, construction plans and equipment, and shall work such<br />

hours, including night shifts and overtime operation, as may be necessary to insure the execution of<br />

the Work in accordance with the approved progress schedule. If the Contractor falls behind the<br />

SUPPLEMENTARY CONDITIONS OF THE CONTRACT FOR CONSTRUCTION 00 73 00 -2


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

progress schedule, the Contractor shall take such steps as may be necessary to improve the<br />

progress by increasing the number of shifts, overtime operations, days of work and the amount of<br />

construction plans, all without additional cost to the Owner.<br />

3.3.5 The Contractor shall not be relieved of obligations to perform the Work in accordance with the<br />

Contract Documents either by activities or duties of the Architect in the Architect’s administration of<br />

the Contract, or by tests, inspections or approvals required or performed by persons other than the<br />

Contractor.<br />

3.3.6 The Contractor shall furnish sufficient forces, construction plant and equipment, and shall work such<br />

hours, including night shifts and overtime operations, as may be necessary to insure the prosecution<br />

of the Work in accordance with the approved progress schedule. If the Contractor falls behind the<br />

progress schedule, the Contractor shall take such steps as may be necessary to improve the<br />

progress by increasing the number of shifts, overtime operations, days of work and the amount of<br />

construction plant, all without additional cost to the Owner.<br />

3.3.7 Failure of the Contractor to comply with the requirements under this provision shall be grounds for<br />

determination by the Architect that the Contractor is not executing the Work with such diligence as<br />

will insure completion within the time specified and such failure may constitute a substantial<br />

violation of the conditions of the Agreement.<br />

3.3.8 Upon such determination, the Owner may terminate the Contractor’s right to proceed with the<br />

Work, or any separable part thereof, in accordance with Article 14 of the General Conditions, or may<br />

with hold further payments as indicated in Article 9.5.1 also of the General Conditions.<br />

3.4 LABOR AND MATERIALS<br />

Add the following Subparagraphs 3.4.4, 3.4.5, 3.4.6 and 3.4.7 to 3.4:<br />

3.4.4 After the Contract has been executed, the Owner and the Architect will consider a formal request for<br />

the substitution of products in place of those specified only under the conditions set forth in the<br />

General Requirements (Division 1 of the Specifications), Section “Product Requirements.”.<br />

3.4.5 By making requests for substitutions based on Subparagraph 3.4.4 above, the Contractor:<br />

1. Represents that the Contractor has personally investigated the proposed substitute product<br />

and determined that it is equal or superior in all respects to that specified;<br />

2. Represents that the Contractor will provide the same warranty for the substitution that the<br />

Contractor would for that specified;<br />

3. Certifies that the cost data presented is complete and includes all related costs under this<br />

Contract, including the Architect's or Engineer’s redesign costs, and waives all claims for<br />

additional costs related to the substitution which subsequently become apparent; and<br />

4. Will coordinate the installation of the accepted substitute, making such changes as may be<br />

required for the Work to be complete in all respects.<br />

3.4.6 The Contractor shall follow all specified and manufacturer’s standards for Delivery, Storage and<br />

Handling of all products. All products that require storage in a climate-controlled environment shall<br />

be so handled. In all cases the more stringent guidelines shall be followed.<br />

3.4.7 The Contractor shall follow all specified and manufacturers instructions and conditions for installation<br />

SUPPLEMENTARY CONDITIONS OF THE CONTRACT FOR CONSTRUCTION 00 73 00 -3


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

of all products and finishes.<br />

3.5 WARRANTY<br />

ADD THE FOLLOWING SUBPARAGRAPHS 3.5.2 and 3.5.3 to 3.5<br />

3.5.2 The warranty provided in this paragraph shall be in addition to and not in limitation of any other<br />

warranty or remedy required by law or by the Contract Documents.<br />

3.5.3 The Contractor shall provide the Owner with written warranties covering the work for the periods of<br />

time specified in the Contract Documents. As a minimum the work will be guaranteed against<br />

defects in materials and workmanship for one year from the date of final acceptance of the project<br />

by the Owner with all mechanical equipment compressors guaranteed for five years from the date of<br />

final acceptance. The date of final acceptance shall be the beginning date of all warranties (see<br />

Article 8).<br />

3.7 PERMITS, FEES AND NOTICES<br />

ADD THE FOLLOWING SUBPARAGRAPHS 3.7.5 TO 3.7:<br />

3.7.5 The Contractor shall meet the latest requirements of the United States Department of Labor<br />

Occupational Safety and Health Standards and comply with The Manual of Acident Prevention in<br />

Construction, all applicable safety and sanitary laws, regulations, and ordinances and any safety<br />

rules or procedures.<br />

3.9 SUPERINTENDENT<br />

Delete Subparagraph 3.9.1 and substitute the following:<br />

3.9.1 The Contractor shall employ and keep at the site of the work during its progress a competent and<br />

thoroughly experienced superintendent capable of handling all phases of the project. The<br />

Superintendent shall have any necessary assistants, foremen and timekeepers required by the scope<br />

of this project, and shall be acceptable to the Architect, and shall not be changed or transferred<br />

unless approved by the Architect, or ceases to be in the employ of the Contractor. If the Contractor<br />

must replace the Superintendent for any reason between “Notice-to-Proceed” and final Architect’s<br />

certification of completion of the work, then the Contractor shall notify Architect that the existing<br />

Superintendent will be leaving the job on a specific date and that all job work shall cease after said<br />

date until a satisfactory replacement Superintendent is found, acceptable to the Architect, and<br />

physically present on the site, properly authorized and briefed by Contractor.<br />

Add the following Subparagraphs 3.9.2, 3.9.3, 3.9.4, 3.9.5, 3.9.6 and 3.9.7 to 3.9:<br />

3.9.2 The Superintendent shall represent the Contractor in the Contractor’s absence and all directions<br />

given to the Superintendent shall be binding as if given to the Contractor. Major and important<br />

directions shall be confirmed in writing to the Contractor. Other directions shall be so confirmed on<br />

written request in each case.<br />

3.9.3 The Contractor shall submit to the Architect the name and resume of the proposed Superintendent<br />

for the Contractor at the preconstruction conference to allow investigation by Architect.<br />

SUPPLEMENTARY CONDITIONS OF THE CONTRACT FOR CONSTRUCTION 00 73 00 -4


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

3.9.4 The Contractor shall be responsible to the Owner for acts and omissions of the Contractor’s<br />

employees, Subcontractors and their agents and employees, and other persons performing portions<br />

of the Work under a contract with the Contractor.<br />

3.9.5 The Contractor shall submit to the Architect the name of the proposed superintendent for the<br />

Contractor at the Pre-Construction Conference. The superintendent shall attend the Pre-<br />

Construction Conference and all Progress Meetings.<br />

3.9.6 The Superintendent will remain on the job until punch list items are corrected.<br />

3.9.7 The Contractor shall give efficient supervision to the work, using the best skill and attention. The<br />

Contractor shall carefully study and compare all drawings, specifications and other instructions and<br />

shall report at once to the Architect any error, inconsistency or omission which is discovered but<br />

shall not be held responsible for their existence or discovery. The Superintendent shall be in<br />

attendance on the job a minimum of six (6) hours per working day from “Notice to Proceed”<br />

continuously through final approval of the work by the Architect. No work shall be allowed to<br />

transpire on the site unless the Superintendent is in attendance at the site.<br />

3.10 CONTRACTORS CONSTRUCTION SCHEDULES<br />

3.10.4 The contractor shall furnish, not later than 7 days of date established for commencement of work, a<br />

bar-chart schedule showing the expected times of completion of the various stages of work on this<br />

project. The work headings therein shall correspond generally with the headings listed in the<br />

Contractor’s Schedule of Values. During progress of the work the Contractor shall enter on the<br />

schedule the actual progress at the end of each month, and shall deliver two (2) copies to the<br />

Architect along with the Contractor’s pay request. Contractor’s pay request will not be processed<br />

until receipt and review of monthly updated bar-chart schedule.<br />

3.11 DOCUMENTS AND SAMPLES AT THE SITE<br />

Add the following Subparagraph 3.11.2 to 3.11:<br />

3.11.2 Copy of Toxic Substance List submitted by both the Contractor and Subcontractors to the Owner,<br />

must be kept at the site during the duration of construction.<br />

3.12 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES<br />

Add the following Subparagraphs 3.12.11, 3.12.12 and 3.12.13 to 3.12:<br />

3.12.11 Shop Drawings and samples shall be dated and contain the following: name of project; project<br />

number; description or names of equipment, materials and items; and complete identification of<br />

locations at which materials or equipment are to be installed. If the shop drawings do not conform<br />

completely to the requirements of the Contract Documents, such nonconformance shall be<br />

specifically noted on the face of the drawings. Refer to Division 1 Section “Submittal Procedures.”<br />

3.12.12 Submission of Shop Drawings and samples shall be accompanied by transmittal letter, containing<br />

project name, Contractor’s name, number of drawings and samples, titles and other pertinent data.<br />

3.12.13 Unless otherwise specified, the number of Shop Drawings and the number of Samples which the<br />

Contractor shall submit and, if necessary , resubmit, is the number that the Contractor requires to<br />

be retained for the Contractor’s use plus 2, which will be retained by the Architect/Engineer.<br />

3.13 USE OF SITE<br />

Add the following Subparagraphs 3.13.2 to 3.13:<br />

SUPPLEMENTARY CONDITIONS OF THE CONTRACT FOR CONSTRUCTION 00 73 00 -5


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

3.13.2 Contractor shall access the Project site from roadways, right-of-ways, easements or temporary<br />

roadways as authorized by the Owner and shall limit construction traffic from residential areas by<br />

utilizing through streets within commercial districts. Use of multiple project site access points shall<br />

be at the discretion of the Owner.<br />

The Contractor shall present a plan, for approval by the Architect and Owner, showing all areas for<br />

safety fencing staging, storage, job office, ingress and egress to the site. No work shall be done<br />

until this is approved.<br />

3.15 CLEANING UP<br />

Add the following to the end of Subparagraph 3.15.1:<br />

3.15.1 Keep interior of the building and keep the area around the building free of stored or unattended<br />

combustible materials.<br />

3.18 INDEMNIFICATION<br />

Delete Subparagraph 3.18.1 and substitute with the following:<br />

3.18.1 To the fullest extent permitted by law, the Contractor shall, for the sum of ten dollars ($10.00) and<br />

other good and valuable consideration paid by the Owner and the Architect/Engineer individually,<br />

receipt hereby acknowledged by the Contractor, Indemnify and hold harmless the Owner and the<br />

Architect/Engineer and their agents and employees from and against all claims, damages, losses<br />

and expenses, including but not limited to attorneys’ fees arising out of or resulting from the<br />

performance of the Work provided that any such claim, damage, loss or expense: (1) is attributable<br />

to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property other<br />

than the Work itself, including the loss of use resulting therefrom and (2) is caused in whole or in<br />

part by any negligent act or omission of the Contractor, any subcontractor, anyone directly or<br />

indirectly employed by any of them, or anyone whose acts any of them may be liable, regardless of<br />

whether or not it is caused in part by a party indemnified hereunder. Such obligation shall not be<br />

construed to negate, abridge or otherwise reduce any other right or obligation of indemnity which<br />

would otherwise exist as to any party or person described in this Paragraph 3.18.<br />

Delete Subparagraph 3.18.2 and substitute the following:<br />

3.18.2 The indemnification which the Contractor and Subcontractors are to provide under Paragraph 3.18<br />

shall include, extend and insure to and be for the benefit of the Owner, Architect, their respective<br />

agents, and employees of any of them, and shall not be limited in any way by any limitation on the<br />

amount of type of damage, compensation or benefits payable by or for the Contractor or any<br />

Subcontractor under Worker’s Compensation or Employer’s Liability Acts, disability acts, employee<br />

benefit acts or other legislation or rule of law, whether legislative, judicial, administrative or common<br />

law.<br />

ARTICLE 4; ADMINSTRATION OF THE CONTRACT<br />

4.01 ARCHITECT<br />

Add the following subparagraphs 4.1.4 to 4.1:<br />

4.1.4 Nothing contained in the Contract Documents shall create any contractual relationship between the<br />

SUPPLEMENTARY CONDITIONS OF THE CONTRACT FOR CONSTRUCTION 00 73 00 -6


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

Architect and the Contractor.<br />

ARTICLE 5; SUBCONTRACTORS<br />

5.3 SUBCONTRACTURAL RELATIONS<br />

Add the following subparagraph 5.3.2 to 5.3:<br />

5.3.2 The Subcontractor agrees, to the fullest extent permitted by law, to indemnify, save harmless and<br />

defend the Contractor, Owner, Architect, Architect’s consultants, their respective agents, and<br />

employees of any of them harmless from any liability for damages to any person or property upon,<br />

or at, or about the project, that may arise as a result of or in connection with the work hereunder,<br />

provided, however, that the Subcontractor shall not be required to indemnify the Contractor against<br />

the Contractor's sole negligence; and the Subcontractor agrees to procure at his own expense,<br />

before the commencement of the work comprehensive general liability including contractor's<br />

protective liability insurance, completed operations and contractual liability insurance and<br />

automobile liability insurance, including the ownership, maintenance, and operation of any<br />

automotive equipment owned, hired and non-owned for the benefit of the Contractor and Owner, in<br />

the sum of Two Hundred Fifty Thousand ($250,000.00) Dollars for damages resulting to one person<br />

and Five Hundred Thousand ($500,000.00) Dollars for damages to persons resulting from one<br />

casualty, and Two Hundred Fifty Thousand ($250,000.00) Dollars for damages to property arising<br />

out of each casualty, and an aggregate of not less than Five Hundred Thousand ($500,000.00)<br />

Dollars for damages to property, and to keep such insurance in force until the construction of the<br />

project is fully completed, and to immediately and before commencing work deliver such policy or<br />

policies or certificates of such insurance to the Contractor.<br />

ARTICLE 7; CHANGES IN THE WORK<br />

7.2 CHANGES IN THE WORK<br />

Add the following Subparagraph 7.2.3, 7.2.4, 7.2.5, 7.2.6, 7.2.7 and 7.2.8 to 7.2:<br />

7.2.3 The Contractor is responsible for all affected work that is a result of a Change Order. All changes<br />

required as a result of a Change Order should be reflected in the price of the Change Order. Any<br />

associated additional work that becomes evident after the Change Order has been signed will be<br />

made at the Contractor’s expense.<br />

7.2.4 When any one change increases or decreases the scope of the original contract, the proposal to<br />

change shall be supported by accurate cost data establishing the fair and current market valve of<br />

the labor, materials, equipment, and incidentals required to accomplish the change, plus a margin to<br />

represent the contractor’s profit and overhead. Cost data shall be in sufficient detail to enable the<br />

Architect or Engineer to confirm the accuracy of such proposal. Profit and overhead shall be added<br />

to additive change orders and shall be deducted on deductive change orders. No deduction shall be<br />

made for profit and overhead on deductive change orders in connection with Direct Material<br />

Purchases.<br />

7.2.5 Cost shall be limited to the following: Cost of materials, including sales tax and cost of delivery, cost<br />

of labor, including Social Security, Old Age and Unemployment Insurance; Worker’s Compensation<br />

Insurance; rental value of power tools and equipment. Overhead shall include the following: Bond<br />

premiums, supervision, superintendence, wages of timekeepers, watchmen and clerks, small tools,<br />

incidentals, general office expense and all other expenses not included in “cost.” If the net value of<br />

a change results in a credit from the Contractor or Subcontractor, the credit given shall be the net<br />

SUPPLEMENTARY CONDITIONS OF THE CONTRACT FOR CONSTRUCTION 00 73 00 -7


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

cost plus overhead and profit except for Direct Material Purchase items. The cost as used herein<br />

shall include all items of labor, materials and equipment.<br />

7.2.6 The Contractor shall not be entitled to any claim for damages or cost including loss of profits, loss of<br />

use, overhead expenses, equipment rental, etc. on account of hindrances or delays from any cause<br />

whatsoever. If the hindrance or delay is caused by any act of God, or by any act or omission on the<br />

part of the Owner, Owner’s agents, or governmental agencies having jurisdiction, such act,<br />

hindrance, or delay may entitle the Contractor to an extension of time only in which to complete the<br />

work which shall be determined by the Architect and approved by the Board, provided that the<br />

Contractor will give written notice as provided herein of the cause of such act, hindrance, or delay.<br />

7.2.7 Should concealed conditions encountered in the performance of the work below the surface of the<br />

ground be at variance with the conditions indicated by the Contract Documents be encountered, the<br />

Contract Sum shall be equitable adjusted by Change Order upon claim by either party made within<br />

five days after the first observance of the conditions.<br />

7.3 CONSTRUCTION CHANGE DIRECTIVES<br />

Delete first sentences of Subparagraph 7.3.6 and substitute the following:<br />

7.3.6 If the Contractor does not respond promptly or disagrees with the method for adjustment in the<br />

Contract Sum, the method and the adjustment shall be determined by the Architect on the basis of<br />

reasonable expenditures and savings of those performing the Work attributable to the change,<br />

including, incase of an increase in the Contract Sum, an allowance for overhead and profit in<br />

accordance with Clauses 7.3.10.1 through 7.3.10.6.<br />

Delete Subparagraph 7.3.6.5 and substitute the following:<br />

7.3.6.5 Cost of supervision and field personnel may be allowed when a contract time extension is allowed,<br />

which is directly attributed to the change.<br />

Add the following Subparagraph 7.3.6.6 to 7.3:<br />

7.3.6.6 Overhead shall include small tools, incidentals, general office and field office expenses, estimating,<br />

data entry and all other expenses not included in “cost.”<br />

Add the following Subparagraph 7.3.10 to 7.3<br />

7.3.10 Subparagraph 7.3.6, the allowance for the combined overhead and profit in the total cost to the<br />

Owner shall be based on the following schedule:<br />

.1 For the Contractor, for Work performed by the Contractor’s own forces, a maximum of<br />

fifteen percent (15%) of the cost.<br />

SUPPLEMENTARY CONDITIONS OF THE CONTRACT FOR CONSTRUCTION 00 73 00 -8


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

.2 For the Contractor, for Work performed by the Contractor’s Subcontractor, a maximum of<br />

seven and one-half percent (7-1/2%) of the amount due the Subcontractor.<br />

.3 For each Subcontractor or Sub-subcontractor involved, for Work performed by that<br />

Subcontractor’s or Sub-subcontractor’s own forces, a maximum of fifteen percent (15%) of<br />

the cost.<br />

.4 For each Subcontractor for work performed by the Subcontractor’s Sub-subcontractors, a<br />

maximum of seven and one-half percent (7-1/2%) of the amount due the Subsubcontractors.<br />

.5 Cost to which overhead and profit is to be applied shall be determined in accordance with<br />

Subparagraph 7.3.6.<br />

.6 In order to facilitate checking of quotations for extras or credits, all proposals, except those<br />

so minor that their propriety can be seen by inspection, shall be accompanied by a<br />

complete itemization of costs including labor, materials and subcontracts. Labor and<br />

materials shall be itemized in the manner prescribed above. Where major cost items are<br />

subcontracts, they shall be itemized also. In no case will a charge over $100.00 be<br />

approved without such itemization.<br />

ARTICLE 8; TIME<br />

8.2 PROGRESS AND COMPLETION<br />

Add the following Subparagraph 8.2.4 and 8.2.5 to 8.2:<br />

8.2.4 The work to be performed under the Contractor’s Base Proposal as defined in the Contract<br />

Documents shall be substantially completed by ________________________.<br />

8.2.5 Failure to complete the Project within the time fixed in this Agreement will result in substantial injury<br />

to the Owner, and as damages arising from such failure cannot be calculated with any degree of<br />

certainty, according to the definition of “ Substantial Completion” in Subparagraph 9.8.1 of the<br />

General Conditions, within the time fixed or within such further time, if any, as maybe authorized in<br />

accordance with Contract Documents, the Contractor shall pay to the Owner as Liquidated Damages<br />

for such delay, and not as a penalty, $500.00 for each and every calendar day elapsing between the<br />

date fixed for Substantial Completion and the date such Substantial Completion shall bee fully<br />

accomplished. It is also hereby agreed that if after thirty (30) Calendar days after Substantial<br />

Completion this Project is not fully and finally completed in accordance with the requirements of the<br />

Contract Documents, the Contractor shall pay to the Owner as Liquidated Damages, and not as a<br />

penalty, for such delay, 1/4 of the rate previously indicated. These Liquidated Damages shall be<br />

payable in addition to any expenses or costs payable by the Contractor to the Owner under the<br />

provision of the Contract Document and shall not exclude the recovery of damages of te Owner<br />

under the Contract Documents.<br />

This provision of Liquidated Damages for delay shall in no manner affect the Owner’s right to<br />

terminate the Contract. The Owner’s exercise of the right to terminate shall not release the<br />

Contactor from his obligation to pay Liquidated Damages.<br />

It is further agreed that the Owner may deduct from the balance of the Contract Sum held by the<br />

Owner the Liquidated Damages stipulated herein or such portions, as said balance will cover.<br />

8.3 DELAYS AND EXTENSIONS OF TIME<br />

Add the following Clause 8.3.1.1 to Subparagraph 8.3.1:<br />

SUPPLEMENTARY CONDITIONS OF THE CONTRACT FOR CONSTRUCTION 00 73 00 -9


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

8.3.1.1 Extension of Time<br />

Extensions on all additions will be granted only to such conditions are in excess of the average for that<br />

period and also that the weather actually affects operations.<br />

Add the following to the end of Subparagraph 8.3.2:<br />

Extension of time requests due to adverse weather shall be submitted within twenty (20) days after adverse<br />

weather. The Contractor shall submit the referenced climatologically summary data immediately upon its<br />

availability and shall show how the time extension request corresponds with the climatological data.<br />

Extension of contract time due to adverse weather shall be for “time only” and will not be the basis of any<br />

monetary claim or request for “extended general conditions.” Refer to Section 00 73 80 “Weather Delay<br />

Log”<br />

Add the following subparagraphs 8.3.4, 8.3.5, 8.3.6, 8.3.7, 8.3.8, 8.3.9 and 8.3.10 to 8.3:<br />

8.3.4 The Contract Time shall be extended by Change Order for such reasonable time as the Architect<br />

may determine and as approved by the Owner.<br />

8.3.5 All Claims for extension of time shall be made in writing to the Architect no more than seven days<br />

after the Occurrence of the delay; otherwise they shall be waived. In the case of a continuing delay<br />

only one claim is necessary.<br />

8.3.6 It is mutually agreed between the parties that time is of the essence of this contract, and that there<br />

will be, on the part of the Owner considerable monetary damage in the event the work is not<br />

completed within the time fixed for completion in the Contract or within the time to which such<br />

completion may have been extended.<br />

8.3.7 The amount per calendar day set forth herein for each day that said Contract is not completed is<br />

hereby agreed upon as the liquidated damages for each and every calendar day that the time<br />

consumed in completing the work under the contract exceeds that time allowed therefore.<br />

8.3.8 The amount shall, in no event, be considered as a penalty or otherwise than as liquidated and<br />

adjusted damages to the Owner of the said Project, and the Contractor and his sureties shall be<br />

liable therefore.<br />

8.3.9 The Contractor agrees to make no claim for damages for delay in the performance of the contract<br />

occasioned by any act or omission of the Owner or any of its agents or representatives, or because<br />

of any injunction which may be brought against the Owner and agrees that any such claim shall be<br />

fully compensated for by an extension of time to complete performance of the Work as provided<br />

herein.<br />

8.3.10 No extension of time beyond the date of completion fixed by terms of the Contract shall be effective<br />

unless in writing, submitted to the Architect, and approved by Owner. The determination made by<br />

the Owner on an application for an extension of time shall be binding and conclusive on the<br />

Contractor.<br />

ARTICLE 9; PAYMENTS AND COMPLETION<br />

SUPPLEMENTARY CONDITIONS OF THE CONTRACT FOR CONSTRUCTION 00 73 00 -10


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

9.3 APPLICATIONS FOR PAYMENT<br />

Add the following subparagraph 9.3.1.4 to 9.3:<br />

9.3.1.4 The full Contract retainage may be reinstated if the manner of completion of the Work and its<br />

progress do not remain satisfactory to the Architect (or if the Surety withholds its consent), or for<br />

other good and sufficient reasons.<br />

9.4 CERTIFICATES FOR PAYMENT<br />

Add the following paragraphs:<br />

9.4.3 The Architect shall certify a payment of ninety percent (90%) of the value of the Work and materials<br />

as above noted according to his best judgment of the correct amount.<br />

9.4.4 On these monthly certificates, ten percent (10%) of the total of the estimated work for that month<br />

shall be retained until completion and acceptance of the job.<br />

9.4.5 Upon substantial completion of the job, the Architect may issue a semi-final certificate covering<br />

payment up to ninety percent (90%) of the Contract Sum less any reserves to cover any incomplete<br />

items.<br />

9.7 FAILURE OF PAYMENT<br />

Add the following article to 9.7:<br />

9.7.2 PAYMENTS TO SUBCONTRACTORS<br />

9.7.2.1 If the Architect fails to issue a Certificate for Payment for any cause which is the fault of the<br />

Contractor and not the fault of a particular Subcontractor, the Contractor shall pay that<br />

Subcontractor on demand, made at any time after the Certificate for Payment should otherwise<br />

have been issued for his work to the extent completed, less the retained percentage.<br />

9.7.2.2 The Contractor shall pay each Subcontractor a just share of any insurance moneys received by the<br />

Contractor under Article 11, and he shall require each Subcontractor to make payments to his<br />

subcontractors.<br />

9.7.2.3 The Architect will, on request, furnish to a Subcontractor, if practicable, information regarding<br />

percentages of completion or amounts applied for by the Contractor and action taken thereon by<br />

the Architect and Owner on account of portions of the Work done by such Subcontractor.<br />

9.7.2.4 Neither the Owner nor the Architect shall have any obligation to pay or to see the payments of any<br />

moneys to any Subcontractor except as may otherwise be required by Florida Statutes. Payment to<br />

material suppliers shall be treated in a manner similar to that provided in Subparagraphs 9.7.2.1, 2,<br />

and 3.<br />

10.6 EMERGENCIES<br />

SUPPLEMENTARY CONDITIONS OF THE CONTRACT FOR CONSTRUCTION 00 73 00 -11


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

ADD THE FOLLOWING SUBPARAGRAPH 10.6.2 TO 10.6:<br />

10.6.2 The Contractor shall provide at the site, and make available to all workers, medical supplies and<br />

equipment necessary to supply first aid service to all persons injured in connection with the work.<br />

The Contractor shall report any and all accidents in writing to Insurance Company, Owner and<br />

Architect within twenty-four (24) hours of the occurrence. The report shall contain the following<br />

information and it shall be the responsibility of the Contractor to have an accident report filled out in<br />

triplicate and submitted as required above with (1) Name of Person or Persons and Home Address,<br />

(2) Location of Occurrence, (3) Time of Day and Date, (4) Description of Occurrence, (5) Statements<br />

of Witnesses and (6) Signature of Contractor’s Superintendent. In addition, if death or serious<br />

injuries or serious damages are caused, the accident shall be reported immediately by telephone or<br />

messenger. If any claim is made by anyone against the Contractor or any Subcontractor on account<br />

of any accident, the Contractor shall promptly report the facts in writing to the Owner, giving full<br />

details of the Claims.<br />

ARTICLE 11; INSURANCES AND BONDS<br />

11.1 CONTRACTOR'S LIABILITY INSURANCE<br />

Delete Subparagraph 11.1.1 and substitute the following:<br />

11.1.1 The Contractor shall purchase from and maintain in a company or companies lawfully authorized to<br />

do business in the State of Florida such insurance as will protect the Contractor from claims set forth<br />

below which may arise out of or result from the Contractor’s operations under the Contract and for<br />

which the Contractor may be legally liable, whether such operations be by the Contractor or by a<br />

Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone for whose<br />

acts any of them may be liable. All insurance policies shall be issued and countersigned by<br />

representatives of such companies duly authorized for the State of Florida and shall be written on<br />

ISO standard forms or their equivalents. The Contractor shall provide the ISO Commercial General<br />

Liability policy for general liability coverage. All liability policies shall provide that the Owner is a<br />

named additional insured as to the operations of the Contractor under the Agreement and shall<br />

provide for the Severability of Insureds Provision. The Owner shall be exempt from, and in no way<br />

liable for, any sums of money, which may represent a deductible in any insurance policy. The<br />

payment of such deductible shall be the responsibility solely of the Contractor and/or Subcontractor<br />

providing such insurance. The insurance shall protect the Contractor from the following claims:<br />

.1 claims under workers’ or workmen compensation, disability benefit and other similar<br />

employee benefit acts, which are applicable to the Work to be performed;<br />

.2 claims for damages because of bodily injury, occupational sickness or disease, or death of<br />

the Contractor’s employees;<br />

.3 claims for damages because of bodily injury, sickness or disease, or death of any person<br />

other than the Contractor’s employees;<br />

.4 claims for damages insured by usual personal injury liability coverage including claims,<br />

which are sustained (1) by a person as a result of an offense directly or indirectly related to<br />

employment of such person by the Contractor, or (2) by another person;<br />

.5 claims for damages, other than to the Work itself, because of injury to or destruction of<br />

tangible property, including loss of use resulting therefrom;<br />

SUPPLEMENTARY CONDITIONS OF THE CONTRACT FOR CONSTRUCTION 00 73 00 -12


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

.6 claims for damages because of bodily injury, death of a person or property damages arising<br />

out of ownership, maintenance or use of a motor vehicle; and<br />

.7 claims involving contractual liability insurance applicable to the Contractor’s obligations<br />

under Paragraph 3.18.<br />

Delete Subparagraph 11.1.2 and substitute the following:<br />

11.1.2.1 The insurance required by Subparagraph 11.1.1 shall be written for not less than limits of $250,000<br />

per person, $500,000 per occurrence or a minimum of $500,000 combined single limit. Coverages,<br />

whether written on an occurrence or claims-made basis, shall be maintained without interruption<br />

from date of commencement of the Work until date of final payment and termination of any<br />

coverage required to be maintained after final payment. The insurance required by Subparagraph<br />

11.1.1 shall include contractual liability insurance applicable to the Contractor’s obligations under<br />

Paragraph 3.18 and coverage for the “XCU” exposure.<br />

.1 Worker’s Compensation: The Contractor shall secure and maintain for the life of this<br />

Agreement, valid Worker’s Compensation Insurance as required by Chapter 440, Florida<br />

Statutes. Copies of the insurance policy shall be filed with the Owner no later than 60 days<br />

after execution of the Owner-Contractor Agreement.<br />

.2 Automobile Liability: The Contractor shall secure and maintain, during the life of this<br />

Agreement, Automobile Liability insurance on all vehicles against bodily injury and property<br />

damage in at least the amounts of $100,000 per person, $300,000 per occurrence, and<br />

property damages in at least the amount of $100,000; or combined single limit of $300,000<br />

for bodily injury and property damage.<br />

Delete Subparagraph 11.1.3 and substitute the following:<br />

11.1.3 Certificates of Insurance acceptable to the Owner shall be filed with the Owner prior to<br />

commencement of the Work. These Certificates and the insurance policies required by this<br />

Paragraph 11.1 shall contain a provision that coverages afforded under the policies will not be<br />

cancelled or allowed to expire until at least 30 days’ prior written notice has been given to the<br />

Owner. If any of the foregoing insurance coverages are required to remain in force after final<br />

payment an additional certificate evidencing continuation of such coverage shall be submitted with<br />

the final Application for Payment as required by Subparagraph 9.10.2. The Contractor shall furnish<br />

one copy each of Certificates of Insurance for each copy of the Agreement which shall specifically<br />

set forth evidence of all insurance coverage required by the Contract Documents. The Certificate of<br />

Insurance shall be dated and show the name of the insured Contractor, the specific job by name<br />

and job number, the name of the insurer, the number of the policy, its effective date, and its<br />

termination date. The Contractor shall furnish a copy of the insurance policy to the Owner within 60<br />

days following execution of the Agreement. If the Acord form certificate is used, the Supplemental<br />

Attachment form, AIA document G715, shall be completed, signed by Contractor’s insurance<br />

representative and attached to the Acord certificate.<br />

Add the following subparagraphs 11.1.4, 11.1.4.1, 11.1.4.2, 11.1.4.3, 11.1.4.4, 11.1.4.5, 11.1.4.6, 11.1.4.7,<br />

11.1..4.8, 11.1.4.9, 11.1.4.10 and 11.1.4.11 to 11.1:<br />

11.1.4 The insurance required by Subparagraph 11.1.1 shall be written for not less than any limits of<br />

liability set forth below, required by Law or set forth in the Contract Documents, whichever is<br />

greater. Other types as may be required by the Project Specifications shall also be furnished.<br />

SUPPLEMENTARY CONDITIONS OF THE CONTRACT FOR CONSTRUCTION 00 73 00 -13


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

11.1.4.1 FURNISH TO THE OWNER A LETTER FROM THE INSURANCE COMPANY STATING THAT<br />

ALL REQUIRED INSURANCE HAS BEEN COMPLIED WITH AS SPECIFIED.<br />

11.1.4.2 THE OWNER, AND THE ARCHITECT, DAG Architects Inc. shall be named as an<br />

ADDITIONAL INSURED on the Contractor’s general liability policies. (Being named as<br />

Certificate Holder is not acceptable).<br />

11.1.4.3 INSURANCE MUST BE MAINTAINED FOR ONE (1) YEAR AFTER FINAL PAYMENT if written<br />

on a claims-made basis.<br />

11.1.4.4 All insurance shall contain provision that coverage afforded under the policies SHALL NOT<br />

BE CANCELED OR MODIFIED UNTIL A MINIMUM OF FIFTEEN (15) DAYS PRIOR WRITTEN<br />

NOTICE TO OWNER HAS BEEN GIVEN, AND THIS PROVISION SHALL BE NOTED ON<br />

CERTIFICATES OF INSURANCE.<br />

11.1.4.5 Deliver to the Architect, before work commences, two (2) certificates evidencing compliance<br />

with all required insurance, using AIA Document G705, Certificate of Insurance.<br />

11.1.4.6 Insurance required shall include Contractual Liability Insurance applicable to the<br />

Contractor’s obligations under Article 3.<br />

11.1.4.7 Property Insurance coverage shall include coverage of perils of windstorms, fire, lightning<br />

vandalism, malicious mischief and those included in extended coverage in the amount of<br />

one hundred percent (100%) of the values at risk. Extended coverage, vandalism, and<br />

malicious mischief insurance may contain the standard deductibles.<br />

11.1.4.8 Contractor shall maintain valid Worker’s Compensation Insurance as required by Chapter<br />

440, Florida Statutes. All Subcontractors shall maintain valid Worker’s Compensation as<br />

required by Florida Statutes.<br />

11.1.4.9 Contractor shall maintain Public Liability Insurance against bodily injury, personal ijury and<br />

property damage, in limits as specified. Coverage shall include Comprehensive General<br />

Liability and Products and Completed Operations Liability.<br />

11.1.4.10 The amounts set forth herein and by Law shall apply equally or whether on or off the site of<br />

the Work.<br />

11.1.4.11 Unless otherwise provided in the Contract Documents, property insurance shall cover<br />

portions of the Work stored off the site after written approval of the Owner at the value<br />

established in the approval, and also portions of the Work in transit.<br />

11.4 PROPERTY INSURANCE<br />

Delete subparagraphs 11.4.1 through 11.4.5 and substitute the following subparagraphs to 11.4:<br />

11.4.1 It is the Contractor’s responsibility to obtain, purchase and maintain property coverage’s (Builder’s<br />

Risk) shall be written for one hundred percent (100%) of the values at risk.<br />

11.4.1.1 Such policy shall include the interest of Owner, Contractor, Subcontractors, and Sub-subcontractors<br />

or any other parties involved in the project. Perils insured shall be “All Risks” including, but not<br />

limited to the following, theft, vandalism, malicious mischief, collapse, flood, earthquake, windstorm,<br />

SUPPLEMENTARY CONDITIONS OF THE CONTRACT FOR CONSTRUCTION 00 73 00 -14


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

sinkhole, falsework, testing and startup, temporary buildings and debris removal, including<br />

demolition. Contractor remains responsible for any deductible under such policy.<br />

11.4.1.2 Any insured loss is payable to the Owner as trustee for the insured, as their interest may appear.<br />

11.4.1.3 The Contractor shall file a copy of all policies with the Owner before an exposure to loss may occur.<br />

11.4.1.4 If the Owner requests in writing that other special insurance be included in the property insurance<br />

policy, the Contractor shall, if possible, include such insurance, and the cost thereof shall be charged<br />

to the Owner by appropriate Change Order.<br />

11.4.1.5 The Owner and Contractor waive all rights against each other for damages caused by fire or other<br />

perils to the extent covered by insurance provided under this paragraph, except such rights as they<br />

may have to the proceeds of such insurance held by the Owner as trustee. The Contractor shall<br />

require similar waivers by Subcontractors and Sub-subcontractors.<br />

Delete Subparagraph 11.4.2 and substitute the following:<br />

11.4.2 Boiler and Machinery Insurance: The Contractor shall purchase and maintain an appropriate<br />

installation floater which shall specifically cover such insured objects which are subject to the boiler<br />

and machinery hazards during installation and until formal acceptance by the Owner.<br />

Add the following Subparagraphs 11.4.2.1, 11.4.2.2, and 11.4.2.3:<br />

11.4.2.1 Before an exposure to loss may occur, the Contractor shall file with the Owner a copy of each policy<br />

that includes insurance coverage required by this Paragraph 1.1.3. Each policy shall contain all<br />

generally applicable conditions, definitions, exclusions and endorsements related to this Project.<br />

Each policy shall contain a provision that the policy will not be canceled or allowed to expire until at<br />

least 30 days’ prior written notice has been given to the Owner.<br />

11.4.2.2 A loss insured under property insurance shall be adjusted by the Owner as fiduciary and made<br />

payable to the Owner as fiduciary for the Insured, as their interests may appear. The Contractor<br />

shall pay Subcontractors their just shares of insurance proceeds received by the Contractor, and by<br />

appropriate agreements, written where legally required for validity, shall require Subcontractors to<br />

make payments to their Subcontractors in similar manner.<br />

11.4.2.3 The Owner as fiduciary shall, upon occurrence of an insured loss, deposit in a separate account<br />

proceeds so received, which the Owner shall distribute in accordance with such agreement as the<br />

parties in interest may reach, or in accordance with an award as provided in Paragraph 4.5. If after<br />

such loss no other special agreement is made, replacement of damaged property shall be covered<br />

by appropriate Change Order.<br />

Delete subparagraph 11.4.7 and substitute the following:<br />

11.4.7 Waivers of Subrogation. If permitted by the Owner's and Contractor's insurance companies, without<br />

penalties, the Owner and Contractor waive all rights against (1) each other and any of their<br />

Subcontractors, Sub-subcontractors, agents and employees, each of the other, (2) the Architect, his<br />

employees and agents, and (3) the engineers, the engineer’s consultants, separate contractors<br />

described in Article 6, if any, and any of their Subcontractors, Sub-subcontractors, agents and<br />

employees, for damages caused by fire or other perils to the extent covered by property insurance<br />

obtained pursuant to this Paragraph 11.3 or other property insurance applicable to the Work, except<br />

such rights as they have to proceeds of such insurance held by the Owner as fiduciary. The Owner<br />

or Contractor, as appropriate, shall require of the Architect, Architect’s consultants, separate<br />

SUPPLEMENTARY CONDITIONS OF THE CONTRACT FOR CONSTRUCTION 00 73 00 -15


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

contractors described in Article 6, if any, and the Subcontractors Sub-subcontractors, agents and<br />

employees of any of them, by appropriate agreements, written where legally required for validity,<br />

similar waivers each in favor of other parties enumerated herein.<br />

The policies shall provide such waivers of subrogation by endorsement or otherwise. A waiver of<br />

subrogation shall be effective as to a person or entity even though that person or entity would<br />

otherwise have a duty of indemnification, contractual or otherwise did not pay the insurance<br />

premium directly or indirectly, and whether or not the person or entity had an insurable interest in<br />

the property damaged.<br />

Add the following subparagraphs 11.4.11 to 11.4:<br />

11.4.11 Partial occupancy or use in accordance with Paragraph 9.9 shall not commence until the insurance<br />

company or companies providing property insurance have consented to such partial occupancy or<br />

use by endorsement or otherwise. The Owner and the Contractor shall take reasonable steps to<br />

obtain consent of the insurance company or companies and shall, without mutual written consent,<br />

take no action with respect to partial occupancy or use that would cause cancellation, lapse or<br />

deduction of insurance.<br />

11.5 PERFORMANCE BOND AND PAYMENT BOND<br />

Delete Subparagraph 11.5.1 and substitute the following:<br />

11.5.1 The Contractor shall furnish the Owner a Performance Bond equal to one hundred percent (100%)<br />

of the contract price. The Performance Bond shall extend as a guarantee bond for one (1) year<br />

after final acceptance of the Work, or until specified guarantees, which exceed one year are<br />

satisfied. The Contractor shall furnish a Labor and Material Payment Bond equal to one hundred<br />

percent (100%) of the contract price.<br />

ADD THE FOLLOWING ARTICLES:<br />

11.6 INSURANCE REQUIREMENTS (MINIMUM)<br />

11.6.1 WORKER’S COMPENSATION<br />

Applicable Per Florida Statute – Chapter 440<br />

Railroad Required<br />

NO<br />

Maritime Required<br />

NO<br />

Employer’s Liability 500,000<br />

11.6.2 CONTRACTOR’S LIABILITY INSURANCE including CONTRACTUAL LIABILITY<br />

Form of Insurance shall be:<br />

Comprehensive General Liability, Premises and Completed Operations, Contractual Liability,<br />

Broad Form.<br />

a. BODILY INJURY<br />

Each Occurrence $1,000,000<br />

Aggregate 1,000,000<br />

b. PROPERTY DAMAGE<br />

Including Complete Operations<br />

Broad Form<br />

Yes<br />

SUPPLEMENTARY CONDITIONS OF THE CONTRACT FOR CONSTRUCTION 00 73 00 -16


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

Each Occurrence 1,000,000<br />

Aggregate 1,000,000<br />

c. PERSONAL INJURY (WITH EMPLOYMENT EXCLUSION DELETED)<br />

Each Occurrence 1,000,000<br />

Aggregate 1,000,000<br />

d. XCU COVERAGE included Yes<br />

11.6.3 MOTOR VEHICLE LIABILITY – Owned, Non-Owned and Hired<br />

a. BODILY INJURY<br />

Each Occurrence 1,000,000<br />

Aggregate 1,000,000<br />

b. PROPERTY DAMAGE<br />

Each Occurrence 200,000<br />

Aggregate 400,000<br />

11.6.4 OWNER’S AND CONTRACTOR’S PROTECTIVE LIABILITY INSURANCE<br />

11.6.5 PROPERTY INSURANCE<br />

END OF SECTON 00 73 00<br />

The Contractor shall provide an Owner’s and Contractor’s Protective Liability Policy with the<br />

following limits: (A separate policy in the name of the Owner must be provided.)<br />

a. BODILY INJURY<br />

Each Occurrence 1,000,000<br />

Aggregate 1,000,000<br />

b. PROPERTY DAMAGE<br />

Each Occurrence 1,000,000<br />

Aggregate 1,000,000<br />

c. PROPERTY INJURY<br />

Each Occurrence 1,000,000<br />

Aggregate 1,000,000<br />

d. Optionally, the Owner may purchase and maintain other insurance for self-protection<br />

against claims, which may arise from operations under the Contract.<br />

a. To be purchased by Contractor: Builders Risk Insurance on completed value form<br />

in the names of the Owner, Architect, and Contractor as their interests may appear<br />

with limits in an amount equal to the Contract Sum for the work, including<br />

coverage for materials and equipment furnished by Owner to be incorporated or<br />

used in the project when stored off the site or when in transit. Coverage shall be<br />

provided on an all risk basis to include extended coverage for fire, lightning, wind<br />

storms, vandalism and malicious mischief.<br />

SUPPLEMENTARY CONDITIONS OF THE CONTRACT FOR CONSTRUCTION 00 73 00 -17


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

“LEFT BLANK”<br />

SUPPLEMENTARY CONDITIONS OF THE CONTRACT FOR CONSTRUCTION 00 73 00 -18


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

SECTION 00 73 80 - WEATHER DELAY LOG<br />

A. Project:<br />

12041 Rosemary Beach Owners Center, rosemary Beach, FL.<br />

B. Date:<br />

C. Weather Event:<br />

D. Work On Progress:<br />

E. Is the work on the Critical Path<br />

F. Length of Delay:<br />

G. If the work is not on the Critical Path, how many days of delay until this work<br />

category will be on the Critical Path<br />

Instructions:<br />

1. The above information is required to be submitted with each payment request on a<br />

monthly basis. The NOA weather report and superintendents daily log must be<br />

submitted with weather extension request.<br />

2. This information will be required as back-up to grant a Time Extension request for delays<br />

caused by weather events.<br />

3. Direct delays for work stoppages that are on the critical path will be given accordingly.<br />

4. Delays for work not on the critical path shall be logged and delay logs for that category<br />

of work shall be accumulated and submitted in the event the work enters the critical<br />

patch and causes a delay of the project.<br />

5. Delays will be granted only on the basis of adverse effect on the Critical Path of work for<br />

the project.<br />

References:<br />

CONTRACT FOR CONSTRUCTION, EXHIBIT C, DIVISION 1 (CONTRACT)<br />

8. Any time or day lost to a weather related delay including wet ground conditions, rain, other<br />

forms of precipitation, and cold weather conditions, shall be an extension to the construction<br />

time regardless whether the period is under normal or adverse weather conditions.<br />

GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION – A201<br />

Article 4.3.7.2 If adverse weather conditions are the basis for a Claim for additional time, such Claim<br />

shall be documented by data substantiating that weather conditions were abnormal for the period of<br />

time, could not have been reasonably anticipated and had an adverse effect on the scheduled<br />

construction.<br />

Submitted by:<br />

Signature:<br />

General Contractor:<br />

WEATHER DELAY LOG 00 73 80 -1


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

END OF SECTION 00 73 80<br />

WEATHER DELAY LOG 00 73 80 -2


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

SECTION 01 11 00 – PRODUCT EVALUATION AND APPROVAL<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. This Section includes the following:<br />

1. Florida Product Evaluation and Approval.<br />

1.2 REFERENCES<br />

A. Florida Statute 553.842<br />

B. Florida Administrative Code 9B-72<br />

C. Definition: Product evaluation and approval system that applies statewide to concurrent with the<br />

Florida Building Code.<br />

1.3 RESPONSIBILITY<br />

A. The Contractor is responsible for providing products approved by the State of Florida with<br />

approval numbers. Do not use products that do not have a Florida approval number.<br />

1.4 SUBMITTAL<br />

A. Submit a copy of the approved product schedule, (attached at the end of this section), to the<br />

Architect within thirty (30) days after project has been awarded. In addition to State<br />

requirements comply with the requirements of the local jurisdiction of the project.<br />

B. Submit the following product approval specification sheet, or local jurisdiction form to obtain<br />

building permits.<br />

1.5 CATEGORIES<br />

A. General: Products, methods, or systems of construction, used in the exterior envelope of a<br />

building must be approved by the Building Department. The products covered are those<br />

products, methods or systems that affect the structural integrity of the building envelope,<br />

including but not limited to the following categories.<br />

1. Panel Walls.<br />

2. Exterior Doors<br />

3. Roofing Products.<br />

4. Skylights<br />

5. Windows<br />

6. Shutters<br />

7. Structural Components<br />

8. New and Innovative Building Envelope Products.<br />

PRODUCT APPROVAL SPECIFICATION SHEET 01 11 00 - 1/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

B. If the Contractor fails to comply with this requirement, non-complying components shall be<br />

removed and replaced with components that do comply at no expense to the Owner.<br />

PART 2 - PRODUCTS (Not Used)<br />

PART 3 - EXECUTION (Not Used)<br />

PRODUCT APPROVAL SPECIFICATION SHEET 01 11 00 - 2/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

PRODUCT APPROVAL SPECIFICATION SHEET<br />

Location:__________________________ Project<br />

Name:__________________________________________________<br />

As required by Florida Statute 553.842 and Florida Administrative Code 9B-72, please provide the<br />

information and the product approval number(s) on the building components listed below if they will be<br />

utilized on the construction project for which you are applying for a building permit. We recommend you<br />

contact your local product supplier should you not know the product approval number for any of the<br />

applicable listed products. More information about statewide product approval can be obtained at<br />

www.floridabuilding.org<br />

Category/Subcategory Manufacturer Product Description Approval Number(s)<br />

A. EXTERIOR DOORS<br />

1. Swinging<br />

2. Sliding<br />

3. Sectional<br />

4. Roll up<br />

5. Automatic<br />

6. Other<br />

B. WINDOWS<br />

1. Single hung<br />

2. Horizontal Slider<br />

3. Casement<br />

4. Double Hung<br />

5. Fixed<br />

6. Awning<br />

7. Pass -through<br />

8. Projected<br />

9. Mullion<br />

10. Wind Breaker<br />

11 Dual Action<br />

12. Other<br />

C. PANEL WALL<br />

1. Siding<br />

2. Soffits<br />

3. EIFS<br />

4. Storefronts<br />

5. Curtain walls<br />

6. Wall louver<br />

7. Glass block<br />

8. Membrane<br />

9. Greenhouse<br />

10. Other<br />

Category/Subcategory (cont.) Manufacturer Product Description Approval Number(s)<br />

D. ROOFING PRODUCTS<br />

1. Asphalt Shingles<br />

2. Underlayments<br />

PRODUCT APPROVAL SPECIFICATION SHEET 01 11 00 - 3/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

3. Roofing Fasteners<br />

4. Non-structural Metal<br />

Roof<br />

5. Built-Up Roofing<br />

6. Modified Bitumen<br />

7. Single Ply Roofing Sys<br />

8. Roofing Tiles<br />

9. Roofing Insulation<br />

10. Waterproofing<br />

11. Wood shingles /shakes<br />

12. Roofing Slate<br />

13. Liquid Applied Roof Sys<br />

14. Cements-Adhesives –<br />

Coatings<br />

15. Roof Tile Adhesive<br />

16. Spray Applied<br />

Polyurethane Roof<br />

17. Other<br />

E. SHUTTERS<br />

1. Accordion<br />

2. Bahama<br />

3. Storm Panels<br />

4. Colonial<br />

5. Roll-up<br />

6. Equipment<br />

7. Others<br />

F. SKYLIGHTS<br />

1. Skylight<br />

2. Other<br />

Category/Subcategory (cont.) Manufacturer Product Description Approval Number(s)<br />

G. STRUCTURAL<br />

COMPONENTS<br />

1. Wood connector/anchor<br />

PRODUCT APPROVAL SPECIFICATION SHEET 01 11 00 - 4/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

2. Truss plates<br />

3. Engineered lumber<br />

4. Railing<br />

5. Coolers-freezers<br />

6. Concrete Admixtures<br />

7. Material<br />

8. Insulation Forms<br />

9. Plastics<br />

10. Deck-Roof<br />

11. Wall<br />

12. Sheds<br />

13. Other<br />

H. NEW EXTERIOR<br />

ENVELOPE PRODUCTS<br />

1.<br />

2.<br />

The products listed below did not demonstrate product approval at plan review. I understand that at the<br />

time of inspection of these products, the following information must be available to the inspector on the<br />

jobsite; 1) copy of the product approval, 2) the performance characteristics which the product was tested<br />

and certified to comply with, 3) copy of the applicable manufacturers installation requirements.<br />

I understand these products may have to be removed if approval cannot be demonstrated during<br />

inspection.<br />

Contractor or Contractor’s Authorized Agent Signature Print Name Date<br />

Location Permit #<br />

END OF SECTION 01 11 00<br />

PRODUCT APPROVAL SPECIFICATION SHEET 01 11 00 - 5/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

This page intentionally left blank.<br />

PRODUCT APPROVAL SPECIFICATION SHEET 01 11 00 - 6/6


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>, FL.<br />

SECTION 01 23 00 - ALTERNATES<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. This Section includes administrative and procedural requirements for alternates.<br />

1.2 DEFINITIONS<br />

A. Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined<br />

in the Bidding Requirements that may be added to or deducted from the Base Bid amount if<br />

Owner decides to accept a corresponding change either in the amount of construction to be<br />

completed or in the products, materials, equipment, systems, or installation methods described<br />

in the Contract Documents.<br />

1. The cost or credit for each alternate is the net addition to or deduction from the Contract<br />

Sum to incorporate alternate into the Work. No other adjustments are made to the<br />

Contract Sum.<br />

1.3 PROCEDURES<br />

A. Coordination: Modify or adjust affected adjacent work as necessary to completely integrate<br />

work of the alternate into Project.<br />

1. Include as part of each alternate, miscellaneous devices, accessory objects, and similar<br />

items incidental to or required for a complete installation whether or not indicated as part<br />

of alternate.<br />

B. Notification: Immediately following award of the Contract, notify each party involved, in<br />

writing, of the status of each alternate. Indicate if alternates have been accepted, rejected, or<br />

deferred for later consideration. Include a complete description of negotiated modifications to<br />

alternates.<br />

C. Execute accepted alternates under the same conditions as other work of the Contract.<br />

D. Schedule: A Schedule of Alternates is included at the end of this Section. Specification<br />

Sections referenced in schedule contain requirements for materials necessary to achieve the<br />

work described under each alternate.<br />

PART 2 - PRODUCTS (Not Used)<br />

PART 3 - EXECUTION<br />

3.1 SCHEDULE OF ALTERNATES<br />

A.<br />

Alternate No. 1: Bocce Ball Courts<br />

Provide a deductive price for the 2 Bocce Ball Courts to include the following items:<br />

1. Aggregate walkway and metal edging to the gate at the Dog Park.<br />

2. Concrete Walkway and benches all around the 2 Bocce Ball Courts.<br />

3. 6’ high concrete privacy wall on the east side of the Bocce Ball Courts.<br />

4. Stadium Style seating, steps and raised planters.<br />

5. All Landscaping shall remain; grassed lawn areas shall be added in place of all removed<br />

hardscape, courts, and seating areas.<br />

ALTERNATES 01 23 00 - 1


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>, FL.<br />

B.<br />

Alternate No. 2: Dog Park<br />

Provide a deductive price for the Dog Park to include the following items:<br />

1. 4’ high concrete garden wall and gates.<br />

2. Metal fencing<br />

3. Aggregate walkway and metal edging<br />

4. All Lawn and Landscaping<br />

5. This area shall remain in its existing vegetative state.<br />

C. Alternate No. 3: Green Wall as shown and detailed on Landscape Drawings<br />

D. Alternate No. 4:<br />

Schedules<br />

Sliding Doors/Louvers as identified on Architectural Floor Plans and<br />

END OF SECTION 01 23 0<br />

Provide a deductive price for the 2 Bocce Ball Courts to include the following items:<br />

1. Aggregate walkway and metal edging to the gate at the Dog Park.<br />

2. Concrete Walkway and benches all around the 2 Bocce Ball Courts.<br />

3. 6’ high concrete privacy wall on the east side of the Bocce Ball Courts.<br />

4. Stadium Style seating, steps and raised planters.<br />

5. All Landscaping shall remain, grassed lawn areas shall be added in place of all removed<br />

hardscape, courts, and seating areas.<br />

ALTERNATES 01 23 00 - 2


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

SECTION 012500 - SUBSTITUTION PROCEDURES<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section includes administrative and procedural requirements for substitutions.<br />

B. Related Requirements:<br />

1. Section 01 60 00 "Product Requirements" for requirements for submitting comparable<br />

product submittals for products by listed manufacturers.<br />

1.2 DEFINITIONS<br />

A. Substitutions: Changes in products, materials, equipment, and methods of construction from<br />

those required by the Contract Documents and proposed by Contractor.<br />

1.3 ACTION SUBMITTALS<br />

A. Substitution Requests: Submit three copies of each request for consideration. Identify product<br />

or fabrication or installation method to be replaced. Include Specification Section number and<br />

title and Drawing numbers and titles.<br />

1. Substitution Request Form: Use CSI Form 13.1A<br />

2. Documentation: Show compliance with requirements for substitutions and the following,<br />

as applicable:<br />

a. Statement indicating why specified product or fabrication or installation cannot be<br />

provided, if applicable.<br />

b. Coordination information, including a list of changes or revisions needed to other<br />

parts of the Work and to construction performed by Owner and separate<br />

contractors, that will be necessary to accommodate proposed substitution.<br />

c. Detailed comparison of significant qualities of proposed substitution with those of<br />

the Work specified. Include annotated copy of applicable Specification Section.<br />

Significant qualities may include attributes such as performance, weight, size,<br />

durability, visual effect, sustainable design characteristics, warranties, and specific<br />

features and requirements indicated. Indicate deviations, if any, from the Work<br />

specified.<br />

d. Product Data, including drawings and descriptions of products and fabrication and<br />

installation procedures.<br />

e. Samples, where applicable or requested.<br />

f. Certificates and qualification data, where applicable or requested.<br />

g. List of similar installations for completed projects with project names and<br />

addresses and names and addresses of architects and owners.<br />

h. Material test reports from a qualified testing agency indicating and interpreting<br />

test results for compliance with requirements indicated.<br />

SUBSTITUTION PROCEDURES 012500 - 1


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

i. Research reports evidencing compliance with building code in effect for Project,<br />

from ICC-ES<br />

j. Detailed comparison of Contractor's construction schedule using proposed<br />

substitution with products specified for the Work, including effect on the overall<br />

Contract Time. If specified product or method of construction cannot be provided<br />

within the Contract Time, include letter from manufacturer, on manufacturer's<br />

letterhead, stating date of receipt of purchase order, lack of availability, or delays<br />

in delivery.<br />

k. Cost information, including a proposal of change, if any, in the Contract Sum.<br />

l. Contractor's certification that proposed substitution complies with requirements in<br />

the Contract Documents except as indicated in substitution request, is compatible<br />

with related materials, and is appropriate for applications indicated.<br />

m. Contractor's waiver of rights to additional payment or time that may subsequently<br />

become necessary because of failure of proposed substitution to produce indicated<br />

results.<br />

3. Architect's Action: If necessary, Architect will request additional information or<br />

documentation for evaluation within seven days of receipt of a request for substitution.<br />

Architect will notify Contractor of acceptance or rejection of proposed substitution within<br />

15 days of receipt of request, or seven days of receipt of additional information or<br />

documentation, whichever is later.<br />

a. Forms of Acceptance: Change Order, Construction Change Directive, or Architect's<br />

Supplemental Instructions for minor changes in the Work.<br />

b. Use product specified if Architect does not issue a decision on use of a proposed<br />

substitution within time allocated.<br />

1.4 QUALITY ASSURANCE<br />

A. Compatibility of Substitutions: Investigate and document compatibility of proposed substitution<br />

with related products and materials. Engage a qualified testing agency to perform compatibility<br />

tests recommended by manufacturers.<br />

PART 2 - PRODUCTS<br />

2.1 SUBSTITUTIONS<br />

A. Substitutions for Cause: Submit requests for substitution immediately on discovery of need for<br />

change, but not later than 15 days prior to time required for preparation and review of related<br />

submittals.<br />

1. Conditions: Architect will consider Contractor's request for substitution when the<br />

following conditions are satisfied:<br />

a. Requested substitution is consistent with the Contract Documents and will produce<br />

indicated results.<br />

b. Requested substitution will not adversely affect Contractor's construction schedule.<br />

c. Requested substitution has received necessary approvals of authorities having<br />

jurisdiction.<br />

d. Requested substitution is compatible with other portions of the Work.<br />

SUBSTITUTION PROCEDURES 012500 - 2


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

e. Requested substitution has been coordinated with other portions of the Work.<br />

f. Requested substitution provides specified warranty.<br />

g. If requested substitution involves more than one contractor, requested substitution<br />

has been coordinated with other portions of the Work, is uniform and consistent, is<br />

compatible with other products, and is acceptable to all contractors involved.<br />

B. Substitutions for Convenience: Not allowed<br />

PART 3 - EXECUTION (Not Used)<br />

END OF SECTION 012500<br />

SUBSTITUTION PROCEDURES 012500 - 3


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

SUBSTITUTION PROCEDURES 012500 - 4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 01 26 00 - CONTRACT MODIFICATION PROCEDURES<br />

PART 1 - GENERAL<br />

SUMMARY<br />

A. Section includes administrative and procedural requirements for handling and processing<br />

Contract modifications.<br />

MINOR CHANGES IN THE WORK<br />

B. Architect will issue supplemental instructions authorizing minor changes in the Work, not<br />

involving adjustment to the Contract Sum or the Contract Time, on AIA Document G710,<br />

"Architect's Supplemental Instructions."<br />

PROPOSAL REQUESTS<br />

C. Owner-Initiated Proposal Requests: Architect will issue a detailed description of proposed<br />

changes in the Work that may require adjustment to the Contract Sum or the Contract Time. If<br />

necessary, the description will include supplemental or revised Drawings and Specifications.<br />

1. Proposal Requests issued by Architect are not instructions either to stop work in progress<br />

or to execute the proposed change.<br />

2. Within time specified in Proposal Request or 20 days, when not otherwise specified,<br />

after receipt of Proposal Request, submit a quotation estimating cost adjustments to the<br />

Contract Sum and the Contract Time necessary to execute the change.<br />

a. Include a list of quantities of products required or eliminated and unit costs, with<br />

total amount of purchases and credits to be made. If requested, furnish survey<br />

data to substantiate quantities.<br />

b. Indicate applicable taxes, delivery charges, equipment rental, and amounts of<br />

trade discounts.<br />

c. Include costs of labor and supervision directly attributable to the change.<br />

d. Include an updated Contractor's construction schedule that indicates the effect of<br />

the change, including, but not limited to, changes in activity duration, start and<br />

finish times, and activity relationship. Use available total float before requesting an<br />

extension of the Contract Time.<br />

e. Quotation Form: Use Acceptable to Architect.<br />

D. Contractor-Initiated Proposals: If latent or changed conditions require modifications to the<br />

Contract, Contractor may initiate a claim by submitting a request for a change to Architect.<br />

1. Include a statement outlining reasons for the change and the effect of the change on the<br />

Work. Provide a complete description of the proposed change. Indicate the effect of the<br />

proposed change on the Contract Sum and the Contract Time.<br />

2. Include a list of quantities of products required or eliminated and unit costs, with total<br />

amount of purchases and credits to be made. If requested, furnish survey data to<br />

substantiate quantities.<br />

3. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade<br />

discounts.<br />

CONTRACT MODIFICATION PROCEDURES 01 26 00 - 1/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

4. Include costs of labor and supervision directly attributable to the change.<br />

5. Include an updated Contractor's construction schedule that indicates the effect of the<br />

change, including, but not limited to, changes in activity duration, start and finish times,<br />

and activity relationship. Use available total float before requesting an extension of the<br />

Contract Time.<br />

6. Comply with requirements in Division 01 Section "Substitution Procedures" if the<br />

proposed change requires substitution of one product or system for product or system<br />

specified.<br />

7. Proposal Request Form: Use form acceptable to Architect.<br />

ADMINISTRATIVE CHANGE ORDERS<br />

E. Allowance Adjustment: Refer to Division 01 Section "Allowances" for administrative procedures<br />

for preparation of Change Order Proposal for adjusting the Contract Sum to reflect actual costs<br />

of allowances.<br />

F. Unit Price Adjustment: Refer to Division 01 Section "Unit Prices" for administrative procedures<br />

for preparation of Change Order Proposal for adjusting the Contract Sum to reflect measured<br />

scope of unit price work.<br />

G. Direct Owner Purchase: Refer to Division 01 Section “Direct Material Purchase Procedure” for<br />

administrative procedures for preparation of Change Order Proposal for adjusting the Contract<br />

Sum to reflect direct material purchases.<br />

CHANGE ORDER PROCEDURES<br />

H. On Owner's approval of a Proposal Request, Architect will issue a Change Order for signatures<br />

of Owner and Contractor on AIA Document G701.<br />

CONSTRUCTION CHANGE DIRECTIVE<br />

I. Construction Change Directive: Architect may issue a Construction Change Directive on<br />

AIA Document G714. Construction Change Directive instructs Contractor to proceed with a<br />

change in the Work, for subsequent inclusion in a Change Order.<br />

1. Construction Change Directive contains a complete description of change in the Work. It<br />

also designates method to be followed to determine change in the Contract Sum or the<br />

Contract Time.<br />

J. Documentation: Maintain detailed records on a time and material basis of work required by the<br />

Construction Change Directive.<br />

1. After completion of change, submit an itemized account and supporting data necessary<br />

to substantiate cost and time adjustments to the Contract.<br />

CONTRACT MODIFICATION PROCEDURES 01 26 00 - 2/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

PART 2 - PRODUCTS (Not Used)<br />

PART 3 - EXECUTION (Not Used)<br />

END OF SECTION 01 26 00<br />

CONTRACT MODIFICATION PROCEDURES 01 26 00 - 3/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

This page intentionally left blank.<br />

CONTRACT MODIFICATION PROCEDURES 01 26 00 - 4/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 01 <strong>29</strong> 00 - PAYMENT PROCEDURES<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. This Section specifies administrative and procedural requirements necessary to prepare and<br />

process Applications for Payment.<br />

1.2 SCHEDULE OF VALUES<br />

A. Coordination: Coordinate preparation of the schedule of values with preparation of Contractor's<br />

construction schedule.<br />

1. Correlate line items in the schedule of values with other required administrative forms<br />

and schedules, including the following:<br />

a. Application for Payment forms with continuation sheets.<br />

b. Submittal schedule.<br />

c. Items required to be indicated as separate activities in Contractor's construction<br />

schedule.<br />

2. Submit the schedule of values to Architect at earliest possible date but no later than<br />

seven days before the date scheduled for submittal of initial Applications for Payment.<br />

3. Subschedules for Phased Work: Where the Work is separated into phases requiring<br />

separately phased payments, provide subschedules showing values correlated with each<br />

phase of payment.<br />

B. Format and Content: Use the Project Manual table of contents as a guide to establish line items<br />

for the schedule of values. Provide at least one line item for each Specification Section.<br />

1. Identification: Include the following Project identification on the schedule of values:<br />

a. Project name and location.<br />

b. Name of Architect.<br />

c. Architect's project number.<br />

d. Contractor's name and address.<br />

e. Date of submittal.<br />

2. Arrange schedule of values consistent with format of AIA Document G703.<br />

3. Provide a breakdown of the Contract Sum in enough detail to facilitate continued<br />

evaluation of Applications for Payment and progress reports. Coordinate with the Project<br />

Manual table of contents. Provide multiple line items for principal subcontract amounts in<br />

excess of five percent of Contract Sum.<br />

4. Round amounts to nearest whole dollar; total shall equal the Contract Sum.<br />

5. Provide a separate line item in the schedule of values for each part of the Work where<br />

Applications for Payment may include materials or equipment purchased or fabricated<br />

and stored, but not yet installed.<br />

6. Provide separate line items in the schedule of values for initial cost of materials, for each<br />

subsequent stage of completion, and for total installed value of that part of the Work.<br />

PAYMENT PROCEDURES 01 <strong>29</strong> 00 - 1/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

7. Allowances: Provide a separate line item in the schedule of values for each allowance.<br />

Show line-item value of unit-cost allowances, as a product of the unit cost, multiplied by<br />

measured quantity. Use information indicated in the Contract Documents to determine<br />

quantities.<br />

8. Each item in the schedule of values and Applications for Payment shall be complete.<br />

Include total cost and proportionate share of general overhead and profit for each item.<br />

a. Temporary facilities and other major cost items that are not direct cost of actual<br />

work-in-place may be shown either as separate line items in the schedule of<br />

values or distributed as general overhead expense, at Contractor's option.<br />

9. Schedule Updating: Update and resubmit the schedule of values before the next<br />

Applications for Payment when Change Orders or Construction Change Directives result<br />

in a change in the Contract Sum.<br />

1.3 APPLICATIONS FOR PAYMENT<br />

A. Each Application for Payment shall be consistent with previous applications and payments as<br />

certified by Architect and paid for by Owner.<br />

1. Initial Application for Payment, Application for Payment at time of Substantial Completion,<br />

and final Application for Payment involve additional requirements.<br />

B. Payment Application Times: The date for each progress payment is indicated in the Agreement<br />

between Owner and Contractor. The period of construction work covered by each Application<br />

for Payment is the period indicated in the Agreement.<br />

C. Payment Application Times: Progress payments shall be submitted to Architect by the 25th day<br />

of each month. The period covered by each Application for Payment is one month, ending on<br />

the last day of the month.<br />

D. Application for Payment Forms: Use AIA Document G702 and AIA Document G703 as form for<br />

Applications for Payment or Contractor’s computer print-out sheet with all required data from<br />

G702 and G703 and as approved by the Owner.<br />

E. Application Preparation: Complete every entry on form. Notarize and execute by a person<br />

authorized to sign legal documents on behalf of Contractor. Architect will return incomplete<br />

applications without action.<br />

1. Entries shall match data on the schedule of values and Contractor's construction<br />

schedule. Use updated schedules if revisions were made.<br />

2. Include amounts of Change Orders and Construction Change Directives issued before<br />

last day of construction period covered by application.<br />

F. Transmittal: Submit three signed and notarized original copies of each Application for Payment<br />

to Architect by a method ensuring receipt within 24 hours. One copy shall include waivers of<br />

lien and similar attachments if required.<br />

1. Transmit each copy with a transmittal form listing attachments and recording appropriate<br />

information about application.<br />

G. Waivers of Mechanic's Lien: With each Application for Payment, submit waivers of mechanic's<br />

lien from entities lawfully entitled to file a mechanic's lien arising out of the Contract and related<br />

to the Work covered by the payment.<br />

PAYMENT PROCEDURES 01 <strong>29</strong> 00 - 2/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

1. Submit partial waivers on each item for amount requested in previous application, after<br />

deduction for retainage, on each item.<br />

2. When an application shows completion of an item, submit conditional final or full waivers.<br />

3. Owner reserves the right to designate which entities involved in the Work must submit<br />

waivers.<br />

4. Waiver Forms: Submit waivers of lien on forms, executed in a manner acceptable to<br />

Owner.<br />

H. Initial Application for Payment: Administrative actions and submittals that must precede or<br />

coincide with submittal of first Application for Payment include the following:<br />

1. List of subcontractors.<br />

2. Schedule of values.<br />

3. Contractor's construction schedule (preliminary if not final).<br />

4. Schedule of unit prices.<br />

5. Submittal schedule (preliminary if not final).<br />

6. List of Contractor's staff assignments.<br />

7. List of Contractor's principal consultants.<br />

8. Copies of building permits.<br />

9. Copies of authorizations and licenses from authorities having jurisdiction for performance<br />

of the Work.<br />

10. Initial progress report.<br />

11. Report of preconstruction conference.<br />

12. Certificates of insurance and insurance policies.<br />

I. Application for Payment at Substantial Completion: After issuing the Certificate of Substantial<br />

Completion, submit an Application for Payment showing 100 percent completion for portion of<br />

the Work claimed as substantially complete.<br />

1. Include documentation supporting claim that the Work is substantially complete and a<br />

statement showing an accounting of changes to the Contract Sum.<br />

2. This application shall reflect Certificates of Partial Substantial Completion issued<br />

previously for Owner occupancy of designated portions of the Work.<br />

J. Final Payment Application: Submit final Application for Payment with releases and supporting<br />

documentation not previously submitted and accepted, including, but not limited, to the<br />

following:<br />

1. Evidence of completion of Project closeout requirements.<br />

2. Insurance certificates for products and completed operations where required and proof<br />

that taxes, fees, and similar obligations were paid.<br />

3. Updated final statement, accounting for final changes to the Contract Sum.<br />

4. AIA Document G706-1994, "Contractor's Affidavit of Payment of Debts and Claims."<br />

5. AIA Document G706A-1994, "Contractor's Affidavit of Release of Liens."<br />

6. AIA Document G707-1994, "Consent of Surety to Final Payment."<br />

7. Evidence that claims have been settled.<br />

8. Final meter readings for utilities, a measured record of stored fuel, and similar data as of<br />

date of Substantial Completion or when Owner took possession of and assumed<br />

responsibility for corresponding elements of the Work.<br />

9. Final liquidated damages settlement statement.<br />

PAYMENT PROCEDURES 01 <strong>29</strong> 00 - 3/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

PART 2 - PRODUCTS (Not Used)<br />

PART 3 - EXECUTION (Not Used)<br />

END OF SECTION 01 <strong>29</strong> 00<br />

PAYMENT PROCEDURES 01 <strong>29</strong> 00 - 4/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 01 31 00 - <strong>PROJECT</strong> MANAGEMENT AND COORDINATION<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section includes administrative provisions for coordinating construction operations on Project<br />

including, but not limited to, the following:<br />

1. Coordination drawings.<br />

2. Requests for Information (RFIs).<br />

3. Project meetings.<br />

B. Related Sections:<br />

1. Division 01 Section "Execution" for procedures for coordinating general installation and<br />

field-engineering services, including establishment of benchmarks and control points.<br />

1.2 DEFINITIONS<br />

A. RFI: Request from Owner, Architect, or Contractor seeking information from each other during<br />

construction.<br />

1.3 COORDINATION<br />

A. Coordination: Coordinate construction operations included in different Sections of the<br />

Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate<br />

construction operations, included in different Sections, that depend on each other for proper<br />

installation, connection, and operation.<br />

1. Schedule construction operations in sequence required to obtain the best results where<br />

installation of one part of the Work depends on installation of other components, before<br />

or after its own installation.<br />

2. Coordinate installation of different components to ensure maximum performance and<br />

accessibility for required maintenance, service, and repair.<br />

3. Make adequate provisions to accommodate items scheduled for later installation.<br />

B. Prepare memoranda for distribution to each party involved, outlining special procedures<br />

required for coordination. Include such items as required notices, reports, and list of attendees<br />

at meetings.<br />

1. Prepare similar memoranda for Owner and separate contractors if coordination of their<br />

Work is required.<br />

C. Administrative Procedures: Coordinate scheduling and timing of required administrative<br />

procedures with other construction activities to avoid conflicts and to ensure orderly progress of<br />

the Work. Such administrative activities include, but are not limited to, the following:<br />

1. Preparation of Contractor's construction schedule.<br />

2. Preparation of the schedule of values.<br />

<strong>PROJECT</strong> MANAGEMENT AND COORDINATION 01 31 00 - 1/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

3. Installation and removal of temporary facilities and controls.<br />

4. Delivery and processing of submittals.<br />

5. Progress meetings.<br />

6. Preinstallation conferences.<br />

7. Project closeout activities.<br />

8. Startup and adjustment of systems.<br />

9. Project closeout activities.<br />

1.4 COORDINATION DRAWINGS<br />

A. Coordination Drawings, General: Prepare coordination drawings in accordance with<br />

requirements in individual Sections, where installation is not completely shown on Shop<br />

Drawings, where limited space availability necessitates coordination, or if coordination is<br />

required to facilitate integration of products and materials fabricated or installed by more than<br />

one entity.<br />

1. Content: Project-specific information, drawn accurately to a scale large enough to<br />

indicate and resolve conflicts. Do not base coordination drawings on standard printed<br />

data. Include the following information, as applicable:<br />

a. Indicate functional and spatial relationships of components of architectural,<br />

structural, civil, mechanical, and electrical systems.<br />

b. Indicate dimensions shown on the Drawings. Specifically note dimensions that<br />

appear to be in conflict with submitted equipment and minimum clearance<br />

requirements. Provide alternate sketches to Architect indicating proposed<br />

resolution of such conflicts. Minor dimension changes and difficult installations will<br />

not be considered changes to the Contract.<br />

B. Coordination Drawing Organization: Organize coordination drawings as follows:<br />

1. Floor Plans and Reflected Ceiling Plans: Show architectural and structural elements, and<br />

mechanical, plumbing, fire protection, fire alarm, and electrical Work. Show locations of<br />

visible ceiling-mounted devices relative to acoustical ceiling grid.<br />

2. Plenum Space: Indicate subframing for support of ceiling and wall systems, mechanical<br />

and electrical equipment, and related Work. Locate components within ceiling plenum to<br />

accommodate layout of light fixtures indicated on Drawings.<br />

3. Mechanical Rooms: Provide coordination drawings for mechanical rooms showing plans<br />

and elevations of mechanical, plumbing, fire protection, fire alarm, and electrical<br />

equipment.<br />

4. Structural Penetrations: Indicate penetrations and openings required for all disciplines.<br />

5. Slab Edge and Embedded Items: Indicate slab edge locations and sizes and locations of<br />

embedded items for metal fabrications, sleeves, anchor bolts, bearing plates, angles,<br />

door floor closers, slab depressions for floor finishes, curbs and housekeeping pads, and<br />

similar items.<br />

6. Review: Architect will review coordination drawings to confirm that the Work is being<br />

coordinated, but not for the details of the coordination, which are the Contractor's<br />

responsibility.<br />

1.5 REQUESTS FOR INFORMATION (RFIs)<br />

A. General: Immediately on discovery of the need for additional information or interpretation of the<br />

Contract Documents, Contractor shall prepare and submit an RFI in the form specified.<br />

<strong>PROJECT</strong> MANAGEMENT AND COORDINATION 01 31 00 - 2/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

1. Architect will return RFIs submitted to Architect by other entities controlled by Contractor<br />

with no response.<br />

2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's<br />

work or work of subcontractors.<br />

B. Content of the RFI: Include a detailed, legible description of item needing information or<br />

interpretation and the following:<br />

1. Project name.<br />

2. Project number.<br />

3. Date.<br />

4. Name of Contractor.<br />

5. Name of Architect.<br />

6. RFI number, numbered sequentially.<br />

7. RFI subject.<br />

8. Specification Section number and title and related paragraphs, as appropriate.<br />

9. Drawing number and detail references, as appropriate.<br />

10. Field dimensions and conditions, as appropriate.<br />

11. Contractor's suggested resolution. If Contractor's solution(s) impacts the Contract Time<br />

or the Contract Sum, Contractor shall state impact in the RFI.<br />

12. Contractor's signature.<br />

13. Attachments: Include sketches, descriptions, measurements, photos, Product Data,<br />

Shop Drawings, coordination drawings, and other information necessary to fully describe<br />

items needing interpretation.<br />

C. RFI Forms: AIA Document G716.<br />

D. Architect's Action: Architect will review each RFI, determine action required, and respond.<br />

Allow seven working days for Architect's response for each RFI. RFIs received by Architect<br />

after 1:00 p.m. will be considered as received the following working day.<br />

1. The following RFIs will be returned without action:<br />

a. Requests for approval of submittals.<br />

b. Requests for approval of substitutions.<br />

c. Requests for coordination information already indicated in the Contract<br />

Documents.<br />

d. Requests for adjustments in the Contract Time or the Contract Sum.<br />

e. Requests for interpretation of Architect's actions on submittals.<br />

f. Incomplete RFIs or inaccurately prepared RFIs.<br />

2. Architect's action may include a request for additional information, in which case<br />

Architect's time for response will date from time of receipt of additional information.<br />

3. Architect's action on RFIs that may result in a change to the Contract Time or the<br />

Contract Sum may be eligible for Contractor to submit Change Proposal according to<br />

Division 01 Section "Contract Modification Procedures."<br />

a. If Contractor believes the RFI response warrants change in the Contract Time or<br />

the Contract Sum, notify Architect in writing within 10 days of receipt of the RFI<br />

response.<br />

E. On receipt of Architect's action, update the RFI log and immediately distribute the RFI response<br />

to affected parties. Review response and notify Architect within seven days if Contractor<br />

disagrees with response.<br />

<strong>PROJECT</strong> MANAGEMENT AND COORDINATION 01 31 00 - 3/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

F. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number.<br />

Submit log weekly. Use CSI Log Form 13.2B. Include the following:<br />

1. Project name.<br />

2. Name and address of Contractor.<br />

3. Name and address of Architect.<br />

4. RFI number including RFIs that were dropped and not submitted.<br />

5. RFI description.<br />

6. Date the RFI was submitted.<br />

7. Date Architect's response was received.<br />

8. Identification of related Minor Change in the Work, Construction Change Directive, and<br />

Proposal Request, as appropriate.<br />

9. Identification of related Field Order, Work Change Directive, and Proposal Request, as<br />

appropriate.<br />

1.6 <strong>PROJECT</strong> MEETINGS<br />

A. General: Schedule and conduct meetings and conferences at Project site, unless otherwise<br />

indicated.<br />

1. Attendees: Inform participants and others involved, and individuals whose presence is<br />

required, of date and time of each meeting. Notify Owner and Architect of scheduled<br />

meeting dates and times.<br />

2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees.<br />

3. Minutes: Entity responsible for conducting meeting will record significant discussions and<br />

agreements achieved. Distribute the meeting minutes to everyone concerned, including<br />

Owner and Architect, within three days of the meeting.<br />

B. Preconstruction Conference: Architect will schedule and conduct a preconstruction conference<br />

before starting construction, at a time convenient to Owner and Architect, but no later than 15<br />

days after execution of the Agreement.<br />

1. Attendees: Authorized representatives of Owner, Architect, and their consultants;<br />

Contractor and its superintendent; major subcontractors; suppliers; and other concerned<br />

parties shall attend the conference. Participants at the conference shall be familiar with<br />

Project and authorized to conclude matters relating to the Work.<br />

2. Agenda: Discuss items of significance that could affect progress, including the following:<br />

a. Tentative construction schedule.<br />

b. Phasing.<br />

c. Critical work sequencing and long-lead items.<br />

d. Designation of key personnel and their duties.<br />

e. Procedures for processing field decisions and Change Orders.<br />

f. Procedures for RFIs.<br />

g. Procedures for testing and inspecting.<br />

h. Procedures for processing Applications for Payment.<br />

i. Distribution of the Contract Documents.<br />

j. Submittal procedures.<br />

k. Sustainable design requirements.<br />

l. Preparation of record documents.<br />

m. Use of the premises and existing buildings.<br />

n. Work restrictions.<br />

o. Working hours.<br />

p. Owner's occupancy requirements.<br />

q. Responsibility for temporary facilities and controls.<br />

<strong>PROJECT</strong> MANAGEMENT AND COORDINATION 01 31 00 - 4/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

r. Procedures for moisture and mold control.<br />

s. Procedures for disruptions and shutdowns.<br />

t. Construction waste management and recycling.<br />

u. Parking availability.<br />

v. Office, work, and storage areas.<br />

w. Equipment deliveries and priorities.<br />

x. First aid.<br />

y. Security.<br />

z. Progress cleaning.<br />

3. Minutes: Entity responsible for conducting meeting will record and distribute meeting<br />

minutes.<br />

C. Preinstallation Conferences: Conduct a preinstallation conference at Project site before each<br />

construction activity that requires coordination with other construction.<br />

1. Attendees: Installer and representatives of manufacturers and fabricators involved in or<br />

affected by the installation and its coordination or integration with other materials and<br />

installations that have preceded or will follow, shall attend the meeting. Advise<br />

Architect of scheduled meeting dates.<br />

2. Agenda: Review progress of other construction activities and preparations for the<br />

particular activity under consideration, including requirements for the following:<br />

a. Contract Documents.<br />

b. Options.<br />

c. Related RFIs.<br />

d. Related Change Orders.<br />

e. Purchases.<br />

f. Deliveries.<br />

g. Submittals.<br />

h. Review of mockups.<br />

i. Possible conflicts.<br />

j. Compatibility problems.<br />

k. Time schedules.<br />

l. Weather limitations.<br />

m. Manufacturer's written recommendations.<br />

n. Warranty requirements.<br />

o. Compatibility of materials.<br />

p. Acceptability of substrates.<br />

q. Temporary facilities and controls.<br />

r. Space and access limitations.<br />

s. Regulations of authorities having jurisdiction.<br />

t. Testing and inspecting requirements.<br />

u. Installation procedures.<br />

v. Coordination with other work.<br />

w. Required performance results.<br />

x. Protection of adjacent work.<br />

y. Protection of construction and personnel.<br />

3. Record significant conference discussions, agreements, and disagreements, including<br />

required corrective measures and actions.<br />

4. Reporting: Distribute minutes of the meeting to each party present and to other parties<br />

requiring information.<br />

5. Do not proceed with installation if the conference cannot be successfully concluded.<br />

Initiate whatever actions are necessary to resolve impediments to performance of the<br />

Work and reconvene the conference at earliest feasible date.<br />

<strong>PROJECT</strong> MANAGEMENT AND COORDINATION 01 31 00 - 5/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

D. Progress Meetings: Conduct progress meetings at monthly intervals.<br />

1. Attendees: In addition to representatives of Owner and Architect, each contractor,<br />

subcontractor, supplier, and other entity concerned with current progress or involved in<br />

planning, coordination, or performance of future activities shall be represented at these<br />

meetings. All participants at the meeting shall be familiar with Project and authorized to<br />

conclude matters relating to the Work.<br />

2. Agenda: Review and correct or approve minutes of previous progress meeting. Review<br />

other items of significance that could affect progress. Include topics for discussion as<br />

appropriate to status of Project.<br />

a. Contractor's Construction Schedule: Review progress since the last meeting.<br />

Determine whether each activity is on time, ahead of schedule, or behind<br />

schedule, in relation to Contractor's construction schedule. Determine how<br />

construction behind schedule will be expedited; secure commitments from parties<br />

involved to do so. Discuss whether schedule revisions are required to ensure that<br />

current and subsequent activities will be completed within the Contract Time.<br />

1) Review schedule for next period.<br />

b. Review present and future needs of each entity present, including the following:<br />

1) Interface requirements.<br />

2) Sequence of operations.<br />

3) Status of submittals.<br />

4) Deliveries.<br />

5) Off-site fabrication.<br />

6) Access.<br />

7) Site utilization.<br />

8) Temporary facilities and controls.<br />

9) Progress cleaning.<br />

10) Quality and work standards.<br />

11) Status of correction of deficient items.<br />

12) Field observations.<br />

13) Status of RFIs.<br />

14) Status of proposal requests.<br />

15) Pending changes.<br />

16) Status of Change Orders.<br />

17) Pending claims and disputes.<br />

18) Documentation of information for payment requests.<br />

3. Minutes: Entity responsible for conducting the meeting will record and distribute the<br />

meeting minutes to each party present and to parties requiring information.<br />

a. Schedule Updating: Revise Contractor's construction schedule after each<br />

progress meeting where revisions to the schedule have been made or recognized.<br />

Issue revised schedule concurrently with the report of each meeting.<br />

<strong>PROJECT</strong> MANAGEMENT AND COORDINATION 01 31 00 - 6/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

PART 2 - PRODUCTS (Not Used)<br />

PART 3 - EXECUTION (Not Used)<br />

END OF SECTION 01 31 00<br />

<strong>PROJECT</strong> MANAGEMENT AND COORDINATION 01 31 00 - 7/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

This page intentionally left blank.<br />

<strong>PROJECT</strong> MANAGEMENT AND COORDINATION 01 31 00 - 8/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 01 32 00 - CONSTRUCTION PROGRESS DOCUMENTATION<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section includes administrative and procedural requirements for documenting the progress of<br />

construction during performance of the Work, including the following:<br />

1. Contractor's construction schedule.<br />

2. Daily construction reports.<br />

3. Field condition reports.<br />

1.2 INFORMATIONAL SUBMITTALS<br />

A. Format for Submittals: Submit required submittals in the following format:<br />

1. Two paper copies.<br />

B. Contractor's Construction Schedule: Initial schedule, of size required to display entire schedule<br />

for entire construction period.<br />

C. Daily Construction Reports: Submit at weekly intervals.<br />

D. Field Condition Reports: Submit at time of discovery of differing conditions.<br />

1.3 COORDINATION<br />

A. Coordinate preparation and processing of schedules and reports with performance of<br />

construction activities and with scheduling and reporting of separate contractors.<br />

B. Coordinate Contractor's construction schedule with the schedule of values, list of subcontracts,<br />

submittal schedule, progress reports, payment requests, and other required schedules and<br />

reports.<br />

1. Secure time commitments for performing critical elements of the Work from entities<br />

involved.<br />

2. Coordinate each construction activity in the network with other activities and schedule<br />

them in proper sequence.<br />

PART 2 - PRODUCTS<br />

2.1 CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL<br />

A. Time Frame: Extend schedule from date established for the Notice to Proceed to date of<br />

Substantial Completion.<br />

CONSTRUCTION PROGRESS DOCUMENTATION 01 32 00 - 1/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

1. Contract completion date shall not be changed by submission of a schedule that shows<br />

an early completion date, unless specifically authorized by Change Order.<br />

B. Activities: Treat each story or separate area as a separate numbered activity for each principal<br />

element of the Work. Comply with the following:<br />

1. Activity Duration: Define activities so no activity is longer than 20 days, unless<br />

specifically allowed by Architect.<br />

2. Procurement Activities: Include procurement process activities for the following long lead<br />

items and major items, requiring a cycle of more than 60 days, as separate activities in<br />

schedule. Procurement cycle activities include, but are not limited to, submittals,<br />

approvals, purchasing, fabrication, and delivery.<br />

3. Submittal Review Time: Include review and resubmittal times indicated in Division 01<br />

Section "Submittal Procedures" in schedule. Coordinate submittal review times in<br />

Contractor's construction schedule with submittal schedule.<br />

4. Startup and Testing Time: Include not less than 10 days for startup and testing.<br />

5. Substantial Completion: Indicate completion in advance of date established for<br />

Substantial Completion, and allow time for Architect's administrative procedures<br />

necessary for certification of Substantial Completion.<br />

6. Punch List and Final Completion: Include not more than 30 days for punch list and final<br />

completion.<br />

C. Recovery Schedule: When periodic update indicates the Work is 14 or more calendar days<br />

behind the current approved schedule, submit a separate recovery schedule indicating means<br />

by which Contractor intends to regain compliance with the schedule.<br />

2.2 CONTRACTOR'S CONSTRUCTION SCHEDULE (GANTT CHART)<br />

A. Gantt-Chart Schedule: Submit a comprehensive, fully developed, horizontal Gantt-chart-type,<br />

Contractor's construction schedule within 30 days of date established for the Notice to Proceed.<br />

B. Preparation: Indicate each significant construction activity separately. Identify first workday of<br />

each week with a continuous vertical line.<br />

1. For construction activities that require three months or longer to complete, indicate an<br />

estimated completion percentage in 10 percent increments within time bar.<br />

2.3 REPORTS<br />

A. Daily Construction Reports: Prepare a daily construction report recording the following<br />

information concerning events at Project site:<br />

1. List of subcontractors at Project site.<br />

2. List of separate contractors at Project site.<br />

3. Approximate count of personnel at Project site.<br />

4. Equipment at Project site.<br />

5. Material deliveries.<br />

6. High and low temperatures and general weather conditions, including presence of rain or<br />

snow.<br />

7. Accidents.<br />

8. Meetings and significant decisions.<br />

9. Unusual events.<br />

10. Stoppages, delays, shortages, and losses.<br />

CONSTRUCTION PROGRESS DOCUMENTATION 01 32 00 - 2/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

11. Meter readings and similar recordings.<br />

12. Emergency procedures.<br />

13. Orders and requests of authorities having jurisdiction.<br />

14. Change Orders received and implemented.<br />

15. Construction Change Directives received and implemented.<br />

16. Services connected and disconnected.<br />

17. Equipment or system tests and startups.<br />

18. Partial completions and occupancies.<br />

19. Substantial Completions authorized.<br />

B. Field Condition Reports: Immediately on discovery of a difference between field conditions and<br />

the Contract Documents, prepare and submit a detailed report. Submit with a Request for<br />

Information. Include a detailed description of the differing conditions, together with<br />

recommendations for changing the Contract Documents.<br />

PART 3 - EXECUTION<br />

3.1 CONTRACTOR'S CONSTRUCTION SCHEDULE<br />

A. Contractor's Construction Schedule Updating: At monthly intervals, update schedule to reflect<br />

actual construction progress and activities. Issue schedule at each regularly scheduled<br />

progress meeting.<br />

1. Revise schedule immediately after each meeting or other activity where revisions have<br />

been recognized or made. Issue updated schedule concurrently with the report of each<br />

such meeting.<br />

2. Include a report with updated schedule that indicates every change, including, but not<br />

limited to, changes in logic, durations, actual starts and finishes, and activity durations.<br />

3. As the Work progresses, indicate final completion percentage for each activity.<br />

B. Distribution: Distribute copies of approved schedule to Architect, Owner, separate contractors,<br />

testing and inspecting agencies, and other parties identified by Contractor with a need-to-know<br />

schedule responsibility.<br />

1. Post copies in Project meeting rooms and temporary field offices.<br />

2. When revisions are made, distribute updated schedules to the same parties and post in<br />

the same locations. Delete parties from distribution when they have completed their<br />

assigned portion of the Work and are no longer involved in performance of construction<br />

activities.<br />

END OF SECTION 01 32 00<br />

CONSTRUCTION PROGRESS DOCUMENTATION 01 32 00 - 3/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

This page intentionally left blank.<br />

CONSTRUCTION PROGRESS DOCUMENTATION 01 32 00 - 4/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

SECTION 01 33 00 - SUBMITTAL PROCEDURES<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section includes requirements for the submittal schedule and administrative and procedural<br />

requirements for submitting Shop Drawings, Product Data, Samples, and other submittals.<br />

B. Related Sections:<br />

1. Division 01 Section "Construction Progress Documentation" for submitting schedules and<br />

reports, including Contractor's construction schedule.<br />

2. Division 01 Section "Operation and Maintenance Data" for submitting operation and<br />

maintenance manuals.<br />

3. Division 01 Section "Project Record Documents" for submitting record Drawings, record<br />

Specifications, and record Product Data.<br />

1.2 DEFINITIONS<br />

A. Action Submittals: Written and graphic information and physical samples that require<br />

Architect's responsive action.<br />

B. Informational Submittals: Written and graphic information and physical samples that do not<br />

require Architect's responsive action. Submittals may be rejected for not complying with<br />

requirements.<br />

1.3 ACTION SUBMITTALS<br />

A. Submittal Schedule: Submit a schedule of submittals, arranged in chronological order by dates<br />

required by construction schedule. Include time required for review, ordering, manufacturing,<br />

fabrication, and delivery when establishing dates. Include additional time required for making<br />

corrections or modifications to submittals noted by the Architect and additional time for handling<br />

and reviewing submittals required by those corrections.<br />

1.4 SUBMITTAL ADMINISTRATIVE REQUIREMENTS<br />

A. Architect's Digital Data Files: Electronic copies of CAD Drawings of the Contract Drawings,<br />

floor plans and elevations only, will be provided upon request by Architect for Contractor's use<br />

in preparing submittals.<br />

1. Architect will furnish Contractor one set of digital data drawing files of the Contract<br />

Drawings upon request by Contractor for use in preparing Shop Drawings.<br />

a. Architect makes no representations as to the accuracy or completeness of digital<br />

data drawing files as they relate to the Contract Drawings.<br />

b. Contractor shall execute a data licensing agreement in the form of AIA Document<br />

C106, Digital Data Licensing Agreement.<br />

SUBMITTAL PROCEDURES 01 33 00 - 1/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

B. Coordination: Coordinate preparation and processing of submittals with performance of<br />

construction activities.<br />

1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals,<br />

and related activities that require sequential activity.<br />

2. Coordinate transmittal of different types of submittals for related parts of the Work so<br />

processing will not be delayed because of need to review submittals concurrently for<br />

coordination.<br />

a. Architect reserves the right to withhold action on a submittal requiring coordination<br />

with other submittals until related submittals are received.<br />

C. Processing Time: Allow time for submittal review, including time for resubmittals, as follows.<br />

Time for review shall commence on Architect's receipt of submittal. No extension of the<br />

Contract Time will be authorized because of failure to transmit submittals enough in advance of<br />

the Work to permit processing, including resubmittals.<br />

1. Initial Review: Allow 15 days for initial review of each submittal. Allow additional time if<br />

coordination with subsequent submittals is required. Architect will advise Contractor<br />

when a submittal being processed must be delayed for coordination.<br />

2. Intermediate Review: If intermediate submittal is necessary, process it in same manner<br />

as initial submittal.<br />

3. Resubmittal Review: Allow 15 days for review of each resubmittal.<br />

D. Identification and Information: Place a permanent label or title block on each paper copy<br />

submittal item for identification.<br />

1. Indicate name of firm or entity that prepared each submittal on label or title block.<br />

2. Provide a space approximately 150 by 200 mm (6 by 8 inches) on label or beside title<br />

block to record Contractor's review and approval markings and action taken by Architect.<br />

3. Include the following information for processing and recording action taken:<br />

a. Project name.<br />

b. Date.<br />

c. Name of Architect.<br />

d. Name of Construction Manager.<br />

e. Name of Contractor.<br />

f. Name of subcontractor.<br />

g. Name of supplier.<br />

h. Name of manufacturer.<br />

i. Submittal number or other unique identifier, including revision identifier.<br />

1) Submittal number shall use Specification Section number followed by a<br />

decimal point and then a sequential number (e.g., 061000.01).<br />

Resubmittals shall include an alphabetic suffix after another decimal point<br />

(e.g., 061000.01.A).<br />

j. Number and title of appropriate Specification Section.<br />

k. Drawing number and detail references, as appropriate.<br />

l. Location(s) where product is to be installed, as appropriate.<br />

m. Other necessary identification.<br />

E. Identification and Information: Identify and incorporate information in each electronic submittal<br />

file as follows:<br />

SUBMITTAL PROCEDURES 01 33 00 - 2/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

1. Assemble complete submittal package into a single indexed file with links enabling<br />

navigation to each item.<br />

2. Name file with submittal number or other unique identifier, including revision identifier.<br />

a. File name shall use project identifier and Specification Section number followed by<br />

a decimal point and then a sequential number (e.g., LNHS-061000.01).<br />

Resubmittals shall include an alphabetic suffix after another decimal point (e.g.,<br />

LNHS-061000.01.A).<br />

3. Provide means for insertion to permanently record Contractor's review and approval<br />

markings and action taken by Architect.<br />

4. Include the following information on an inserted cover sheet:<br />

a. Project name.<br />

b. Date.<br />

c. Name and address of Architect.<br />

d. Name of Construction Manager.<br />

e. Name of Contractor.<br />

f. Name of firm or entity that prepared submittal.<br />

g. Name of subcontractor.<br />

h. Name of supplier.<br />

i. Name of manufacturer.<br />

j. Number and title of appropriate Specification Section.<br />

k. Drawing number and detail references, as appropriate.<br />

l. Location(s) where product is to be installed, as appropriate.<br />

m. Related physical samples submitted directly.<br />

n. Other necessary identification.<br />

F. Options: Identify options requiring selection by the Architect.<br />

G. Deviations: Identify deviations from the Contract Documents on submittals.<br />

H. Additional Paper Copies: Unless additional copies are required for final submittal, and unless<br />

Architect observes noncompliance with provisions in the Contract Documents, initial submittal<br />

may serve as final submittal.<br />

1. Submit one copy of submittal to concurrent reviewer in addition to specified number of<br />

copies to Architect.<br />

I. Transmittal: Assemble each submittal individually and appropriately for transmittal and<br />

handling. Transmit each submittal using a transmittal form. Architect will discard submittals<br />

received from sources other than Contractor.<br />

1. Transmittal Form: Use AIA Document G810.<br />

2. On an attached separate sheet, prepared on Contractor's letterhead, record relevant<br />

information, requests for data, revisions other than those requested by Architect on<br />

previous submittals, and deviations from requirements in the Contract Documents,<br />

including minor variations and limitations. Include same identification information as<br />

related submittal.<br />

J. Resubmittals: Make resubmittals in same form and number of copies as initial submittal.<br />

1. Note date and content of previous submittal.<br />

2. Note date and content of revision in label or title block and clearly indicate extent of<br />

revision.<br />

SUBMITTAL PROCEDURES 01 33 00 - 3/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

3. Resubmit submittals until they are marked with approval notation from Architect's action<br />

stamp.<br />

K. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers,<br />

fabricators, installers, authorities having jurisdiction, and others as necessary for performance of<br />

construction activities. Show distribution on transmittal forms.<br />

L. Use for Construction: Use only final submittals that are marked with approval notation from<br />

Architect's action stamp.<br />

PART 2 - PRODUCTS<br />

2.1 SUBMITTAL PROCEDURES<br />

A. General Submittal Procedure Requirements:<br />

1. Action Submittals: Submit three paper copies of each submittal, unless otherwise<br />

indicated. Architect will return two copies.<br />

2. Informational Submittals: Submit two paper copies of each submittal, unless otherwise<br />

indicated. Architect will not return copies.<br />

3. Closeout Submittals and Maintenance Material Submittals: Comply with requirements<br />

specified in Division 01 Section "Closeout Procedures."<br />

4. Certificates and Certifications Submittals: Provide a statement that includes signature of<br />

entity responsible for preparing certification. Certificates and certifications shall be<br />

signed by an officer or other individual authorized to sign documents on behalf of that<br />

entity.<br />

a. Provide a digital signature with digital certificate on electronically-submitted<br />

certificates and certifications where indicated.<br />

b. Provide a notarized statement on original paper copy certificates and certifications<br />

where indicated.<br />

5. Test and Inspection Reports Submittals: Comply with requirements specified in<br />

Division 01 Section "Quality Requirements."<br />

B. Product Data: Collect information into a single submittal for each element of construction and<br />

type of product or equipment.<br />

1. If information must be specially prepared for submittal because standard published data<br />

are not suitable for use, submit as Shop Drawings, not as Product Data.<br />

2. Mark each copy of each submittal to show which products and options are applicable.<br />

3. Include the following information, as applicable:<br />

a. Manufacturer's catalog cuts.<br />

b. Manufacturer's product specifications.<br />

c. Standard color charts.<br />

d. Statement of compliance with specified referenced standards.<br />

e. Testing by recognized testing agency.<br />

f. Application of testing agency labels and seals.<br />

g. Notation of coordination requirements.<br />

h. Availability and delivery time information.<br />

4. For equipment, include the following in addition to the above, as applicable:<br />

SUBMITTAL PROCEDURES 01 33 00 - 4/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

a. Wiring diagrams showing factory-installed wiring.<br />

b. Printed performance curves.<br />

c. Operational range diagrams.<br />

d. Clearances required to other construction, if not indicated on accompanying Shop<br />

Drawings.<br />

5. Submit Product Data before or concurrent with Samples.<br />

6. Submit Product Data in the following format:<br />

a. Three paper copies of Product Data, unless otherwise indicated. Architect will<br />

return two copies.<br />

C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base<br />

Shop Drawings on reproductions of the Contract Documents or standard printed data, unless<br />

submittal based upon Architect's digital data drawing files is otherwise permitted.<br />

1. Preparation: Fully illustrate requirements in the Contract Documents. Include the<br />

following information, as applicable:<br />

a. Identification of products.<br />

b. Schedules.<br />

c. Compliance with specified standards.<br />

d. Notation of coordination requirements.<br />

e. Notation of dimensions established by field measurement.<br />

f. Relationship and attachment to adjoining construction clearly indicated.<br />

g. Seal and signature of professional engineer if specified.<br />

2. Sheet Size: Except for templates, patterns, and similar full-size drawings, submit Shop<br />

Drawings on sheets at least 215 by 280 mm (8-1/2 by 11 inches) but no larger than 600<br />

by 900 mm (24 by 36 inches) .<br />

3. Submit Shop Drawings in the following format:<br />

a. Two opaque (bond) copies of each submittal. Architect will return one copy.<br />

D. Samples: Submit Samples for review of kind, color, pattern, and texture for a check of these<br />

characteristics with other elements and for a comparison of these characteristics between<br />

submittal and actual component as delivered and installed.<br />

1. Transmit Samples that contain multiple, related components such as accessories<br />

together in one submittal package.<br />

2. Identification: Attach label on unexposed side of Samples that includes the following:<br />

a. Generic description of Sample.<br />

b. Product name and name of manufacturer.<br />

c. Sample source.<br />

d. Number and title of applicable Specification Section.<br />

3. Disposition: Maintain sets of approved Samples at Project site, available for qualitycontrol<br />

comparisons throughout the course of construction activity. Sample sets may be<br />

used to determine final acceptance of construction associated with each set.<br />

a. Samples that may be incorporated into the Work are indicated in individual<br />

Specification Sections. Such Samples must be in an undamaged condition at time<br />

of use.<br />

SUBMITTAL PROCEDURES 01 33 00 - 5/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

b. Samples not incorporated into the Work, or otherwise designated as Owner's<br />

property, are the property of Contractor.<br />

4. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or<br />

sections of units showing the full range of colors, textures, and patterns available.<br />

a. Number of Samples: Submit one full set(s) of available choices where color,<br />

pattern, texture, or similar characteristics are required to be selected from<br />

manufacturer's product line. Architect will return submittal with options selected.<br />

5. Samples for Verification: Submit full-size units or Samples of size indicated, prepared<br />

from same material to be used for the Work, cured and finished in manner specified, and<br />

physically identical with material or product proposed for use, and that show full range of<br />

color and texture variations expected. Samples include, but are not limited to, the<br />

following: partial sections of manufactured or fabricated components; small cuts or<br />

containers of materials; complete units of repetitively used materials; swatches showing<br />

color, texture, and pattern; color range sets; and components used for independent<br />

testing and inspection.<br />

a. Number of Samples: Submit two sets of Samples. Architect will retain one<br />

Sample sets; remainder will be returned.<br />

1) If variation in color, pattern, texture, or other characteristic is inherent in<br />

material or product represented by a Sample, submit at least three sets of<br />

paired units that show approximate limits of variations.<br />

E. Contractor's Construction Schedule: Comply with requirements specified in Division 01 Section<br />

"Construction Progress Documentation."<br />

F. Application for Payment: Comply with requirements specified in Division 01 Section "Payment<br />

Procedures."<br />

G. Schedule of Values: Comply with requirements specified in Division 01 Section "Payment<br />

Procedures."<br />

H. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each<br />

portion of the Work, including those who are to furnish products or equipment fabricated to a<br />

special design. Use CSI Form 1.5A.<br />

1. Submit subcontract list in the following format:<br />

a. Number of Copies: Two paper copies of subcontractor list, unless otherwise<br />

indicated. Architect will return one copy.<br />

I. Coordination Drawings: Comply with requirements specified in Division 01 Section "Project<br />

Management and Coordination."<br />

J. Qualification Data: Prepare written information that demonstrates capabilities and experience of<br />

firm or person. Include lists of completed projects with project names and addresses, contact<br />

information of architects and owners, and other information specified.<br />

K. Welding Certificates: Prepare written certification that welding procedures and personnel<br />

comply with requirements in the Contract Documents. Submit record of Welding Procedure<br />

Specification and Procedure Qualification Record on American Welding Society (AWS) forms.<br />

Include names of firms and personnel certified.<br />

SUBMITTAL PROCEDURES 01 33 00 - 6/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

L. Installer Certificates: Submit written statements on manufacturer's letterhead certifying that<br />

Installer complies with requirements in the Contract Documents and, where required, is<br />

authorized by manufacturer for this specific Project.<br />

M. Manufacturer Certificates: Submit written statements on manufacturer's letterhead certifying<br />

that manufacturer complies with requirements in the Contract Documents. Include evidence of<br />

manufacturing experience where required.<br />

N. Product Certificates: Submit written statements on manufacturer's letterhead certifying that<br />

product complies with requirements in the Contract Documents.<br />

O. Material Certificates: Submit written statements on manufacturer's letterhead certifying that<br />

material complies with requirements in the Contract Documents.<br />

P. Material Test Reports: Submit reports written by a qualified testing agency, on testing agency's<br />

standard form, indicating and interpreting test results of material for compliance with<br />

requirements in the Contract Documents.<br />

Q. Product Test Reports: Submit written reports indicating current product produced by<br />

manufacturer complies with requirements in the Contract Documents. Base reports on<br />

evaluation of tests performed by manufacturer and witnessed by a qualified testing agency, or<br />

on comprehensive tests performed by a qualified testing agency.<br />

R. Research Reports: Submit written evidence, from a model code organization acceptable to<br />

authorities having jurisdiction, that product complies with building code in effect for Project.<br />

S. Schedule of Tests and Inspections: Comply with requirements specified in Division 01 Section<br />

"Quality Requirements."<br />

T. Field Test Reports: Submit reports indicating and interpreting results of field tests performed<br />

either during installation of product or after product is installed in its final location, for<br />

compliance with requirements in the Contract Documents.<br />

U. Maintenance Data: Comply with requirements specified in Division 01 Section "Operation and<br />

Maintenance Data."<br />

V. Design Data: Prepare and submit written and graphic information, including, but not limited to,<br />

performance and design criteria, list of applicable codes and regulations, and calculations.<br />

Include list of assumptions and other performance and design criteria and a summary of loads.<br />

Include load diagrams if applicable. Provide name and version of software, if any, used for<br />

calculations. Include page numbers.<br />

2.2 DELEGATED-DESIGN SERVICES<br />

A. Performance and Design Criteria: Where professional design services or certifications by a<br />

design professional are specifically required of Contractor by the Contract Documents, provide<br />

products and systems complying with specific performance and design criteria indicated.<br />

1. If criteria indicated are not sufficient to perform services or certification required, submit a<br />

written request for additional information to Architect.<br />

B. Delegated-Design Services Certification: In addition to Shop Drawings, Product Data, and other<br />

required submittals, submit three paper copies of certificate, signed and sealed by the<br />

SUBMITTAL PROCEDURES 01 33 00 - 7/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

responsible design professional, for each product and system specifically assigned to<br />

Contractor to be designed or certified by a design professional.<br />

1. Indicate that products and systems comply with performance and design criteria in the<br />

Contract Documents. Include list of codes, loads, and other factors used in performing<br />

these services.<br />

PART 3 - EXECUTION<br />

3.1 CONTRACTOR'S REVIEW<br />

A. Action and Informational Submittals: Review each submittal and check for coordination with<br />

other Work of the Contract and for compliance with the Contract Documents. Note corrections<br />

and field dimensions. Mark with approval stamp before submitting to Architect.<br />

B. Project Closeout and Maintenance/Material Submittals: Refer to requirements in Division 01<br />

Section "Closeout Procedures."<br />

C. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name<br />

and location, submittal number, Specification Section title and number, name of reviewer, date<br />

of Contractor's approval, and statement certifying that submittal has been reviewed, checked,<br />

and approved for compliance with the Contract Documents.<br />

3.2 ARCHITECT'S ACTION<br />

A. General: Architect will not review submittals that do not bear Contractor's approval stamp and<br />

will return them without action.<br />

B. Action Submittals: Architect will review each submittal, make marks to indicate corrections or<br />

modifications required, and return it. Architect will stamp each submittal with an action stamp<br />

and will mark stamp appropriately to indicate action.<br />

C. Informational Submittals: Architect will review each submittal and will not return it, or will return<br />

it if it does not comply with requirements. Architect will forward each submittal to appropriate<br />

party.<br />

D. Incomplete submittals are not acceptable, will be considered nonresponsive, and will be<br />

returned without review.<br />

E. Submittals not required by the Contract Documents may not be reviewed and may be<br />

discarded.<br />

END OF SECTION 01 33 00<br />

SUBMITTAL PROCEDURES 01 33 00 - 8/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 01 40 00 - QUALITY REQUIREMENTS<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section includes administrative and procedural requirements for quality assurance and quality<br />

control.<br />

B. Testing and inspecting services are required to verify compliance with requirements specified or<br />

indicated. These services do not relieve Contractor of responsibility for compliance with the<br />

Contract Document requirements.<br />

1. Specified tests, inspections, and related actions do not limit Contractor's other qualityassurance<br />

and -control procedures that facilitate compliance with the Contract Document<br />

requirements.<br />

2. Requirements for Contractor to provide quality-assurance and -control services required<br />

by Architect, Owner, or authorities having jurisdiction are not limited by provisions of this<br />

Section.<br />

C. Related Sections:<br />

1. Divisions 02 through 49 Sections for specific test and inspection requirements.<br />

1.2 DEFINITIONS<br />

A. Quality-Assurance Services: Activities, actions, and procedures performed before and during<br />

execution of the Work to guard against defects and deficiencies and substantiate that proposed<br />

construction will comply with requirements.<br />

B. Quality-Control Services: Tests, inspections, procedures, and related actions during and after<br />

execution of the Work to evaluate that actual products incorporated into the Work and<br />

completed construction comply with requirements. Services do not include contract<br />

enforcement activities performed by Architect.<br />

C. Mockups: Full size physical assemblies that are constructed on-site. Mockups are constructed<br />

to verify selections made under sample submittals; to demonstrate aesthetic effects and, where<br />

indicated, qualities of materials and execution; to review coordination, testing, or operation; to<br />

show interface between dissimilar materials; and to demonstrate compliance with specified<br />

installation tolerances. Mockups are not Samples. Unless otherwise indicated, approved<br />

mockups establish the standard by which the Work will be judged.<br />

1. Laboratory Mockups: Full-size, physical assemblies constructed at testing facility to<br />

verify performance characteristics.<br />

D. Preconstruction Testing: Tests and inspections performed specifically for the Project before<br />

products and materials are incorporated into the Work to verify performance or compliance with<br />

specified criteria.<br />

E. Product Testing: Tests and inspections that are performed by an NRTL, an NVLAP, or a testing<br />

agency qualified to conduct product testing and acceptable to authorities having jurisdiction, to<br />

establish product performance and compliance with specified requirements.<br />

QUALITY REQUIREMENTS 01 40 00 - 1/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

F. Source Quality-Control Testing: Tests and inspections that are performed at the source, i.e.,<br />

plant, mill, factory, or shop.<br />

G. Field Quality-Control Testing: Tests and inspections that are performed on-site for installation<br />

of the Work and for completed Work.<br />

H. Testing Agency: An entity engaged to perform specific tests, inspections, or both. Testing<br />

laboratory shall mean the same as testing agency.<br />

I. Installer/Applicator/Erector: Contractor or another entity engaged by Contractor as an<br />

employee, Subcontractor, or Sub-subcontractor, to perform a particular construction operation,<br />

including installation, erection, application, and similar operations.<br />

1. Use of trade-specific terminology in referring to a trade or entity does not require that<br />

certain construction activities be performed by accredited or unionized individuals, or that<br />

requirements specified apply exclusively to specific trade or trades.<br />

J. Experienced: When used with an entity or individual, "experienced" means having successfully<br />

completed a minimum of five previous projects similar in nature, size, and extent to this Project;<br />

being familiar with special requirements indicated; and having complied with requirements of<br />

authorities having jurisdiction.<br />

1.3 CONFLICTING REQUIREMENTS<br />

A. Referenced Standards: If compliance with two or more standards is specified and the<br />

standards establish different or conflicting requirements for minimum quantities or quality levels,<br />

comply with the most stringent requirement. Refer conflicting requirements that are different,<br />

but apparently equal, to Architect for a decision before proceeding.<br />

B. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be<br />

the minimum provided or performed. The actual installation may comply exactly with the<br />

minimum quantity or quality specified, or it may exceed the minimum within reasonable limits.<br />

To comply with these requirements, indicated numeric values are minimum or maximum, as<br />

appropriate, for the context of requirements. Refer uncertainties to Architect for a decision<br />

before proceeding.<br />

1.4 INFORMATIONAL SUBMITTALS<br />

A. Contractor's Statement of Responsibility: When required by authorities having jurisdiction,<br />

submit copy of written statement of responsibility sent to authorities having jurisdiction before<br />

starting work on the following systems.<br />

1. Main wind-force resisting system or a wind-resisting component listed in the wind-forceresisting<br />

system quality assurance plan prepared by the Architect.<br />

B. Testing Agency Qualifications: For testing agencies specified in "Quality Assurance" Article to<br />

demonstrate their capabilities and experience. Include proof of qualifications in the form of a<br />

recent report on the inspection of the testing agency by a recognized authority.<br />

1.5 REPORTS AND DOCUMENTS<br />

A. Test and Inspection Reports: Prepare and submit certified written reports specified in other<br />

Sections. Include the following:<br />

QUALITY REQUIREMENTS 01 40 00 - 2/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

1. Date of issue.<br />

2. Project title and number.<br />

3. Name, address, and telephone number of testing agency.<br />

4. Dates and locations of samples and tests or inspections.<br />

5. Names of individuals making tests and inspections.<br />

6. Description of the Work and test and inspection method.<br />

7. Identification of product and Specification Section.<br />

8. Complete test or inspection data.<br />

9. Test and inspection results and an interpretation of test results.<br />

10. Record of temperature and weather conditions at time of sample taking and testing and<br />

inspecting.<br />

11. Comments or professional opinion on whether tested or inspected Work complies with<br />

the Contract Document requirements.<br />

12. Name and signature of laboratory inspector.<br />

13. Recommendations on retesting and reinspecting.<br />

B. Manufacturer's Field Reports: Prepare written information documenting tests and inspections<br />

specified in other Sections. Include the following:<br />

1. Name, address, and telephone number of representative making report.<br />

2. Statement on condition of substrates and their acceptability for installation of product.<br />

3. Summary of installation procedures being followed, whether they comply with<br />

requirements and, if not, what corrective action was taken.<br />

4. Results of operational and other tests and a statement of whether observed performance<br />

complies with requirements.<br />

5. Other required items indicated in individual Specification Sections.<br />

C. Permits, Licenses, and Certificates: For Owner's records, submit copies of permits, licenses,<br />

certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee<br />

payments, judgments, correspondence, records, and similar documents, established for<br />

compliance with standards and regulations bearing on performance of the Work.<br />

1.6 QUALITY ASSURANCE<br />

A. General: Qualifications paragraphs in this article establish the minimum qualification levels<br />

required; individual Specification Sections specify additional requirements.<br />

B. Manufacturer Qualifications: A firm experienced in manufacturing products or systems similar<br />

to those indicated for this Project and with a record of successful in-service performance, as<br />

well as sufficient production capacity to produce required units.<br />

C. Fabricator Qualifications: A firm experienced in producing products similar to those indicated<br />

for this Project and with a record of successful in-service performance, as well as sufficient<br />

production capacity to produce required units.<br />

D. Installer Qualifications: A firm or individual experienced in installing, erecting, or assembling<br />

work similar in material, design, and extent to that indicated for this Project, whose work has<br />

resulted in construction with a record of successful in-service performance.<br />

E. Professional Engineer Qualifications: A professional engineer who is legally qualified to<br />

practice in jurisdiction where Project is located and who is experienced in providing engineering<br />

services of the kind indicated. Engineering services are defined as those performed for<br />

installations of the system, assembly, or product that are similar to those indicated for this<br />

Project in material, design, and extent.<br />

QUALITY REQUIREMENTS 01 40 00 - 3/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

F. Specialists: Certain Specification Sections require that specific construction activities shall be<br />

performed by entities who are recognized experts in those operations. Specialists shall satisfy<br />

qualification requirements indicated and shall be engaged for the activities indicated.<br />

1. Requirements of authorities having jurisdiction shall supersede requirements for<br />

specialists.<br />

G. Testing Agency Qualifications: An NRTL, an NVLAP, or an independent agency with the<br />

experience and capability to conduct testing and inspecting indicated, as documented according<br />

to ASTM E 3<strong>29</strong>; and with additional qualifications specified in individual Sections; and where<br />

required by authorities having jurisdiction, that is acceptable to authorities.<br />

1. NRTL: A nationally recognized testing laboratory according to <strong>29</strong> CFR 1910.7.<br />

2. NVLAP: A testing agency accredited according to NIST's National Voluntary Laboratory<br />

Accreditation Program.<br />

H. Manufacturer's Representative Qualifications: An authorized representative of manufacturer<br />

who is trained and approved by manufacturer to observe and inspect installation of<br />

manufacturer's products that are similar in material, design, and extent to those indicated for<br />

this Project.<br />

I. Preconstruction Testing: Where testing agency is indicated to perform preconstruction testing<br />

for compliance with specified requirements for performance and test methods, comply with the<br />

following:<br />

1. Contractor responsibilities include the following:<br />

a. Provide test specimens representative of proposed products and construction.<br />

b. Submit specimens in a timely manner with sufficient time for testing and analyzing<br />

results to prevent delaying the Work.<br />

c. Build laboratory mockups at testing facility using personnel, products, and methods<br />

of construction indicated for the completed Work.<br />

d. When testing is complete, remove test specimens, assemblies, mockups; do not<br />

reuse products on Project.<br />

2. Testing Agency Responsibilities: Submit a certified written report of each test, inspection,<br />

and similar quality-assurance service to Architect, with copy to Contractor. Interpret tests<br />

and inspections and state in each report whether tested and inspected work complies<br />

with or deviates from the Contract Documents.<br />

J. Mockups: Before installing portions of the Work requiring mockups, build mockups for each<br />

form of construction and finish required to comply with the following requirements, using<br />

materials indicated for the completed Work:<br />

1. Build mockups in location and of size indicated or, if not indicated, as directed by<br />

Architect.<br />

2. Notify Architect seven days in advance of dates and times when mockups will be<br />

constructed.<br />

3. Demonstrate the proposed range of aesthetic effects and workmanship.<br />

4. Obtain Architect's approval of mockups before starting work, fabrication, or construction.<br />

a. Allow seven days for initial review and each re-review of each mockup.<br />

5. Maintain mockups during construction in an undisturbed condition as a standard for<br />

judging the completed Work.<br />

6. Demolish and remove mockups when directed, unless otherwise indicated.<br />

QUALITY REQUIREMENTS 01 40 00 - 4/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

1.7 QUALITY CONTROL<br />

A. Owner Responsibilities: Where quality-control services are indicated as Owner's responsibility,<br />

Owner will engage a qualified testing agency to perform these services.<br />

1. Owner will furnish Contractor with names, addresses, and telephone numbers of testing<br />

agencies engaged and a description of types of testing and inspecting they are engaged<br />

to perform.<br />

2. Costs for retesting and reinspecting construction that replaces or is necessitated by work<br />

that failed to comply with the Contract Documents will be charged to Contractor, and the<br />

Contract Sum will be adjusted by Change Order.<br />

B. Contractor Responsibilities: Tests and inspections not explicitly assigned to Owner are<br />

Contractor's responsibility. Perform additional quality-control activities required to verify that the<br />

Work complies with requirements, whether specified or not.<br />

1. Where services are indicated as Contractor's responsibility, engage a qualified testing<br />

agency to perform these quality-control services.<br />

a. Contractor shall not employ same entity engaged by Owner, unless agreed to in<br />

writing by Owner.<br />

2. Notify testing agencies at least 24 hours in advance of time when Work that requires<br />

testing or inspecting will be performed.<br />

3. Where quality-control services are indicated as Contractor's responsibility, submit a<br />

certified written report, in duplicate, of each quality-control service.<br />

4. Testing and inspecting requested by Contractor and not required by the Contract<br />

Documents are Contractor's responsibility.<br />

5. Submit additional copies of each written report directly to authorities having jurisdiction,<br />

when they so direct.<br />

C. Manufacturer's Field Services: Where indicated, engage a manufacturer's representative to<br />

observe and inspect the Work. Manufacturer's representative's services include examination of<br />

substrates and conditions, verification of materials, inspection of completed portions of the<br />

Work, and submittal of written reports.<br />

D. Retesting/Reinspecting: Regardless of whether original tests or inspections were Contractor's<br />

responsibility, provide quality-control services, including retesting and reinspecting, for<br />

construction that replaced Work that failed to comply with the Contract Documents.<br />

E. Testing Agency Responsibilities: Cooperate with Architect and Contractor in performance of<br />

duties. Provide qualified personnel to perform required tests and inspections.<br />

1. Notify Architect and Contractor promptly of irregularities or deficiencies observed in the<br />

Work during performance of its services.<br />

2. Determine the location from which test samples will be taken and in which in-situ tests<br />

are conducted.<br />

3. Conduct and interpret tests and inspections and state in each report whether tested and<br />

inspected work complies with or deviates from requirements.<br />

4. Submit a certified written report, in duplicate, of each test, inspection, and similar qualitycontrol<br />

service through Contractor.<br />

5. Do not release, revoke, alter, or increase the Contract Document requirements or<br />

approve or accept any portion of the Work.<br />

6. Do not perform any duties of Contractor.<br />

QUALITY REQUIREMENTS 01 40 00 - 5/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

F. Associated Services: Cooperate with agencies performing required tests, inspections, and<br />

similar quality-control services, and provide reasonable auxiliary services as requested. Notify<br />

agency sufficiently in advance of operations to permit assignment of personnel. Provide the<br />

following:<br />

1. Access to the Work.<br />

2. Incidental labor and facilities necessary to facilitate tests and inspections.<br />

3. Adequate quantities of representative samples of materials that require testing and<br />

inspecting. Assist agency in obtaining samples.<br />

4. Facilities for storage and field curing of test samples.<br />

5. Delivery of samples to testing agencies.<br />

6. Preliminary design mix proposed for use for material mixes that require control by testing<br />

agency.<br />

7. Security and protection for samples and for testing and inspecting equipment at Project<br />

site.<br />

G. Coordination: Coordinate sequence of activities to accommodate required quality-assurance<br />

and -control services with a minimum of delay and to avoid necessity of removing and replacing<br />

construction to accommodate testing and inspecting.<br />

1. Schedule times for tests, inspections, obtaining samples, and similar activities.<br />

PART 2 - PRODUCTS (Not Used)<br />

PART 3 - EXECUTION<br />

3.1 REPAIR AND PROTECTION<br />

A. General: On completion of testing, inspecting, sample taking, and similar services, repair<br />

damaged construction and restore substrates and finishes.<br />

1. Provide materials and comply with installation requirements specified in other<br />

Specification Sections or matching existing substrates and finishes. Restore patched<br />

areas and extend restoration into adjoining areas with durable seams that are as invisible<br />

as possible. Comply with the Contract Document requirements for cutting and patching<br />

in Division 01 Section "Execution."<br />

B. Protect construction exposed by or for quality-control service activities.<br />

C. Repair and protection are Contractor's responsibility, regardless of the assignment of<br />

responsibility for quality-control services.<br />

END OF SECTION 01 40 00<br />

QUALITY REQUIREMENTS 01 40 00 - 6/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 01 42 00 - REFERENCES<br />

PART 1 - GENERAL<br />

1.1 DEFINITIONS<br />

A. General: Basic Contract definitions are included in the Conditions of the Contract.<br />

B. "Approved": When used to convey Architect's action on Contractor's submittals, applications,<br />

and requests, "approved" is limited to Architect's duties and responsibilities as stated in the<br />

Conditions of the Contract.<br />

C. "Directed": A command or instruction by Architect. Other terms including "requested,"<br />

"authorized," "selected," "required," and "permitted" have the same meaning as "directed."<br />

D. "Indicated": Requirements expressed by graphic representations or in written form on<br />

Drawings, in Specifications, and in other Contract Documents. Other terms including "shown,"<br />

"noted," "scheduled," and "specified" have the same meaning as "indicated."<br />

E. "Regulations": Laws, ordinances, statutes, and lawful orders issued by authorities having<br />

jurisdiction, and rules, conventions, and agreements within the construction industry that control<br />

performance of the Work.<br />

F. "Furnish": Supply and deliver to Project site, ready for unloading, unpacking, assembly,<br />

installation, and similar operations.<br />

G. "Install": Operations at Project site including unloading, temporarily storing, unpacking,<br />

assembling, erecting, placing, anchoring, applying, working to dimension, finishing, curing,<br />

protecting, cleaning, and similar operations.<br />

H. "Provide": Furnish and install, complete and ready for the intended use.<br />

I. "Project Site": Space available for performing construction activities. The extent of Project site<br />

is shown on Drawings and may or may not be identical with the description of the land on which<br />

Project is to be built.<br />

1.2 INDUSTRY STANDARDS<br />

A. Applicability of Standards: Unless the Contract Documents include more stringent<br />

requirements, applicable construction industry standards have the same force and effect as if<br />

bound or copied directly into the Contract Documents to the extent referenced. Such standards<br />

are made a part of the Contract Documents by reference.<br />

B. Publication Dates: Comply with standards in effect as of date of the Contract Documents<br />

unless otherwise indicated.<br />

C. Copies of Standards: Each entity engaged in construction on Project should be familiar with<br />

industry standards applicable to its construction activity. Copies of applicable standards are not<br />

bound with the Contract Documents.<br />

REFERENCES 01 42 00 - 1/12


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

1. Where copies of standards are needed to perform a required construction activity, obtain<br />

copies directly from publication source.<br />

1.3 ABBREVIATIONS AND ACRONYMS<br />

A. Industry Organizations: Where abbreviations and acronyms are used in Specifications or other<br />

Contract Documents, they shall mean the recognized name of the entities indicated in Thomson<br />

Gale's "Encyclopedia of Associations" or in Columbia Books' "National Trade & Professional<br />

Associations of the U.S."<br />

B. Industry Organizations: Where abbreviations and acronyms are used in Specifications or other<br />

Contract Documents, they shall mean the recognized name of the entities in the following list.<br />

AA<br />

AAADM<br />

AABC<br />

AAMA<br />

AASHTO<br />

AATCC<br />

ABAA<br />

ABMA<br />

ACI<br />

ACPA<br />

AEIC<br />

AF&PA<br />

AGA<br />

AGC<br />

AHA<br />

AHAM<br />

AI<br />

AIA<br />

AISC<br />

AISI<br />

AITC<br />

Aluminum Association, Inc. (The)<br />

American Association of Automatic Door Manufacturers<br />

Associated Air Balance Council<br />

American Architectural Manufacturers Association<br />

American Association of State Highway and Transportation Officials<br />

American Association of Textile Chemists and Colorists<br />

Air Barrier Association of America<br />

American Bearing Manufacturers Association<br />

American Concrete Institute<br />

American Concrete Pipe Association<br />

Association of Edison Illuminating Companies, Inc. (The)<br />

American Forest & Paper Association<br />

American Gas Association<br />

Associated General Contractors of America (The)<br />

American Hardboard Association<br />

(Now part of CPA)<br />

Association of Home Appliance Manufacturers<br />

Asphalt Institute<br />

American Institute of Architects (The)<br />

American Institute of Steel Construction<br />

American Iron and Steel Institute<br />

American Institute of Timber Construction<br />

REFERENCES 01 42 00 - 2/12


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

ALCA<br />

ALSC<br />

AMCA<br />

ANSI<br />

AOSA<br />

APA<br />

APA<br />

APA EWS<br />

API<br />

ARI<br />

ARMA<br />

ASCE<br />

ASCE/SEI<br />

ASHRAE<br />

ASME<br />

ASSE<br />

ASTM<br />

AWCI<br />

AWCMA<br />

AWI<br />

AWPA<br />

AWS<br />

AWWA<br />

BHMA<br />

Associated Landscape Contractors of America<br />

(Now PLANET - Professional Landcare Network)<br />

American Lumber Standard Committee, Incorporated<br />

Air Movement and Control Association International, Inc.<br />

American National Standards Institute<br />

Association of Official Seed Analysts, Inc.<br />

Architectural Precast Association<br />

APA - The Engineered Wood Association<br />

APA - The Engineered Wood Association; Engineered Wood Systems<br />

(See APA - The Engineered Wood Association)<br />

American Petroleum Institute<br />

Air-Conditioning & Refrigeration Institute<br />

Asphalt Roofing Manufacturers Association<br />

American Society of Civil Engineers<br />

American Society of Civil Engineers/Structural Engineering Institute<br />

(See ASCE)<br />

American Society of Heating, Refrigerating and Air-Conditioning Engineers<br />

ASME International<br />

(American Society of Mechanical Engineers International)<br />

American Society of Sanitary Engineering<br />

ASTM International<br />

(American Society for Testing and Materials International)<br />

Association of the Wall and Ceiling Industry<br />

American Window Covering Manufacturers Association<br />

(Now WCMA)<br />

Architectural Woodwork Institute<br />

American Wood Protection Association<br />

(Formerly: American Wood Preservers' Association)<br />

American Welding Society<br />

American Water Works Association<br />

Builders Hardware Manufacturers Association<br />

REFERENCES 01 42 00 - 3/12


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

BIA<br />

BICSI<br />

BIFMA<br />

BISSC<br />

BWF<br />

CCC<br />

CDA<br />

CEA<br />

CEA<br />

CFFA<br />

CGA<br />

CIMA<br />

CISCA<br />

CISPI<br />

CLFMI<br />

CRRC<br />

CPA<br />

CPPA<br />

CRI<br />

CRSI<br />

CSA<br />

CSA<br />

CSI<br />

CSI<br />

CSSB<br />

CTI<br />

Brick Industry Association (The)<br />

BICSI, Inc.<br />

BIFMA International<br />

(Business and Institutional Furniture Manufacturer's Association International)<br />

Baking Industry Sanitation Standards Committee<br />

Badminton World Federation<br />

(Formerly: IBF - International Badminton Federation)<br />

Carpet Cushion Council<br />

Copper Development Association<br />

Canadian Electricity Association<br />

Consumer Electronics Association<br />

Chemical Fabrics & Film Association, Inc.<br />

Compressed Gas Association<br />

Cellulose Insulation Manufacturers Association<br />

Ceilings & Interior Systems Construction Association<br />

Cast Iron Soil Pipe Institute<br />

Chain Link Fence Manufacturers Institute<br />

Cool Roof Rating Council<br />

Composite Panel Association<br />

Corrugated Polyethylene Pipe Association<br />

Carpet and Rug Institute (The)<br />

Concrete Reinforcing Steel Institute<br />

Canadian Standards Association<br />

CSA International<br />

(Formerly: IAS - International Approval Services)<br />

Cast Stone Institute<br />

Construction Specifications Institute (The)<br />

Cedar Shake & Shingle Bureau<br />

Cooling Technology Institute<br />

(Formerly: Cooling Tower Institute)<br />

REFERENCES 01 42 00 - 4/12


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

DHI<br />

EIA<br />

EIMA<br />

EJCDC<br />

EJMA<br />

ESD<br />

ETL SEMCO<br />

FIBA<br />

FIVB<br />

FM Approvals<br />

FM Global<br />

FMRC<br />

FRSA<br />

FSA<br />

FSC<br />

GA<br />

GANA<br />

GRI<br />

GS<br />

GSI<br />

HI<br />

HI<br />

HMMA<br />

HPVA<br />

HPW<br />

Door and Hardware Institute<br />

Electronic Industries Alliance<br />

EIFS Industry Members Association<br />

Engineers Joint Contract Documents Committee<br />

Expansion Joint Manufacturers Association, Inc.<br />

ESD Association<br />

(Electrostatic Discharge Association)<br />

Intertek ETL SEMCO<br />

(Formerly: ITS - Intertek Testing Service NA)<br />

Federation Internationale de Basketball<br />

(The International Basketball Federation)<br />

Federation Internationale de Volleyball<br />

(The International Volleyball Federation)<br />

FM Approvals LLC<br />

FM Global<br />

(Formerly: FMG - FM Global)<br />

Factory Mutual Research<br />

(Now FM Global)<br />

Florida Roofing, Sheet Metal & Air Conditioning Contractors Association, Inc.<br />

Fluid Sealing Association<br />

Forest Stewardship Council<br />

Gypsum Association<br />

Glass Association of North America<br />

(Part of GSI)<br />

Green Seal<br />

Geosynthetic Institute<br />

Hydraulic Institute<br />

Hydronics Institute<br />

Hollow Metal Manufacturers Association<br />

(Part of NAAMM)<br />

Hardwood Plywood & Veneer Association<br />

H. P. White Laboratory, Inc.<br />

REFERENCES 01 42 00 - 5/12


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

IAS<br />

IBF<br />

ICEA<br />

ICRI<br />

IEC<br />

IEEE<br />

IESNA<br />

IEST<br />

IGCC<br />

IGMA<br />

ILI<br />

ISO<br />

ISSFA<br />

ITS<br />

ITU<br />

KCMA<br />

LMA<br />

LPI<br />

MBMA<br />

MFMA<br />

MFMA<br />

MH<br />

MHIA<br />

MIA<br />

MPI<br />

International Approval Services<br />

(Now CSA International)<br />

International Badminton Federation<br />

(Now BWF)<br />

Insulated Cable Engineers Association, Inc.<br />

International Concrete Repair Institute, Inc.<br />

International Electrotechnical Commission<br />

Institute of Electrical and Electronics Engineers, Inc. (The)<br />

Illuminating Engineering Society of North America<br />

Institute of Environmental Sciences and Technology<br />

Insulating Glass Certification Council<br />

Insulating Glass Manufacturers Alliance<br />

Indiana Limestone Institute of America, Inc.<br />

International Organization for Standardization<br />

Available from ANSI<br />

International Solid Surface Fabricators Association<br />

Intertek Testing Service NA<br />

(Now ETL SEMCO)<br />

International Telecommunication Union<br />

Kitchen Cabinet Manufacturers Association<br />

Laminating Materials Association<br />

(Now part of CPA)<br />

Lightning Protection Institute<br />

Metal Building Manufacturers Association<br />

Maple Flooring Manufacturers Association, Inc.<br />

Metal Framing Manufacturers Association, Inc.<br />

Material Handling<br />

(Now MHIA)<br />

Material Handling Industry of America<br />

Marble Institute of America<br />

Master Painters Institute<br />

REFERENCES 01 42 00 - 6/12


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

MSS<br />

NAAMM<br />

NACE<br />

NADCA<br />

NAGWS<br />

NAIMA<br />

NBGQA<br />

NCAA<br />

NCMA<br />

NCPI<br />

NCTA<br />

NEBB<br />

NECA<br />

NeLMA<br />

NEMA<br />

NETA<br />

NFHS<br />

NFPA<br />

NFRC<br />

NGA<br />

NHLA<br />

NLGA<br />

NOFMA<br />

NOMMA<br />

NRCA<br />

NRMCA<br />

Manufacturers Standardization Society of The Valve and Fittings Industry Inc.<br />

National Association of Architectural Metal Manufacturers<br />

NACE International<br />

(National Association of Corrosion Engineers International)<br />

National Air Duct Cleaners Association<br />

National Association for Girls and Women in Sport<br />

North American Insulation Manufacturers Association<br />

National Building Granite Quarries Association, Inc.<br />

National Collegiate Athletic Association (The)<br />

National Concrete Masonry Association<br />

National Clay Pipe Institute<br />

National Cable & Telecommunications Association<br />

National Environmental Balancing Bureau<br />

National Electrical Contractors Association<br />

Northeastern Lumber Manufacturers' Association<br />

National Electrical Manufacturers Association<br />

InterNational Electrical Testing Association<br />

National Federation of State High School Associations<br />

NFPA<br />

(National Fire Protection Association)<br />

National Fenestration Rating Council<br />

National Glass Association<br />

National Hardwood Lumber Association<br />

National Lumber Grades Authority<br />

NOFMA: The Wood Flooring Manufacturers Association<br />

(Formerly: National Oak Flooring Manufacturers Association)<br />

National Ornamental & Miscellaneous Metals Association<br />

National Roofing Contractors Association<br />

National Ready Mixed Concrete Association<br />

REFERENCES 01 42 00 - 7/12


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

NSF<br />

NSSGA<br />

NTMA<br />

NTRMA<br />

NWWDA<br />

OPL<br />

PCI<br />

PDCA<br />

PDI<br />

PGI<br />

PLANET<br />

PTI<br />

RCSC<br />

RFCI<br />

RIS<br />

SAE<br />

SDI<br />

SDI<br />

SEFA<br />

SEI/ASCE<br />

SGCC<br />

SIA<br />

SIGMA<br />

SJI<br />

SMA<br />

NSF International<br />

(National Sanitation Foundation International)<br />

National Stone, Sand & Gravel Association<br />

National Terrazzo & Mosaic Association, Inc. (The)<br />

National Tile Roofing Manufacturers Association<br />

(Now TRI)<br />

National Wood Window and Door Association<br />

(Now WDMA)<br />

Omega Point Laboratories, Inc.<br />

(Now ITS)<br />

Precast/Prestressed Concrete Institute<br />

Painting & Decorating Contractors of America<br />

Plumbing & Drainage Institute<br />

PVC Geomembrane Institute<br />

Professional Landcare Network<br />

(Formerly: ACLA - Associated Landscape Contractors of America)<br />

Post-Tensioning Institute<br />

Research Council on Structural Connections<br />

Resilient Floor Covering Institute<br />

Redwood Inspection Service<br />

SAE International<br />

Steel Deck Institute<br />

Steel Door Institute<br />

Scientific Equipment and Furniture Association<br />

Structural Engineering Institute/American Society of Civil Engineers<br />

(See ASCE)<br />

Safety Glazing Certification Council<br />

Security Industry Association<br />

Sealed Insulating Glass Manufacturers Association<br />

(Now IGMA)<br />

Steel Joist Institute<br />

Screen Manufacturers Association<br />

REFERENCES 01 42 00 - 8/12


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SMACNA<br />

SMPTE<br />

SPFA<br />

SPIB<br />

SPRI<br />

SSINA<br />

SSPC<br />

STI<br />

SWI<br />

SWRI<br />

TCA<br />

TCNA<br />

TIA/EIA<br />

TMS<br />

TPI<br />

TPI<br />

TRI<br />

UL<br />

UNI<br />

USAV<br />

USGBC<br />

USITT<br />

WASTEC<br />

WCLIB<br />

WCMA<br />

WCSC<br />

Sheet Metal and Air Conditioning Contractors'<br />

National Association<br />

Society of Motion Picture and Television Engineers<br />

Spray Polyurethane Foam Alliance<br />

(Formerly: SPI/SPFD - The Society of the Plastics Industry, Inc.; Spray<br />

Polyurethane Foam Division)<br />

Southern Pine Inspection Bureau (The)<br />

Single Ply Roofing Industry<br />

Specialty Steel Industry of North America<br />

SSPC: The Society for Protective Coatings<br />

Steel Tank Institute<br />

Steel Window Institute<br />

Sealant, Waterproofing, & Restoration Institute<br />

Tile Council of America, Inc.<br />

(Now TCNA)<br />

Tile Council of North America, Inc.<br />

Telecommunications Industry Association/Electronic Industries Alliance<br />

The Masonry Society<br />

Truss Plate Institute, Inc.<br />

Turfgrass Producers International<br />

Tile Roofing Institute<br />

Underwriters Laboratories Inc.<br />

Uni-Bell PVC Pipe Association<br />

USA Volleyball<br />

U.S. Green Building Council<br />

United States Institute for Theatre Technology, Inc.<br />

Waste Equipment Technology Association<br />

West Coast Lumber Inspection Bureau<br />

Window Covering Manufacturers Association<br />

Window Covering Safety Council<br />

REFERENCES 01 42 00 - 9/12


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

(Formerly: WCMA - Window Covering Manufacturers Association)<br />

WDMA<br />

WI<br />

WIC<br />

WMMPA<br />

WSRCA<br />

WWPA<br />

Window & Door Manufacturers Association<br />

(Formerly: NWWDA - National Wood Window and Door Association)<br />

Woodwork Institute (Formerly: WIC - Woodwork Institute of California)<br />

Woodwork Institute of California<br />

(Now WI)<br />

Wood Moulding & Millwork Producers Association<br />

Western States Roofing Contractors Association<br />

Western Wood Products Association<br />

C. Code Agencies: Where abbreviations and acronyms are used in Specifications or other<br />

Contract Documents, they shall mean the recognized name of the entities in the following list.<br />

IAPMO<br />

ICC<br />

ICC-ES<br />

International Association of Plumbing and Mechanical Officials<br />

International Code Council<br />

ICC Evaluation Service, Inc.<br />

D. Federal Government Agencies: Where abbreviations and acronyms are used in Specifications<br />

or other Contract Documents, they shall mean the recognized name of the entities in the<br />

following list. Names, telephone numbers, and Web sites are subject to change and are<br />

believed to be accurate and up-to-date as of the date of the Contract Documents.<br />

CE<br />

CPSC<br />

DOC<br />

DOD<br />

DOE<br />

EPA<br />

FAA<br />

FCC<br />

FDA<br />

GSA<br />

HUD<br />

LBL<br />

NCHRP<br />

Army Corps of Engineers<br />

Consumer Product Safety Commission<br />

Department of Commerce<br />

Department of Defense<br />

Department of Energy<br />

Environmental Protection Agency<br />

Federal Aviation Administration<br />

Federal Communications Commission<br />

Food and Drug Administration<br />

General Services Administration<br />

Department of Housing and Urban Development<br />

Lawrence Berkeley National Laboratory<br />

National Cooperative Highway Research Program<br />

(See TRB)<br />

REFERENCES 01 42 00 - 10/12


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

NIST<br />

OSHA<br />

PBS<br />

PHS<br />

RUS<br />

SD<br />

TRB<br />

USDA<br />

USPS<br />

National Institute of Standards and Technology<br />

Occupational Safety & Health Administration<br />

Public Buildings Service<br />

(See GSA)<br />

Office of Public Health and Science<br />

Rural Utilities Service<br />

(See USDA)<br />

State Department<br />

Transportation Research Board<br />

Department of Agriculture<br />

Postal Service<br />

E. Standards and Regulations: Where abbreviations and acronyms are used in Specifications or<br />

other Contract Documents, they shall mean the recognized name of the standards and<br />

regulations in the following list. Names, telephone numbers, and Web sites are subject to<br />

change and are believed to be accurate and up-to-date as of the date of the Contract<br />

Documents.<br />

ADAAG<br />

CFR<br />

DOD<br />

DSCC<br />

FED-STD<br />

FS<br />

Americans with Disabilities Act (ADA)<br />

Architectural Barriers Act (ABA)<br />

Accessibility Guidelines for Buildings and Facilities<br />

Available from U.S. Access Board<br />

Code of Federal Regulations<br />

Available from Government Printing Office<br />

Department of Defense Military Specifications and Standards<br />

Available from Department of Defense Single Stock Point<br />

Defense Supply Center Columbus<br />

(See FS)<br />

Federal Standard<br />

(See FS)<br />

Federal Specification<br />

Available from Department of Defense Single Stock Point<br />

Available from Defense Standardization Program<br />

Available from General Services Administration<br />

Available from National Institute of Building Sciences<br />

FTMS<br />

Federal Test Method Standard<br />

(See FS)<br />

REFERENCES 01 42 00 - 11/12


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

MIL<br />

MIL-STD<br />

MILSPEC<br />

UFAS<br />

(See MILSPEC)<br />

(See MILSPEC)<br />

Military Specification and Standards<br />

Available from Department of Defense Single Stock Point<br />

Uniform Federal Accessibility Standards<br />

Available from Access Board<br />

PART 2 - PRODUCTS (Not Used)<br />

PART 3 - EXECUTION (Not Used)<br />

END OF SECTION 01 42 00<br />

REFERENCES 01 42 00 - 12/12


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 01 50 00 - TEMPORARY FACILITIES AND CONTROLS<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section includes requirements for temporary utilities, support facilities, and security and<br />

protection facilities.<br />

B. Related Section:<br />

1. Division 01 Section "Summary" for work restrictions and limitations on utility interruptions.<br />

1.2 USE CHARGES<br />

A. Water and Sewer Service from Existing System: Water from Owner's existing water system is<br />

available for use without metering and without payment of use charges. Provide connections<br />

and extensions of services as required for construction operations.<br />

B. Electric Power Service from Existing System: Electric power from Owner's existing system is<br />

available for use without metering and without payment of use charges. Provide connections<br />

and extensions of services as required for construction operations.<br />

1.3 INFORMATIONAL SUBMITTALS<br />

A. Site Plan: Show temporary facilities, utility hookups, staging areas, and parking areas for<br />

construction personnel.<br />

B. Erosion- and Sedimentation-Control Plan: Show compliance with requirements of EPA<br />

Construction General Permit or authorities having jurisdiction, whichever is more stringent.<br />

1.4 QUALITY ASSURANCE<br />

A. Electric Service: Comply with NECA, NEMA, and UL standards and regulations for temporary<br />

electric service. Install service to comply with NFPA 70.<br />

B. Tests and Inspections: Arrange for authorities having jurisdiction to test and inspect each<br />

temporary utility before use. Obtain required certifications and permits.<br />

1.5 <strong>PROJECT</strong> CONDITIONS<br />

A. Temporary Use of Permanent Facilities: Engage installer of each permanent service to assume<br />

responsibility for operation, maintenance, and protection of each permanent service during its<br />

use as a construction facility before Owner's acceptance, regardless of previously assigned<br />

responsibilities.<br />

TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 1/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

PART 2 - PRODUCTS<br />

2.1 MATERIALS<br />

A. Chain-Link Fencing: Minimum 50-mm (2-inch), 3.8-mm- (0.148-inch-) thick, galvanized steel,<br />

chain-link fabric fencing; minimum 1.8 m (6 feet) high with galvanized steel pipe posts; minimum<br />

60-mm- (2-3/8-inch-) OD line posts and 73-mm- (2-7/8-inch-) OD corner and pull posts.<br />

B. Portable Chain-Link Fencing: Minimum 50-mm (2-inch), 3.8-mm- (0.148-inch-) thick, galvanized<br />

steel, chain-link fabric fencing; minimum 1.8 m (6 feet) high with galvanized steel pipe posts;<br />

minimum 60-mm- (2-3/8-inch-) OD line posts and 73-mm- (2-7/8-inch-) OD corner and pull<br />

posts, with 42-mm- (1-5/8-inch-) OD top and bottom rails. Provide concrete bases for<br />

supporting posts.<br />

C. Wood Enclosure Fence: Plywood, 1.8 m (6 feet) high, framed with four 50-by-100-mm (2-by-4-<br />

inch) rails, with preservative-treated wood posts spaced not more than 2.4 m (8 feet) apart.<br />

2.2 TEMPORARY FACILITIES<br />

A. Field Offices, General: Prefabricated or mobile units with serviceable finishes, temperature<br />

controls, and foundations adequate for normal loading.<br />

B. Common-Use Field Office: Of sufficient size to accommodate needs of Owner, Architect and<br />

construction personnel office activities and to accommodate project meetings specified in other<br />

Division 01 Sections. Keep office clean and orderly.<br />

C. Storage and Fabrication Sheds: Provide sheds sized, furnished, and equipped to<br />

accommodate materials and equipment for construction operations.<br />

2.3 EQUIPMENT<br />

A. Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by<br />

locations and classes of fire exposures.<br />

B. HVAC Equipment: Unless Owner authorizes use of permanent HVAC system, provide vented,<br />

self-contained, liquid-propane-gas or fuel-oil heaters with individual space thermostatic control.<br />

1. Use of gasoline-burning space heaters, open-flame heaters, or salamander-type heating<br />

units is prohibited.<br />

2. Heating Units: Listed and labeled for type of fuel being consumed, by a testing agency<br />

acceptable to authorities having jurisdiction, and marked for intended use.<br />

3. Permanent HVAC System: If Owner authorizes use of permanent HVAC system for<br />

temporary use during construction, provide filter with MERV of 8 at each return air grille in<br />

system and remove at end of construction and clean HVAC system as required in<br />

Division 01 Section "Closeout Procedures."<br />

TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 2/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION, GENERAL<br />

A. Locate facilities where they will serve Project adequately and result in minimum interference<br />

with performance of the Work. Relocate and modify facilities as required by progress of the<br />

Work.<br />

1. Locate facilities to limit site disturbance as specified in Division 01 Section "Summary."<br />

B. Provide each facility ready for use when needed to avoid delay. Do not remove until facilities<br />

are no longer needed or are replaced by authorized use of completed permanent facilities.<br />

3.2 TEMPORARY UTILITY INSTALLATION<br />

A. General: Install temporary service or connect to existing service.<br />

1. Arrange with utility company, Owner, and existing users for time when service can be<br />

interrupted, if necessary, to make connections for temporary services.<br />

B. Sewers and Drainage: Provide temporary utilities to remove effluent lawfully.<br />

1. Connect temporary sewers to municipal system as directed by authorities having<br />

jurisdiction.<br />

C. Water Service: Connect to Owner's existing water service facilities. Clean and maintain water<br />

service facilities in a condition acceptable to Owner. At Substantial Completion, restore these<br />

facilities to condition existing before initial use.<br />

D. Sanitary Facilities: Provide temporary toilets, wash facilities, and drinking water for use of<br />

construction personnel. Comply with requirements of authorities having jurisdiction for type,<br />

number, location, operation, and maintenance of fixtures and facilities.<br />

E. Heating and Cooling: Provide temporary heating and cooling required by construction activities<br />

for curing or drying of completed installations or for protecting installed construction from<br />

adverse effects of low temperatures or high humidity. Select equipment that will not have a<br />

harmful effect on completed installations or elements being installed.<br />

F. Ventilation and Humidity Control: Provide temporary ventilation required by construction<br />

activities for curing or drying of completed installations or for protecting installed construction<br />

from adverse effects of high humidity. Select equipment that will not have a harmful effect on<br />

completed installations or elements being installed. Coordinate ventilation requirements to<br />

produce ambient condition required and minimize energy consumption.<br />

G. Electric Power Service: Connect to Owner's existing electric power service. Maintain<br />

equipment in a condition acceptable to Owner.<br />

H. Lighting: Provide temporary lighting with local switching that provides adequate illumination for<br />

construction operations, observations, inspections, and traffic conditions.<br />

1. Install and operate temporary lighting that fulfills security and protection requirements<br />

without operating entire system.<br />

TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 3/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

I. Telephone Service: Provide temporary telephone service in common-use facilities for use by all<br />

construction personnel. Install one telephone line(s) for each field office.<br />

1. At each telephone, post a list of important telephone numbers.<br />

a. Police and fire departments.<br />

b. Ambulance service.<br />

c. Contractor's home office.<br />

d. Architect's office.<br />

e. Engineers' offices.<br />

f. Owner's office.<br />

g. Principal subcontractors' field and home offices.<br />

2. Provide superintendent with cellular telephone or portable two-way radio for use when<br />

away from field office.<br />

3.3 SUPPORT FACILITIES INSTALLATION<br />

A. General: Comply with the following:<br />

1. Provide construction for temporary offices, shops, and sheds located within construction<br />

area or within 9 m (30 feet) of building lines that is noncombustible according to<br />

ASTM E 136. Comply with NFPA 241.<br />

2. Maintain support facilities until Architect schedules Substantial Completion inspection.<br />

Remove before Substantial Completion. Personnel remaining after Substantial<br />

Completion will be permitted to use permanent facilities, under conditions acceptable to<br />

Owner.<br />

B. Temporary Roads and Paved Areas: Construct and maintain temporary roads and paved areas<br />

adequate for construction operations. Locate temporary roads and paved areas within<br />

construction limits indicated on Drawings.<br />

1. Provide dust-control treatment that is nonpolluting and nontracking. Reapply treatment<br />

as required to minimize dust.<br />

C. Traffic Controls: Comply with requirements of authorities having jurisdiction.<br />

1. Protect existing site improvements to remain including curbs, pavement, and utilities.<br />

2. Maintain access for fire-fighting equipment and access to fire hydrants.<br />

D. Parking: Use designated areas of Owner's existing parking areas for construction personnel.<br />

E. Dewatering Facilities and Drains: Comply with requirements of authorities having jurisdiction.<br />

Maintain Project site, excavations, and construction free of water.<br />

1. Dispose of rainwater in a lawful manner that will not result in flooding Project or adjoining<br />

properties nor endanger permanent Work or temporary facilities.<br />

2. Remove snow and ice as required to minimize accumulations.<br />

F. Project Signs: Provide Project signs as indicated. Unauthorized signs are not permitted.<br />

1. Identification Signs: Provide Project identification signs as indicated on Drawings.<br />

2. Temporary Signs: Provide other signs as indicated and as required to inform public and<br />

individuals seeking entrance to Project.<br />

TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 4/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

a. Provide temporary, directional signs for construction personnel and visitors.<br />

3. Maintain and touchup signs so they are legible at all times.<br />

G. Waste Disposal Facilities: Comply with requirements specified in Division 01 Section<br />

"Construction Waste Management and Disposal."<br />

H. Waste Disposal Facilities: Provide waste-collection containers in sizes adequate to handle<br />

waste from construction operations. Comply with requirements of authorities having jurisdiction.<br />

Comply with Division 01 Section "Execution" for progress cleaning requirements.<br />

I. Lifts and Hoists: Provide facilities necessary for hoisting materials and personnel.<br />

1. Truck cranes and similar devices used for hoisting materials are considered "tools and<br />

equipment" and not temporary facilities.<br />

3.4 SECURITY AND PROTECTION FACILITIES INSTALLATION<br />

A. Environmental Protection: Provide protection, operate temporary facilities, and conduct<br />

construction as required to comply with environmental regulations and that minimize possible<br />

air, waterway, and subsoil contamination or pollution or other undesirable effects.<br />

B. Temporary Erosion and Sedimentation Control: Provide measures to prevent soil erosion and<br />

discharge of soil-bearing water runoff and airborne dust to undisturbed areas and to adjacent<br />

properties and walkways, according to requirements of 2003 EPA Construction General Permit<br />

or authorities having jurisdiction, whichever is more stringent.<br />

C. Stormwater Control: Comply with requirements of authorities having jurisdiction. Provide<br />

barriers in and around excavations and subgrade construction to prevent flooding by runoff of<br />

stormwater from heavy rains.<br />

D. Tree and Plant Protection: Install temporary fencing located as indicated or outside the drip line<br />

of trees to protect vegetation from damage from construction operations. Protect tree root<br />

systems from damage, flooding, and erosion.<br />

E. Pest Control: Engage pest-control service to recommend practices to minimize attraction and<br />

harboring of rodents, roaches, and other pests and to perform extermination and control<br />

procedures at regular intervals so Project will be free of pests and their residues at Substantial<br />

Completion. Obtain extended warranty for Owner. Perform control operations lawfully, using<br />

environmentally safe materials.<br />

F. Site Enclosure Fence: Before construction operations begin, furnish and install site enclosure<br />

fence in a manner that will prevent people and animals from easily entering site except by<br />

entrance gates.<br />

1. Extent of Fence: As required to enclose entire Project site or portion determined<br />

sufficient to accommodate construction operations.<br />

2. Maintain security by limiting number of keys and restricting distribution to authorized<br />

personnel. Furnish one set of keys to Owner.<br />

G. Security Enclosure and Lockup: Install temporary enclosure around partially completed areas<br />

of construction. Provide lockable entrances to prevent unauthorized entrance, vandalism, theft,<br />

and similar violations of security. Lock entrances at end of each work day.<br />

TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 5/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

H. Barricades, Warning Signs, and Lights: Comply with requirements of authorities having<br />

jurisdiction for erecting structurally adequate barricades, including warning signs and lighting.<br />

I. Temporary Enclosures: Provide temporary enclosures for protection of construction, in<br />

progress and completed, from exposure, foul weather, other construction operations, and<br />

similar activities. Provide temporary weathertight enclosure for building exterior.<br />

1. Where heating or cooling is needed and permanent enclosure is not complete, insulate<br />

temporary enclosures.<br />

J. Temporary Partitions: Provide temporary fire-rated closures for the two corridor openings until<br />

such time as the two doors 300G and 300N can be procured and installed to maintain the 3<br />

hour fire protection of the openings that is required for the final construction.<br />

1. Where fire-resistance-rated temporary partitions are indicated or are required by<br />

authorities having jurisdiction, construct partitions according to the rated assemblies.<br />

2. Insulate partitions to control noise transmission to occupied areas.<br />

3. Seal joints and perimeter. Equip partitions with gasketed dustproof doors and security<br />

locks where openings are required.<br />

K. Temporary Fire Protection: Install and maintain temporary fire-protection facilities of types<br />

needed to protect against reasonably predictable and controllable fire losses. Comply with<br />

NFPA 241.<br />

1. Prohibit smoking in construction areas.<br />

2. Supervise welding operations, combustion-type temporary heating units, and similar<br />

sources of fire ignition according to requirements of authorities having jurisdiction.<br />

3. Develop and supervise an overall fire-prevention and -protection program for personnel<br />

at Project site. Review needs with local fire department and establish procedures to be<br />

followed. Instruct personnel in methods and procedures. Post warnings and information.<br />

3.5 MOISTURE AND MOLD CONTROL<br />

A. Contractor's Moisture Protection Plan: Avoid trapping water in finished work. Document visible<br />

signs of mold that may appear during construction.<br />

B. Exposed Construction Phase: Before installation of weather barriers, when materials are<br />

subject to wetting and exposure and to airborne mold spores, protect materials from water<br />

damage and keep porous and organic materials from coming into prolonged contact with<br />

concrete.<br />

C. Partially Enclosed Construction Phase: After installation of weather barriers but before full<br />

enclosure and conditioning of building, when installed materials are still subject to infiltration of<br />

moisture and ambient mold spores, protect as follows:<br />

1. Do not load or install drywall or other porous materials or components, or items with high<br />

organic content, into partially enclosed building.<br />

2. Keep interior spaces reasonably clean and protected from water damage.<br />

3. Discard or replace water-damaged and wet material.<br />

4. Discard, replace or clean stored or installed material that begins to grow mold.<br />

5. Perform work in a sequence that allows any wet materials adequate time to dry before<br />

enclosing the material in drywall or other interior finishes.<br />

TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 6/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

D. Controlled Construction Phase of Construction: After completing and sealing of the building<br />

enclosure but prior to the full operation of permanent HVAC systems, maintain as follows:<br />

1. Control moisture and humidity inside building by maintaining effective dry-in conditions.<br />

2. Remove materials that can not be completely restored to their manufactured moisture<br />

level within 48 hours.<br />

3.6 OPERATION, TERMINATION, AND REMOVAL<br />

A. Supervision: Enforce strict discipline in use of temporary facilities. To minimize waste and<br />

abuse, limit availability of temporary facilities to essential and intended uses.<br />

B. Maintenance: Maintain facilities in good operating condition until removal.<br />

1. Maintain operation of temporary enclosures, heating, cooling, humidity control,<br />

ventilation, and similar facilities on a 24-hour basis where required to achieve indicated<br />

results and to avoid possibility of damage.<br />

C. Temporary Facility Changeover: Do not change over from using temporary security and<br />

protection facilities to permanent facilities until Substantial Completion.<br />

D. Termination and Removal: Remove each temporary facility when need for its service has<br />

ended, when it has been replaced by authorized use of a permanent facility, or no later than<br />

Substantial Completion. Complete or, if necessary, restore permanent construction that may<br />

have been delayed because of interference with temporary facility. Repair damaged Work,<br />

clean exposed surfaces, and replace construction that cannot be satisfactorily repaired.<br />

1. Materials and facilities that constitute temporary facilities are property of Contractor.<br />

Owner reserves right to take possession of Project identification signs.<br />

2. At Substantial Completion, repair, renovate, and clean permanent facilities used during<br />

construction period. Comply with final cleaning requirements specified in Division 01<br />

Section "Closeout Procedures."<br />

END OF SECTION 01 50 00<br />

TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 7/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

This page intentionally left blank.<br />

TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 8/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 01 60 00 - PRODUCT REQUIREMENTS<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section includes administrative and procedural requirements for selection of products for use in<br />

Project; product delivery, storage, and handling; manufacturers' standard warranties on<br />

products; special warranties; and comparable products.<br />

B. Related Section:<br />

1. Division 01 Section "Substitution Procedures" for requests for substitutions.<br />

1.2 DEFINITIONS<br />

A. Products: Items obtained for incorporating into the Work, whether purchased for Project or<br />

taken from previously purchased stock. The term "product" includes the terms "material,"<br />

"equipment," "system," and terms of similar intent.<br />

1. Named Products: Items identified by manufacturer's product name, including make or<br />

model number or other designation shown or listed in manufacturer's published product<br />

literature, that is current as of date of the Contract Documents.<br />

2. New Products: Items that have not previously been incorporated into another project or<br />

facility. Products salvaged or recycled from other projects are not considered new<br />

products.<br />

3. Comparable Product: Product that is demonstrated and approved through submittal<br />

process to have the indicated qualities related to type, function, dimension, in-service<br />

performance, physical properties, appearance, and other characteristics that equal or<br />

exceed those of specified product.<br />

B. Basis-of-Design Product Specification: A specification in which a specific manufacturer's<br />

product is named and accompanied by the words "basis-of-design product," including make or<br />

model number or other designation, to establish the significant qualities related to type, function,<br />

dimension, in-service performance, physical properties, appearance, and other characteristics<br />

for purposes of evaluating comparable products of additional manufacturers named in the<br />

specification.<br />

1.3 ACTION SUBMITTALS<br />

A. Comparable Product Requests: Submit request for consideration of each comparable product.<br />

Identify product or fabrication or installation method to be replaced. Include Specification<br />

Section number and title and Drawing numbers and titles.<br />

1. Architect's Action: If necessary, Architect will request additional information or<br />

documentation for evaluation within one week of receipt of a comparable product request.<br />

Architect will notify Contractor of approval or rejection of proposed comparable product<br />

request within 15 days of receipt of request, or seven days of receipt of additional<br />

information or documentation, whichever is later.<br />

a. Form of Approval: As specified in Division 01 Section "Submittal Procedures."<br />

PRODUCT REQUIREMENTS 01 60 00 - 1/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

b. Use product specified if Architect does not issue a decision on use of a<br />

comparable product request within time allocated.<br />

B. Basis-of-Design Product Specification Submittal: Comply with requirements in Division 01<br />

Section "Submittal Procedures." Show compliance with requirements.<br />

1.4 QUALITY ASSURANCE<br />

A. Compatibility of Options: If Contractor is given option of selecting between two or more<br />

products for use on Project, select product compatible with products previously selected, even if<br />

previously selected products were also options.<br />

1.5 PRODUCT DELIVERY, STORAGE, AND HANDLING<br />

A. Deliver, store, and handle products using means and methods that will prevent damage,<br />

deterioration, and loss, including theft and vandalism. Comply with manufacturer's written<br />

instructions.<br />

B. Delivery and Handling:<br />

1. Schedule delivery to minimize long-term storage at Project site and to prevent<br />

overcrowding of construction spaces.<br />

2. Coordinate delivery with installation time to ensure minimum holding time for items that<br />

are flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other<br />

losses.<br />

3. Deliver products to Project site in an undamaged condition in manufacturer's original<br />

sealed container or other packaging system, complete with labels and instructions for<br />

handling, storing, unpacking, protecting, and installing.<br />

4. Inspect products on delivery to determine compliance with the Contract Documents and<br />

to determine that products are undamaged and properly protected.<br />

C. Storage:<br />

1. Store products to allow for inspection and measurement of quantity or counting of units.<br />

2. Store materials in a manner that will not endanger Project structure.<br />

3. Store products that are subject to damage by the elements, under cover in a weathertight<br />

enclosure above ground, with ventilation adequate to prevent condensation.<br />

4. Store foam plastic from exposure to sunlight, except to extent necessary for period of<br />

installation and concealment.<br />

5. Comply with product manufacturer's written instructions for temperature, humidity,<br />

ventilation, and weather-protection requirements for storage.<br />

6. Protect stored products from damage and liquids from freezing.<br />

1.6 PRODUCT WARRANTIES<br />

A. Warranties specified in other Sections shall be in addition to, and run concurrent with, other<br />

warranties required by the Contract Documents. Manufacturer's disclaimers and limitations on<br />

product warranties do not relieve Contractor of obligations under requirements of the Contract<br />

Documents.<br />

1. Manufacturer's Warranty: Written warranty furnished by individual manufacturer for a<br />

particular product and specifically endorsed by manufacturer to Owner.<br />

PRODUCT REQUIREMENTS 01 60 00 - 2/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

2. Special Warranty: Written warranty required by the Contract Documents to provide<br />

specific rights for Owner.<br />

B. Special Warranties: Prepare a written document that contains appropriate terms and<br />

identification, ready for execution.<br />

1. Manufacturer's Standard Form: Modified to include Project-specific information and<br />

properly executed.<br />

2. Specified Form: When specified forms are included with the Specifications, prepare a<br />

written document using indicated form properly executed.<br />

3. Refer to Divisions 02 through 49. Sections for specific content requirements and<br />

particular requirements for submitting special warranties.<br />

C. Submittal Time: Comply with requirements in Division 01 Section "Closeout Procedures."<br />

PART 2 - PRODUCTS<br />

2.1 PRODUCT SELECTION PROCEDURES<br />

A. General Product Requirements: Provide products that comply with the Contract Documents,<br />

are undamaged and, unless otherwise indicated, are new at time of installation.<br />

1. Provide products complete with accessories, trim, finish, fasteners, and other items<br />

needed for a complete installation and indicated use and effect.<br />

2. Standard Products: If available, and unless custom products or nonstandard options are<br />

specified, provide standard products of types that have been produced and used<br />

successfully in similar situations on other projects.<br />

3. Owner reserves the right to limit selection to products with warranties not in conflict with<br />

requirements of the Contract Documents.<br />

4. Where products are accompanied by the term "as selected," Architect will make<br />

selection.<br />

5. Descriptive, performance, and reference standard requirements in the Specifications<br />

establish salient characteristics of products.<br />

B. Product Selection Procedures:<br />

1. Product: Where Specifications name a single manufacturer and product, provide the<br />

named product that complies with requirements. Comparable products or substitutions<br />

for Contractor's convenience will not be considered.<br />

2. Manufacturer/Source: Where Specifications name a single manufacturer or source,<br />

provide a product by the named manufacturer or source that complies with requirements.<br />

Comparable products or substitutions for Contractor's convenience will not be<br />

considered.<br />

3. Products:<br />

a. Restricted List: Where Specifications include a list of names of both<br />

manufacturers and products, provide one of the products listed that complies with<br />

requirements. Comparable products or substitutions for Contractor's convenience<br />

will not be considered.<br />

b. Nonrestricted List: Where Specifications include a list of names of both available<br />

manufacturers and products, provide one of the products listed, or an unnamed<br />

product, that complies with requirements. Comply with requirements in<br />

"Comparable Products" Article for consideration of an unnamed product.<br />

PRODUCT REQUIREMENTS 01 60 00 - 3/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

4. Manufacturers:<br />

a. Restricted List: Where Specifications include a list of manufacturers' names,<br />

provide a product by one of the manufacturers listed that complies with<br />

requirements. Comparable products or substitutions for Contractor's convenience<br />

will no] be considered.<br />

b. Nonrestricted List: Where Specifications include a list of available manufacturers,<br />

provide a product by one of the manufacturers listed, or a product by an unnamed<br />

manufacturer, that complies with requirements. Comply with requirements in<br />

"Comparable Products" Article for consideration of an unnamed manufacturer's<br />

product.<br />

5. Basis-of-Design Product: Where Specifications name a product, or refer to a product<br />

indicated on Drawings, and include a list of manufacturers, provide the specified or<br />

indicated product or a comparable product by one of the other named manufacturers.<br />

Drawings and Specifications indicate sizes, profiles, dimensions, and other<br />

characteristics that are based on the product named. Comply with requirements in<br />

"Comparable Products" Article for consideration of an unnamed product by one of the<br />

other named manufacturers.<br />

C. Visual Matching Specification: Where Specifications require "match Architect's sample",<br />

provide a product that complies with requirements and matches Architect's sample. Architect's<br />

decision will be final on whether a proposed product matches.<br />

1. If no product available within specified category matches and complies with other<br />

specified requirements, comply with requirements in Division 01 Section "Substitution<br />

Procedures" for proposal of product.<br />

D. Visual Selection Specification: Where Specifications include the phrase "as selected by<br />

Architect from manufacturer's full range" or similar phrase, select a product that complies with<br />

requirements. Architect will select color, gloss, pattern, density, or texture from manufacturer's<br />

product line that includes both standard and premium items.<br />

2.2 COMPARABLE PRODUCTS<br />

A. Conditions for Consideration: Architect will consider Contractor's request for comparable<br />

product when the following conditions are satisfied. If the following conditions are not satisfied,<br />

Architect may return requests without action, except to record noncompliance with these<br />

requirements:<br />

1. Evidence that the proposed product does not require revisions to the Contract<br />

Documents, that it is consistent with the Contract Documents and will produce the<br />

indicated results, and that it is compatible with other portions of the Work.<br />

2. Detailed comparison of significant qualities of proposed product with those named in the<br />

Specifications. Significant qualities include attributes such as performance, weight, size,<br />

durability, visual effect, and specific features and requirements indicated.<br />

3. Evidence that proposed product provides specified warranty.<br />

4. List of similar installations for completed projects with project names and addresses and<br />

names and addresses of architects and owners, if requested.<br />

5. Samples, if requested.<br />

PRODUCT REQUIREMENTS 01 60 00 - 4/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

PART 3 - EXECUTION (Not Used)If reference to a special warranty form was added where a single<br />

warranty must cover work by several contractors, insert form here and delete "Not Used" above.<br />

END OF SECTION 01 60 00<br />

PRODUCT REQUIREMENTS 01 60 00 - 5/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

This page intentionally left blank.<br />

PRODUCT REQUIREMENTS 01 60 00 - 6/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 01 73 00 - EXECUTION<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section includes general administrative and procedural requirements governing execution of the<br />

Work including, but not limited to, the following:<br />

1. Construction layout.<br />

2. Field engineering and surveying.<br />

3. Installation of the Work.<br />

4. Cutting and patching.<br />

5. Coordination of Owner-installed products.<br />

6. Progress cleaning.<br />

7. Starting and adjusting.<br />

8. Protection of installed construction.<br />

9. Correction of the Work.<br />

B. Related Sections:<br />

1. Division 01 Section "Closeout Procedures" for submitting final property survey with<br />

Project Record Documents, recording of Owner-accepted deviations from indicated lines<br />

and levels, and final cleaning.<br />

2. Division 07 Section "Penetration Firestopping" for patching penetrations in fire-rated<br />

construction.<br />

1.2 QUALITY ASSURANCE<br />

A. Cutting and Patching: Comply with requirements for and limitations on cutting and patching of<br />

construction elements.<br />

1. Structural Elements: When cutting and patching structural elements, notify Architect of<br />

locations and details of cutting and await directions from the Architect before proceeding.<br />

Shore, brace, and support structural element during cutting and patching. Do not cut and<br />

patch structural elements in a manner that could change their load-carrying capacity or<br />

increase deflection<br />

a. Operational Elements: Do not cut and patch operating elements and related<br />

components in a manner that results in reducing their capacity to perform as<br />

intended or that results in increased maintenance or decreased operational life or<br />

safety.<br />

2. Other Construction Elements: Do not cut and patch other construction elements or<br />

components in a manner that could change their load-carrying capacity, that results in<br />

reducing their capacity to perform as intended, or that results in increased maintenance<br />

or decreased operational life or safety.<br />

3. Visual Elements: Do not cut and patch construction in a manner that results in visual<br />

evidence of cutting and patching. Do not cut and patch exposed construction in a<br />

manner that would, in Architect's opinion, reduce the building's aesthetic qualities.<br />

EXECUTION 01 73 00 - 1/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

Remove and replace construction that has been cut and patched in a visually<br />

unsatisfactory manner.<br />

1.3 WARRANTY<br />

A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or<br />

damaged during installation or cutting and patching operations, by methods and with materials<br />

so as not to void existing warranties.<br />

PART 2 - PRODUCTS<br />

2.1 MATERIALS<br />

A. General: Comply with requirements specified in other Sections.<br />

1. For projects requiring compliance with sustainable design and construction practices and<br />

procedures, utilize products for patching that comply with requirements of Division 01<br />

Section "Sustainable Design Requirements."<br />

B. In-Place Materials: Use materials for patching identical to in-place materials. For exposed<br />

surfaces, use materials that visually match in-place adjacent surfaces to the fullest extent<br />

possible.<br />

1. If identical materials are unavailable or cannot be used, use materials that, when<br />

installed, will provide a match acceptable to the Architect for the visual and functional<br />

performance of in-place materials.<br />

PART 3 - EXECUTION<br />

3.1 EXAMINATION<br />

A. Existing Conditions: The existence and location of underground and other utilities and<br />

construction indicated as existing are not guaranteed. Before beginning sitework, investigate<br />

and verify the existence and location of underground utilities, mechanical and electrical<br />

systems, and other construction affecting the Work.<br />

1. Before construction, verify the location and invert elevation at points of connection of<br />

sanitary sewer, storm sewer, and water-service piping; underground electrical services,<br />

and other utilities.<br />

2. Furnish location data for work related to Project that must be performed by public utilities<br />

serving Project site.<br />

B. Examination and Acceptance of Conditions: Before proceeding with each component of the<br />

Work, examine substrates, areas, and conditions, with Installer or Applicator present where<br />

indicated, for compliance with requirements for installation tolerances and other conditions<br />

affecting performance. Record observations.<br />

1. Verify compatibility with and suitability of substrates, including compatibility with existing<br />

finishes or primers.<br />

EXECUTION 01 73 00 - 2/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

2. Examine roughing-in for mechanical and electrical systems to verify actual locations of<br />

connections before equipment and fixture installation.<br />

3. Examine walls, floors, and roofs for suitable conditions where products and systems are<br />

to be installed.<br />

4. Proceed with installation only after unsatisfactory conditions have been corrected.<br />

Proceeding with the Work indicates acceptance of surfaces and conditions.<br />

3.2 PREPARATION<br />

A. Field Measurements: Take field measurements as required to fit the Work properly. Recheck<br />

measurements before installing each product. Where portions of the Work are indicated to fit to<br />

other construction, verify dimensions of other construction by field measurements before<br />

fabrication. Coordinate fabrication schedule with construction progress to avoid delaying the<br />

Work.<br />

B. Space Requirements: Verify space requirements and dimensions of items shown<br />

diagrammatically on Drawings.<br />

C. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for<br />

clarification of the Contract Documents caused by differing field conditions outside the control of<br />

the Contractor, submit a request for information to Architect according to requirements in<br />

Division 01 Section "Project Management and Coordination."<br />

3.3 CONSTRUCTION LAYOUT<br />

A. Verification: Before proceeding to lay out the Work, verify layout information shown on<br />

Drawings, in relation to the property survey and existing benchmarks. If discrepancies are<br />

discovered, notify Architect promptly.<br />

B. General: Lay out the Work using accepted surveying practices.<br />

1. Establish benchmarks and control points to set lines and levels at each story of<br />

construction and elsewhere as needed to locate each element of Project.<br />

2. Establish dimensions within tolerances indicated. Do not scale Drawings to obtain<br />

required dimensions.<br />

3. Inform installers of lines and levels to which they must comply.<br />

4. Check the location, level and plumb, of every major element as the Work progresses.<br />

5. Notify Architect when deviations from required lines and levels exceed allowable<br />

tolerances.<br />

C. Site Improvements: Locate and lay out site improvements, including pavements, grading, fill<br />

and topsoil placement, utility slopes, and rim and invert elevations.<br />

D. Building Lines and Levels: Locate and lay out control lines and levels for structures, building<br />

foundations, column grids, and floor levels, including those required for mechanical and<br />

electrical work. Transfer survey markings and elevations for use with control lines and levels.<br />

Level foundations and piers from two or more locations.<br />

EXECUTION 01 73 00 - 3/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

3.4 FIELD ENGINEERING<br />

A. Reference Points: Locate existing permanent benchmarks, control points, and similar reference<br />

points before beginning the Work. Preserve and protect permanent benchmarks and control<br />

points during construction operations.<br />

B. Benchmarks: Establish and maintain a minimum of two permanent benchmarks on Project site,<br />

referenced to data established by survey control points. Comply with authorities having<br />

jurisdiction for type and size of benchmark.<br />

3.5 INSTALLATION<br />

A. General: Locate the Work and components of the Work accurately, in correct alignment and<br />

elevation, as indicated.<br />

1. Make vertical work plumb and make horizontal work level.<br />

2. Where space is limited, install components to maximize space available for maintenance<br />

and ease of removal for replacement.<br />

3. Conceal pipes, ducts, and wiring in finished areas, unless otherwise indicated.<br />

B. Comply with manufacturer's written instructions and recommendations for installing products in<br />

applications indicated.<br />

C. Install products at the time and under conditions that will ensure the best possible results.<br />

Maintain conditions required for product performance until Substantial Completion.<br />

D. Conduct construction operations so no part of the Work is subjected to damaging operations or<br />

loading in excess of that expected during normal conditions of occupancy.<br />

E. Tools and Equipment: Do not use tools or equipment that produce harmful noise levels.<br />

F. Templates: Obtain and distribute to the parties involved templates for work specified to be<br />

factory prepared and field installed. Check Shop Drawings of other work to confirm that<br />

adequate provisions are made for locating and installing products to comply with indicated<br />

requirements.<br />

G. Attachment: Provide blocking and attachment plates and anchors and fasteners of adequate<br />

size and number to securely anchor each component in place, accurately located and aligned<br />

with other portions of the Work. Where size and type of attachments are not indicated, verify<br />

size and type required for load conditions.<br />

1. Mounting Heights: Where mounting heights are not indicated, mount components at<br />

heights directed by Architect.<br />

2. Allow for building movement, including thermal expansion and contraction.<br />

3. Coordinate installation of anchorages. Furnish setting drawings, templates, and<br />

directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and<br />

items with integral anchors, that are to be embedded in concrete or masonry. Deliver<br />

such items to Project site in time for installation.<br />

H. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated,<br />

arrange joints for the best visual effect. Fit exposed connections together to form hairline joints.<br />

I. Hazardous Materials: Use products, cleaners, and installation materials that are not considered<br />

hazardous.<br />

EXECUTION 01 73 00 - 4/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

3.6 CUTTING AND PATCHING<br />

A. Cutting and Patching, General: Employ skilled workers to perform cutting and patching.<br />

Proceed with cutting and patching at the earliest feasible time, and complete without delay.<br />

1. Cut in-place construction to provide for installation of other components or performance<br />

of other construction, and subsequently patch as required to restore surfaces to their<br />

original condition.<br />

2. No exterior concrete or asphalt paving will be cut for any reason without the expressed<br />

written permission of the School District. Directional boring is to be utilized when<br />

practical to do so.<br />

B. Temporary Support: Provide temporary support of work to be cut.<br />

C. Protection: Protect in-place construction during cutting and patching to prevent damage.<br />

Provide protection from adverse weather conditions for portions of Project that might be<br />

exposed during cutting and patching operations.<br />

D. Adjacent Occupied Areas: Avoid interference with use of adjoining areas or interruption of free<br />

passage to adjoining areas.<br />

E. Existing Utility Services and Mechanical/Electrical Systems: Where existing services/systems<br />

are required to be removed, relocated, or abandoned, bypass such services/systems before<br />

cutting to prevent interruption to occupied areas.<br />

F. Cutting: Cut in-place construction by sawing, drilling, breaking, chipping, grinding, and similar<br />

operations, including excavation, using methods least likely to damage elements retained or<br />

adjoining construction. If possible, review proposed procedures with original Installer; comply<br />

with original Installer's written recommendations.<br />

1. In general, use hand or small power tools designed for sawing and grinding, not<br />

hammering and chopping. Cut holes and slots neatly to minimum size required, and with<br />

minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.<br />

2. Finished Surfaces: Cut or drill from the exposed or finished side into concealed surfaces.<br />

3. Concrete and Masonry: Cut using a cutting machine, such as an abrasive saw or a<br />

diamond-core drill.<br />

4. Excavating and Backfilling: Comply with requirements in applicable Division 31 Sections<br />

where required by cutting and patching operations.<br />

5. Mechanical and Electrical Services: Cut off pipe or conduit in walls or partitions to be<br />

removed. Cap, valve, or plug and seal remaining portion of pipe or conduit to prevent<br />

entrance of moisture or other foreign matter after cutting.<br />

6. Proceed with patching after construction operations requiring cutting are complete.<br />

G. Patching: Patch construction by filling, repairing, refinishing, closing up, and similar operations<br />

following performance of other work. Patch with durable seams that are as invisible as<br />

practicable. Provide materials and comply with installation requirements specified in other<br />

Sections, where applicable.<br />

1. Inspection: Where feasible, test and inspect patched areas after completion to<br />

demonstrate physical integrity of installation.<br />

2. Exposed Finishes: Restore exposed finishes of patched areas and extend finish<br />

restoration into retained adjoining construction in a manner that will minimize evidence of<br />

patching and refinishing.<br />

EXECUTION 01 73 00 - 5/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

3. Floors and Walls: Where walls or partitions that are removed extend one finished area<br />

into another, patch and repair floor and wall surfaces in the new space. Provide an even<br />

surface of uniform finish, color, texture, and appearance. Remove in-place floor and wall<br />

coverings and replace with new materials, if necessary, to achieve uniform color and<br />

appearance.<br />

4. Ceilings: Patch, repair, or rehang in-place ceilings as necessary to provide an evenplane<br />

surface of uniform appearance.<br />

5. Exterior Building Enclosure: Patch components in a manner that restores enclosure to a<br />

weathertight condition.<br />

H. Cleaning: Clean areas and spaces where cutting and patching are performed. Remove paint,<br />

mortar, oils, putty, and similar materials from adjacent finished surfaces.<br />

3.7 PROGRESS CLEANING<br />

A. General: Clean Project site and work areas daily, including common areas. Enforce<br />

requirements strictly. Dispose of materials lawfully.<br />

1. Comply with requirements in NFPA 241 for removal of combustible waste materials and<br />

debris.<br />

2. Do not hold waste materials more than seven days during normal weather or three days if<br />

the temperature is expected to rise above 80 deg F (27 deg C) .<br />

3. Containerize hazardous and unsanitary waste materials separately from other waste.<br />

Mark containers appropriately and dispose of legally, according to regulations.<br />

B. Site: Maintain Project site free of waste materials and debris.<br />

C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for<br />

proper execution of the Work.<br />

1. Remove liquid spills promptly.<br />

2. Where dust would impair proper execution of the Work, broom-clean or vacuum the<br />

entire work area, as appropriate.<br />

D. Installed Work: Keep installed work clean. Clean installed surfaces according to written<br />

instructions of manufacturer or fabricator of product installed, using only cleaning materials<br />

specifically recommended. If specific cleaning materials are not recommended, use cleaning<br />

materials that are not hazardous to health or property and that will not damage exposed<br />

surfaces.<br />

E. Concealed Spaces: Remove debris from concealed spaces before enclosing the space.<br />

F. Exposed Surfaces in Finished Areas: Clean exposed surfaces and protect as necessary to<br />

ensure freedom from damage and deterioration at time of Substantial Completion.<br />

G. Waste Disposal: Do not bury or burn waste materials on-site. Do not wash waste materials<br />

down sewers or into waterways.<br />

H. During handling and installation, clean and protect construction in progress and adjoining<br />

materials already in place. Apply protective covering where required to ensure protection from<br />

damage or deterioration at Substantial Completion.<br />

EXECUTION 01 73 00 - 6/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

I. Clean and provide maintenance on completed construction as frequently as necessary through<br />

the remainder of the construction period. Adjust and lubricate operable components to ensure<br />

operability without damaging effects.<br />

J. Limiting Exposures: Supervise construction operations to assure that no part of the<br />

construction, completed or in progress, is subject to harmful, dangerous, damaging, or<br />

otherwise deleterious exposure during the construction period.<br />

3.8 STARTING AND ADJUSTING<br />

A. Start equipment and operating components to confirm proper operation. Remove<br />

malfunctioning units, replace with new units, and retest.<br />

B. Adjust equipment for proper operation. Adjust operating components for proper operation<br />

without binding.<br />

C. Test each piece of equipment to verify proper operation. Test and adjust controls and safeties.<br />

Replace damaged and malfunctioning controls and equipment.<br />

D. Manufacturer's Field Service: Comply with qualification requirements in Division 01 Section<br />

"Quality Requirements."<br />

3.9 PROTECTION OF INSTALLED CONSTRUCTION<br />

A. Provide final protection and maintain conditions that ensure installed Work is without damage or<br />

deterioration at time of Substantial Completion.<br />

B. Comply with manufacturer's written instructions for temperature and relative humidity.<br />

3.10 CORRECTION OF THE WORK<br />

A. Repair or remove and replace defective construction. Restore damaged substrates and<br />

finishes.<br />

1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up<br />

with matching materials, and properly adjusting operating equipment.<br />

B. Restore permanent facilities used during construction to their specified condition.<br />

C. Remove and replace damaged surfaces that are exposed to view if surfaces cannot be repaired<br />

without visible evidence of repair.<br />

D. Repair components that do not operate properly. Remove and replace operating components<br />

that cannot be repaired.<br />

E. Remove and replace chipped, scratched, and broken glass or reflective surfaces.<br />

END OF SECTION 01 73 00<br />

EXECUTION 01 73 00 - 7/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

This page intentionally left blank.<br />

EXECUTION 01 73 00 - 8/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 01 77 00 - CLOSEOUT PROCEDURES<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section includes administrative and procedural requirements for contract closeout, including,<br />

but not limited to, the following:<br />

1. Substantial Completion procedures.<br />

2. Final completion procedures.<br />

3. Warranties.<br />

4. Final cleaning.<br />

B. Related Sections:<br />

1. Division 01 Section "Operation and Maintenance Data" for operation and maintenance<br />

manual requirements.<br />

2. Division 01 Section "Project Record Documents" for submitting Record Drawings, Record<br />

Specifications, and Record Product Data.<br />

3. Division 01 Section "Demonstration and Training" for requirements for instructing Owner's<br />

personnel.<br />

4. Divisions 02 through 49 Sections for specific closeout and special cleaning requirements<br />

for the Work in those Sections.<br />

1.2 SUBSTANTIAL COMPLETION<br />

A. Preliminary Procedures: Before requesting inspection for determining date of Substantial<br />

Completion, complete the following. List items below that are incomplete with request.<br />

1. Prepare a list of items to be completed and corrected (punch list), the value of items on<br />

the list, and reasons why the Work is not complete.<br />

2. Advise Owner of pending insurance changeover requirements.<br />

3. Submit specific warranties, workmanship bonds, maintenance service agreements, final<br />

certifications, and similar documents.<br />

4. Obtain and submit releases permitting Owner unrestricted use of the Work and access to<br />

services and utilities. Include occupancy permits, operating certificates, and similar<br />

releases.<br />

5. Prepare and submit Project Record Documents, operation and maintenance manuals,<br />

final completion construction photographic documentation, damage or settlement<br />

surveys, property surveys, and similar final record information.<br />

6. Deliver tools, spare parts, extra materials, and similar items to location designated by<br />

Owner. Label with manufacturer's name and model number where applicable.<br />

7. Make final changeover of permanent locks and deliver keys to Owner. Advise Owner's<br />

personnel of changeover in security provisions.<br />

8. Complete startup testing of systems.<br />

9. Submit test/adjust/balance records.<br />

10. Terminate and remove temporary facilities from Project site, along with mockups,<br />

construction tools, and similar elements.<br />

11. Advise Owner of changeover in heat and other utilities.<br />

CLOSEOUT PROCEDURES 01 77 00 - 1/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

12. Submit changeover information related to Owner's occupancy, use, operation, and<br />

maintenance.<br />

13. Complete final cleaning requirements, including touchup painting.<br />

14. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual<br />

defects.<br />

B. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of<br />

request, Architect will either proceed with inspection or notify Contractor of unfulfilled<br />

requirements. Architect will prepare the Certificate of Substantial Completion after inspection or<br />

will notify Contractor of items, either on Contractor's list or additional items identified by<br />

Architect, that must be completed or corrected before certificate will be issued.<br />

1. Reinspection: Request reinspection when the Work identified in previous inspections as<br />

incomplete is completed or corrected.<br />

2. Results of completed inspection will form the basis of requirements for final completion.<br />

1.3 FINAL COMPLETION<br />

A. Preliminary Procedures: Before requesting final inspection for determining final completion,<br />

complete the following:<br />

1. Submit a final Application for Payment according to Division 01 Section "Payment<br />

Procedures."<br />

2. Submit certified copy of Architect's Substantial Completion inspection list of items to be<br />

completed or corrected (punch list), endorsed and dated by Architect. The certified copy<br />

of the list shall state that each item has been completed or otherwise resolved for<br />

acceptance.<br />

3. Submit evidence of final, continuing insurance coverage complying with insurance<br />

requirements.<br />

4. Submit pest-control final inspection report and warranty.<br />

5. Instruct Owner's personnel in operation, adjustment, and maintenance of products,<br />

equipment, and systems.<br />

B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request,<br />

Architect will either proceed with inspection or notify Contractor of unfulfilled requirements.<br />

Architect will prepare a final Certificate for Payment after inspection or will notify Contractor of<br />

construction that must be completed or corrected before certificate will be issued.<br />

1. Reinspection: Request reinspection when the Work identified in previous inspections as<br />

incomplete is completed or corrected.<br />

1.4 LIST OF INCOMPLETE ITEMS (PUNCH LIST)<br />

A. Organization of List: Include name and identification of each space and area affected by<br />

construction operations for incomplete items and items needing correction including, if<br />

necessary, areas disturbed by Contractor that are outside the limits of construction.<br />

1. Organize list of spaces in sequential order, starting with exterior areas first.<br />

2. Organize items applying to each space by major element, including categories for ceiling,<br />

individual walls, floors, equipment, and building systems.<br />

3. Submit list of incomplete items in the following format:<br />

a. One paper copy, unless otherwise indicated. Architect.<br />

CLOSEOUT PROCEDURES 01 77 00 - 2/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

1.5 WARRANTIES<br />

A. Submittal Time: Submit written warranties on request of Architect for designated portions of the<br />

Work where commencement of warranties other than date of Substantial Completion is<br />

indicated.<br />

B. Organize warranty documents into an orderly sequence based on the table of contents of the<br />

Project Manual.<br />

1. Bind warranties and bonds in heavy-duty, 3-ring, vinyl-covered, loose-leaf binders,<br />

thickness as necessary to accommodate contents, and sized to receive 215-by-280-mm<br />

(8-1/2-by-11-inch) paper.<br />

2. Provide heavy paper dividers with plastic-covered tabs for each separate warranty. Mark<br />

tab to identify the product or installation. Provide a typed description of the product or<br />

installation, including the name of the product and the name, address, and telephone<br />

number of Installer.<br />

3. Identify each binder on the front and spine with the typed or printed title "WARRANTIES,"<br />

Project name, and name of Contractor.<br />

4. Scan warranties and bonds and assemble complete warranty and bond submittal<br />

package into a single indexed electronic PDF file with links enabling navigation to each<br />

item. Provide table of contents at beginning of document.<br />

C. Provide additional copies of each warranty to include in operation and maintenance manuals.<br />

PART 2 - PRODUCTS<br />

2.1 MATERIALS<br />

A. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or<br />

fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially<br />

hazardous to health or property or that might damage finished surfaces.<br />

PART 3 - EXECUTION<br />

3.1 FINAL CLEANING<br />

A. General: Perform final cleaning. Conduct cleaning and waste-removal operations to comply<br />

with local laws and ordinances and Federal and local environmental and antipollution<br />

regulations.<br />

B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each<br />

surface or unit to condition expected in an average commercial building cleaning and<br />

maintenance program. Comply with manufacturer's written instructions.<br />

1. Complete the following cleaning operations before requesting inspection for certification<br />

of Substantial Completion for entire Project or for a portion of Project:<br />

a. Clean Project site, yard, and grounds, in areas disturbed by construction activities,<br />

including landscape development areas, of rubbish, waste material, litter, and<br />

other foreign substances.<br />

CLOSEOUT PROCEDURES 01 77 00 - 3/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

b. Sweep paved areas broom clean. Remove petrochemical spills, stains, and other<br />

foreign deposits.<br />

c. Rake grounds that are neither planted nor paved to a smooth, even-textured<br />

surface.<br />

d. Remove tools, construction equipment, machinery, and surplus material from<br />

Project site.<br />

e. Clean exposed exterior and interior hard-surfaced finishes to a dirt-free condition,<br />

free of stains, films, and similar foreign substances. Avoid disturbing natural<br />

weathering of exterior surfaces. Restore reflective surfaces to their original<br />

condition.<br />

f. Remove debris and surface dust from limited access spaces, including roofs,<br />

plenums, shafts, trenches, equipment vaults, manholes, attics, and similar spaces.<br />

g. Sweep concrete floors broom clean in unoccupied spaces.<br />

h. Vacuum carpet and similar soft surfaces, removing debris and excess nap;<br />

shampoo if visible soil or stains remain.<br />

i. Clean transparent materials, including mirrors and glass in doors and windows.<br />

Remove glazing compounds and other noticeable, vision-obscuring materials.<br />

Replace chipped or broken glass and other damaged transparent materials.<br />

Polish mirrors and glass, taking care not to scratch surfaces.<br />

j. Remove labels that are not permanent.<br />

k. Touch up and otherwise repair and restore marred, exposed finishes and surfaces.<br />

Replace finishes and surfaces that cannot be satisfactorily repaired or restored or<br />

that already show evidence of repair or restoration.<br />

1) Do not paint over "UL" and other required labels and identification, including<br />

mechanical and electrical nameplates.<br />

l. Wipe surfaces of mechanical and electrical equipment and similar equipment.<br />

Remove excess lubrication, paint and mortar droppings, and other foreign<br />

substances.<br />

m. Replace parts subject to operating conditions during construction that may impede<br />

operation or reduce longevity.<br />

n. Clean plumbing fixtures to a sanitary condition, free of stains, including stains<br />

resulting from water exposure.<br />

o. Replace disposable air filters and clean permanent air filters. Clean exposed<br />

surfaces of diffusers, registers, and grills.<br />

p. Clean light fixtures, lamps, globes, and reflectors to function with full efficiency.<br />

Replace burned-out bulbs, and those noticeably dimmed by hours of use, and<br />

defective and noisy starters in fluorescent and mercury vapor fixtures to comply<br />

with requirements for new fixtures.<br />

q. Leave Project clean and ready for occupancy.<br />

C. Pest Control: Engage an experienced, licensed exterminator to make a final inspection and rid<br />

Project of rodents, insects, and other pests. Prepare a report.<br />

END OF SECTION 01 77 00<br />

CLOSEOUT PROCEDURES 01 77 00 - 4/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 01 78 23 - OPERATION AND MAINTENANCE DATA<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. This Section includes administrative and procedural requirements for preparing operation and<br />

maintenance manuals, including the following:<br />

1. Emergency manuals.<br />

2. Operation manuals for systems, subsystems, and equipment.<br />

3. Maintenance manuals for the care and maintenance of products, materials, and finishes,<br />

systems and equipment.<br />

B. See Divisions 02 through 49 Sections for specific operation and maintenance manual<br />

requirements for the Work in those Sections.<br />

1.2 SUBMITTALS<br />

A. Manual: Submit one copy of each manual in final form at least 15 days before final inspection.<br />

Architect will return copy with comments within 15 days after final inspection.<br />

1. Correct or modify each manual to comply with Architect's comments. Submit 2 copies of<br />

each corrected manual within 15 days of receipt of Architect's comments.<br />

PART 2 - PRODUCTS<br />

2.1 <strong>MANUAL</strong>S, GENERAL<br />

A. Organization: Unless otherwise indicated, organize each manual into a separate section for<br />

each system and subsystem, and a separate section for each piece of equipment not part of a<br />

system. Each manual shall contain a title page, table of contents, and manual contents.<br />

B. Title Page: Enclose title page in transparent plastic sleeve. Include the following information:<br />

1. Subject matter included in manual.<br />

2. Name and address of Project.<br />

3. Name and address of Owner.<br />

4. Date of submittal.<br />

5. Name, address, and telephone number of Contractor.<br />

6. Name and address of Architect.<br />

7. Cross-reference to related systems in other operation and maintenance manuals.<br />

C. Table of Contents: List each product included in manual, identified by product name, indexed to<br />

the content of the volume, and cross-referenced to Specification Section number in Project<br />

Manual.<br />

OPERATION AND MAINTENANCE DATA 01 78 23 - 1/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

D. Manual Contents: Organize into sets of manageable size. Arrange contents alphabetically by<br />

system, subsystem, and equipment. If possible, assemble instructions for subsystems,<br />

equipment, and components of one system into a single binder.<br />

1. Binders: Heavy-duty, 3-ring, vinyl-covered, loose-leaf binders, in thickness necessary to<br />

accommodate contents, sized to hold 215-by-280-mm (8-1/2-by-11-inch) paper; with<br />

clear plastic sleeve on spine to hold label describing contents and with pockets inside<br />

covers to hold folded oversize sheets.<br />

a. Identify each binder on front and spine, with printed title "OPERATION AND<br />

MAINTENANCE <strong>MANUAL</strong>," Project title or name, and subject matter of contents.<br />

Indicate volume number for multiple-volume sets.<br />

2. Dividers: Heavy-paper dividers with plastic-covered tabs for each section. Mark each<br />

tab to indicate contents. Include typed list of products and major components of<br />

equipment included in the section on each divider, cross-referenced to Specification<br />

Section number and title of Project Manual.<br />

3. Protective Plastic Sleeves: Transparent plastic sleeves designed to enclose diagnostic<br />

software diskettes for computerized electronic equipment.<br />

4. Drawings: Attach reinforced, punched binder tabs on drawings and bind with text.<br />

a. If oversize drawings are necessary, fold drawings to same size as text pages and<br />

use as foldouts.<br />

b. If drawings are too large to be used as foldouts, fold and place drawings in labeled<br />

envelopes and bind envelopes in rear of manual. At appropriate locations in<br />

manual, insert typewritten pages indicating drawing titles, descriptions of contents,<br />

and drawing locations.<br />

2.2 EMERGENCY <strong>MANUAL</strong>S<br />

A. Content: Organize manual into a separate section for type of emergency, emergency<br />

instructions, and emergency procedures.<br />

B. Type of Emergency: Where applicable for each type of emergency indicated below, include<br />

instructions and procedures for each system, subsystem, piece of equipment, and component<br />

for fire, water leak, power failure and equipment failure.<br />

C. Emergency Instructions: Describe and explain warnings, trouble indications, error messages,<br />

and similar codes and signals. Include responsibilities of Owner's operating personnel for<br />

notification of Installer, supplier, and manufacturer to maintain warranties.<br />

D. Emergency Procedures: Include instructions on stopping, shutdown instructions for each type<br />

of emergency, operating instructions for conditions outside normal operating limits, and required<br />

sequences for electric or electronic systems.<br />

2.3 OPERATION <strong>MANUAL</strong>S<br />

A. Content: In addition to requirements in this Section, include operation data required in<br />

individual Specification Sections and equipment descriptions, operating standards, operating<br />

procedures, operating logs, wiring and control diagrams, and license requirements.<br />

B. Descriptions: Include the following:<br />

OPERATION AND MAINTENANCE DATA 01 78 23 - 2/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

1. Product name and model number.<br />

2. Manufacturer's name.<br />

3. Equipment identification with serial number of each component.<br />

4. Equipment function.<br />

5. Operating characteristics.<br />

6. Limiting conditions.<br />

7. Performance curves.<br />

8. Engineering data and tests.<br />

9. Complete nomenclature and number of replacement parts.<br />

C. Operating Procedures: Include start-up, break-in, and control procedures; stopping and normal<br />

shutdown instructions; routine, normal, seasonal, and weekend operating instructions; and<br />

required sequences for electric or electronic systems.<br />

D. Systems and Equipment Controls: Describe the sequence of operation, and diagram controls<br />

as installed.<br />

E. Piped Systems: Diagram piping as installed, and identify color-coding where required for<br />

identification.<br />

2.4 PRODUCT MAINTENANCE <strong>MANUAL</strong><br />

A. Content: Organize manual into a separate section for each product, material, and finish.<br />

Include source information, product information, maintenance procedures, repair materials and<br />

sources, and warranties and bonds, as described below.<br />

B. Source Information: List each product included in manual, identified by product name and<br />

arranged to match manual's table of contents. For each product, list name, address, and<br />

telephone number of Installer or supplier and maintenance service agent, and cross-reference<br />

Specification Section number and title in Project Manual.<br />

C. Product Information: Include the following, as applicable:<br />

1. Product name and model number.<br />

2. Manufacturer's name.<br />

3. Color, pattern, and texture.<br />

4. Material and chemical composition.<br />

5. Reordering information for specially manufactured products.<br />

D. Maintenance Procedures: Include manufacturer's written recommendations and inspection<br />

procedures, types of cleaning agents, methods of cleaning, schedule for cleaning and<br />

maintenance, and repair instructions.<br />

E. Repair Materials and Sources: Include lists of materials and local sources of materials and<br />

related services.<br />

F. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and<br />

conditions that would affect validity of warranties or bonds.<br />

2.5 SYSTEMS AND EQUIPMENT MAINTENANCE <strong>MANUAL</strong><br />

A. Content: For each system, subsystem, and piece of equipment not part of a system, include<br />

source information, manufacturers' maintenance documentation, maintenance procedures,<br />

OPERATION AND MAINTENANCE DATA 01 78 23 - 3/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

maintenance and service schedules, spare parts list and source information, maintenance<br />

service contracts, and warranty and bond information, as described below.<br />

B. Source Information: List each system, subsystem, and piece of equipment included in manual,<br />

identified by product name and arranged to match manual's table of contents. For each<br />

product, list name, address, and telephone number of Installer or supplier and maintenance<br />

service agent, and cross-reference Specification Section number and title in Project Manual.<br />

C. Manufacturers' Maintenance Documentation: Manufacturers' maintenance documentation<br />

including maintenance instructions, drawings and diagrams for maintenance, nomenclature of<br />

parts and components, and recommended spare parts for each component part or piece of<br />

equipment:<br />

D. Maintenance Procedures: Include test and inspection instructions, troubleshooting guide,<br />

disassembly instructions, and adjusting instructions that detail essential maintenance<br />

procedures:<br />

E. Maintenance and Service Schedules: Include service and lubrication requirements, list of<br />

required lubricants for equipment, and separate schedules for preventive and routine<br />

maintenance and service with standard time allotment.<br />

F. Spare Parts List and Source Information: Include lists of replacement and repair parts, with<br />

parts identified and cross-referenced to manufacturers' maintenance documentation and local<br />

sources of maintenance materials and related services.<br />

G. Maintenance Service Contracts: Include copies of maintenance agreements with name and<br />

telephone number of service agent.<br />

H. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and<br />

conditions that would affect validity of warranties or bonds.<br />

PART 3 - EXECUTION<br />

3.1 <strong>MANUAL</strong> PREPARATION<br />

A. Emergency Manual: Assemble a complete set of emergency information indicating procedures<br />

for use by emergency personnel and by Owner's operating personnel for types of emergencies<br />

indicated.<br />

B. Product Maintenance Manual: Assemble a complete set of maintenance data indicating care<br />

and maintenance of each product, material, and finish incorporated into the Work.<br />

C. Operation and Maintenance Manuals: Assemble a complete set of operation and maintenance<br />

data indicating operation and maintenance of each system, subsystem, and piece of equipment<br />

not part of a system.<br />

D. Manufacturers' Data: Where manuals contain manufacturers' standard printed data, include<br />

only sheets pertinent to product or component installed. Mark each sheet to identify each<br />

product or component incorporated into the Work. If data include more than one item in a<br />

tabular format, identify each item using appropriate references from the Contract Documents.<br />

Identify data applicable to the Work and delete references to information not applicable.<br />

OPERATION AND MAINTENANCE DATA 01 78 23 - 4/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

E. Drawings: Prepare drawings supplementing manufacturers' printed data to illustrate the<br />

relationship of component parts of equipment and systems and to illustrate control sequence<br />

and flow diagrams. Coordinate these drawings with information contained in Record Drawings<br />

to ensure correct illustration of completed installation.<br />

1. Do not use original Project Record Documents as part of operation and maintenance<br />

manuals.<br />

F. Comply with Division 01 Section "Closeout Procedures" for schedule for submitting operation<br />

and maintenance documentation.<br />

END OF SECTION 01 78 23<br />

OPERATION AND MAINTENANCE DATA 01 78 23 - 5/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

This page intentionally left blank.<br />

OPERATION AND MAINTENANCE DATA 01 78 23 - 6/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 01 78 39 - <strong>PROJECT</strong> RECORD DOCUMENTS<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. This Section includes administrative and procedural requirements for Project Record<br />

Documents, including the following:<br />

1. Record Drawings.<br />

2. Record Specifications.<br />

3. Record Product Data.<br />

B. See Division 01 Section "Operation and Maintenance Data" for operation and maintenance<br />

manual requirements.<br />

C. See Divisions 02 through 49 Sections for specific requirements for Project Record Documents<br />

of the Work in those Sections.<br />

1.2 SUBMITTALS<br />

A. Record Drawings: Comply with the following:<br />

1. Number of Copies: Submit one set(s) of marked-up Record Prints.<br />

2. Number of Copies: Submit copies of Record Drawings as follows:<br />

a. Initial Submittal: Submit one set of marked-up Record Prints. Architect will review<br />

for completeness.<br />

b. Final Submittal: Submit one final set of marked-up Record Prints.<br />

B. Record Specifications: Submit one copy of Project's Specifications, including addenda and<br />

contract modifications.<br />

C. Record Product Data: Submit one copy of each Product Data submittal.<br />

PART 2 - PRODUCTS<br />

2.1 RECORD DRAWINGS<br />

A. Record Prints: Maintain one set of blue- or black-line white prints of the Contract Drawings and<br />

Shop Drawings.<br />

1. Preparation: Mark Record Prints to show the actual installation where installation varies<br />

from that shown originally. Require individual or entity who obtained record data,<br />

whether individual or entity is Installer, subcontractor, or similar entity, to prepare the<br />

marked-up Record Prints.<br />

a. Give particular attention to information on concealed elements that would be<br />

difficult to identify or measure and record later.<br />

<strong>PROJECT</strong> RECORD DOCUMENTS 01 78 39 - 1/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

b. Record data as soon as possible after obtaining it. Record and check the markup<br />

before enclosing concealed installations.<br />

2. Mark the Contract Drawings or Shop Drawings, whichever is most capable of showing<br />

actual physical conditions, completely and accurately. If Shop Drawings are marked,<br />

show cross-reference on the Contract Drawings.<br />

3. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish<br />

between changes for different categories of the Work at same location.<br />

4. Note Construction Change Directive numbers, alternate numbers, Change Order<br />

numbers, and similar identification, where applicable.<br />

B. Format: Identify and date each Record Drawing; include the designation "<strong>PROJECT</strong> RECORD<br />

DRAWING" in a prominent location.<br />

1. Record Prints: Organize Record Prints and newly prepared Record Drawings into<br />

manageable sets. Bind each set with durable paper cover sheets. Include identification<br />

on cover sheets.<br />

2.2 RECORD SPECIFICATIONS<br />

A. Preparation: Mark Specifications to indicate the actual product installation where installation<br />

varies from that indicated in Specifications, addenda, and contract modifications.<br />

1. Give particular attention to information on concealed products and installations that<br />

cannot be readily identified and recorded later.<br />

2. Mark copy with the proprietary name and model number of products, materials, and<br />

equipment furnished, including substitutions and product options selected.<br />

3. Record the name of manufacturer, supplier, Installer, and other information necessary to<br />

provide a record of selections made.<br />

4. Note related Change Orders and Record Drawings where applicable.<br />

2.3 RECORD PRODUCT DATA<br />

A. Preparation: Mark Product Data to indicate the actual product installation where installation<br />

varies substantially from that indicated in Product Data submittal.<br />

1. Give particular attention to information on concealed products and installations that<br />

cannot be readily identified and recorded later.<br />

2. Include significant changes in the product delivered to Project site and changes in<br />

manufacturer's written instructions for installation.<br />

3. Note related Change Orders and Record Drawings where applicable.<br />

2.4 MISCELLANEOUS RECORD SUBMITTALS<br />

A. Assemble miscellaneous records required by other Specification Sections for miscellaneous<br />

record keeping and submittal in connection with actual performance of the Work. Bind or file<br />

miscellaneous records and identify each, ready for continued use and reference.<br />

<strong>PROJECT</strong> RECORD DOCUMENTS 01 78 39 - 2/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

PART 3 - EXECUTION<br />

3.1 RECORDING AND MAINTENANCE<br />

A. Recording: Maintain one copy of each submittal during the construction period for Project<br />

Record Document purposes. Post changes and modifications to Project Record Documents as<br />

they occur; do not wait until the end of Project.<br />

B. Maintenance of Record Documents and Samples: Store Record Documents and Samples in<br />

the field office apart from the Contract Documents used for construction. Do not use Project<br />

Record Documents for construction purposes. Maintain Record Documents in good order and<br />

in a clean, dry, legible condition, protected from deterioration and loss. Provide access to<br />

Project Record Documents for Architect's reference during normal working hours.<br />

END OF SECTION 01 78 39<br />

<strong>PROJECT</strong> RECORD DOCUMENTS 01 78 39 - 3/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

This page intentionally left blank.<br />

<strong>PROJECT</strong> RECORD DOCUMENTS 01 78 39 - 4/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 01 79 00 - DEMONSTRATION AND TRAINING<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. This Section includes administrative and procedural requirements for instructing Owner's<br />

personnel, including the following:<br />

1. Demonstration of operation of systems, subsystems, and equipment.<br />

2. Training in operation and maintenance of systems, subsystems, and equipment.<br />

B. See Divisions 02 through 49 Sections Sections for specific requirements for demonstration and<br />

training for products in those Sections.<br />

PART 2 - PRODUCTS<br />

2.1 INSTRUCTION PROGRAM<br />

A. Program Structure: Develop an instruction program that includes individual training for each<br />

system and equipment not part of a system, as required by individual Specification Sections,<br />

and as follows:<br />

B. Training Modules: For each module, include instruction for the following:<br />

1. Basis of System Design, Operational Requirements, and Criteria: Include system and<br />

equipment descriptions, operating standards, regulatory requirements, equipment<br />

function, operating characteristics, limiting conditions, and performance curves.<br />

2. Documentation: Review emergency, operations, and maintenance manuals; Project<br />

Record Documents; identification systems; warranties and bonds; and maintenance<br />

service agreements.<br />

3. Emergencies: Include instructions on stopping; shutdown instructions; operating<br />

instructions for conditions outside normal operating limits; instructions on meaning of<br />

warnings, trouble indications, and error messages; and required sequences for electric or<br />

electronic systems.<br />

4. Operations: Include startup, break-in, control, and safety procedures; stopping and<br />

normal shutdown instructions; routine, normal, seasonal, and weekend operating<br />

instructions; operating procedures for emergencies and equipment failure; and required<br />

sequences for electric or electronic systems.<br />

5. Adjustments: Include alignments and checking, noise, vibration, economy, and efficiency<br />

adjustments.<br />

6. Troubleshooting: Include diagnostic instructions and test and inspection procedures.<br />

7. Maintenance: Include inspection procedures, types of cleaning agents, methods of<br />

cleaning, procedures for preventive and routine maintenance, and instruction on use of<br />

special tools.<br />

8. Repairs: Include diagnosis, repair, and disassembly instructions; instructions for<br />

identifying parts; and review of spare parts needed for operation and maintenance.<br />

DEMONSTRATION AND TRAINING 01 79 00 - 1/2


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

PART 3 - EXECUTION<br />

3.1 INSTRUCTION<br />

A. Engage qualified instructors to instruct Owner's personnel to adjust, operate, and maintain<br />

systems, subsystems, and equipment not part of a system.<br />

B. Scheduling: Provide instruction at mutually agreed on times. For equipment that requires<br />

seasonal operation, provide similar instruction at start of each season.<br />

1. Schedule training with Owner with at least seven days' advance notice.<br />

END OF SECTION 01 79 00<br />

DEMONSTRATION AND TRAINING 01 79 00 - 2/2


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

SECTION 033000 - CAST-IN-PLACE CONCRETE<br />

PART 1 - GENERAL<br />

1.01 SUMMARY<br />

A. Section Includes:<br />

1. Formwork for cast-in-place concrete, with shoring, bracing, and anchorage.<br />

2. Formwork accessories.<br />

3. Form stripping.<br />

4. Reinforcing steel for cast-in-place concrete.<br />

5. Cast-in-place concrete, including concrete for the following:<br />

a. Foundations, footings.<br />

b. Slabs on grade.<br />

c. Equipment pads and bases.<br />

d. Columns and beams.<br />

e. Retaining walls.<br />

6. Concrete curing.<br />

B. Related Sections:<br />

1. Unit Masonry: Division 4.<br />

1.02 DEFINITIONS<br />

A. Unexposed Finish: A general-use finish, with no appearance criteria, applicable to all formed<br />

concrete concealed from view after completion of construction.<br />

B. Exposed Finish: A general-use finish applicable to all formed concrete exposed to view and<br />

including surfaces which may receive a paint coating (if any).<br />

1.03 SUBMITTALS<br />

A. Shop Drawings: Submit shop drawings for fabrication and placement of the following:<br />

1. Reinforcement: Comply with ACI SP-66. Include bar schedules, diagrams of bent bars,<br />

arrangement of concrete reinforcement, and splices. Show construction joints.<br />

B. Quality Control Submittals: Submit the following information related to quality assurance<br />

requirements specified: Design data: Submit proposed mix designs and test data before concrete<br />

operations begin. Identify for each mix submitted the method by which proportions have been<br />

selected.<br />

1. For mix designs based on field experience, include individual strength test results, standard<br />

deviation, and required average compressive strength (f’c) calculations.<br />

2. For mix designs based on trial mixtures, include trial mix proportions, test results, and<br />

graphical analysis and show required average compressive strength (f’c).<br />

3. Indicate quantity of each ingredient per cubic yard of concrete.<br />

4. Indicate type and quantity of admixtures proposed or required.<br />

5. Test reports: Submit laboratory test reports for all testing specified.<br />

CAST IN PLACE CONCRETE 033000-1


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

6. Certifications: Submit affidavits from an independent testing agency certifying that all<br />

materials furnished under this section conform to specifications.<br />

7. Certifications: Provide certification from manufacturers of concrete admixtures that chloride<br />

content complies with specified requirements.<br />

8. Submit batch tickets complying with ASTM C 685 or delivery tickets complying with ASTM<br />

C 94, as applicable, for each load of concrete used in the work.<br />

1.04 QUALITY ASSURANCE<br />

A. Codes and Standards: Comply with the following documents, except where requirements of the<br />

contract documents or of governing authorities are more stringent:<br />

1. ACI 301.<br />

2. ACI 318.<br />

3. CRSI Manual of Standard Practice.<br />

B. Testing Agency Services:<br />

1. Employ, at contractor's expense, an independent testing agency acceptable to the Architect to<br />

perform specified tests and other services required for quality assurance.<br />

a. Testing agency shall meet ASTM E 3<strong>29</strong> requirements.<br />

C. Source of Materials: Obtain materials of each type from same source for the entire project.<br />

1.05 DELIVERY, STORAGE, AND HANDLING<br />

A. Deliver reinforcement to project site bundled and tagged with metal tags indicating bar size, lengths and<br />

other data corresponding to information shown on placement drawings.<br />

1. Store concrete reinforcement materials at the site to prevent damage and accumulation of<br />

dirt or rust.<br />

2. Store cementitious materials in a dry, weather tight location. Maintain accurate records of<br />

shipment and use.<br />

B. Store aggregates to permit free drainage and to avoid contamination with deleterious matter or<br />

other aggregates. When stockpiled on ground, discard bottom 6 inches of pile.<br />

C. Handle aggregates to avoid segregation.<br />

PART 2 - PRODUCTS<br />

2.01 FORM WORK<br />

A. Facing Materials:<br />

1. Unexposed finish concrete: Any standard form materials that produce structurally sound<br />

concrete. Exposed finish concrete: Materials selected to offer optimum smooth, stain-free<br />

final appearance and minimum number of joints. Provide materials with sufficient strength<br />

to resist hydrostatic head without bow or deflection in excess of allowable tolerances, and<br />

as follows:<br />

a. Plywood: PS-I "B-B (Concrete Form) Plywood", Class I, Exterior Grade, mill-oiled<br />

and edge sealed.<br />

CAST IN PLACE CONCRETE 033000-2


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

B. Form Work Accessories:<br />

1. Form coating: Form release agent that will not adversely affect concrete surfaces or<br />

prevent subsequent application of concrete coatings.<br />

2. Metal ties: Commercially manufactured types; cone snap ties, taper removable bolt, or<br />

other type which will leave no metal closer than 1-1/2 inches from surface of concrete when<br />

forms are removed, leaving not more that a 1 inch diameter hole in concrete surface.<br />

3. Fillets: Wood or plastic fillets for chamfered corners, in maximum lengths possible.<br />

2.02 REINFORCING MATERIALS<br />

A. Reinforcing Bars: Provide deformed bars complying with the following, except where otherwise<br />

indicated: ASTM A 615, Grade 60.<br />

B. Welded Wire Fabric: ASTM A 185, cold-drawn steel, plain.<br />

C. Reinforcing Accessories:<br />

1. Tie wire: Black annealed type, 16-1/2 gage or heavier.<br />

2. Supports: Bar supports conforming to specifications of CRSI "Manual of Standard<br />

Practice".<br />

Class I (plastic protected) at all formed surfaces which will be exposed to weather.<br />

Class 1 (plastic protected) or Class 2 (stainless steel protected) at all formed surfaces<br />

which will be exposed to view but not to weather.<br />

Precast concrete blocks of strength equal to or greater than specified strength of concrete<br />

or Class 3 supports equipped with sand plates, where concrete will be cast against earth.<br />

Concrete masonry units will not be accepted.<br />

2.03 CONCRETE MATERIALS<br />

A. Portland Cement: ASTM C 150, and as follows:<br />

1. Type I.<br />

2. Fly Ash: Not to be used.<br />

3. Water: Potable<br />

4. Gray and White cement locations as shown on Plans and Details<br />

B. Aggregates:<br />

1. Normal weight concrete: ASTM C 33.<br />

a. Class IN.<br />

b. Gradation as specified below under mix design.<br />

C. Admixtures - General: Admixtures which result in more than 0.1 percent of soluble chloride ions by<br />

weight of cement are prohibited.<br />

D. Air-Entraining Admixture: ASTM C 260 and certified by manufacturer for compatibility with other mix<br />

components.<br />

E. Water-Reducing Admixture: ASTM C 494, Type A.<br />

2.04 GROUT MIXES FOR UNIT MASONRY<br />

A. Comply with ASTM C476. Use grout of consistency that will completely fill spaces intended to<br />

receive grout. Grout shall be 3000 psi minimum and shall be capable of passing through a 1"<br />

diameter pump hose.<br />

CAST IN PLACE CONCRETE 033000-3


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

2.05 MISCELLANEOUS MATERIALS AND ACCESSORIES<br />

A. Waterstops, General: Provide waterstops at construction joints and as otherwise indicated, sized and<br />

configured to suit joints.<br />

1. Polyvinyl chloride waterstops: Corps of Engineers CRD-C 572.<br />

B. Vapor Retarder: Membrane for installation beneath slabs on grade, resistant to decay when tested in<br />

accordance with ASTM E 154, and as follows:<br />

1. 6 mil polyethylene.<br />

C. Nonshrink Grout: ASTM C 1107.<br />

1. Type: Provide nonmetallic type only.<br />

D. Burlap: AASHTO M 182, Class 2 jute or kenaf cloth.<br />

E. Moisture-Retaining Cover: ASTM C 171, and as follows:<br />

1. Curing paper.<br />

2. Polyethylene film.<br />

3. White burlap-polyethylene sheeting.<br />

F<br />

Liquid Curing Compounds:<br />

1. Material - curing compounds: Comply with ASTM C 309, Type I.<br />

a. Non-yellowing formulation where subject to ultraviolet light.<br />

b. Curing and sealing compound: Where indicated, provide curing and sealing<br />

formulation with long-lasting finish that is resistant to chemicals, oil, grease, deicing<br />

salts, and abrasion.<br />

G. Bonding Compound: Non-redispersable acrylic bonding admixture, ASTM C 1059, Type II.<br />

H. Epoxy Bonding Systems: ASTM C 881; type, grade and class as required for project conditions.<br />

2.06 CONCRETE MIX DESIGN<br />

A. Review: Do not begin concrete operations until proposed mix has been reviewed by the Architect.<br />

B. Proportioning of Normal Weight Concrete: Comply with recommendations of AC I 211.1.<br />

C. Required Average Strength: Establish the required average strength f(cr) of the design mix on the<br />

basis of either field experience or trial mixtures as specified in ACI 301, and proportion mixes<br />

accordingly. If trial mixtures method is used, employ an independent testing agency acceptable to<br />

the Architect for preparing and reporting proposed mix design.<br />

D. Admixtures:<br />

1. Air-entraining admixture: Add at rate to achieve specified air content.<br />

a. Do not use in slabs-on-grade scheduled to receive topping, unless manufacturer of<br />

topping recommends use over air-entrained concrete.<br />

2. Water-reducing admixture: Add as required for placement and workability.<br />

3. Do not use admixtures not specified or approved.<br />

E. Design mix to meet or exceed each requirement specified. Where more than one criterion is<br />

specified, the most stringent shall apply. For example, a minimum cement content or maximum<br />

water-cement ratio may be required in order to achieve the required strength.<br />

1. Specified compressive strength (f' c) (ASTM C 39): 4000 psi at 28 days. Maximum water-<br />

CAST IN PLACE CONCRETE 033000-4


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

cement ratio by weight: 0.46 maximum for air-entrained concrete. Maximum slump: 4" + 1”<br />

2. Maximum nominal size of coarse aggregate: As recommended in ACI 211. I.<br />

3. Total air content (ASTM C 173 or ASTM C 231): 3 percent.<br />

F. Mix adjustments: Provided that no additional expense to owner is involved, contractor may submit<br />

for Architect's approval requests for adjustment to approved concrete mixes when circumstances<br />

such as changed project conditions, weather or unfavorable test results occur. Include laboratory<br />

test data substantiating specified properties with mix adjustment requests.<br />

2.07 CONTROL OF MIX IN THE FIELD<br />

A. Slump: A tolerance of up to 1 inch above that specified will be permitted for I batch in 5 consecutive<br />

batches tested. Concrete of lower slump than that specified may be used, provided proper placing and<br />

consolidation is obtained.<br />

1. No addition of water will be acceptable after initial batching of the concrete at the batching plant.<br />

B. Do not use batches that exceed tolerances.<br />

2.08 CONCRETE MIXING<br />

A. On-Site Equipment: Mix concrete materials in appropriate drum type batch machine mixer, in<br />

compliance with ASTM C 685. Mix each batch minimum of 1-1/2 minutes and maximum of 5<br />

minutes before discharging concrete. Clean thoroughly at end of day and before changing concrete<br />

type.<br />

B. Transit Mixers: Mix concrete materials in transit mixers, complying with requirements of ASTM C<br />

94.<br />

PART 3 - EXECUTION<br />

3.01 CONCRETE FORM PREPARATION<br />

A. General: Comply with requirements of ACI 301 for form work, and as herein specified. The<br />

contractor is responsible for design, engineering, and construction of form work, and for its timely<br />

removal.<br />

B. Earth Forms: Hand-trim bottoms and sides of earth forms to profiles indicated on the drawings.<br />

Remove loose dirt before placing concrete.<br />

C. Design: Design and fabricate forms for easy removal, without impact, shock, or damage to concrete<br />

surfaces or other portions of the work. Design to support all applied loads until concrete is<br />

adequately cured, within allowable tolerances and deflection limits.<br />

D. Construction: Construct and brace form work to accurately achieve end results required by contract<br />

documents, with all elements properly located and free of distortion. Provide for necessary<br />

openings, inserts, anchorages, and other features shown or otherwise required.<br />

1. Joints: Minimize form joints and make watertight to prevent leakage of concrete.<br />

2. Align joints symmetrically at exposed conditions.<br />

3. Chamfers: Provide chamfered edges and comers at exposed locations, unless specifically<br />

CAST IN PLACE CONCRETE 033000-5


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

indicated otherwise on the drawings.<br />

4. Permanent openings: Provide openings to accommodate work of other trades, sized and<br />

located accurately. Securely support items built into forms; provide additional bracing at<br />

openings and discontinuities in form work.<br />

5. Temporary openings: Provide temporary openings for cleaning and inspection in most<br />

inconspicuous locations at base of forms, closed with tight-fitting panels designed to<br />

minimize appearance of joints in finished concrete work.<br />

E. Tolerances for Formed Surfaces: Comply with minimum tolerances established in ACI 117, unless<br />

more stringent requirements are indicated on the drawings.<br />

F. Release Agent: Provide either form materials with factory-applied nonabsorptive liner or fieldapplied<br />

form coating. If field-applied coating is employed, thoroughly clean and recondition form<br />

work and reapply coating before each use. Rust on form surfaces is unacceptable.<br />

3.02 VAPOR RETARDER INSTALLATION<br />

A. General: Place vapor retarder sheet over prepared base material, aligning longer dimension parallel<br />

to direction of pour and lapped 6 inches. Seal joints with appropriate tape.<br />

3.03 PLACING REINFORCEMENT<br />

A. General: Comply with requirements of ACI 301 and as herein specified.<br />

B. Preparation: Clean reinforcement of loose rust and mill scale, soil, and other materials which<br />

adversely affect bond with concrete.<br />

C. Placement: Place reinforcement to achieve not less than minimum concrete coverages required for<br />

protection. Accurately position, support, and secure reinforcement against displacement. Provide<br />

Class C tension lap splices complying with ACI 318 unless otherwise indicated. Do not field-bend<br />

partially embedded bars unless otherwise indicated or approved.<br />

1. Use approved bar supports and tie wire, as required. Set wire ties to avoid contact with or<br />

penetration of exposed concrete surfaces. Tack welding of reinforcing is not permitted.<br />

2. Wire fabric: Install in maximum lengths possible, lapping adjoining pieces not less than one<br />

full mesh. Offset end laps to prevent continuous laps in either direction, and splice laps with<br />

tie wire.<br />

3.04 JOINT CONSTRUCTION<br />

A<br />

Construction Joints: Locate and install construction joints as indicated on drawings. If construction<br />

joints are not indicated, locate in manner which will not impair strength and will have least impact on<br />

appearance, as acceptable to the Architect. The surface of concrete construction joints shall be<br />

cleaned and laitance removed. Immediately before new concrete is placed, construction joints shall<br />

be wetted and standing water removed.<br />

1. Keyways: Provide keyways not less than 1-1/2 inches deep.<br />

2. Reinforcement: Continue reinforcement across and perpendicular to construction joints,<br />

unless details specifically indicate otherwise.<br />

3. Waterstops: Provide waterstops as indicated, installing to form continuous, watertight dam,<br />

with field joints fabricated in strict accordance with manufacturer's instructions.<br />

B. Control Joints: Construct contraction joints in slabs poured on grade to form panels of sizes indicated<br />

on drawings, but not more than 15 feet apart in either direction.<br />

CAST IN PLACE CONCRETE 033000-6


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

1. Saw cuts: Form control joints by means of saw cuts one-fourth the depth of the slab,<br />

performed within 12 hours after slab finishing without dislodging aggregate.<br />

3.05 INSTALLATION OF EMBEDDED ITEMS<br />

A. General: Set anchorage devices and other items required for other work connected to or supported<br />

by cast-in-place concrete, using templates, setting drawings, and instructions from suppliers of<br />

items to be embedded.<br />

1. Edge Forms and Screeds: Set edge forms and intermediate screeds as necessary to achieve l<br />

elevations indicated for finished slab surfaces.<br />

3.06 CONCRETE PLACEMENT<br />

A. Inspection: Before beginning concrete placement, inspect form work, reinforcing steel, and items to<br />

be embedded, verifying that all such work has been completed.<br />

1. Wood forms: Moisten immediately before placing concrete in locations where form coatings<br />

are not used.<br />

B. Placement - General: Comply with requirements of ACI 304 and as follows:<br />

1. Schedule continuous placement on concrete to prevent the formation of cold joints.<br />

2. Provide construction joints if concrete for a particular element or component cannot be placed<br />

in continuous operation.<br />

3. Deposit concrete as close as possible to its final location, to avoid segregation.<br />

C. Placement in Forms: Limit horizontal layers to depths which can be properly consolidated, but in no<br />

event greater than 24 inches.<br />

1. Consolidate concrete by means of mechanical vibrators, inserted vertical in freshly placed<br />

concrete in a systematic pattern at close intervals. Penetrate previously placed concrete to<br />

ensure that separate concrete layers are knitted together.<br />

2. Vibrate concrete sufficiently to achieve consistent consolidation without segregation of coarse<br />

aggregates. Do not use vibrators to move concrete laterally.<br />

D. Slab Placement: Schedule continuous placement and consolidation of concrete within planned<br />

construction joints. Thoroughly consolidate concrete without displacing reinforcement or embedded<br />

items, using internal vibrators, vibrating screeds, roller pipe screeds, or other means acceptable to<br />

Architect.<br />

Strike off and level concrete slab surfaces, using highway straightedges, darbies, or bull floats before<br />

bleed water can collect on surface. Do not work concrete further until finishing operations are<br />

commenced.<br />

3.07 FINISHING FORMED SURFACES<br />

A. Repairs - General: Repair surface defects, including tie holes, immediately after removing form<br />

work.<br />

1. Remove honeycombed areas and other defective concrete down to sound concrete, cutting<br />

perpendicular to surface or slightly undercutting. Dampen patch location and area<br />

immediately surrounding it prior to applying bonding compound or patching mortar.<br />

2. Before bonding compound has dried, apply patching mixture matching original concrete in<br />

materials and mix except for omission of coarse aggregate, and using a blend of white and<br />

normal portland cement as necessary to achieve color match. Consolidate thoroughly and<br />

strike off slightly higher than surrounding surface.<br />

CAST IN PLACE CONCRETE 033000-7


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

B. Unexposed Form Finish: Repair tie holes and patch defective areas. Rub down or chip off forms or<br />

other raised areas exceeding 1/4 inch height.<br />

C. Exposed Form Finish: Repair and patch defective areas, with fins or other projections completely<br />

removed and smoothed.<br />

1. Smooth rubbed finish: Apply to surfaces indicated no later than 24 hours after form removal.<br />

a. Wet concrete surfaces to be finished and rub with Carborundum brick or other<br />

abrasive until uniform color and texture are achieved.<br />

b. Do not apply separate grout mixture.<br />

2. Contiguous unformed surfaces: Strike smooth and float to a similar texture tops of walls,<br />

horizontal offsets, and other unformed surfaces. Continue final finish of formed surfaces<br />

across unformed surfaces, unless otherwise specifically indicated.<br />

3.08 FINISHING SLAB<br />

A. Finishing Operations - General:<br />

1. Do not directly apply water to slab surface or dust with cement.<br />

2. Use hand or powered equipment only as recommended in ACI 302.1R.<br />

3. Screeding: Strike off to required grade and within surface tolerances indicated. Verify<br />

conformance to surface tolerances. Correct deficiencies while concrete is still plastic.<br />

4. Bull Floating: Immediately following screeding, bull float or darby before bleed water appears to<br />

eliminate ridges, fill in voids, and embed coarse aggregate. Recheck and correct surface<br />

tolerances.<br />

5. Do not perform subsequent finishing until excess moisture or bleed water has disappeared<br />

and concrete will support either foot pressure with less than 1/4 inch indentation or weight of<br />

power floats without damaging flatness.<br />

6. Final Floating: Float to embed coarse aggregate, to eliminate ridges, to compact concrete, to<br />

consolidate mortar at surface, and to achieve uniform, sandy texture. Recheck and correct<br />

surface tolerances.<br />

7. Trowel Finish: All slabs that receive resilient floor coverings shall be trowel finished.<br />

B. Coordinate appearance and texture of required final finishes with the Architect before application.<br />

1. Apply final finishes in the locations indicated on the drawings.<br />

C. Float Finish: As specified above.<br />

D. Slab Surface Tolerances:<br />

1. Achieve flat, level planes except where grades are indicated. Slope uniformly to drains.<br />

2. Floated and trowel finishes: Depressions between high spots shall not exceed 1/8 inch under<br />

a 10 foot straightedge.<br />

E. Repair of Slab Surfaces: Test slab surfaces for smoothness and to verify surface plane to tolerance<br />

specified.<br />

1. Repair defects as follows:<br />

a. High areas: Correct by grinding after concrete has cured for not less than 14 days.<br />

b. Low areas: Immediately after completion of surface finishing operations, cut out low<br />

areas and replace with fresh concrete. Finish repaired areas to blend with adjacent concrete.<br />

Proprietary patching compounds may be used when approved by the Architect.<br />

2. Crazed or cracked areas: Cut out defective areas, except random cracks and single holes not<br />

CAST IN PLACE CONCRETE 033000-8


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

exceeding 1 inch in diameter, by cutting out and replacing with fresh concrete. Remove defective<br />

areas with clean, square cuts. Dampen exposed concrete and apply bonding compound. Mix,<br />

place, compact and finish patching concrete to match adjacent concrete.<br />

3. Isolated cracks and holes: Groove top of cracks and cut out holes not over 1 inch in diameter.<br />

Dampen cleaned concrete surfaces and apply bonding compound; place dry pack or proprietary<br />

repair compound acceptable to Architect while bonding compound is still active:<br />

a. Dry-pack mix: one part portland cement to 2-1/2 parts fine aggregate and enough<br />

water as required for handling and placing.<br />

b. Install patching mixture and consolidate thoroughly, striking off level with and<br />

matching surrounding surface. Do not allow patched areas to dry out prematurely.<br />

3.09 CONCRETE CURING AND PROTECTION<br />

A. General:<br />

1. Prevent premature drying of freshly placed concrete, and protect from excessively cold or hot<br />

temperatures until concrete has cured.<br />

2. Provide curing of concrete by one of the methods listed and as appropriate to service conditions<br />

and type of applied finish in each case.<br />

B. Curing Period:<br />

1. Not less than 7 days for standard cements and mixes.<br />

C. Formed Surfaces: Cure formed concrete surfaces by moist curing with forms in place for full curing<br />

period or until forms are removed.<br />

1. Keep wooden or metal forms moist when exposed to heat of the sun.<br />

2. If forms are removed prior to completion of curing process, continue curing by one of the<br />

applicable methods specified.<br />

D. Surfaces Not in Contact with Forms:<br />

1. Start curing as soon as free water has disappeared, but before surface is dry. Place to<br />

protect adjacent concrete edges. Acceptable curing methods:<br />

a. Water ponding.<br />

b. Water-saturated sand.<br />

c. Water-fog spray.<br />

d. Saturated burlap: provide 4-inch minimum overlap at joints.<br />

e. Moisture-retaining cover: Lap not less than 3-inches at edges and ends, and seal with<br />

waterproof tape or adhesive. Repair holes or tears during curing period with same tape<br />

or adhesive. Maintain covering in intimate contact with concrete surface. Secure to<br />

avoid displacement.<br />

1. Extend covering past slab edges at least twice the thickness of the slab.<br />

2. Do not use plastic sheeting on surfaces which will be exposed to view when<br />

in service.<br />

3. Curing compound: Apply at rate stated by manufacturer to conform with<br />

moisture-retention requirements specified, using second, immediate<br />

application at right angles to first, if necessary, and reapply if damaged by<br />

rain.<br />

4. Curing and sealing compound: Apply at rate stated by manufacturer to conform<br />

with moisture-retention requirements specified, using second, immediate<br />

application at right angles to first, if necessary, and reapply if damaged by rain.<br />

Apply additional coat near substantial completion to act as sealer.<br />

5. Use curing compounds only in locations permitted or required. Do not apply<br />

CAST IN PLACE CONCRETE 033000-9


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

E. Avoid rapid drying at end of curing period.<br />

to surfaces to receive other finishes, coating, or coverings.<br />

F. General: Comply with recommendations of ACI 347 for shoring and reshoring in multistory<br />

construction.<br />

G. Low-Rise Construction: Extend shoring from ground to roof.<br />

H. Reshoring: Remove shores and reshore in a planned sequence, to avoid damage to partly cured<br />

concrete. Locate and provide adequate reshoring to safely support work without excessive stress or<br />

deflection.<br />

3.10 REMOVAL OF FORMS AND SUPPORTS<br />

A. Non-Load-Bearing Form Work: Provided that concrete has hardened sufficiently that it will not be<br />

damaged, forms not actually supporting weight of concrete or weight of soffit forms may be removed after<br />

concrete has cured at not less than 50 degrees F for 24 hours. Maintain curing and protection operations<br />

after form removal.<br />

B. Load-Bearing Form Work: Do not remove shoring and forms supporting weight of concrete, such as<br />

beam soffits, joists, slabs, and other structural elements, until concrete has attained 75 percent of<br />

specified compressive strength. In addition, the contractor shall have determined that the actual<br />

compressive strength attained is adequate to support the weight of the concrete and superimposed<br />

loads.<br />

C. Keep reshores in place a minimum of 15 days after placing upper tier, and longer if required, until<br />

concrete has attained 100 percent of specified compressive strength. In addition, the contractor shall<br />

have determined that the actual compressive strength attained is adequate to support the weight of<br />

the concrete and superimposed loads.<br />

D. Keep supports in place until heavy loads due to construction operations have been removed.<br />

E. Test field-cured specimens to determine potential compressive strength of concrete for specific<br />

locations.<br />

3.11 MISCELLANEOUS CONCRETE ITEMS<br />

A. Fill-in: Fill in holes and openings left in concrete structures for passage of work by other trades after<br />

such work is in place. Place such fill-in concrete to blend with existing construction, using same mix<br />

and curing methods.<br />

B. Equipment Bases and Foundations: Provide machine and equipment bases and foundations, as<br />

indicated on drawings. Set anchor bolts at correct elevations, complying with diagrams or templates<br />

of equipment<br />

C. Manufacturer.<br />

1. Grout base plates and foundations as indicated with nonshrink grout.<br />

2. Use nonmetallic grout for exposed conditions, unless otherwise indicated.<br />

3.12 CONCRETE REPAIRS<br />

A. Perform cosmetic repairs of concrete surfaces as specified under concrete application.<br />

B. Perform structural repairs with prior approval of the Architect for method and procedure, using epoxy<br />

bonding systems. The Architect's approval is required for repair methods using materials other than<br />

CAST IN PLACE CONCRETE 033000-10


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

those specified.<br />

3.13 QUALITY CONTROL TESTING DURING CONSTRUCTION<br />

A. Concrete: Composite Sampling and Making and Curing of Specimens: ASTM C 172 and ASTM C 31.<br />

1. Take samples at point of discharge.<br />

2. For pumped concrete, perform sampling and testing at the frequencies specified herein at<br />

point of delivery to pump, and perform additional sampling and testing at the same frequency<br />

at discharge from line. Results obtained at discharge from line shall be used for acceptance<br />

of concrete.<br />

B. Slump: ASTM C 143. One test per strength test and additional tests if concrete consistency changes.<br />

Modify sampling to comply with ASTM C 94.<br />

C. Air Content of Normal Weight Concrete: ASTM C 173 or ASTM C 231. One test per strength test<br />

performed on air-entrained concrete.<br />

D. Concrete Temperature:<br />

Test each time a set of strength test specimens is made.<br />

E. Compressive Strength Tests: ASTM C 39.<br />

1. Compression test specimens: Mold and cure one set of 4 standard cylinders for each<br />

compressive strength required.<br />

2. Testing for acceptance of potential strength of as-delivered concrete:<br />

a. Obtain samples on a statistically sound, random basis.<br />

b. Minimum frequency:<br />

1. One set per 100 cubic yards or fraction thereof for each day's pour of each<br />

concrete class.<br />

2. One set per 3500 square feet of slab or wall area or fraction thereof for each<br />

day's pour of each concrete class.<br />

3. When the above testing frequency would provide fewer than 5 strength tests<br />

for a given class of concrete during the project, conduct testing from not less<br />

than 5 randomly selected batches, or from each batch if fewer than five.<br />

3. Test one specimen per set at 7 days for information unless an earlier age is required.<br />

4. Test 2 specimens per set for acceptance of strength potential; test at 28 days unless other<br />

age is specified. The test result shall be the average of the two specimens. If one specimen<br />

shows evidence of improper sampling, molding, or testing, the test result shall be the result<br />

of the remaining specimen; if both show such evidence, discard the test result and inform the<br />

Architect. Retain one specimen from each set for later testing, if required.<br />

5. Strength potential of as-delivered concrete will be considered acceptable if all of the following<br />

criteria are met.<br />

a. No individual test result falls below specified compressive strength by more than 500<br />

psi. Not more than 10 percent of individual test results fall below specified<br />

compressive strength (f’c).<br />

b. Average of any 3 consecutive strength test results equals or exceeds specified<br />

compressive strength (f'c).<br />

6. Evaluate construction and curing procedures and implement corrective action when strength<br />

results for field-cured specimens are less than 85 percent of test values for companion<br />

laboratory-cured specimens.<br />

CAST IN PLACE CONCRETE 033000-11


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

J. Removal of forms or supports: Mold additional specimens and field-cure with concrete<br />

represented; test to determine strength of concrete at proposed time of form or support<br />

removal.<br />

F. Test Results: Testing agency shall report test results in writing to Architect and contractor within 24<br />

hours of test.<br />

1. Test reports shall contain the following data:<br />

a. Project name, number, and other identification.<br />

b. Name of concrete testing agency.<br />

c. Date and time of sampling.<br />

d. Concrete type and class.<br />

e. Location of concrete batch in the completed work.<br />

f. All information required by respective ASTM test methods.<br />

2. Nondestructive testing devices such as impact hammer or sonoscope may be used at Architect's<br />

option for assistance in determining probable concrete strength at various locations or for<br />

selecting areas to be cored, but such tests shall not be the sole basis for acceptance or<br />

rejection.<br />

3. The testing agency shall make additional test of in-place concrete as directed by the<br />

Architect when test results indicate that specified strength and other concrete characteristics<br />

have not been attained.<br />

a. Testing agency may conduct tests of cored cylinders complying with ASTM C 42, or<br />

tests as directed.<br />

b. Cost of additional testing shall be borne by the contractor when unacceptable<br />

concrete has been verified.<br />

G. Grout: Test grout compressive strength per ASTM C 1019 for each 2000 square feet of wall area or<br />

portion thereof.<br />

END OF SECTION 033000<br />

CAST IN PLACE CONCRETE 033000-12


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

SECTION 033816 - UNBONDED POST-TENSIONED CONCRETE<br />

PART 1 - GENERAL<br />

1.1 ACTION SUBMITTALS<br />

A. Product Data: For each type of product.<br />

B. Shop Drawings: Prepared by or under the supervision of a qualified professional engineer,<br />

detailing tendon layout and installation procedures.<br />

C. Delegated-Design Submittal: For post-tensioning system.<br />

1. Sealed design calculations prepared by a qualified structural engineer indicating method<br />

of elongation calculation including values used for friction coefficients, anchorage seating<br />

loss, elastic shortening, creep, relaxation, and shrinkage.<br />

1.2 INFORMATIONAL SUBMITTALS<br />

A. Qualification Data: For Installer and manufacturer.<br />

B. Product certificates.<br />

C. Mill Test Reports: For prestressing strand.<br />

D. Field quality-control reports.<br />

E. Stressing Records: Submit the same day as stressing operations.<br />

1.3 QUALITY ASSURANCE<br />

A. Manufacturer Qualifications: Fabricating plant certified by PTI according to procedures set forth<br />

in PTI's "Manual for Certification of Plants Producing Unbonded Single Strand Tendons."<br />

B. Installer Qualifications: A qualified installer whose full-time Project superintendent has<br />

successfully completed PTI's Level 1 - Field Fundamentals course or has equivalent verifiable<br />

experience and knowledge acceptable to Architect.<br />

1. Superintendent must receive training from post-tensioning supplier in the operation of<br />

stressing equipment to be used on Project.<br />

C. Testing Agency Qualifications: Qualified according to ASTM E 3<strong>29</strong> for testing indicated.<br />

1. Testing Agency Inspector: Personnel performing field inspections and measuring<br />

elongations shall have successfully completed PTI's Level 1 - Field Fundamentals course<br />

or shall have equivalent verifiable experience and knowledge acceptable to Architect.<br />

UNBONDED POST-TENSIONED CONCRETE 033816 - 1


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

1.4 DELIVERY, STORAGE, AND HANDLING<br />

A. Deliver, store, and handle post-tensioning materials according to PTI's "Field Procedures<br />

Manual for Unbonded Single Strand Tendons."<br />

PART 2 - PRODUCTS<br />

2.1 PERFORMANCE REQUIREMENTS<br />

A. Delegated Design: Engage a qualified professional engineer, as defined in Section 014000<br />

"Quality Requirements," to design post-tensioned reinforcement.<br />

B. Structural Performance: Design cast-in-place, post-tensioned concrete reinforcement as<br />

indicated in this Section. Show final effective forces, tendon profiles, and nonprestressed<br />

reinforcement on design installation drawings.<br />

C. Design structure to withstand the loads indicated according to governing codes, within limits and<br />

under conditions indicated.<br />

D. Comply with ACI 318 requirements unless more stringent requirements are indicated.<br />

E. Fire Resistance: Design members such that thickness and concrete cover over reinforcement<br />

comply with fire-resistance requirements of authorities having jurisdiction.<br />

F. Fire Resistance: Design members such that thickness and concrete cover over reinforcement<br />

comply with the following fire-resistance requirements:<br />

1. Slabs: Two hours.<br />

2. Beam: Two hours.<br />

G. Deflection Limits Including Creep and Shrinkage Effects:<br />

1. Total Dead Load: L/600.<br />

2. Total Dead Plus Live Load: L/360.<br />

H. Closure Strips: Locate closure strips at midspan and adjust tendon forces and profiles<br />

accordingly. Calculate moments in spans with closure strips assuming a continuous slab.<br />

Provide only nonprestressed reinforcement within closure strips. Design reinforcement in<br />

closure strip to carry ultimate moment at midspan.<br />

2.2 PRESTRESSING TENDONS<br />

A. ACI Publications: Comply with ACI 423.6, "Specification for Unbonded Single Strand Tendons,"<br />

unless otherwise indicated in the Contract Documents.<br />

B. Prestressing Strand: ASTM A 416/A 416M, Grade 270, uncoated, seven-wire, low-relaxation,<br />

0.5-inch diameter strand.<br />

C. Post-Tensioning Coating: Compound with friction-reducing, moisture-displacing, and corrosioninhibiting<br />

properties; chemically stable and nonreactive with prestressing steel, nonprestressed<br />

reinforcement, sheathing material, and concrete.<br />

UNBONDED POST-TENSIONED CONCRETE 033816 - 2


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

D. Tendon Sheathing:<br />

1. Minimum Thickness: 0.050 inch for polyethylene or polypropylene with a minimum<br />

density of 0.034 lb/cu. in.<br />

2. Continuous over length of tendon to provide watertight encapsulation of strand and<br />

between anchorages to prevent intrusion of cement paste or loss of coating for a nonencapsulated<br />

system.<br />

E. Anchorage Device and Coupler Assembly: Assembly of strand, wedges, and anchorage device<br />

or coupler complying with static and fatigue testing requirements and capable of developing 95<br />

percent of actual breaking strength of strand.<br />

F. Encapsulation System: Watertight encapsulation of prestressing strand consisting of the<br />

following:<br />

1. Wedge-Cavity Caps: Attached to anchorages with a positive mechanical connection and<br />

completely filled with post-tensioning coating.<br />

2. Sleeves: Attached to anchorage device with positive mechanical connection; overlapped<br />

a minimum of 4 inches with sheathing and completely filled with post-tensioning coating.<br />

2.3 NONPRESTRESSED STEEL BARS<br />

A. Support Bars, Reinforcing Bars, Hairpins:<br />

1. Steel: ASTM A 615/A 615M, Grade 60, deformed.<br />

2. Low-Alloy Steel: ASTM A 706/A 706M, deformed.<br />

B. Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening<br />

tendons and tendon support bars in place. Manufacture bar supports, according to CRSI's<br />

"Manual of Standard Practice," from steel wire, plastic, or precast concrete of greater<br />

compressive strength than concrete, and as follows:<br />

1. For uncoated bars, use all-plastic bar supports.<br />

2.4 ACCESSORIES<br />

A. Pocket Formers: Capable of completely sealing wedge cavity; sized to provide the required<br />

cover over the anchorage and allow access for cutting strand tail.<br />

B. Anchorage Fasteners: Stainless steel nails, wires, and screws used to attach anchorage<br />

devices to formwork.<br />

C. Sheathing Repair Tape: Elastic, self-adhesive, moistureproof tape with minimum width of 2<br />

inches, in contrasting color to tendon sheathing; nonreactive with sheathing, coating, or<br />

prestressing steel.<br />

2.5 PATCHING MATERIAL<br />

A. One-component, polymer-modified, premixed patching material containing selected silica<br />

aggregates and portland cement, suitable for vertical and overhead applications. Do not use<br />

material containing chlorides or other chemicals known to be deleterious to prestressing steel or<br />

material that is reactive with prestressing steel, anchorage device material, or concrete.<br />

UNBONDED POST-TENSIONED CONCRETE 033816 - 3


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

PART 3 - EXECUTION<br />

3.1 FORMWORK<br />

A. Provide formwork for post-tensioned elements as specified in Section 033000 "Cast-in-Place<br />

Concrete." Design formwork to support load redistribution that may occur during stressing<br />

operation. Ensure that formwork does not restrain elastic shortening, camber, or deflection<br />

resulting from application of prestressing force.<br />

B. Do not remove forms supporting post-tensioned elements until tendons have been fully stressed<br />

and elongations have been approved by Architect.<br />

C. Do not place concrete in supported floors until tendons on supporting floors have been stressed<br />

and elongations have been approved by Architect.<br />

3.2 NONPRESTRESSED STEEL REINFORCEMENT PLACEMENT<br />

A. Placement of nonprestressed steel reinforcement is specified in Section 033000 "Cast-in-Place<br />

Concrete." Coordinate placement of nonprestressed steel reinforcement with installation of<br />

post-tensioning tendons.<br />

3.3 TENDON INSTALLATION<br />

A. Install tendons according to installation drawings and procedures stated in PTI's "Field<br />

Procedures Manual for Unbonded Single Strand Tendons."<br />

1. Tolerances: Comply with tolerances in ACI 423.6 for beams and slabs.<br />

B. Tendon Supports: Provide continuous slab bolsters or bars supported on individual high chairs<br />

spaced at a maximum of 42 inches o.c. to ensure tendons remain in their designated positions<br />

during construction operations and concrete placement.<br />

1. Support tendons as required to provide profiles shown on installation drawings. Position<br />

supports at high and low points and at intervals not exceeding 48 inches. Ensure that<br />

tendon profiles between high and low points are smooth parabolic curves.<br />

2. Attach tendons to supporting chairs and reinforcement without damaging tendon<br />

sheathing.<br />

3. Support slab tendons independent of beam reinforcement.<br />

C. Maintain tendon profile within maximum allowable deviations from design profile as follows:<br />

1. 1/4 inch for member depth less than or equal to 8 inches.<br />

2. 3/8 inch for member depth greater than 8 inches and less than or equal to 24 inches.<br />

3. 1/2 inch (13 mm) for member depth greater than 24 inches.<br />

D. Maintain minimum radius of curvature of 480-strand diameters for lateral deviations to avoid<br />

openings, ducts, and embedded items. Maintain a minimum of 2 inches of separation between<br />

tendons at locations of curvature.<br />

E. Limit tendon bundles to five tendons. Do not twist or entwine tendons within a bundle. Maintain<br />

a minimum distance of 12 inches between center of adjacent bundles.<br />

UNBONDED POST-TENSIONED CONCRETE 033816 - 4


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

F. If tendon locations conflict with nonprestressed reinforcement or embedded items, tendon<br />

placement governs. Obtain Architect's approval before relocating tendons or tendon<br />

anchorages that interfere with one another.<br />

G. Deviations in horizontal spacing and location of slab tendons are permitted when required to<br />

avoid openings and inserts.<br />

H. Installation of Anchorage Devices:<br />

1. Place anchorage devices at locations shown on approved installation drawings.<br />

2. Do not switch fixed- and stressing-end anchorage locations.<br />

3. Attach pocket formers, intermediate anchorage devices, and stressing-end anchorage<br />

devices securely to bulkhead forms. Install stressing-end and intermediate anchorage<br />

devices perpendicular to tendon axis.<br />

4. Install tendons straight, without vertical or horizontal curvature, for a minimum of 12<br />

inches behind stressing-end and intermediate anchorages.<br />

5. Embed intermediate anchorage devices at construction joints in first concrete placed at<br />

joint.<br />

6. Minimum splice length in reinforcing bars at anchorages is 24 inches. Stagger splices a<br />

minimum of 60 inches.<br />

7. Place fixed-end anchorage devices in formwork at locations shown on installation<br />

drawings. Support anchorages firmly to avoid movement during concrete placement.<br />

8. Remove loose caps on fixed-end anchorages, refill with post-tensioning coating, and reattach<br />

caps to achieve a watertight enclosure.<br />

I. Maintain minimum concrete cover according to ACI 423.6.<br />

J. Maintain minimum clearance of 6 inches between tendons and openings.<br />

K. Prior to concrete placement, mark tendon locations on formwork with spray paint.<br />

L. Do not install sleeves within 36 inches of anchorages after tendon layout has been inspected.<br />

M. Do not install conduit, pipe, or embeds requiring movement of tendons after tendon layout has<br />

been inspected.<br />

N. Do not use couplers unless location has been approved by Architect.<br />

3.4 SHEATHING INSPECTION AND REPAIR<br />

A. Inspect sheathing for damage after installing tendons. Repair damaged areas by restoring posttensioning<br />

coating and repairing or replacing tendon sheathing.<br />

1. Ensure that sheathing is watertight and there are no air voids.<br />

2. Follow tape repair procedures in PTI's "Field Procedures Manual for Unbonded Single<br />

Strand Tendons."<br />

B. Maximum length of exposed strand behind anchorages is as follows:<br />

1. Fixed End: 12 inches.<br />

2. Intermediate and Stressing End:<br />

1 inch.<br />

a. Cover exposed strand with sheathing repair tape to prevent contact with concrete.<br />

UNBONDED POST-TENSIONED CONCRETE 033816 - 5


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

C. Immediately remove and replace tendons that have damaged strand.<br />

3.5 CONCRETE PLACEMENT<br />

A. Place concrete as specified in Section 033000 "Cast-in-Place Concrete." Ensure compaction of<br />

concrete around anchorages.<br />

B. Ensure that position of tendon and nonprestressed-steel reinforcement does not change during<br />

concrete placement. Reposition tendons and nonprestressed-steel reinforcement moved during<br />

concrete placement to original location.<br />

C. Ensure that method of concrete placement does not damage tendon sheathing. Do not support<br />

pump lines, chutes, or other concrete-placing equipment on tendons.<br />

3.6 TENDON STRESSING<br />

A. Calibrate stressing jacks and gages at start of project and at least every six months thereafter.<br />

Keep copies of calibration certificates for each jack-and-gage pair on Project site that are<br />

available for inspection. Exercise care in handling stressing equipment to ensure that proper<br />

calibration is maintained.<br />

B. Stress tendons only under supervision of a qualified post-tensioning superintendent.<br />

C. Do not begin stressing operations until concrete strength has reached 3000 psi as indicated by<br />

compression tests of field-cured cylinders.<br />

D. Complete stressing within 96 hours of concrete placement.<br />

E. If concrete has not reached required strength, obtain Architect's approval to partially stress<br />

tendons and delay final stressing until concrete has reached required strength.<br />

F. If detensioning and restressing of tendon is required, discard wedges used in original stressing<br />

and provide new wedges.<br />

G. Mark and measure elongations according to PTI's "Field Procedures Manual for Unbonded<br />

Single Strand Tendons." Measure elongations to closest 1/8 inch.<br />

H. Submit stressing records within one day of completion of stressing. If discrepancies between<br />

measured and calculated elongations exceed plus or minus 7 percent, resolve these<br />

discrepancies to satisfaction of Architect.<br />

I. Prestressing will be considered acceptable if gage pressures shown on stressing record<br />

correspond to required stressing force and calculated and measured elongations agree within 7<br />

percent.<br />

J. If measured elongations deviate from calculated elongations by more than 7 percent, additional<br />

testing, restressing, strengthening, or replacing of affected elements may be required.<br />

3.7 TENDON FINISHING<br />

A. Do not cut strand tails or cover anchorages until stressing records have been reviewed and<br />

approved by Architect.<br />

UNBONDED POST-TENSIONED CONCRETE 033816 - 6


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

B. Cut strand tails as soon as possible after approval of elongations.<br />

C. Install caps and sleeves on intermediate anchorages within one day of stressing.<br />

D. Cut strand tails and install caps on stressing-end anchorages within one day of Architect's<br />

acceptance of elongations.<br />

E. Patch stressing pockets within one day of cutting strand tail. Clean inside surface of pocket to<br />

remove laitance or post-tensioning coating before installing patch material. Finish patch material<br />

flush with adjacent concrete.<br />

3.8 FIELD QUALITY CONTROL<br />

A. Testing Agency: Owner will engage a qualified testing agency to perform tests and inspections.<br />

1. Before concrete placement, testing agency will inspect the following for compliance with<br />

post-tensioning installation drawings and the Contract Documents:<br />

a. Location and number of tendons.<br />

b. Tendon profiles and cover.<br />

c. Installation of backup bars, hairpins, and other nonprestressed reinforcement<br />

shown on post-tensioning installation drawings.<br />

d. Installation of pocket formers and anchorage devices.<br />

e. Repair of damaged sheathing.<br />

f. Connections between sheathing and anchorage devices.<br />

2. Testing agency will record tendon elongations during stressing.<br />

3. Testing agency will immediately report deviations from the Contract Documents to<br />

Architect.<br />

3.9 PROTECTION<br />

A. Do not expose tendons to electric ground currents, welding sparks, or temperatures that would<br />

degrade components.<br />

B. Protect exposed components within one workday of their exposure during installation.<br />

C. Prevent water from entering tendons during installation and stressing.<br />

D. Provide weather protection to stressing-end anchorages if strand tails are not cut within 10 days<br />

of stressing the tendons.<br />

3.10 REPAIRS<br />

A. Submit repair procedure to Architect for evaluation and approval.<br />

B. Do not proceed with repairs requiring removal of concrete unless authorized in writing by<br />

Architect.<br />

END OF SECTION 033816<br />

UNBONDED POST-TENSIONED CONCRETE 033816 - 7


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

THIS PAGE LEFT BLANK INTENTIONALLY<br />

UNBONDED POST-TENSIONED CONCRETE 033816 - 8


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

SECTION 034100 - PRECAST STRUCTURAL CONCRETE<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section Includes precast structural concrete.<br />

1.2 PREINSTALLATION MEETINGS<br />

A. Preinstallation Conference: Conduct conference at to be scheduled by Architect following<br />

contract award.<br />

1.3 ACTION SUBMITTALS<br />

A. Product Data: For each type of product.<br />

B. Design Mixtures: For each precast concrete mixture.<br />

C. Shop Drawings:<br />

1. Include member locations, plans, elevations, dimensions, shapes and sections, openings,<br />

support conditions, and types of reinforcement, including special reinforcement.<br />

2. Detail fabrication and installation of precast structural concrete units, including<br />

connections at member ends and to adjoining construction.<br />

D. Delegated-Design Submittal: For precast structural concrete indicated to comply with<br />

performance requirements and design criteria, including analysis data signed and sealed by the<br />

qualified professional engineer responsible for their preparation.<br />

1.4 INFORMATIONAL SUBMITTALS<br />

A. Qualification Data: For installer and fabricator.<br />

B. Welding certificates.<br />

C. Material certificates.<br />

D. Material Test Reports: For aggregates.<br />

E. Source quality-control reports.<br />

F. Field quality-control reports.<br />

PRECAST STRUCTURAL CONCRETE 034100 - 1


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

1.5 QUALITY ASSURANCE<br />

A. Fabricator Qualifications: A firm that assumes responsibility for engineering precast structural<br />

concrete units to comply with performance requirements. Responsibility includes preparation of<br />

Shop Drawings and comprehensive engineering analysis by a qualified professional engineer.<br />

1. Designated as a PCI-certified plant as follows:<br />

a. Group C, Category C2 - Prestressed Hollowcore and Repetitively Produced<br />

Products<br />

B. Quality-Control Standard: For manufacturing procedures, testing requirements, and qualitycontrol<br />

recommendations for types of units required, comply with PCI MNL 116, "Manual for<br />

Quality Control for Plants and Production of Structural Precast Concrete Products."<br />

C. Welding Qualifications: Qualify procedures and personnel according to the following:<br />

1. AWS D1.1/D1.1M, "Structural Welding Code - Steel."<br />

2. AWS D1.4/D1.4M, "Structural Welding Code - Reinforcing Steel."<br />

1.6 COORDINATION<br />

A. Furnish loose connection hardware and anchorage items to be embedded in or attached to<br />

other construction before starting that Work. Provide locations, setting diagrams, templates,<br />

instructions, and directions, as required, for installation.<br />

PART 2 - PRODUCTS<br />

2.1 PERFORMANCE REQUIREMENTS<br />

A. Delegated Design: Engage a qualified professional engineer, as defined in Section 014000<br />

"Quality Requirements," to design precast structural concrete units.<br />

B. Design Standards: Comply with ACI 318 and with design recommendations in PCI MNL 120,<br />

"PCI Design Handbook - Precast and Prestressed Concrete," applicable to types of precast<br />

structural concrete units indicated.<br />

C. Structural Performance: Precast structural concrete units and connections shall withstand<br />

design loads indicated within limits and under conditions indicated.<br />

2.2 REINFORCING MATERIALS<br />

A. Reinforcing Bars: ASTM A 615/A 615M, Grade 60, deformed.<br />

B. Low-Alloy-Steel Reinforcing Bars: ASTM A 706/A 706M, deformed.<br />

C. Steel Bar Mats: ASTM A 184/A 184M, fabricated from ASTM A 615, Grade 60<br />

assembled with clips.<br />

deformed bars,<br />

D. Plain-Steel Welded Wire Reinforcement: ASTM A 185/A 185M, fabricated from galvanized-steel<br />

wire into flat sheets.<br />

PRECAST STRUCTURAL CONCRETE 034100 - 2


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

E. Deformed-Steel Welded Wire Reinforcement: ASTM A 497/A 497M or ASTM A 1064/A 1064M,<br />

flat sheet.<br />

F. Supports: Suspend reinforcement from back of mold or use bolsters, chairs, spacers, and other<br />

devices for spacing, supporting, and fastening reinforcing bars and welded wire reinforcement in<br />

place according to PCI MNL 116.<br />

2.3 PRESTRESSING TENDONS<br />

A. Strand: ASTM A 416, Grade 270 , uncoated, seven-wire, low-relaxation strand.<br />

1. Coat unbonded post-tensioning strand with post-tensioning coating complying with<br />

ACI 423.7 and sheath with polypropylene tendon sheathing complying with ACI 423.7.<br />

Include anchorage devices and coupler assemblies.<br />

2.4 CONCRETE MATERIALS<br />

A. Portland Cement: ASTM C 150/C 150M, Type I or Type III, gray, unless otherwise indicated.<br />

B. Supplementary Cementitious Materials:<br />

1. Fly Ash: ASTM C 618, Class C or F, with maximum loss on ignition of 3 percent.<br />

2. Metakaolin: ASTM C 618, Class N.<br />

3. Silica Fume: ASTM C 1240, with optional chemical and physical requirement.<br />

4. Ground Granulated Blast-Furnace Slag: ASTM C 989, Grade 100 or 120.<br />

5. Blended Hydraulic Cement: ASTM C 595/C 595M, Type IS, portland blast-furnace slag<br />

cement.<br />

C. Normal-Weight Aggregates: Except as modified by PCI MNL 116, ASTM C 33/C 33M, with<br />

coarse aggregates complying with Class 5S. Stockpile fine and coarse aggregates for each type<br />

of exposed finish from a single source (pit or quarry) for Project.<br />

D. Water: Potable; free from deleterious material that may affect color stability, setting, or strength<br />

of concrete and complying with chemical limits of PCI MNL 116.<br />

E. Air-Entraining Admixture: ASTM C 260, certified by manufacturer to be compatible with other<br />

required admixtures.<br />

F. Chemical Admixtures: Certified by manufacturer to be compatible with other admixtures and to<br />

not contain calcium chloride, or more than 0.15 percent chloride ions or other salts by weight of<br />

admixture.<br />

2.5 STEEL CONNECTION MATERIALS<br />

A. Carbon-Steel Shapes and Plates: ASTM A 36/A 36M.<br />

B. Carbon-Steel-Headed Studs: ASTM A 108, Grade 1010 through 1020, cold finished,<br />

AWS D1.1/D1.1M, Type A or B, with arc shields and with minimum mechanical properties of<br />

PCI MNL 116.<br />

C. Carbon-Steel Plate: ASTM A 283/A 283M, Grade C.<br />

PRECAST STRUCTURAL CONCRETE 034100 - 3


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

D. Malleable-Iron Castings: ASTM A 47/A 47M, Grade 32510 or Grade 35028.<br />

E. Carbon-Steel Castings: ASTM A 27/A 27M, Grade 60-30.<br />

F. High-Strength, Low-Alloy Structural Steel: ASTM A 572/A 572M.<br />

G. Carbon-Steel Structural Tubing: ASTM A 500/A 500M, Grade B or Grade C.<br />

H. Wrought Carbon-Steel Bars: ASTM A 675/A 675M, Grade 65.<br />

I. Deformed-Steel Wire or Bar Anchors: ASTM A 496/A 496M or ASTM A 706/A 706M.<br />

J. Carbon-Steel Bolts and Studs: ASTM A 307, Grade A ; carbon-steel, hex-head bolts and studs;<br />

carbon-steel nuts, ASTM A 563; and flat, unhardened steel washers, ASTM F 844.<br />

K. High-Strength Bolts and Nuts: ASTM A 325 or ASTM A 490 Type 1, heavy hex steel structural<br />

bolts; heavy hex carbon-steel nuts, ASTM A 563; and hardened carbon-steel washers,<br />

ASTM F 436.<br />

1. Do not zinc coat ASTM A 490 bolts.<br />

L. Zinc-Coated Finish: For exterior steel items, steel in exterior walls, and items indicated for<br />

galvanizing, apply zinc coating by hot-dip process according to ASTM A 123/A 123M or<br />

ASTM A 153/A 153M<br />

1. Galvanizing Repair Paint: High-zinc-dust-content paint with dry film containing not less<br />

than 94 percent zinc dust by weight, and complying with DOD-P-21035B or SSPC-<br />

Paint 20.<br />

M. Shop-Primed Finish: Prepare surfaces of nongalvanized-steel items, except those surfaces to<br />

be embedded in concrete, according to requirements in SSPC-SP 3, and shop apply lead- and<br />

chromate-free, rust-inhibitive primer, complying with performance requirements in MPI 79<br />

SSPC-Paint 25 according to SSPC-PA 1.<br />

2.6 BEARING PADS<br />

A. Provide bearing pads for precast structural concrete units as recommended by precast<br />

fabricator for application.<br />

2.7 GROUT MATERIALS<br />

A. Sand-Cement Grout: Portland cement, ASTM C 150/C 150M, Type I, and clean, natural sand,<br />

ASTM C 144 or ASTM C 404. Mix at ratio of 1 part cement to 2-1/2 to 3 parts sand, by volume,<br />

with minimum water required for placement and hydration. Water-soluble chloride ion content<br />

less than 0.06 percent by weight of cement when tested according to ASTM C 1218/C 1218M.<br />

B. Nonmetallic, Nonshrink Grout: Packaged, nonmetallic, noncorrosive, nonstaining grout<br />

containing selected silica sands, portland cement, shrinkage-compensating agents, plasticizing<br />

and water-reducing agents, complying with ASTM C 1107/C 1107M, Grade A for drypack and<br />

Grades B and C for flowable grout and of consistency suitable for application within a 30-minute<br />

working time. Water-soluble chloride ion content less than 0.06 percent by weight of cement<br />

when tested according to ASTM C 1218/C 1218M.<br />

PRECAST STRUCTURAL CONCRETE 034100 - 4


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

C. Epoxy-Resin Grout: Two-component, mineral-filled epoxy resin; ASTM C 881/C 881M, of type,<br />

grade, and class to suit requirements.<br />

2.8 CONCRETE MIXTURES<br />

A. Prepare design mixtures for each type of precast concrete required.<br />

1. Use fly ash, pozzolan, ground granulated blast-furnace slag, and silica fume as needed<br />

to reduce the total amount of portland cement, which would otherwise be used, by not<br />

less than 40 percent.<br />

2. Limit use of fly ash to 20 percent replacement of portland cement by weight and ground<br />

granulated blast-furnace slag to 20 percent of portland cement by weight; metakaolin and<br />

silica fume to 10 percent of portland cement by weight.<br />

B. Design mixtures may be prepared by a qualified independent testing agency or by qualified<br />

precast plant personnel at precast structural concrete fabricator's option.<br />

C. Limit water-soluble chloride ions to maximum percentage by weight of cement permitted by<br />

ACI 318 or PCI MNL 116 when tested according to ASTM C 1218.<br />

D. Normal-Weight Concrete Mixtures: Proportion by either laboratory trial batch or field test data<br />

methods according to ACI 211.1, with materials to be used on Project, to provide normal-weight<br />

concrete with the following properties:<br />

1. Compressive Strength (28 Days): 5000 psi.<br />

2. Maximum Water-Cementitious Materials Ratio: 0.45.<br />

E. Water Absorption: Limit water absorption to 6 percent by weight or 14 percent by volume, tested<br />

according to ASTM C 642, except for boiling requirement.<br />

F. Add air-entraining admixture at manufacturer's prescribed rate to result in concrete at point of<br />

placement having an air content complying with PCI MNL 116.<br />

G. When included in design mixtures, add other admixtures to concrete mixtures according to<br />

manufacturer's written instructions.<br />

H. Concrete Mix Adjustments: Concrete mix design adjustments may be proposed if characteristics<br />

of materials, Project conditions, weather, test results, or other circumstances warrant.<br />

2.9 FABRICATION<br />

A. Cast-in Anchors, Inserts, Plates, Angles, and Other Anchorage Hardware: Fabricate anchorage<br />

hardware with sufficient anchorage and embedment to comply with design requirements.<br />

Accurately position for attachment of loose hardware, and secure in place during precasting<br />

operations. Locate anchorage hardware where it does not affect position of main reinforcement<br />

or concrete placement.<br />

1. Weld-headed studs and deformed bar anchors used for anchorage according to<br />

AWS D1.1/D1.1M and AWS C5.4, "Recommended Practices for Stud Welding."<br />

B. Furnish loose hardware items including steel plates, clip angles, seat angles, anchors, dowels,<br />

cramps, hangers, and other hardware shapes for securing precast structural concrete units to<br />

supporting and adjacent construction.<br />

PRECAST STRUCTURAL CONCRETE 034100 - 5


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

C. Cast-in reglets, slots, holes, and other accessories in precast structural concrete units as<br />

indicated on the Contract Drawings.<br />

D. Cast-in openings larger than 10 inches in any dimension. Do not drill or cut openings or<br />

prestressing strand without Architect's approval.<br />

E. Reinforcement: Comply with recommendations in PCI MNL 116 for fabricating, placing, and<br />

supporting reinforcement.<br />

F. Reinforce precast structural concrete units to resist handling, transportation, and erection<br />

stresses and specified in-place loads.<br />

G. Prestress tendons for precast structural concrete units by either pretensioning or posttensioning<br />

methods. Comply with PCI MNL 116.<br />

H. Comply with requirements in PCI MNL 116 and in this Section for measuring, mixing,<br />

transporting, and placing concrete. After concrete batching, no additional water may be added.<br />

I. Place concrete in a continuous operation to prevent cold joints or planes of weakness from<br />

forming in precast concrete units.<br />

J. Thoroughly consolidate placed concrete by vibration without dislocating or damaging<br />

reinforcement and built-in items, and minimize pour lines, honeycombing, or entrapped air voids<br />

on surfaces. Use equipment and procedures complying with PCI MNL 116.<br />

K. Comply with PCI MNL 116 procedures for hot- and cold-weather concrete placement.<br />

L. Identify pickup points of precast structural concrete units and orientation in structure with<br />

permanent markings, complying with markings indicated on Shop Drawings. Imprint or<br />

permanently mark casting date on each precast structural concrete unit on a surface that does<br />

not show in finished structure.<br />

M. Cure concrete, according to requirements in PCI MNL 116, by moisture retention without heat or<br />

by accelerated heat curing using live steam or radiant heat and moisture. Cure units until<br />

compressive strength is high enough to ensure that stripping does not have an effect on<br />

performance or appearance of final product.<br />

N. Discard and replace precast structural concrete units that do not comply with requirements,<br />

including structural, manufacturing tolerance, and appearance, unless repairs meet<br />

requirements in PCI MNL 116 and meet Architect's approval.<br />

2.10 FABRICATION TOLERANCES<br />

A. Fabricate precast structural concrete units to shapes, lines, and dimensions indicated so each<br />

finished unit complies with PCI MNL 116 product dimension tolerances as well as position<br />

tolerances for cast-in items.<br />

2.11 COMMERCIAL FINISHES<br />

A. Commercial Grade: Remove fins and protrusions larger than 1/8 inch and fill holes larger than<br />

1/2 inch. Rub or grind ragged edges. Faces must have true, well-defined surfaces. Air holes,<br />

water marks, and color variations are permitted. Limit form joint offsets to 3/16 inch.<br />

PRECAST STRUCTURAL CONCRETE 034100 - 6


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

B. Screed or float finish unformed surfaces. Strike off and consolidate concrete with vibrating<br />

screeds to a uniform finish. Hand screed at projections. Normal color variations, minor<br />

indentations, minor chips, and spalls are permitted. Major imperfections, honeycombing, or<br />

defects are not permitted.<br />

C. Smooth, steel trowel finish unformed surfaces. Consolidate concrete, bring to proper level with<br />

straightedge, float, and trowel to a smooth, uniform finish.<br />

D. Apply roughened surface finish according to ACI 318 (ACI 318M) to precast concrete units that<br />

receive concrete topping after installation.<br />

2.12 SOURCE QUALITY CONTROL<br />

A. Testing: Test and inspect precast structural concrete according to PCI MNL 116 requirements<br />

and ASTM C 1610/C 1610M, ASTM C 1611/C 1611M, ASTM C 1621/C 1621M, and<br />

ASTM C 1712/C 1712M.<br />

B. Defective Units: Discard and replace precast structural concrete units that do not comply with<br />

requirements, including strength, manufacturing tolerances, and color and texture range.<br />

Chipped, spalled, or cracked units may be repaired, subject to Architect's approval.<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION<br />

A. Install clips, hangers, bearing pads, and other accessories required for connecting precast<br />

structural concrete units to supporting members and backup materials.<br />

B. Erect precast structural concrete level, plumb, and square within specified allowable tolerances.<br />

Provide temporary structural framing, shoring, and bracing as required to maintain position,<br />

stability, and alignment of units until permanent connections are complete.<br />

1. Maintain horizontal and vertical joint alignment and uniform joint width as erection<br />

progresses.<br />

2. Remove projecting lifting devices and use plastic patch caps or sand-cement grout to fill<br />

voids within recessed lifting devices flush with surface of adjacent precast surfaces when<br />

recess is exposed.<br />

3. For hollow-core slab voids used as electrical raceways or mechanical ducts, align voids<br />

between units and tape butt joint at end of slabs.<br />

C. Connect precast structural concrete units in position by bolting, welding, grouting, or as<br />

otherwise indicated on Shop Drawings. Remove temporary shims, wedges, and spacers as<br />

soon as practical after connecting and grouting are completed.<br />

D. Field cutting of precast units is not permitted without approval of Architect.<br />

E. Fasteners: Do not use drilled or powder-actuated fasteners for attaching accessory items to<br />

precast, prestressed concrete units.<br />

F. Welding: Comply with applicable requirements in AWS D1.1/D1.1M and AWS D1.4/D1.4M for<br />

welding, welding electrodes, appearance, quality of welds, and methods used in correcting<br />

welding work.<br />

PRECAST STRUCTURAL CONCRETE 034100 - 7


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

G. At bolted connections, use lock washers, tack welding, or other approved means to prevent<br />

loosening of nuts after final adjustment.<br />

H. Grouting or Dry-Packing Connections and Joints: Grout connections and joints and open<br />

spaces at keyways, connections, and joints where required or indicated on Shop Drawings.<br />

Retain flowable grout in place until hard enough to support itself. Alternatively, pack spaces with<br />

stiff dry-pack grout material, tamping until voids are completely filled.<br />

3.2 ERECTION TOLERANCES<br />

A. Erect precast structural concrete units level, plumb, square, and in alignment without exceeding<br />

the noncumulative erection tolerances of PCI MNL 135.<br />

B. Minimize variations between adjacent slab members by jacking, loading, or other method<br />

recommended by fabricator and approved by Architect.<br />

3.3 FIELD QUALITY CONTROL<br />

A. Special Inspections: Engage a qualified special inspector to perform the following special<br />

inspections:<br />

1. Erection of precast structural concrete members.<br />

B. Testing Agency: Owner will engage a qualified testing agency to perform tests and inspections.<br />

C. Visually inspect field welds and test according to ASTM E 165 or to ASTM E 709 and<br />

ASTM E 1444. High-strength bolted connections are subject to inspections.<br />

D. Testing agency will report test results promptly and in writing to Contractor and Architect.<br />

E. Repair or remove and replace work where tests and inspections indicate that it does not comply<br />

with specified requirements.<br />

F. Additional testing and inspecting, at Contractor's expense, shall be performed to determine<br />

compliance of replaced or additional work with specified requirements.<br />

G. Prepare test and inspection reports.<br />

3.4 REPAIRS<br />

A. Repair precast structural concrete units if permitted by Architect.<br />

1. Repairs may be permitted if structural adequacy, serviceability, durability, and<br />

appearance of units have not been impaired.<br />

B. Mix patching materials and repair units so cured patches blend with color, texture, and<br />

uniformity of adjacent exposed surfaces and show no apparent line of demarcation between<br />

original and repaired work, when viewed in typical daylight illumination from a distance of 20<br />

feet.<br />

C. Prepare and repair damaged galvanized coatings with galvanizing repair paint according to<br />

ASTM A 780/A 780M.<br />

PRECAST STRUCTURAL CONCRETE 034100 - 8


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

D. Wire brush, clean, and paint damaged prime-painted components with same type of shop<br />

primer.<br />

E. Remove and replace damaged precast structural concrete units that cannot be repaired or<br />

when repairs do not comply with requirements as determined by Architect.<br />

3.5 CLEANING<br />

A. Clean mortar, plaster, fireproofing, weld slag, and other deleterious material from concrete<br />

surfaces and adjacent materials immediately.<br />

B. Clean exposed surfaces of precast concrete units after erection and completion of joint<br />

treatment to remove weld marks, other markings, dirt, and stains.<br />

1. Perform cleaning procedures, if necessary, according to precast concrete fabricator's<br />

written recommendations. Protect other work from staining or damage due to cleaning<br />

operations.<br />

2. Do not use cleaning materials or processes that could change the appearance of<br />

exposed concrete finishes or damage adjacent materials.<br />

END OF SECTION 034100<br />

PRECAST STRUCTURAL CONCRETE 034100 - 9


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

THIS PAGE LEFT BLANK INTENTIONALLY<br />

PRECAST STRUCTURAL CONCRETE 034100 - 10


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

SECTION 042000 - CONCRETE MASONRY<br />

PART 1 - GENERAL<br />

1.01 RELATED DOCUMENTS<br />

A. Conform to Division 1, Section 04000 and other sections of this division.<br />

1.02 APPLICABLE CODES AND STANDARDS<br />

A. Florida Building Code - latest edition adopted in building area.<br />

Building Code Requirements for Masonry Structures (ACI 530-05 / ASCE 5-99 / TMS 402-99).<br />

Specification for Masonry Structures (ACI 530-02 / ASCE 6-99 / TMS 602-99).<br />

PART 2 - PRODUCTS<br />

2.01 MORTAR MATERIALS<br />

A. Refer to Section 04000/Masonry, General.<br />

2.02 STEEL REINFORCEMENT<br />

A. Refer to Section 04000/Masonry, General.<br />

2.03 MASONRY WALL CLEANERS<br />

A. Refer to Section 04000/Masonry, General.<br />

2.04 MASONRY WALL CONTROL EXPANSION JOINTS<br />

A. Refer to Section 04000/Masonry, General.<br />

2.05 CONCRETE MASONRY UNITS<br />

A. STANDARD WEIGHT CONCRETE MASONRY UNITS<br />

1. Conform to ASTM C90-01a, grade "N", Type II, 8" x 16" and 12” x 16” modular units, thickness<br />

as indicated on the drawings, minimum 1" face shells. Units 8" or more thick must have<br />

minimum 1 1/4" face shells. Aggregate is to be gravel, air-cooled blast furnace slag, or crushed<br />

stone. Units are to be acceptable visually, structurally, and free from undesirable defects<br />

resulting from either manufacturer or handling, as judged by ARCHITECT.<br />

The design compressive strength of the masonry, f'm = 1500 psi minimum (1900 PSI on net<br />

area).<br />

2. Units which have not been subjected to an approved method of steam curing must be stored for<br />

30 days prior to use.<br />

3. Sound transmission loss through 4" unpainted unplastered wall, must not measure less than<br />

36 decibels.<br />

4. Linear drying shrinkage must not be greater than 0.04% when tested as prescribed by National<br />

Bureau of Standards.<br />

5. Moisture content at time of delivery must not exceed 75% of relative humidity, as measured by<br />

approved methods of Portland Cement Association.<br />

6. Standard brick sized units are to be solid, but otherwise conform to these paragraphs.<br />

B. ACCESSORY UNITS<br />

1. 8" x 16" x 8" thick header block at locations indicated.<br />

2. 8" x 16" knock out cut-lintel units, thickness as indicated.<br />

CONCRETE MASONRY 042000-1


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

3. Furnish regular corner, half, and half corner units; and all lintel and half block units as required<br />

by conditions shown on architectural and structural drawings.<br />

C. CUSTOM MASONRY UNITS<br />

1. A1 Block Corporation, Unit No. 377<br />

2. Screen Wall Decorative Unit, nominal 12” x 12” x 4” thick<br />

3. Color: White<br />

2.06 GROUT MATERIALS<br />

A. Refer to Sections 03000/Concrete, General and 03300/Cast-In-Place Concrete.<br />

2.07 MORTAR PREPARATION<br />

A. Conform to ASTM C270 for procedures. Proportion as Florida Building Code, Type N, for concrete<br />

masonry, use a one bag mix as follows:<br />

3 bags high strength masonry cement<br />

13.5 – 5 gallon buckets sand.<br />

2.08 PRECAST LINTELS<br />

A. High strength precast and pre-stressed concrete lintels designed to be used unfilled or filled to form a<br />

composite reinforced concrete beam using concrete masonry units equal to 'Cast-Crete'.<br />

PART 3 - EXECUTION<br />

3.01 GENERAL<br />

A. Refer to Section 04000/Masonry, General.<br />

B. Conform to referenced codes.<br />

C. No wetting of concrete masonry units is permitted. All openings in walls to have concrete-filled reinforced<br />

lintels, unless otherwise indicated on drawings.<br />

D. Refer to Section 04000/Masonry, General for sample panel requirement.<br />

3.02 COURSING AND JOINTING<br />

A. Concrete Masonry - Lay all units plumb and true to line, with uniform 3/8" joints, and in running bond.<br />

Joints wider than 3/8" will be rejected.<br />

Lay to course out at 8 inch centers.<br />

B. Strike all joints flush, after mortar has partially set, and sack or float walls head joints to give smooth<br />

uniform appearance and tool all horizontal joints concave where walls are to be left exposed. At stucco<br />

or hard tile locations delete tooling of joints.<br />

3.03 LAYING MASONRY UNITS<br />

A. For bonding masonry to concrete foundation or floor slabs, concrete to be clean with laitance removed<br />

and aggregate exposed.<br />

B. Lay starting joint with full mortar coverage on the joint; except that areas where grout occurs are to be<br />

free of mortar so that grout will contact concrete.<br />

CONCRETE MASONRY 042000-2


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

C. Units shall be laid to preserve vertical continuity of cells to be filled. The vertical alignment shall be<br />

sufficient to maintain a clean, unobstructed flue measuring not less than 3"x3". Place no units or cut<br />

pieces of masonry less than 4" nominal.<br />

D. In placing mortar in horizontal joints, completely cover the face shells of each unit with mortar. Solidly fill<br />

all head joints to the thickness of the face shell and shove units tightly in place. Solidly bed in mortar all<br />

head and cross web bed joints adjacent to cells to be grouted to prevent leakage of mortar.<br />

E. Lay designated walls in two separate wythes, with insulated cavity as indicated.<br />

F. Anchor and bond intersecting masonry walls with 50% masonry bond, except as noted otherwise on<br />

drawings.<br />

G. Install precast and/or composite steel lintels over all openings. Set lintels in place with joints pointed to<br />

match adjacent work. Build in lintels, reinforce and fill with structural concrete grout as work progresses.<br />

1. Steel lintels shall be provided with 3" minimum structural bearing each side of openings.<br />

2. Pre-cast concrete lintels shall be provided with 8" minimum structural bearing each side of<br />

openings.<br />

3. Typical steel and cut masonry lintels, even if not shown on structural or architectural drawings,<br />

shall be reinforced with a minimum of 1 #5 bar continuous (extend 12" minimum each end) and<br />

grouted solid.<br />

4. Concrete masonry work shall not proceed beyond the elevation of door and window headers<br />

until all vertical reinforced cells and reinforced horizontal lintels have been grouted.<br />

H. At hard tile locations take extra care in laying units such that wall will be suitable for thinset tile installation<br />

directly to wall. Grind any unevenness judged unacceptable by ARCHITECT.<br />

I. Install wall control/expansion joints at 20 ft. o.c. and/or as shown and detailed on<br />

architectural/engineering drawings. Refer to Sections 04000/Masonry, General and 07920/Sealants,<br />

Caulking and Seals for additional requirements.<br />

3.04 CUTTING<br />

A. Do all cutting of block with carborundum or equivalent saw. To facilitate proper coursing, half blocks may<br />

be used to reduce amount of cutting. No masonry will be permitted to be used if not cut properly.<br />

Masonry broken by "blows" will be replaced, even if found after the wall has been completed.<br />

3.05 PLACING STEEL REINFORCEMENT<br />

A. Reinforcing steel to be straight, except for bends around corners and as detailed otherwise on drawings.<br />

Lap reinforcing steel 48 bar diameters minimum. Place vertical bars in exact center of cells, or as<br />

otherwise indicated, and hold in position at top and bottom and at intervals not to exceed 96 bar<br />

diameters. Vertical cavity rebar to be run in maximum possible lengths, 5'-0" minimum, using low lift<br />

grouting procedures.<br />

B. Completely embed joint reinforcement in mortar or grout. Lap splices 6 inches minimum at all locations.<br />

C. Lap dowels in footings to vertical steel in masonry columns by placing in aligned cells, then grouting cells<br />

to obtain bonded lap between wall and footings.<br />

D. Reinforce and grout all reinforced horizontal block courses, as wall is built-up.<br />

3.06 DOUBLE WYTHE MASONRY CAVITY WALL INSULATION<br />

CONCRETE MASONRY 042000-3


Anderson Engineers, P.A.<br />

12041 – <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNER’S CENTER<br />

A. Refer to Section 07210/Thermal and Sound Insulation.<br />

3.07 PLACING GROUT<br />

A. Insure all walls are cured minimum of three (3) days, and are solid, or braced against movement, during<br />

grouting. No one is to "walk" the walls. Notify ARCHITECT minimum of 24 hours or one full working day<br />

before start of each grouting operation.<br />

B. CONTRACTOR is to use only low-lift grouting procedure unless otherwise authorized by ARCHITECT<br />

and OWNER.<br />

1. Grout lifts that exceed 5'-0" must have prior approval of the OWNER. Contractor shall neatly<br />

saw-cut cleanout/inspection holes or provide manufacturered inspection blocks at the bottom of<br />

all reinforced vertical cells for grout lifts greater than 5'-0".<br />

C. Grouting of reinforced vertical cells shall occur at intervals to allow grouting of all composite steel and/or<br />

precast lintels. Concrete masonry shall not be installed above lintels prior to grouting of all lintels.<br />

D. Consolidate all grout at time of pouring by puddling or vibrating and then reconsolidate by again puddling<br />

later before plasticity is lost. Stop grout pour 1 1/2" below top unit to form construction joint for<br />

subsequent pours. Neatly sawcut and provide cleanout/inspection hole at the bottom of all cells to be<br />

filled with grout when pour, if authorized, exceeds 5'-0" in height.<br />

E. CONTRACTOR has sole responsibility of completing masonry and grouting operations necessary to<br />

construct a sound load-bearing crack-free wall.<br />

F. Properly cure grout placed in horizontal reinforced precast concrete lintels minimum seven (7) days.<br />

3.08 All masonry walls, if not receiving a formed and poured concrete beam at top and even if not shown on<br />

structural or architectural drawings, are to receive, as a minimum, a top knockout lintel block course<br />

reinforced with 1 #5 bar continuous and filled with concrete grout.<br />

3.09 WATERPROOFING<br />

A. Refer to Division 7 for waterproof coating installed over concrete and masonry surfaces behind face<br />

veneer and elsewhere.<br />

B. Masonry CONTRACTOR is responsible for providing a uniformly regular surface prior to application of<br />

coating, with full and tight joints between concrete block units and around all brick ties or other embedded<br />

items. Remove projecting mortar and fill all joints and voids.<br />

3.10 WALL FLASHING<br />

A. Refer to Section 04000/Masonry, General for installation of wall flashings.<br />

3.11 POINTING AND CLEANING<br />

A. Refer to Section 04000/Masonry, General.<br />

END OF SECTION 042000<br />

CONCRETE MASONRY 042000-4


DAG Architects Inc.<br />

12042 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 04 72 00 - CAST STONE<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. This Section includes the following:<br />

1. Cast stone trim, including the following:<br />

a. Coping.<br />

b. Wall Caps.<br />

c. Other hardscape features<br />

1.2 DEFINITIONS<br />

A. Cast Stone: Architectural precast concrete building units intended to simulate natural cut stone.<br />

1.3 SUBMITTALS<br />

A. Product Data: Include dimensions of individual components.<br />

B. Shop Drawings: Show fabrication and installation details for cast stone units. Include<br />

dimensions, details of reinforcement and anchorages if any, and indication of finished faces.<br />

C. Samples: For each color and texture of cast stone required.<br />

D. Colored Mortar Samples: For each mortar color required.<br />

E. Qualification Data: For manufacturer.<br />

F. Material Test Reports.<br />

1.4 QUALITY ASSURANCE<br />

A. Manufacturer Qualifications: A qualified manufacturer of cast stone units similar to those<br />

indicated for this Project, with sufficient production capacity to manufacture required units.<br />

1. Manufacturer is a producing member of the Cast Stone Institute.<br />

B. Source Limitations for Cast Stone: Obtain cast stone units through one source from a single<br />

manufacturer.<br />

C. Source Limitations for Mortar Materials: Obtain mortar ingredients of a uniform quality, including<br />

color, from one manufacturer for each cementitious component and from one source of<br />

producer for each aggregate.<br />

1.5 DELIVERY, STORAGE, AND HANDLING<br />

A. Coordinate delivery of cast stone with unit masonry work to minimize the need for on-site<br />

storage and to avoid delaying the Work.<br />

1.6 <strong>PROJECT</strong> CONDITIONS<br />

A. Cold-Weather Requirements: Do not use frozen materials or materials mixed or coated with ice<br />

or frost. Do not build on frozen substrates. Comply with cold-weather construction<br />

requirements contained in ACI 530.1/ace 6/TMS 602.<br />

1. Cold-Weather Cleaning: Use liquid cleaning methods only when air temperature is 40<br />

deg F (4 deg C) and above and will remain so until cast stone has dried, but not less than<br />

7 days after completing cleaning.<br />

B. Hot-Weather Requirements: Comply with hot-weather construction requirements contained in<br />

ACI 530.1/ASCE 6/TMS 602.<br />

CAST STONE 04 72 00 - 1


DAG Architects Inc.<br />

12042 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

PART 2 - PRODUCTS<br />

2.1 MANUFACTURERS<br />

A. Manufacturers: Subject to compliance with requirements, provide products by one of the<br />

following.<br />

1. Advanced Cast Stone, Inc.<br />

2. Architectural Cast Stone Corp.<br />

3. Continental Cast Stone Manufacturing, Inc.<br />

2.2 CAST STONE UNITS<br />

A. Provide cast stone units complying with ASTM C 1364 using the vibrant dry tamp or wet-cast<br />

method.<br />

1. Slope exposed horizontal surfaces 1:12, unless otherwise indicated.<br />

2. Provide raised fillets at backs of sills and at ends indicated to be built into jambs.<br />

3. Provide drips on projecting elements, unless otherwise indicated.<br />

B. Cure units by one of the following methods:<br />

1. Cure units with steam in enclosed curing room at temperature of 105 deg F (41 deg C) or<br />

above and 95 to 100 percent relative humidity for 6 hours.<br />

2. Cure units with dense fog and water spray in enclosed warm curing room at 95 to 100<br />

percent relative humidity for 24 hours.<br />

3. Cure units to comply with one of the following:<br />

a. Not less than 5 days at mean daily temperature of 70 deg F (21 deg C) or above.<br />

b. Not less than 6 days at mean daily temperature of 60 deg F (16 deg C) or above.<br />

c. Not less than 7 days at mean daily temperature of 50 deg F (10 deg C) or above.<br />

d. Not less than 8 days at mean daily temperature of 45 deg F (7 deg C) or above.<br />

C. Acid etch units after curing to remove cement film from surfaces to be exposed to view.<br />

D. Colors and Textures: As selected by Architect from manufacturer’s full range.<br />

2.3 ACCESSORIES<br />

A. Anchors and Dowels: Type and size indicated, fabricated from Type 304 stainless steel<br />

complying with ASTM A 240/A 240M, ASTM A 276, or ASTM A 666.<br />

B. Proprietary Acidic Cleaner: Manufacturer's standard-strength, general-purpose cleaner<br />

complying with requirements in Division 04 Section "Unit Masonry Assemblies" and approved<br />

for intended use by cast stone manufacturer and approved by cleaner manufacturer for use on<br />

cast stone and adjacent masonry materials.<br />

2.4 MORTAR<br />

A. Comply with requirements in Division 04 Section "Unit Masonry" for mortar materials and mixes.<br />

1. For setting mortar, use Type S.<br />

2. For pointing mortar, use Type N.<br />

3. Pigmented Mortar: Use colored cement product.<br />

2.5 SOURCE QUALITY CONTROL<br />

A. Employ an independent testing agency to sample and test cast stone units according to<br />

ASTM C 1364.<br />

CAST STONE 04 72 00 - 2


DAG Architects Inc.<br />

12042 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

PART 3 - EXECUTION<br />

3.1 EXAMINATION<br />

A. Examine substrates and conditions, with installer present, for compliance with requirements for<br />

installation tolerances and other conditions affecting performance of cast stone.<br />

1. Proceed with installation only after unsatisfactory conditions have been corrected.<br />

3.2 SETTING CAST STONE IN MORTAR<br />

A. Install cast stone units to comply with requirements in Division 4 Section “Unit Masonry<br />

Assemblies.”<br />

B Set units in full bed of mortar with full head joints, unless otherwise indicated.<br />

1. Set units with joints 1/4 to 3/8 inch (6 to 10 mm) wide.<br />

2. Install anchors, supports, fasteners and other attachments necessary to secure units in<br />

place.<br />

3. Fill dowel holes and anchor slots with mortar.<br />

4. Fill collar joints solid as units are set.<br />

5. Build concealed flashing into mortar joints as units are set.<br />

6. Keep head joints in coping and other units with exposed horizontal surfaces open to<br />

receive sealant.<br />

7. Keep joints at shelf angles open to receive sealant.<br />

C. Hand rake out joints for pointing with mortar to depths of not less than 3/4 inch (19). Rake joints<br />

to uniform depths with square bottoms and clean sides. Scrub faces of units to remove excess<br />

mortar as joints are raked. Do not use drills or power tools for raking out existing joints.<br />

D. Point mortar joints by placing and compacting mortar in layers not greater than 3/8 inch (10mm).<br />

Compact each layer thoroughly and allow it to become thumbprint hard before applying next<br />

layer.<br />

E. Tool exposed joints slightly concave when thumbprint hard, using a jointer larger than joint<br />

thickness, unless otherwise indicated.<br />

F. Provide expansion, control, and pressure-relieving joints of widths and at locations indicated.<br />

Keep joints free of mortal and other rigid materials.<br />

G. Prepare joints indicated to receive sealant and apply sealant of type and at locations indicated<br />

to comply with applicable requirements in Division 7 Section “Joint Sealants.”<br />

3.3 INSTALLATION TOLERANCES<br />

A. Variation from Plumb: Do not exceed 1/8 inch in 10 feet (3 mm in 3 m), 1/4 inch in 20 feet (6<br />

mm in 6 m), or 1/2 inch (12 mm) maximum.<br />

B. Variation from Level: Do not exceed 1/8 inch in 10 feet (3 mm in 3 m), 1/4 inch in 20 feet (6 mm<br />

in 6 m), or 1/2 inch (12 mm) maximum.<br />

C. Variation in Joint Width: Do not vary joint thickness more than 1/8 inch in 36 inches (3 mm in<br />

900 mm) or one-fourth of nominal joint width, whichever is less.<br />

D. Variation in Plane between Adjacent Surfaces (Lipping): Do not vary from flush alignment with<br />

adjacent units or adjacent surfaces indicated to be flush with units by more than 1/16 inch (1.5<br />

mm) , except due to warpage of units.<br />

3.4 ADJUSTING AND CLEANING<br />

A. Remove and replace stained and otherwise damaged units and units not matching approved<br />

Samples. Cast stone may be repaired if methods and results are approved by Architect.<br />

1. Replace units in a manner that shows no evidence of replacement.<br />

B. In-Progress Cleaning: Clean cast stone as work progresses.<br />

1. Remove mortar fins and smears before tooling joints.<br />

CAST STONE 04 72 00 - 3


DAG Architects Inc.<br />

12042 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

C. Final Cleaning: After mortar is thoroughly set and cured, clean exposed cast stone to comply<br />

with requirements in Division 04 Section "Unit Masonry."<br />

END OF SECTION 04 72 00<br />

CAST STONE 04 72 00 - 4


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

SECTION 054000 - COLD-FORMED METAL FRAMING<br />

A. Section Includes:<br />

1. Load-bearing soffit framing.<br />

1.2 ACTION SUBMITTALS<br />

A. Product Data: For each type of cold-formed steel framing product and accessory.<br />

B. LEED Submittals:<br />

1. Product Data for Credit MR 4: For products having recycled content, documentation<br />

indicating percentages by weight of postconsumer and preconsumer recycled content.<br />

Include statement indicating cost for each product having recycled content.<br />

C. Shop Drawings:<br />

1. Include layout, spacings, sizes, thicknesses, and types of cold-formed steel framing;<br />

fabrication; and fastening and anchorage details, including mechanical fasteners.<br />

2. Indicate reinforcing channels, opening framing, supplemental framing, strapping,<br />

bracing, bridging, splices, accessories, connection details, and attachment to adjoining<br />

work.<br />

1.3 QUALITY ASSURANCE<br />

A. Product Tests: Mill certificates or data from a qualified independent testing agency.<br />

B. Welding Qualifications: Qualify procedures and personnel according to AWS D1.3/D1.3M,<br />

"Structural Welding Code - Sheet Steel."<br />

PART 2 - PRODUCTS<br />

2.1 MANUFACTURERS<br />

A. Manufacturers: Subject to compliance with requirements, provide products by one of the<br />

following<br />

1. AllSteel & Gypsum Products, Inc.<br />

2. California Expanded Metal Products Company.<br />

3. ClarkWestern Building Systems, Inc.<br />

4. Consolidated Fabricators Corp.; Building Products Division.<br />

5. Craco Mfg., Inc.<br />

6. Custom Stud Inc.<br />

7. Design Shapes in Steel.<br />

8. Dietrich Metal Framing; a Worthington Industries company.<br />

9. Formetal Co. Inc. (The).<br />

COLD-FORMED METAL FRAMING 054000 - 1


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

10. MarinoWARE.<br />

11. MBA Building Supplies, Inc.<br />

12. Nuconsteel; a Nucor Company.<br />

13. Olmar Supply, Inc.<br />

14. Quail Run Building Materials, Inc.<br />

15. SCAFCO Corporation.<br />

16. Southeastern Stud & Components, Inc.<br />

17. State Building Products, Inc.<br />

18. Steel Construction Systems.<br />

19. Steel Network, Inc. (The).<br />

20. Steel Structural Systems.<br />

21. Steeler, Inc.<br />

22. Super Stud Building Products, Inc.<br />

23. Telling Industries, LLC.<br />

24. United Metal Products, Inc.<br />

25. United Steel Manufacturing.<br />

2.2 PERFORMANCE REQUIREMENTS<br />

A. AISI Specifications and Standards: Unless more stringent requirements are indicated, comply<br />

with AISI S100 and AISI S200.<br />

2.3 COLD-FORMED STEEL FRAMING, GENERAL<br />

1. Grade: [ST33H<br />

2. Coating: G90<br />

B. Steel Sheet for Vertical Deflection Drift Clips: ASTM A 653/A 653M, structural steel, zinc<br />

coated, of grade and coating as follows:<br />

1. Grade: [33 (230)]<br />

2. Coating: [ G90 (Z275)].<br />

2.4 EXTERIOR NON-LOAD-BEARING WALL FRAMING<br />

A. Steel Studs: Manufacturer's standard C-shaped steel studs, of web depths indicated, punched,<br />

with stiffened flanges, and as follows:<br />

1. Minimum Base-Metal Thickness: [0.0538 inch (1.37 mm) ]<br />

2. Flange Width: 1-5/8 inches (41 mm)<br />

B. Steel Track: Manufacturer's standard U-shaped steel track, of web depths indicated, unpunched,<br />

with unstiffened flanges, and matching minimum base-metal thickness of steel studs.<br />

C. Vertical Deflection Clips: Manufacturer's standard clips, capable of accommodating upward and<br />

downward vertical displacement of primary structure through positive mechanical attachment to<br />

stud web.<br />

COLD-FORMED METAL FRAMING 054000 - 2


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

1. Manufacturers: Subject to compliance with requirements, provide products by one of<br />

the following<br />

a. AllSteel & Gypsum Products, Inc.<br />

b. ClarkWestern Building Systems, Inc.<br />

c. Dietrich Metal Framing; a Worthington Industries company.<br />

d. MarinoWARE.<br />

e. SCAFCO Corporation.<br />

f. Steel Network, Inc. (The).<br />

g. Steeler, Inc.<br />

2.5 FRAMING ACCESSORIES<br />

A. Fabricate steel-framing accessories from steel sheet, ASTM A 1003/A 1003M, Structural<br />

Grade, Type H, metallic coated, of same grade and coating weight used for framing members.<br />

B. Provide accessories of manufacturer's standard thickness and configuration.<br />

2.6 ANCHORS, CLIPS, AND FASTENERS<br />

A. Steel Shapes and Clips: ASTM A 36/A 36M, zinc coated by hot-dip process according to<br />

ASTM A 123/A 123M.<br />

B. Expansion Anchors: Fabricated from corrosion-resistant materials, with allowable load or<br />

strength design capacities calculated according to ICC-ES AC193 and ACI 318 greater than or<br />

equal to the design load, as determined by testing per ASTM E 488 conducted by a qualified<br />

testing agency.<br />

C. Power-Actuated Anchors: Fastener system of type suitable for application indicated, fabricated<br />

from corrosion-resistant materials, with allowable load capacities calculated according to ICC-<br />

ES AC70, greater than or equal to the design load, as determined by testing per ASTM E 1190<br />

conducted by a qualified testing agency.<br />

D. Mechanical Fasteners: ASTM C 1513, corrosion-resistant-coated, self-drilling, self-tapping,<br />

steel drill screws.<br />

1. Head Type: Low-profile head beneath sheathing, manufacturer's standard elsewhere.<br />

2.7 MISCELLANEOUS MATERIALS<br />

A. Galvanizing Repair Paint: ASTM A 780.<br />

B. Cement Grout: Portland cement, ASTM C 150, Type I; and clean, natural sand, ASTM C 404.<br />

Mix at ratio of 1 part cement to 2-1/2 parts sand, by volume, with minimum water required for<br />

placement and hydration.<br />

C. Nonmetallic, Nonshrink Grout: Premixed, nonmetallic, noncorrosive, nonstaining grout<br />

containing selected silica sands, portland cement, shrinkage-compensating agents, and<br />

COLD-FORMED METAL FRAMING 054000 - 3


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

plasticizing and water-reducing agents, complying with ASTM C 1107/C 1107M, with fluid<br />

consistency and 30-minute working time.<br />

D. Shims: Load bearing, high-density multimonomer plastic, and nonleaching; or of cold-formed<br />

steel of same grade and coating as framing members supported by shims.<br />

PART 3 - EXECUTION<br />

3.1 PREPARATION<br />

A. Install load bearing shims or grout between the underside of load-bearing wall bottom track and<br />

the top of foundation wall or slab at locations with a gap larger than 1/4 inch (6 mm) to ensure a<br />

uniform bearing surface on supporting concrete or masonry construction.<br />

B. Install sealer gaskets at the underside of wall bottom track or rim track and at the top of<br />

foundation wall or slab at stud or joist locations.<br />

3.2 INSTALLATION, GENERAL<br />

A. Cold-formed steel framing may be shop or field fabricated for installation, or it may be field<br />

assembled.<br />

B. Install cold-formed steel framing according to AISI S200 and to manufacturer's written<br />

instructions unless more stringent requirements are indicated.<br />

C. Install cold-formed steel framing and accessories plumb, square, and true to line, and with<br />

connections securely fastened.<br />

D. Install framing members in one-piece lengths.<br />

E. Install temporary bracing and supports to secure framing and support loads comparable in<br />

intensity to those for which structure was designed. Maintain braces and supports in place,<br />

undisturbed, until entire integrated supporting structure has been completed and permanent<br />

connections to framing are secured.<br />

F. Do not bridge building expansion joints with cold-formed steel framing. Independently frame<br />

both sides of joints.<br />

G. Install insulation, specified in Section 072100 "Thermal Insulation," in built-up exterior framing<br />

members, such as headers, sills, boxed joists, and multiple studs at openings, that are<br />

inaccessible on completion of framing work.<br />

H. Fasten hole reinforcing plate over web penetrations that exceed size of manufacturer's approved<br />

or standard punched openings.<br />

I. Erection Tolerances: Install cold-formed steel framing level, plumb, and true to line to a<br />

maximum allowable tolerance variation of 1/8 inch in 10 feet (1:960) and as follows:<br />

COLD-FORMED METAL FRAMING 054000 - 4


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

1. Space individual framing members no more than plus or minus 1/8 inch (3 mm) from<br />

plan location. Cumulative error shall not exceed minimum fastening requirements of<br />

sheathing or other finishing materials.<br />

3.3 EXTERIOR NON-LOAD-BEARING WALL INSTALLATION<br />

A. Install continuous tracks sized to match studs. Align tracks accurately and securely anchor to<br />

supporting structure as indicated.<br />

B. Fasten both flanges of studs to top and bottom track unless otherwise indicated. Space studs as<br />

follows:<br />

1. Stud Spacing: 16 inches (406 mm)<br />

C. Set studs plumb, except as needed for diagonal bracing or required for nonplumb walls or<br />

warped surfaces and similar requirements.<br />

3.4 REPAIRS AND PROTECTION<br />

A. Galvanizing Repairs: Prepare and repair damaged galvanized coatings on fabricated and<br />

installed cold-formed steel framing with galvanized repair paint according to ASTM A 780 and<br />

manufacturer's written instructions.<br />

B. Provide final protection and maintain conditions, in a manner acceptable to manufacturer and<br />

Installer, that ensure that cold-formed steel framing is without damage or deterioration at time<br />

of Substantial Completion.<br />

END OF SECTION 054000<br />

COLD-FORMED METAL FRAMING 054000 - 5


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

COLD-FORMED METAL FRAMING 054000 - 6


DAG Architects Inc<br />

12042 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

SECTION 05 50 00 - METAL FABRICATIONS<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. This Section includes the following:<br />

1. Miscellaneous steel framing and supports.<br />

2. Shelf angles.<br />

3. Loose bearing and leveling plates.<br />

4. Steel weld plates and angles.<br />

5. Metal bollards.<br />

6. Loose steel lintels.<br />

7. Metal ladder<br />

1.2 SUBMITTALS<br />

A. Product Data: For the following:<br />

1. Grout.<br />

B. Shop Drawings: Include plans, elevations, sections, and details of metal fabrications and their<br />

connections. Show anchorage and accessory items.<br />

C. Templates: For anchors and bolts.<br />

PART 2 - PRODUCTS<br />

2.1 METALS<br />

A. All material in the exterior walls and exposed to the weather shall be galvanized,<br />

unless noted otherwise.<br />

B. Metal Surfaces, General: Provide materials with smooth, flat surfaces without blemishes.<br />

C. Ferrous Metals:<br />

1. Steel Plates, Shapes, and Bars: ASTM A 36/A 36M.<br />

2. Steel Tubing: ASTM A 500, cold-formed steel tubing.<br />

3. Steel Pipe: ASTM A 53/A 53M, standard weight (Schedule 40), unless another weight is<br />

indicated or required by structural loads.<br />

4. Slotted Channel Framing: Cold-formed metal channels complying with MFMA-3, 1-5/8 by<br />

1-5/8 inches (41 by 41 mm). Channels made from galvanized steel complying with<br />

ASTM A 653/A 653M, structural steel, Grade 33 (Grade 230), with G90 (Z275) coating;<br />

0.079-inch (2-mm) nominal thickness.<br />

5. Cast Iron: ASTM A 48/A 48M, Class 30, unless another class is indicated or required by<br />

structural loads.<br />

2.2 FASTENERS<br />

A. General: Type 316 stainless-steel fasteners for exterior use and at exterior walls. Select<br />

fasteners for grade, and class required.<br />

B. Cast-in-Place Anchors in Concrete: Threaded or wedge type; galvanized ferrous castings, either<br />

ASTM A 47/A 47M malleable iron or ASTM A 27/A 27M cast steel. Provide bolts, washers, and<br />

shims as needed, hot-dip galvanized per ASTM A 153/A 153M.<br />

METAL FABRICATIONS 05 50 00 - 1


DAG Architects Inc<br />

12042 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

2.3 MISCELLANEOUS MATERIALS<br />

A. Universal Shop Primer: Fast-curing, lead-and chromate-free, universal modified alkyd primer<br />

complying with MPI #79, as indicated in Division 09 Section “Exterior Painting” for the metal<br />

bollards. Refer to Division 09 Section “High Performance Coating” for all exterior and exposed<br />

steel.<br />

B. Galvanizing Repair Paint: SSPC-Paint 20, high-zinc-dust-content paint for re-galvanizing welds<br />

in steel.<br />

C. Non-shrink, Nonmetallic Grout: Factory-packaged, non-staining, noncorrosive, nongaseous<br />

grout complying with ASTM C 1107.<br />

D. Concrete Materials and Properties: Comply with requirements in Division 03 Section "Cast-in-<br />

Place Concrete" for normal-weight, air-entrained, ready-mix concrete with a minimum 28-day<br />

compressive strength of 3000 psi (20 MPa) , unless otherwise indicated.<br />

2.4 FABRICATION<br />

A. General: Preassemble items in the shop to greatest extent possible. Use connections that<br />

maintain structural value of joined pieces.<br />

1. Cut, drill, and punch metals cleanly and accurately. Remove burrs and ease edges.<br />

Remove sharp or rough areas on exposed surfaces.<br />

2. Weld corners and seams continuously. Use materials and methods that minimize<br />

distortion and develop strength and corrosion resistance of base metals. Obtain fusion<br />

without undercut or overlap. Remove welding flux immediately. Finish exposed welds<br />

smooth and blended.<br />

3. Form exposed connections with hairline joints, flush and smooth, using concealed<br />

fasteners where possible. Locate joints where least conspicuous.<br />

4. Fabricate seams and other connections that will be exposed to weather in a manner to<br />

exclude water. Provide weep holes where water may accumulate.<br />

5. Where units are indicated to be cast into concrete or built into masonry, equip with<br />

integrally welded steel strap anchors, not less than 24 inches (600 mm) o.c.<br />

B. Miscellaneous Framing and Supports: Provide steel framing and supports not specified in other<br />

Sections as needed to complete the Work. Fabricate units from steel shapes, plates, and bars<br />

of welded construction. Cut, drill, and tap units to receive hardware, hangers, and similar<br />

items.<br />

C. Loose Steel Lintels: Fabricate loose steel lintels from steel angles and shapes of size indicated<br />

for openings and recesses in masonry walls and partitions at locations indicated.<br />

1. Lintels in Exterior Walls: Galvanize, unless noted otherwise.<br />

D. Shelf Angles: Fabricate shelf angles of sizes indicated and for attachment to framing. Fabricate<br />

with horizontally slotted holes to receive 3/4-inch (19-mm) bolts, spaced not more than 6<br />

inches (150 mm) from ends and 24 inches (600 mm) o.c.<br />

1. Shelf Angles in Exterior Walls: Galvanize, unless noted otherwise.<br />

2. Furnish wedge-type concrete inserts, complete with fasteners, to attach shelf angles to<br />

cast-in-place concrete.<br />

E. Loose Bearing and Leveling Plates: Provide loose bearing and leveling plates for steel items<br />

bearing on masonry or concrete construction. Drill plates to receive anchor bolts.<br />

F. Metal Bollards: Fabricate from Schedule 40 steel pipe.<br />

G. Metal Ladders:<br />

1. General: Provide ladder in one piece but no more then 2 sections. Ladder shall be<br />

designed and approved through shop drawings. Ladder shall be designed for parapet<br />

wall access to roof with over rail extension and steps on both sides. Ladder should<br />

extend from wall 8-inches as indicated on the drawings.<br />

2. Side rails: Continuous, 1/2-by-2-1/2-inch (12.7-by-64-mm) steel flat bars, with eased<br />

edges. Space side rails 24 inches apart, as indicated on the drawings.<br />

METAL FABRICATIONS 05 50 00 - 2


DAG Architects Inc<br />

12042 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

3. Steel Ladder Construction: Flat bar side rails, with 3/4-inch- (19-mm-) diameter steel bar<br />

rungs fitted in centerline of side rails, plug-welded, and ground smooth on outer rail<br />

faces.<br />

4. Exterior Steel Ladders: Galvanize.<br />

5. Finish: Refer to Division 09 Section “Exterior Painting” for field finishing.<br />

2.5 FINISHES<br />

A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for<br />

recommendations for applying and designating finishes. Finish metal fabrications after<br />

assembly.<br />

B. Steel and Iron Finishes:<br />

1. Hot-dip galvanize items as indicated to comply with ASTM A 123/A 123M or<br />

ASTM A 153/A 153M as applicable.<br />

2. Preparation for Shop Priming: Prepare uncoated ferrous-metal surfaces to comply with<br />

requirements indicated below for environmental exposure conditions of installed metal<br />

fabrications:<br />

a. Exteriors (SSPC Zone 1B) and Items Indicated to Receive Zinc-Rich Primer: SSPC-<br />

SP 6/NACE No. 3, "Commercial Blast Cleaning."<br />

b. Interiors (SSPC Zone 1A): SSPC-SP 3, "Power Tool Cleaning."<br />

3. Shop Priming: Apply shop primer to uncoated surfaces of metal fabrications, except<br />

those with galvanized finishes and those to be embedded in concrete, sprayed-on<br />

fireproofing, or masonry, to comply with SSPC-PA 1, "Paint Application Specification<br />

No. 1: Shop, Field, and Maintenance Painting," for shop painting.<br />

C. Refer to Division 09 Section “High Performance Coatings,” for exterior painted finishes.<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION<br />

A. General: Perform cutting, drilling, and fitting required for installing metal fabrications. Set<br />

metal fabrications accurately in location, with edges and surfaces level, plumb, and true.<br />

1. Fit exposed connections accurately together. Weld connections that are not to be left as<br />

exposed joints but cannot be shop welded. Do not weld, cut, or abrade surfaces of<br />

exterior units that have been hot-dip galvanized after fabrication.<br />

2. Provide anchorage devices and fasteners where metal fabrications are required to be<br />

fastened to in-place construction.<br />

3. Provide temporary bracing or anchors in formwork for items that are to be built into<br />

concrete, masonry, or similar construction.<br />

B. Set bearing and leveling plates on cleaned surfaces using wedges, shims, or leveling nuts.<br />

After bearing members have been positioned and plumbed, tighten anchor bolts and pack<br />

solidly with non-shrink, nonmetallic grout.<br />

C. Bollards:<br />

1. Anchor bollards in place with concrete footings. Place concrete and vibrate or tamp for<br />

consolidation. Support and brace bollards in position until concrete has cured. Prior to<br />

installing bollards coordinate with bank equipment size.<br />

D. Touch up surfaces and finishes after erection.<br />

1. Painted Surfaces: Clean field welds, bolted connections, and abraded areas and touch<br />

up paint with the same material as used for shop painting.<br />

2. Galvanized Surfaces: Clean field welds, bolted connections, and abraded areas and<br />

repair galvanizing to comply with ASTM A 780.<br />

END OF SECTION 05 50 00<br />

METAL FABRICATIONS 05 50 00 - 3


DAG Architects Inc<br />

12042 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

“LEFT BLANK”<br />

METAL FABRICATIONS 05 50 00 - 4


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

SECTION 055213 - PIPE AND TUBE RAILINGS<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section Includes:<br />

1. Stainless-steel pipe and tube railings.<br />

B. Related Requirements:<br />

1.2 ACTION SUBMITTALS<br />

A. Product Data: For the following:<br />

1. Manufacturer's product lines of mechanically connected railings.<br />

2. Railing brackets.<br />

3. Grout, anchoring cement, and paint products.<br />

B. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work.<br />

C. Samples: For each type of exposed finish required.<br />

D. Delegated-Design Submittal: For railings, including analysis data signed and sealed by the<br />

qualified professional engineer responsible for their preparation.<br />

1.3 INFORMATIONAL SUBMITTALS<br />

A. Product Test Reports: For pipe and tube railings, for tests performed by a qualified testing<br />

agency, according to ASTM E 894 and ASTM E 935.<br />

PART 2 - PRODUCTS<br />

2.1 MANUFACTURERS<br />

A. Stainless-Steel Pipe and Tube Railings:<br />

1. Manufacturers: Subject to compliance with requirements, provide products by one of the<br />

following available manufacturers offering products that may be incorporated into the<br />

Work include the following:<br />

a. Blum, Julius & Co., Inc.<br />

b. Stainless Fabricators, Inc.<br />

c. Sterling Dula Architectural Products, Inc; Div. of Kane Manufacturing..<br />

d. Tubular Specialties Manufacturing, Inc.<br />

PIPE AND TUBE RAILINGS 055213 - 1


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

e. Wagner, R & B, Inc.<br />

2.2 PERFORMANCE REQUIREMENTS<br />

A. Delegated Design: Engage a qualified professional engineer, as defined in Section 014000<br />

"Quality Requirements," to design railings, including attachment to building construction.<br />

B. Structural Performance: Railings, including attachment to building construction, shall withstand<br />

the effects of gravity loads and the following loads and stresses within limits and under<br />

conditions indicated:<br />

1. Handrails and Top Rails of Guards:<br />

a. Uniform load of 50 lbf/ ft. (0.73 kN/m) applied in any direction.<br />

b. Concentrated load of 200 lbf (0.89 kN) applied in any direction.<br />

c. Uniform and concentrated loads need not be assumed to act concurrently.<br />

2. Infill of Guards:<br />

a. Concentrated load of 50 lbf (0.22 kN) applied horizontally on an area of 1 sq. ft.<br />

(0.093 sq. m) .<br />

b. Infill load and other loads need not be assumed to act concurrently.<br />

2.3 METALS, GENERAL<br />

A. Brackets, Flanges, and Anchors: Cast or formed metal of same type of material and finish as<br />

supported rails unless otherwise indicated.<br />

1. Provide type of bracket with [flange tapped for concealed anchorage to threaded<br />

hanger bolt] [predrilled hole for exposed bolt anchorage] and that provides 1-1/2-inch<br />

(38-mm) clearance from inside face of handrail to finished wall surface.<br />

2.4 STAINLESS STEEL<br />

A. Tubing: ASTM A 554, Grade MT 304<br />

B. Pipe: ASTM A 312/A 312M, Grade TP 304<br />

C. Castings: ASTM A 743/A 743M, Grade CF 8 or CF 20.<br />

D. Plate and Sheet: ASTM A 240/A 240M or ASTM A 666, Type 304<br />

2.5 FASTENERS<br />

A. General: Provide the following:<br />

1. Stainless-Steel Railings: Type 304 stainless-steel fasteners.<br />

PIPE AND TUBE RAILINGS 055213 - 2


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

2. Material for Exterior Locations and Where Stainless Steel Is Indicated: Alloy Group 1<br />

(A1) stainless-steel bolts, ASTM F 593 (ASTM F 738M), and nuts, ASTM F 594<br />

(ASTM F 836M) .<br />

2.6 MISCELLANEOUS MATERIALS<br />

A. Welding Rods and Bare Electrodes: Select according to AWS specifications for metal alloy<br />

welded.<br />

B. Bituminous Paint: Cold-applied asphalt emulsion complying with ASTM D 1187/D 1187M.<br />

C. Nonshrink, Nonmetallic Grout: Factory-packaged, nonstaining, noncorrosive, nongaseous grout<br />

complying with ASTM C 1107/C 1107M. Provide grout specifically recommended by<br />

manufacturer for interior and exterior applications.<br />

2.7 FABRICATION<br />

A. Cut, drill, and punch metals cleanly and accurately. Remove burrs and ease edges to a radius of<br />

approximately 1/32 inch (1 mm) unless otherwise indicated. Remove sharp or rough areas on<br />

exposed surfaces.<br />

B. Form work true to line and level with accurate angles and surfaces.<br />

C. Welded Connections: Cope components at connections to provide close fit, or use fittings<br />

designed for this purpose. Weld all around at connections, including at fittings.<br />

1. Use materials and methods that minimize distortion and develop strength and corrosion<br />

resistance of base metals.<br />

2. Obtain fusion without undercut or overlap.<br />

3. Remove flux immediately.<br />

4. At exposed connections, finish exposed surfaces smooth and blended so no roughness<br />

shows after finishing and welded surface matches contours of adjoining surfaces.<br />

D. Nonwelded Connections: Connect members with concealed mechanical fasteners and fittings.<br />

Fabricate members and fittings to produce flush, smooth, rigid, hairline joints.<br />

E. Form changes in direction by bending.<br />

F. For changes in direction made by bending, use jigs to produce uniform curvature for each<br />

repetitive configuration required. Maintain cross section of member throughout entire bend<br />

without buckling, twisting, cracking, or otherwise deforming exposed surfaces of components.<br />

G. Close exposed ends of railing members with prefabricated end fittings.<br />

H. Provide wall returns at ends of wall-mounted handrails unless otherwise indicated.<br />

I. Brackets, Flanges, Fittings, and Anchors: Provide wall brackets, flanges, miscellaneous fittings,<br />

and anchors to interconnect railing members to other work unless otherwise indicated.<br />

PIPE AND TUBE RAILINGS 055213 - 3


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

1. At brackets and fittings fastened to plaster or gypsum board partitions, provide crushresistant<br />

fillers or other means to transfer loads through wall finishes to structural<br />

supports and prevent bracket or fitting rotation and crushing of substrate.<br />

2.8 STAINLESS-STEEL FINISHES<br />

A. Directional Satin Finish: No. 4.<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION, GENERAL<br />

A. Set railings accurately in location, alignment, and elevation; measured from established lines<br />

and levels and free of rack.<br />

1. Do not weld, cut, or abrade surfaces of railing components that are coated or finished<br />

after fabrication and that are intended for field connection by mechanical or other means<br />

without further cutting or fitting.<br />

2. Set posts plumb within a tolerance of 1/16 inch in 3 feet (2 mm in 1 m) .<br />

3. Align rails so variations from level for horizontal members and variations from parallel<br />

with rake of steps and ramps for sloping members do not exceed 1/4 inch in 12 feet (6<br />

mm in 3.5 m) .<br />

B. Control of Corrosion: Prevent galvanic action and other forms of corrosion by insulating metals<br />

and other materials from direct contact with incompatible materials.<br />

1. Coat, with a heavy coat of bituminous paint, concealed surfaces of aluminum that are in<br />

contact with grout, concrete, masonry, wood, or dissimilar metals.<br />

3.2 ANCHORING POSTS<br />

A. Use metal sleeves preset and anchored into concrete for installing posts. After posts are inserted<br />

into sleeves, fill annular space between post and sleeve with [nonshrink, nonmetallic grout]<br />

[or] [anchoring cement], mixed and placed to comply with anchoring material manufacturer's<br />

written instructions.<br />

B. Form or core-drill holes not less than 5 inches (125 mm) deep and 3/4 inch (20 mm) larger than<br />

OD of post for installing posts in concrete. Clean holes of loose material, insert posts, and fill<br />

annular space between post and concrete with [nonshrink, nonmetallic grout] [or] [anchoring<br />

cement], mixed and placed to comply with anchoring material manufacturer's written<br />

instructions.<br />

C. Anchor posts to metal surfaces with oval flanges, angle type, or floor type as required by<br />

conditions, connected to posts and to metal supporting members.<br />

PIPE AND TUBE RAILINGS 055213 - 4


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

3.3 ATTACHING RAILINGS<br />

A. Attach railings to wall with wall brackets[, except where end flanges are used]. Locate<br />

brackets as indicated or, if not indicated, at spacing required to support structural loads.<br />

B. Secure wall brackets and railing end flanges to building construction as follows:<br />

1. For concrete and solid masonry anchorage, use drilled-in expansion shields and hanger or<br />

lag bolts.<br />

2. For hollow masonry anchorage, use toggle bolts.<br />

3. For wood stud partitions, use hanger or lag bolts set into studs or wood backing between<br />

studs. Coordinate with carpentry work to locate backing members.<br />

4. For steel-framed partitions, use self-tapping screws fastened to steel framing or to<br />

concealed steel reinforcements.<br />

5. For steel-framed partitions, use toggle bolts installed through flanges of steel framing or<br />

through concealed steel reinforcements.<br />

3.4 ADJUSTING AND CLEANING<br />

A. Touchup Painting: Immediately after erection, clean field welds, bolted connections, and<br />

abraded areas of shop paint, and paint exposed areas with the same material as used for shop<br />

painting to comply with SSPC-PA 1 requirements for touching up shop-painted surfaces.<br />

B. Galvanized Surfaces: Clean field welds, bolted connections, and abraded areas, and repair<br />

galvanizing to comply with ASTM A 780/A 780M.<br />

END OF SECTION 055213<br />

PIPE AND TUBE RAILINGS 055213 - 5


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

PIPE AND TUBE RAILINGS 055213 - 6


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

SECTION 061000 - ROUGH CARPENTRY<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section Includes:<br />

1. Framing with dimension lumber. (Stage Framing)<br />

2. Framing with dimension lumber. (Cabana Framing)<br />

3. Wood blocking and nailers.<br />

4. Plywood backing panels.<br />

1.2 ACTION SUBMITTALS<br />

A. Product Data: For each type of process and factory-fabricated product.<br />

1. Include data for wood-preservative treatment from chemical treatment manufacturer and<br />

certification by treating plant that treated materials comply with requirements<br />

1.3 INFORMATIONAL SUBMITTALS<br />

A. Evaluation Reports: For the following, from ICC-ES:<br />

1. Wood-preservative-treated wood.<br />

2. Power-driven fasteners.<br />

3. Powder-actuated fasteners.<br />

4. Expansion anchors.<br />

5. Metal framing anchors.<br />

PART 2 - PRODUCTS<br />

2.1 WOOD PRODUCTS, GENERAL<br />

1. Factory mark each piece of lumber with grade stamp of grading agency.<br />

2. For exposed lumber indicated to receive a stained or natural finish, mark grade stamp on<br />

end or back of each piece or omit grade stamp and provide certificates of grade<br />

compliance issued by grading agency.<br />

3. Provide dressed lumber, S4S, unless otherwise indicated.<br />

B. Maximum Moisture Content of Lumber: 15 percent for 2-inch nominal (38-mm actual)<br />

thickness or less, 19 percent for more than 2-inch nominal (38-mm actual) thickness unless<br />

otherwise indicated.<br />

ROUGH CARPENTRY 061000 - 1


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

2.2 WOOD-PRESERVATIVE-TREATED LUMBER<br />

A. Preservative Treatment by Pressure Process: AWPA U1; Use Category UC2 for interior<br />

construction not in contact with the ground, Use Category UC3b for exterior construction not in<br />

contact with the ground, and Use Category UC4a for items in contact with the ground].<br />

1. Preservative Chemicals: Acceptable to authorities having jurisdiction and containing no<br />

arsenic or chromium.<br />

B. Kiln-dry lumber after treatment to a maximum moisture content of 19 percent. Do not use<br />

material that is warped or that does not comply with requirements for untreated material.<br />

C. Mark lumber with treatment quality mark of an inspection agency approved by the ALSC Board<br />

of Review.<br />

D. Application: Treat items indicated on Drawings, and the following:<br />

1. Wood cants, nailers, curbs, equipment support bases, blocking, stripping, and similar<br />

members in connection with roofing, flashing, vapor barriers, and waterproofing.<br />

2. Wood sills, sleepers, blocking, and similar concealed members in contact with masonry<br />

or concrete.<br />

3. Wood framing and furring attached directly to the interior of below-grade exterior<br />

masonry or concrete walls.<br />

4. Wood framing members that are less than 18 inches (460 mm) above the ground in<br />

crawlspaces or unexcavated areas.<br />

5. Wood floor plates that are installed over concrete slabs-on-grade.<br />

2.3 MISCELLANEOUS LUMBER<br />

A. General: Provide miscellaneous lumber indicated and lumber for support or attachment of other<br />

construction, including the following:<br />

1. Blocking.<br />

2. Nailers.<br />

3. Stage Floor Framing<br />

4. Cants.<br />

5. Furring.<br />

6. Grounds.<br />

B. For items of dimension lumber size, provide Construction or No. 2 grade lumber of any species.<br />

C. For concealed boards, provide lumber with 15 percent maximum moisture content and any<br />

of the following species and grades:<br />

1. Mixed southern pine; No. 2 grade; SPIB.<br />

2. Eastern softwoods; No. 2 Common grade; NeLMA.<br />

3. Northern species; No. 2 Common grade; NLGA.<br />

4. Western woods; Construction or No. 2 Common grade; WCLIB or WWPA.<br />

ROUGH CARPENTRY 061000 - 2


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

2.4 MISCELLANEOUS LUMBER<br />

A. General: Provide miscellaneous lumber indicated and lumber for support or attachment of other<br />

construction, including the following:<br />

1. Cabana Framing:<br />

B. Grade: Premium<br />

C. Wood Species: Ipe,<br />

D. Finish: Apply Ipe Oil to all surfaces.<br />

2.5 PLYWOOD BACKING PANELS<br />

A. Equipment Backing Panels: DOC PS 1, Exterior, AC in thickness indicated or, if not indicated,<br />

not less than 3/4-inch (19-mm) nominal thickness.<br />

2.6 FASTENERS<br />

A. General: Provide fasteners of size and type indicated that comply with requirements specified in<br />

this article for material and manufacture.<br />

1. Where rough carpentry is exposed to weather, in ground contact, pressure-preservative<br />

treated, or in area of high relative humidity, provide fasteners with hot-dip zinc coating<br />

complying with ASTM A 153/A 153M.<br />

B. Power-Driven Fasteners: NES NER-272.<br />

C. Bolts: Steel bolts complying with ASTM A 307, Grade A (ASTM F 568M, Property Class 4.6);<br />

with ASTM A 563 (ASTM A 563M) hex nuts and, where indicated, flat washers.<br />

2.7 METAL FRAMING ANCHORS<br />

A. Subject to compliance with requirements, provide product indicated on Drawings<br />

B. Allowable Design Loads: Provide products with allowable design loads, as published by<br />

manufacturer, that meet or exceed those indicated<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION, GENERAL<br />

A. Set rough carpentry to required levels and lines, with members plumb, true to line, cut, and<br />

fitted. Fit rough carpentry to other construction; scribe and cope as needed for accurate fit.<br />

Locate nailers, blocking, and similar supports to comply with requirements for attaching other<br />

construction.<br />

ROUGH CARPENTRY 061000 - 3


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

B. Framing Standard: Comply with AF&PA's WCD 1, "Details for Conventional Wood Frame<br />

Construction," unless otherwise indicated.<br />

C. Framing with Engineered Wood Products: Install engineered wood products to comply with<br />

manufacturer's written instructions.<br />

D. Install fire-retardant treated plywood backing panels with classification marking of testing<br />

agency exposed to view.<br />

E. Metal Framing Anchors: Install metal framing anchors to comply with manufacturer's written<br />

instructions. Install fasteners through each fastener hole.<br />

F. Do not splice structural members between supports unless otherwise indicated.<br />

G. Comply with AWPA M4 for applying field treatment to cut surfaces of preservative-treated<br />

lumber.<br />

H. Where wood-preservative-treated lumber is installed adjacent to metal decking, install<br />

continuous flexible flashing separator between wood and metal decking.<br />

I. Securely attach rough carpentry work to substrate by anchoring and fastening as indicated,<br />

complying with the following:<br />

1. NES NER-272 for power-driven fasteners.<br />

2. Table R602.3(1), "Fastener Schedule for Structural Members," and Table R602.3(2),<br />

"Alternate Attachments," in ICC's International Residential Code for One- and Two-<br />

Family Dwellings.<br />

END OF SECTION 061000<br />

ROUGH CARPENTRY 061000 - 4


DAG Architects<br />

2041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL<br />

SECTION 061516 - WOOD ROOF DECKING<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section includes solid-sawn wood roof decking,<br />

1.2 ACTION SUBMITTALS<br />

A. Product Data: For each type of product.<br />

PART 2 - PRODUCTS<br />

2.1 WOOD ROOF DECKING, GENERAL<br />

A. General: Comply with DOC PS 20 and with applicable grading rules of inspection agencies<br />

certified by ALSC's Board of Review.<br />

2.2 SOLID-SAWN WOOD ROOF DECKING<br />

A. Standard for Solid-Sawn Wood Roof Decking: Comply with AITC 112.<br />

B. Roof Decking Species: Ipe<br />

C. Roof Decking Nominal Size: 2 by 6.<br />

D. Roof Decking Grade: Premium<br />

E. Grade Stamps: Factory mark each item with grade stamp of grading agency. Apply grade stamp<br />

to surfaces that are not exposed to view.<br />

F. Face Surface: Smooth.<br />

G. Edge Pattern: Vee grooved & Tongue & Groove .<br />

H. Finish: Apply Ipe Oil to all surfaces.<br />

2.3 ACCESSORY MATERIALS<br />

A. Fastener Material: Stainless Steel<br />

WOOD ROOF DECKING 061516 - 1


DAG Architects<br />

2041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL<br />

B. Sealants: Latex, complying with ASTM C 834 Type OP, Grade NF and with applicable<br />

requirements in Section 079200 "Joint Sealants," recommended by sealant manufacturer and<br />

manufacturer of substrates for intended application.<br />

1. Sealants shall have a VOC content of 250 or less.<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION<br />

A. Install solid-sawn wood roof decking to comply with AITC 112.<br />

1. Locate end joints for combination simple and two-span continuous lay-up.<br />

B. Apply joint sealant to seal roof decking at exterior walls at the following locations:<br />

1. Between roof decking and supports located at exterior walls.<br />

2. Between roof decking and exterior walls that butt against underside of roof decking.<br />

3. Between tongues and grooves of roof decking over exterior walls and supports at exterior<br />

walls.<br />

3.2 PROTECTION<br />

A. Provide water-resistive barrier over roof decking as the Work progresses to protect roof decking<br />

until roofing is applied.<br />

END OF SECTION 061516<br />

WOOD ROOF DECKING 061516 - 2


DAG Architects<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

Rosemary Beach, FL.<br />

SECTION 061533 - WOOD DECKING<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section Includes:<br />

1. Wood decking for Stage and Side Stage.<br />

2. Sliding Doors with wood louvers<br />

3. Support framing for elevated Stage.<br />

1.2 ACTION SUBMITTALS<br />

A. Product Data: For preservative-treated wood products and metal framing anchors.<br />

1.3 INFORMATIONAL SUBMITTALS<br />

A. Material Certificates:<br />

B. Evaluation Reports: For the following, from ICC-ES:<br />

1. Preservative-treated wood products.<br />

Metal framing anchors.<br />

2. Decking fasteners.<br />

PART 2 - PRODUCTS<br />

2.1 LUMBER, GENERAL<br />

A. Comply with DOC PS 20 and with grading rules of lumber grading agencies certified by<br />

ALSC's Board of Review as applicable. If no grading agency is indicated, comply with the<br />

applicable rules of any rules-writing agency certified by ALSC's Board of Review.<br />

1. Factory mark each item with grade stamp of grading agency.<br />

2. For items that are exposed to view in the completed Work, mark grade stamp on end or<br />

back of each piece.<br />

3. Provide dressed lumber, S4S, unless otherwise indicated.<br />

2.2 WOOD DECKING<br />

A. Dimension Lumber Decking of the following species:<br />

1. Ipe<br />

WOOD DECKING 061533 - 1


DAG Architects<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

Rosemary Beach, FL.<br />

2.3 DIMENSION LUMBER FRAMING<br />

A. Stage Framing: Select Structural No. 1 grade of the following species:<br />

1. Southern pine; SPIB.<br />

2. Spruce-pine-fir; NLGA.<br />

3. Douglas fir-south; WWPA.<br />

4. Spruce-pine-fir (South); NeLMA, WCLIB, or WWPA.<br />

2.4 PRESERVATIVE TREATMENT<br />

A. Pressure treat boards and dimension lumber with waterborne preservative according to<br />

AWPA U1; Use Category UC4a<br />

B. Pressure treat timber with waterborne preservative according to AWPA U1; Use<br />

Category UC4a.<br />

C. Preservative Chemicals: Acceptable to authorities having jurisdiction.<br />

1. Do not use chemicals containing arsenic or chromium, except for timber posts.<br />

D. Use process that includes water-repellent treatment.<br />

E. Mark treated wood with treatment quality mark of an inspection agency approved by ALSC's<br />

Board of Review.<br />

F. Application: Treat items indicated on Drawings and the following:<br />

1. Framing members less than 18 inches (460 mm) above grade.<br />

2. Sills and ledgers.<br />

3. Members in contact with masonry or concrete.<br />

4. Posts.<br />

5. Round wood poles.<br />

6. Decking.<br />

2.5 FASTENERS<br />

A. General: Provide fasteners of size and type indicated, acceptable to authorities having<br />

jurisdiction, and that comply with requirements specified in this article for material and<br />

manufacture. Provide nails or screws, in sufficient length, to penetrate not less than 1-1/2 inches<br />

(38 mm) into wood substrate.<br />

1. Use stainless steel unless otherwise indicated.<br />

2. For pressure-preservative-treated wood, use stainless-steel fasteners.<br />

WOOD DECKING 061533 - 2


DAG Architects<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

Rosemary Beach, FL.<br />

2.6 METAL FRAMING ANCHORS<br />

A. Manufacturers: Subject to compliance with requirements, provide products by the following<br />

B. Basis-of-Design Products: Subject to compliance with requirements, provide<br />

1. Simpson Strong-Tie Co., Inc.<br />

C. Galvanized-Steel Sheet: Hot-dip, G185 (Z550) coating designation.<br />

2.7 CONCEALED DECKING FASTENERS<br />

A. Deck Splines: Corrosion-resistant metal or plastic splines that fit in grooves routed into the sides<br />

of decking material and are fastened to deck framing with screws. Splines provide uniform<br />

spacing of decking material.<br />

1. Products: Subject to compliance with requirements, provide the following<br />

a. Ipe Clip Fastener Company Inc. (The); Ipe Clip.<br />

B. Deck Clips: Black-oxide-coated, stainless-steel clips designed to be fastened to deck framing<br />

with screws, and to secure decking material with teeth that also provide uniform spacing of<br />

decking material.<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION, GENERAL<br />

A. Set work to required levels and lines, with members plumb, true to line, cut, and fitted. Fit work<br />

to other construction; scribe and cope as needed for accurate fit.<br />

B. Framing Standard: Comply with AF&PA WCD1 unless otherwise indicated.<br />

C. Install wood decking with crown up (bark side down).<br />

D. Install plastic lumber to comply with manufacturer's written instructions.<br />

E. Secure decking to framing with deck clips.<br />

F. Install metal framing anchors to comply with manufacturer's written instructions.<br />

G. Do not splice structural members between supports unless otherwise indicated.<br />

H.<br />

I. Securely attach exterior rough carpentry work to substrate by anchoring and fastening as<br />

indicated, complying with the following:<br />

WOOD DECKING 061533 - 3


DAG Architects<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

Rosemary Beach, FL.<br />

1. ICC-ES AC70 for power-driven fasteners.<br />

2. "Fastening Schedule" in ICC's International Building Code.<br />

3. "Fastener Schedule for Structural Members" and "Alternate Attachments" in ICC's<br />

International Residential Code for One- and Two-Family Dwellings.<br />

3.2 ELEVATED DECK JOIST FRAMING INSTALLATION<br />

A. General: Install joists with crown edge up and support ends of each member with not less than<br />

1-1/2 inches (38 mm) of bearing on wood or metal, or 3 inches (76 mm) on masonry. Attach<br />

floor joists where framed into wood supporting members by using wood ledgers as indicated or,<br />

if not indicated, by using metal joist hangers. Do not notch joists.<br />

B. Lap members framing from opposite sides of beams or girders not less than 4 inches (102 mm,)<br />

or securely tie opposing members together.<br />

END OF SECTION 061533<br />

WOOD DECKING 061533 - 4


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

SECTION 061600 - SHEATHING<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section Includes:<br />

1. Roof sheathing.<br />

1.2 ACTION SUBMITTALS<br />

A. Product Data: For each type of process and factory-fabricated product. Indicate component<br />

materials and dimensions and include construction and application details.<br />

1. Include data for wood-preservative treatment from chemical treatment manufacturer and<br />

certification by treating plant that treated plywood complies with requirements.<br />

2. Include data for fire-retardant treatment from chemical treatment manufacturer and<br />

certification by treating plant that treated plywood complies with requirements.<br />

PART 2 - PRODUCTS<br />

2.1 PERFORMANCE REQUIREMENTS<br />

A. Fire-Test-Response Characteristics: For assemblies with fire-resistance ratings, provide<br />

materials and construction identical to those of assemblies tested for fire resistance per<br />

ASTM E 119 by a testing and inspecting agency acceptable to authorities having jurisdiction.<br />

1. Fire-Resistance Ratings: Indicated by design designations from UL's "Fire Resistance<br />

Directory."<br />

2.2 WOOD PANEL PRODUCTS<br />

A. Plywood: DOC PS 1.<br />

2.3 ROOF SHEATHING<br />

A. Plywood Roof Sheathing: Exterior, Structural I sheathing.<br />

2.4 FASTENERS<br />

A. General: Provide fasteners of size and type indicated that comply with requirements specified in<br />

this article for material and manufacture.<br />

SHEATHING 061600 - 1


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

1. For roof[ and wall sheathing, provide fasteners with hot-dip zinc coating complying with<br />

ASTM A 153/A 153M.<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION, GENERAL<br />

A. Do not use materials with defects that impair quality of sheathing or pieces that are too small to<br />

use with minimum number of joints or optimum joint arrangement. Arrange joints so that pieces<br />

do not span between fewer than three support members.<br />

B. Cut panels at penetrations, edges, and other obstructions of work; fit tightly against abutting<br />

construction unless otherwise indicated.<br />

C. Securely attach to substrate by fastening as indicated, complying with the following:<br />

1. NES NER-272 for power-driven fasteners.<br />

2. Table 2304.9.1, "Fastening Schedule," in ICC's "International Building Code."<br />

D. Coordinate wall and roof sheathing installation with flashing and joint-sealant installation so<br />

these materials are installed in sequence and manner that prevent exterior moisture from passing<br />

through completed assembly.<br />

E. Do not bridge building expansion joints; cut and space edges of panels to match spacing of<br />

structural support elements.<br />

3.2 GYPSUM SHEATHING INSTALLATION<br />

A. Comply with GA-253 and with manufacturer's written instructions.<br />

1. Fasten gypsum sheathing to cold-formed metal framing with screws.<br />

2. Install boards with a 3/8-inch (9.5-mm) gap where non-load-bearing construction abuts<br />

structural elements.<br />

3. Install boards with a 1/4-inch (6.4-mm) gap where they abut masonry or similar materials<br />

that might retain moisture, to prevent wicking.<br />

B. Seal sheathing joints according to sheathing manufacturer's written instructions.<br />

1. Apply elastomeric sealant to joints and fasteners and trowel flat. Apply sufficient amount<br />

of sealant to completely cover joints and fasteners after troweling. Seal other penetrations<br />

and openings.<br />

2. Apply glass-fiber sheathing tape to glass-mat gypsum sheathing joints and apply and<br />

trowel silicone emulsion sealant to embed entire face of tape in sealant. Apply sealant to<br />

exposed fasteners with a trowel so fasteners are completely covered. Seal other<br />

penetrations and openings.<br />

END OF SECTION 061600<br />

SHEATHING 061600 - 2


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERES CENTER<br />

Rosemary Beach, FL.<br />

SECTION 06 40 23 - INTERIOR ARCHITECTURAL WOODWORK<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. This Section includes the following:<br />

1. Plastic-laminate cabinets.<br />

2. Plastic-laminate countertops.<br />

3. Plastic-Laminate shelving<br />

B. Interior architectural woodwork includes wood furring, blocking, shims, and hanging strips<br />

unless concealed within other construction before woodwork installation.<br />

1.2 SUBMITTALS<br />

A. Product Data: For cabinet hardware and accessories.<br />

B. Shop Drawings: Show location of each item, dimensioned plans and elevations, large-scale<br />

details, attachment devices, and other components.<br />

C. Samples:<br />

1. Lumber and panel products with shop-applied opaque finish, for each finish system and<br />

color, with exposed surface finished.<br />

2. Plastic-laminates, for each type, color, pattern, and surface finish.<br />

1.3 QUALITY ASSURANCE<br />

A. Installer Qualifications: Fabricator of woodwork.<br />

B. Quality Standard: Unless otherwise indicated, comply with AWI's "Architectural Woodwork<br />

Quality Standards”.<br />

1.4 <strong>PROJECT</strong> CONDITIONS<br />

A. Environmental Limitations: Do not deliver or install woodwork until building is enclosed, wet<br />

work is complete, and HVAC system is operating and maintaining temperature and relative<br />

humidity at occupancy levels during the remainder of the construction period.<br />

B. Field Measurements: Where woodwork is indicated to fit to other construction, verify<br />

dimensions of other construction by field measurements before fabrication, and indicate<br />

measurements on Shop Drawings. Coordinate fabrication schedule with construction progress<br />

to avoid delaying the Work.<br />

1. Locate concealed framing, blocking, and reinforcements that support woodwork by field<br />

measurements before being enclosed, and indicate measurements on Shop Drawings.<br />

PART 2 - PRODUCTS<br />

2.1 MATERIALS<br />

A. Wood Products:<br />

1. Hardboard: AHA A135.4.<br />

2. Medium-Density Fiberboard: ANSI A208.2, Grade MD, made with binder containing no<br />

urea formaldehyde.<br />

3. Particleboard: ANSI A208.1, Grade M-2-Exterior Glue.<br />

4. Softwood Plywood: DOC PS 1, Medium Density Overlay.<br />

5. Veneer-Faced Panel Products (Hardwood Plywood): HPVA HP-1, made with adhesive<br />

containing no urea formaldehyde.<br />

INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 1


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERES CENTER<br />

Rosemary Beach, FL.<br />

B. Melamine: Particleboard or medium-density fiberboard finished with thermally fused, melamineimpregnated<br />

decorative paper complying with LMA SAT-1.<br />

C. High-Pressure Decorative Laminate: NEMA LD 3, grades as indicated or, if not indicated, as<br />

required by woodwork quality standard.<br />

2.2 CABINET HARDWARE AND ACCESSORIES<br />

A. General: Provide cabinet hardware and accessory materials associated with architectural<br />

woodwork, except for items specified in Division 08 Section "Door Hardware”.<br />

B. Frameless Concealed Hinges (European Type): BHMA A156.9, B01602, self-closing.<br />

C. Wire Pulls: Back mounted, solid metal 4 inches (100 mm) long, 5/16 inch (8 mm) in diameter.<br />

D. Adjustable Shelf Standards and Supports: BHMA A 156.9, B04071; with shelf rest, B04081 and<br />

BHMA A 156.9, B04102; with shelf brackets. B04112.<br />

E. Drawer Slides: BHMA A156.9, B05091.<br />

1. Standard Duty (Grade 1, Grade 2, and Grade 3): Side mounted and extending under<br />

bottom edge of drawer; full-extension type; zinc-plated steel or epoxy-coated steel with<br />

polymer rollers.<br />

2. Heavy Duty (Grade 1HD-100 and Grade 1HD-200): Side mounted; full-overtravelextension<br />

type; zinc-plated steel ball-bearing slides.<br />

3. Box Drawer Slides: Grade 1; for drawers not more than 6 inches (150 mm) high and 24<br />

inches (600 mm) wide<br />

4. File Drawer Slides: Grade 1HD-100; for drawers more than 6 inches (150 mm) high or<br />

24 inches (600 mm) wide.<br />

5. Pencil Drawer Slides: Grade 2; for drawers not more than 3 inches (75 mm) high and 24<br />

inches (600 mm) wide.<br />

6. Keyboard Slides: Grade 1; for computer keyboard shelves.<br />

F. Door Locks: BHMA A156.11, E07121. Provide locks at all doors unless noted otherwise.<br />

G. Drawer Locks: BHMA A156.11, E07041. Provide locks at all drawers unless noted otherwise.<br />

H. Grommets for Cable Passage through Countertops: 2-inch (51-mm) OD, molded-plastic<br />

grommets and matching plastic caps with slot for wire passage.<br />

1. Product: Subject to compliance with requirements, provide “SG series” by Doug Mockett<br />

& Company, Inc.<br />

I. Exposed Hardware Finishes: For exposed hardware, provide finish that complies with<br />

BHMA A156.18 for BHMA finish number indicated.<br />

1. Satin Stainless Steel: BHMA 630.<br />

J. For concealed hardware, provide manufacturer’s standard finish that complies with product<br />

class requirements in BHMA 156.9.<br />

2.3 MISCELLANEOUS MATERIALS<br />

A. Furring, Blocking, Shims, and Hanging Strips: Softwood or hardwood lumber, fire-retardanttreated,<br />

kiln-dried to less than 15 percent moisture content.<br />

B. Adhesives, General: Do not use adhesives that contain urea formaldehyde.<br />

2.4 FABRICATION<br />

A. General: Complete fabrication to maximum extent possible before shipment to Project site.<br />

Where necessary for fitting at site, provide allowance for scribing, trimming, and fitting.<br />

1. Fabricate to AWI Premium quality standards.<br />

2. Shop cut openings to maximum extent possible. Sand edges of cutouts to remove<br />

splinters and burrs. Seal edges of openings in countertops with a coat of varnish.<br />

B. Shelving: Plastic laminate 3/4-inch (19-mm) particle board shelving with PVC front edge.<br />

Plastic laminate and paint color of brackets to be selected by Architect.<br />

INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 2


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERES CENTER<br />

Rosemary Beach, FL.<br />

C. Plastic-Laminate Cabinets:<br />

1. Quality Standard: Comply with AWI Section 400 requirements for Laminate cabinets.<br />

2. Grade: Custom.<br />

3. AWI Type of Cabinet Construction: Flush overlay.<br />

4. Grain or Pattern Direction: Vertically for drawer fronts, doors, and fixed panels.<br />

5. Laminate Cladding for Exposed Surfaces: High-pressure decorative laminate over ¾-<br />

inch particleboard as follows:<br />

a. Horizontal Surfaces Other Than Tops: Grade HGS.<br />

b. Postformed Surfaces: Grade HGP.<br />

c. Vertical Surfaces: Grade HGS.<br />

d. Edges: Lumber edge for transparent finish matching wood species and cut on<br />

cabinet surfaces PVC edge banding, 0.12 inch (3-mm) thick, matching laminate in<br />

color, pattern and finish.<br />

1) All edge banding must be fee of delamination, bubbles, and all adhesive<br />

residues.<br />

2) All edges must be banded.<br />

6. Materials for Semiexposed Surfaces Other Than Drawer Bodies: Melamine, over 3/4-inch<br />

particleboard. High-pressure decorative laminate, Grade HGS.<br />

a. To include, but not limited to the following:<br />

1) Interior shelving.<br />

b. Melamine Color:<br />

1) To be selected by Architect.<br />

c. Edges of Plastic-Laminate Shelves: PVC edge banding, 0.12 inch (3-mm) thick,<br />

matching laminate in color, pattern and finish.<br />

1) All edge banding must be free of delamination, bubbles, and all adhesive<br />

residue.<br />

2) All edges must be banded.<br />

7. Drawer Sides and Backs: High pressure decorative laminate (melamine) on 7 ply veneer<br />

core substrate; all visible surfaces with drawer in normal open position, compatible with<br />

interior finish or solid hardwood lumber (minimum of 1/2-inch thick).<br />

a. Melamine Color:<br />

1) To be selected by Architect.<br />

8. Drawer Bottoms: Melamine, over 1/4-inch veneer core panel product “B” face hardwood<br />

veneer or thermoset decorative overlay panel product.<br />

a. Melamine Color:<br />

1) To be selected by Architect.<br />

9. Joinery for Case Body Members:<br />

a. Tops, Exposed Ends and Bottoms:<br />

1) Stop dado, glued under pressure and either nailed, or screwed (fasteners<br />

will not be visible on exposed parts).<br />

2) Doweled, glued under pressure (approximately 4 dowels per foot of joint).<br />

3) European assembly screws (37 mm from end, 128 mm on center, fasteners<br />

will not be visible on exposed parts).<br />

b. Exposed End Corner Details and Face Frame Attachment:<br />

1) Mitered joint: lock miter or spline or biscuit, glued under pressure (no visible<br />

fasteners).<br />

2) Non-mitered joints, i.e. 90 degree applications: butt joint glued under<br />

pressure (no visible fasteners).<br />

c. Cabinet Backs – Wall Hung: Wall hung cabinet backs must be relied upon to<br />

support the full weight of the cabinet and its anticipated load for hanging/mounting<br />

purposes. Hanging/mounting mechanisms should transfer load to case body<br />

members.<br />

INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 3


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERES CENTER<br />

Rosemary Beach, FL.<br />

1) Full bound, captured in grooves on cabinet sides, top and bottom.<br />

2) Full overlay, plant-on backs: Minimum 1/2-inch thick attached with minimum<br />

#12 plated (not case-hardened) screws spaced minimum 3-inches on<br />

center. Anchor strips not required for backs 1/2-inch and thicker so<br />

attached. Edge of back should not be exposed on finished ends.<br />

d. Cabinet Backs – Floor Standing:<br />

1) Side bound, captured in grooves; glued and fastened to top and bottom.<br />

2) Full overlay, plant-on backs: minimum 1/2-inch thick attached with minimum<br />

#12 plated (not case-hardened) screws spaced minimum 3-inches on<br />

center. Anchor strips not required for back 1/2-inch and thicker so attached.<br />

Edge of back should not be exposed on finished ends.<br />

e. Anchor Strips for cabinet backs less than 1/2-inch thick: Minimum 1/2-inch thick<br />

lumber or panel product, minimum 2-1/2-inches width; securely attached to the<br />

wall side of the cabinet back – top and bottom for wall hung cabinets, top only for<br />

floor standing cabinets.<br />

10. Drawer Construction Techniques and Supports:<br />

a. Multiple Dovetail (all corners), French Dovetail front/dadoed back, glued under<br />

pressure.<br />

b. Doweled, glued under pressure (minimum 32 mm dowel spacing to 4-inch high, 64<br />

mm dowel spacing above 4-inches.<br />

c. Lock Shoulder, glued and pin nailed.<br />

d. Bottoms shall be set into sides, back and front, 1/4-inch deep groove with<br />

minimum 3/8-inch standing shoulder.<br />

11. Drawer Hardware Static Load: Combination metal and roller bearing drawer slides.<br />

12. Adjustable Shelf Techniques and Support: Metal shelf standards (recessed flush) or<br />

Multiple holes (minimum 5-mm diameter with pins).<br />

13. Colors, Patterns, and Finishes: As selected by Architect from laminate manufacturer’s<br />

full range of solid colors, wood grains or pattern finishes.<br />

14. Provide dust panels of 1/4-inch (6.4-mm) plywood or tempered hardboard above<br />

compartments and drawers, unless located directly under tops.<br />

D. Plastic-Laminate Countertops:<br />

1. High-Pressure Decorative Laminate Grade: HGS.<br />

2. Colors, Patterns, and Finishes: As selected by Architect from laminate manufacturer’s<br />

full range.<br />

3. Edge Treatment: Same as laminate cladding on horizontal surfaces.<br />

4. Core Material at Sinks: Particleboard made with exterior glue.<br />

2.5 SHOP FINISHING<br />

A. General: The entire finish of interior architectural woodwork is specified in this Section,<br />

regardless of whether shop applied or applied after installation. The extent to which the final<br />

finish is applied at fabrication shop is Contractor’s option, except shop apply at least the prime<br />

coat before delivery. Refer to Division 9 Section “Painting” for final finishing of installed<br />

architectural woodwork and for stain, varnish and sealer.<br />

B. Final touchup, filling countersunk fasteners, cleaning and polishing after installation.<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION<br />

A. Before installation, condition woodwork to average prevailing humidity conditions in installation<br />

areas. Examine shop-fabricated work for completion and complete work as required, including<br />

removal of packing and backpriming.<br />

B. Grade: Install woodwork to comply with requirements for the same grade specified in Part 2 for<br />

fabrication of type of woodwork involved.<br />

INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 4


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERES CENTER<br />

Rosemary Beach, FL.<br />

C. Install woodwork level, plumb, true, and straight to a tolerance of 1/8 inch in 96 inches (3 mm in<br />

2400 mm) . Shim as required with concealed shims.<br />

D. Scribe and cut woodwork to fit adjoining work, refinish cut surfaces, and repair damaged finish<br />

at cuts.<br />

E. Anchor woodwork to anchors or blocking built in or directly attached to substrates. Secure with<br />

countersunk, concealed fasteners and blind nailing as required for complete installation. Use<br />

fine finishing nails or finishing screws for exposed fastening, countersunk and filled flush with<br />

woodwork and matching final finish if transparent finish is indicated.<br />

F. Cabinets: Install without distortion so doors and drawers fit openings properly and are<br />

accurately aligned. Adjust hardware to center doors and drawers in openings and to provide<br />

unencumbered operation.<br />

1. Fasten wall cabinets through back, near top and bottom, at ends and not more than 16<br />

inches (400 mm) o.c.<br />

G. Countertops: Anchor securely by screwing through corner blocks of base cabinets or other<br />

supports into underside of countertop. Calk space between backsplash and wall with sealant<br />

specified in Division 07 Section "Joint Sealants."<br />

END OF SECTION 06 40 23<br />

‘LEFT BLANK”<br />

INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 5


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERES CENTER<br />

Rosemary Beach, FL.<br />

INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 6


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

SECTION 064800 - WOOD DOOR FRAMES<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section Includes:<br />

1. Exterior frames and jambs.<br />

2. Interior frames and jambs.<br />

1.2 ACTION SUBMITTALS<br />

A. Product Data: For each type of product.<br />

B. Shop Drawings: Show location of each item, dimensioned plans and elevations, large-scale<br />

details, attachment devices, and other components.<br />

C. Samples:<br />

1. Lumber for each species and cut, finished on one side and one edge.<br />

1.3 INFORMATIONAL SUBMITTALS<br />

A. Woodwork Quality Standard Compliance Certificates: AWI Quality Certification Program<br />

certificates.<br />

PART 2 - PRODUCTS<br />

2.1 WOOD FRAMES, GENERAL<br />

A. Quality Standard: Unless otherwise indicated, comply with the "Architectural Woodwork<br />

Standards" for grades of wood frames indicated for construction, finishes, installation, and other<br />

requirements.<br />

1. Provide labels and certificates from AWI certification program indicating that<br />

woodwork, including installation, complies with requirements of grades specified.<br />

2.2 EXTERIOR FRAMES AND JAMBS FOR TRANSPARENT FINISH<br />

A. Grade: Premium.<br />

B. Wood Species: Ipe,<br />

WOOD FRAMES 064800 - 1


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

C. Finish: Apply Ipe Oil to all surfaces.<br />

2.3 INTERIOR FRAMES AND JAMBS FOR TRANSPARENT FINISH<br />

A. Grade: Premium.<br />

B. Wood Species: Ipe<br />

C. Finish: Apply Ipe Oil to all surfaces.<br />

2.4 WOOD MATERIALS<br />

A. Wood Products: Provide materials that comply with requirements of referenced quality standard<br />

for each type of wood frame and quality grade specified unless otherwise indicated.<br />

2.5 MISCELLANEOUS MATERIALS<br />

A. Exterior Blocking, Shims, and Nailers: Softwood or hardwood lumber, pressure-preservative<br />

treated, kiln dried to less than 15 percent moisture content.<br />

1. Preservative Treatment by Pressure Process: AWPA U1; Use Category UC3b.<br />

a. Kiln dry lumber after treatment to a maximum moisture content of 19 percent.<br />

b. Mark lumber with treatment quality mark of an inspection agency approved by the<br />

American Lumber Standards Committee's (ALSC) Board of Review.<br />

B. Interior Blocking, Shims, and Nailers: Softwood or hardwood lumber , kiln dried to less than<br />

15 percent moisture content.<br />

C. Nails for Exterior Use: stainless steel.<br />

D. Screws for Exterior Use: stainless steel.<br />

E. Provide self-drilling screws for metal-framing supports.<br />

F. Anchors: Select material, type, size, and finish required for each substrate for secure anchorage.<br />

Provide metal expansion sleeves or expansion bolts for post-installed anchors. Use nonferrousmetal<br />

or hot-dip galvanized anchors and inserts at inside face of exterior walls and at floors.<br />

G. Adhesives: Do not use adhesives that contain urea formaldehyde.<br />

2.6 FABRICATION<br />

A. Fabricate wood frames to dimensions, profiles, and details indicated. Ease edges to radius<br />

indicated for the following:<br />

WOOD FRAMES 064800 - 2


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

1. Edges of Solid-Wood (Lumber) Members: 1/16 inch (1.5 mm)<br />

indicated.<br />

unless otherwise<br />

PART 3 - EXECUTION<br />

3.1 PREPARATION<br />

A. Before installation, condition wood frames to average prevailing humidity conditions in<br />

installation areas.<br />

3.2 INSTALLATION<br />

A. Grade: Install wood frames to comply with same grade as item to be installed.<br />

B. Install wood frames level, plumb, true, and straight. Shim as required with concealed shims.<br />

Install level and plumb to a tolerance of 1/8 inch in 96 inches (3 mm in 2400 mm) .<br />

C. Scribe and cut wood frames to fit adjoining work, refinish cut surfaces, and repair damaged<br />

finish at cuts.<br />

D. Fire-Retardant-Treated Wood: Handle, store, and install fire-retardant-treated wood to comply<br />

with chemical treatment manufacturer's written instructions, including those for adhesives used<br />

to install woodwork.<br />

E. Anchor wood frames to anchors or blocking built in or directly attached to substrates. Secure<br />

with countersunk, concealed fasteners and blind nailing. Use fine finishing nails[ or finishing<br />

screws] for exposed fastening, countersunk and filled flush with woodwork.<br />

1. For shop-finished items, use filler matching finish of items being installed.<br />

END OF SECTION 064800<br />

WOOD FRAMES 064800 - 3


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

WOOD FRAMES 064800 - 4


DAG Architects Inc.<br />

12041 Rosemary Owners Center<br />

Rosemary Beach, FL<br />

SECTION 07 21 00 - THERMAL INSULATION<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. This Section includes the following:<br />

1. Board insulation.<br />

2. Concealed batt insulation.<br />

1.2 SUBMITTALS<br />

A. Product Data: For each type of product indicated.<br />

B. Product test reports.<br />

1.3 QUALITY ASSURANCE<br />

A. Source Limitations: Obtain each type of building insulation through one source from a single<br />

manufacturer.<br />

B. Fire-Test-Response Characteristics: Provide insulation and related materials with the fire-testresponse<br />

characteristics indicated, as determined by testing identical products per test method<br />

indicated below by UL or another testing and inspecting agency acceptable to authorities having<br />

jurisdiction. Identify materials with appropriate markings of applicable testing and inspecting<br />

agency.<br />

1. Surface-Burning Characteristics: ASTM E 84.<br />

2. Fire-Resistance Ratings: ASTM E 119.<br />

3. Combustion Characteristics: ASTM E 136.<br />

PART 2 - PRODUCTS<br />

2.1 FOAM-PLASTIC BOARD INSULATION<br />

A. Extruded-Polystyrene Board Insulation: ASTM C 578, Type IV, 1.60 lb/cu. ft. (26 kg/cu. m) with<br />

maximum flame-spread and smoke-developed indexes of 75 and 450, respectively:<br />

1. Manufacturers:<br />

a. DiversiFoam Products.<br />

b. Dow Chemical Company.<br />

c. Owens Corning.<br />

d. Pactiv Building Products Division.<br />

2.2 OPENED CELL SPRAY POLYURETHANE FOAM INSULATION<br />

A. Manufacturer:<br />

1. Demilec (USA) LLC Arlington, TX, SEALECTION 500<br />

B. Application sprayed with Blazelok IB4 Intumescent Coating on the top of all foam surfaces<br />

covered with a minimum nominal thickness of 3 dry mils, 5 wet mils of Blazelok IB4.<br />

2.3 GLASS-FIBER BLANKET INSULATION<br />

A. Manufacturers:<br />

1. CertainTeed Corporation.<br />

2. Guardian Fiberglass, Inc.<br />

3. Johns Manville.<br />

4. Knauf Fiber Glass.<br />

THERMAL INSULATION 07 21 00 - 1


DAG Architects Inc.<br />

12041 Rosemary Owners Center<br />

Rosemary Beach, FL<br />

5. Owens Corning.<br />

B. Unfaced, Flexible Glass-Fiber Blanket Insulation: ASTM C 665, Type I (blankets without<br />

membrane facing); consisting of fibers; with maximum flame-spread and smoke-developed<br />

indexes of 25 and 50, respectively, passing ASTM E 136 for combustion characteristics.<br />

C. Location: Install where batt insulation is indicated on the drawings.<br />

2.4 INSULATION FASTENERS<br />

A. Product with demonstrated capability to bond insulation securely to substrates indicated without<br />

damaging insulation and substrates.<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION, GENERAL<br />

A. Comply with insulation manufacturer's written instructions applicable to products and application<br />

indicated.<br />

B. Install insulation that is undamaged, dry, and unsoiled and that has not been left exposed at any<br />

time to ice, rain, and snow.<br />

C. Extend insulation in thickness indicated to envelop entire area to be insulated. Cut and fit tightly<br />

around obstructions and fill voids with insulation. Remove projections that interfere with<br />

placement.<br />

D. For preformed insulating units, provide sizes to fit applications indicated and selected from<br />

manufacturer's standard thicknesses, widths, and lengths. Apply single layer of insulation units<br />

to produce thickness indicated unless multiple layers are otherwise shown or required to make<br />

up total thickness.<br />

3.2 INSTALLATION OF BOARD INSULATION<br />

A. On units of foam-plastic board insulation, install pads of adhesive spaced approximately 24<br />

inches (610 mm) o.c. both ways on inside face, and as recommended by manufacturer. Fit<br />

courses of insulation with edges butted tightly in both directions. Press units firmly against<br />

inside substrates indicated.<br />

3.3 INSTALLATION OF GENERAL BUILDING INSULATION<br />

A. Install batt insulation in cavities formed by framing members according to the following<br />

requirements:<br />

1. Use insulation widths and lengths that fill the cavities formed by framing members. If<br />

more than one length is required to fill cavity, provide lengths that will produce a snug fit<br />

between ends.<br />

2. Place insulation in cavities formed by framing members to produce a friction fit between<br />

edges of insulation and adjoining framing members.<br />

3. For metal-framed wall cavities where cavity heights exceed 96 inches (2438 mm) ,<br />

support unfaced blankets mechanically to metal studs.<br />

B. Stuff glass-fiber loose-fill insulation into miscellaneous voids and cavity spaces where shown.<br />

Compact to approximately 40 percent of normal maximum volume equaling a density of<br />

approximately 2.5 lb/cu. ft. (40 kg/cu. m) .<br />

END OF SECTION 07 21 00<br />

THERMAL INSULATION 07 21 00 - 2


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

SECTION 074213.23 - METAL COMPOSITE MATERIAL WALL PANELS<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section includes metal composite material wall panels.<br />

B. Panel system requirements include the following components:<br />

1. Aluminum-faced composite panels with mounting system. Panel mounting system<br />

including anchorages, furring, fasteners, gaskets and sealants, related flashing adapters<br />

and masking for a complete installation.<br />

2. Shop-installed aluminum stiffeners on all panels of 20 square feet or larger. Minimum<br />

stiffener recommendation is one per 20 square feet of panel area.<br />

3. Parapet coping, column covers, soffits, sills, border and filler items may be indicated as<br />

integral components of the panels system or as designed.<br />

4. System to be fabricated and installed per Florida Building Code requirements.<br />

1.2 PREINSTALLATION MEETINGS<br />

A. Pre-installation Conference: Conduct conference at Project site.<br />

1.3 ACTION SUBMITTALS<br />

A. Product Data: For each type of product.<br />

B. Shop Drawings: Include fabrication and installation layouts of metal composite material panels;<br />

details of edge conditions, joints, panel profiles, corners, anchorages, attachment assembly,<br />

trim, flashings, closures, and accessories; and special details.<br />

C. Samples: For each type of metal composite material panel indicated.<br />

1.4 INFORMATIONAL SUBMITTALS<br />

A. Product test reports.<br />

B. Warranties: Samples of special warranties.<br />

1.5 CLOSEOUT SUBMITTALS<br />

A. Maintenance data.<br />

METAL COMPOSITE MATERIAL WALL PANELS 074213.23 - 1


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

1.6 QUALITY ASSURANCE<br />

A. Installer Qualifications: An entity that employs installers and supervisors who are trained and<br />

approved by manufacturer.<br />

B. Composite panel manufacturer shall have a minimum of 15 years’ architectural experience in<br />

the manufacture of this product and be located within the continental USA.<br />

C. Fabrication and installation of composite panels shall be from a single source.<br />

D. Fabricator shall be acceptable to composite panel manufacturer.<br />

E. Fabricator and installer shall have a minimum 5 years’ experience in architectural metal panel<br />

work similar in scope and size to this project.<br />

F. Coordinate fabrication schedule with construction progress as directed by the contractor to<br />

avoid delay of work.<br />

G. Shop drawings shall show the preferred joint details providing a watertight and structurally<br />

sound wall panel system that allows no uncontrolled water penetration, on the inside face of the<br />

panel system as determined by ASTM E331.<br />

H. Maximum deviation from vertical and horizontal alignment of erected panels: 6 mm (1/4") in 6<br />

m (20') non-accumulative.<br />

I. Panel fabricator and installer shall assume undivided responsibility for all components of the<br />

exterior panel system, including but not limited to, attachment to sub-construction, panel-topanel<br />

joinery, panel-to-dissimilar-material joinery and joint seal associated with the panel<br />

system.<br />

1.7 WARRANTY<br />

A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or<br />

replace components of metal composite material panel systems that fail in materials or<br />

workmanship within specified warranty period.<br />

1. Warranty Period: One year from date of Substantial Completion.<br />

B. Special Warranty on Panel Finishes: Manufacturer's standard form in which manufacturer<br />

agrees to repair finish or replace metal composite material panels that show evidence of<br />

deterioration of factory-applied finishes within specified warranty period.<br />

1. Finish Warranty Period: The aluminum composite material manufacturer shall warrant<br />

for a period of 30 years against Max 5 fade based on ASTM D2244 and Max 8 chalk<br />

based on ASTM D4212 and delamination of the paint from date of Substantial<br />

Completion.<br />

METAL COMPOSITE MATERIAL WALL PANELS 074213.23 - 2


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

PART 2 - PRODUCTS<br />

2.1 PERFORMANCE REQUIREMENTS<br />

A. Structural Performance: Provide metal composite material panel systems capable of<br />

withstanding the effects of the following loads, based on testing according to ASTM E 330: and<br />

the Florida Building Code.<br />

1. Wind Loads: As indicated on Drawings.<br />

2. Other Design Loads: As indicated on Drawings.<br />

3. Deflection Limits: For wind loads, no greater than 1/180 of the span.<br />

B. Air Infiltration: Air leakage of not more than 0.06 cfm/sq. ft. (0.3 L/s per sq. m) when tested<br />

according to ASTM E 283 at the following test-pressure difference:<br />

1. Test-Pressure Difference: [ 1.57 lbf/sq. ft. (75 Pa)] [6.24 lbf/sq. ft. (300 Pa) ].<br />

C. Water Penetration under Static Pressure: No water penetration when tested according to<br />

ASTM E 331 at the following test-pressure difference:<br />

D. Thermal Movements: Allow for thermal movements from ambient and surface temperature<br />

changes by preventing buckling, opening of joints, overstressing of components, failure of joint<br />

sealants, failure of connections, and other detrimental effects. Base calculations on surface<br />

temperatures of materials due to both solar heat gain and nighttime-sky heat loss.<br />

1. Temperature Change (Range): 120 deg F (67 deg C) , ambient.<br />

2.2 METAL COMPOSITE MATERIAL WALL PANELS


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

finish coat and 0.5 mil (approx) optional clear coat for special finishes. containing<br />

70% Kynar 500 ® resins. (If Colorweld ® 500XL, coating shall consist of a 0.2 mil<br />

(approx.) barrier prime coat, a 0.80 mil (approx.) color coat, containing 70% Kynar<br />

500 ® resins and a 0.5 mil (approx.) clear coat containing 70% Kynar 500 ®<br />

resins.)<br />

Nominal dry film thickness is 1.50 mils.<br />

c. Gloss: ASTM D523 standard at 60º shall be 5–50 based on color system.<br />

d. Pencil hardness: ASTM D3363 shall be F-2H minimum.<br />

e. Flexibility T-Bend: ASTM D4145 shall be 0-2T-Bend; no pick-off.<br />

f. Adhesion: ASTM D3359 reverse impact 1/16" crosshatch shall show no cracking<br />

or adhesion loss.<br />

g. Reverse Impact: ASTM D2794 1500 x metal thickness aluminum shall show no<br />

cracking or adhesion loss.<br />

h. Acid Resistance: ASTM D1308, 10% muriatic acid, 24 hrs., shall show no effect.<br />

20% sulfuric acid, 18 hrs, shall show no effect.<br />

i. Acid Rain Test: Kesternich SO2, DIN 500180, 10 cycles min. No objectionable<br />

color change.<br />

j. Alkali Resistance: ASTM D1308, 10%, 25% NaOH, 1 hr., shall show no effect.<br />

k. Salt Spray Resistance: ASTM B117, 5% salt fog at 95°F. Pass 4,000 hrs. less than<br />

1/16" average creep from scribe; up to a few #8 blisters.<br />

l. Humidity Resistance: ASTM D714 & ASTM D2247 100% relative humidity at<br />

95ºF, shall pass 4,000 hrs., # 8 blisters.<br />

m. Exterior Exposure: 10 years at 45º, South Florida. ASTM D2244 shall be Max. 5<br />

fade and ASTM D4214 shall be Max. 8 chalk.<br />

n. Paint system shall meet the requirements of AAMA 2605-11 specifications.<br />

o. (FEVE) Megaflon ® , Coraflon ® , Valflon ® or any Lumiflon ® -based paint systems are<br />

not acceptable.<br />

p. Paint system shall have more than 20 years of architectural field use.<br />

C. Formed from extruded aluminum.<br />

D. Attachment Assembly: Manufacturer's standard.<br />

2.3 MISCELLANEOUS MATERIALS<br />

A. Miscellaneous Metal Subframing and Furring: ASTM C 645, cold-formed, metallic-coated steel<br />

sheet ASTM A 653/A 653M, G90 (Z275 hot-dip galvanized) coating designation or<br />

ASTM A 792/A 792M, Class AZ50 (Class AZM150) aluminum-zinc-alloy coating designation<br />

unless otherwise indicated. Provide manufacturer's standard sections as required for support and<br />

alignment of metal composite material panel system.<br />

B. Panel Accessories: Provide components required for a complete, weathertight panel system<br />

including trim, copings, fasciae, mullions, sills, corner units, clips, flashings, sealants, gaskets,<br />

fillers, closure strips, and similar items. Match material and finish of metal composite material<br />

panels unless otherwise indicated.<br />

C. Flashing and Trim: Provide flashing and trim formed from same material as metal composite<br />

material panels as required to seal against weather and to provide finished appearance.<br />

Locations include, but are not limited to, bases, drips, sills, jambs, corners, endwalls, framed<br />

openings, rakes, fasciae, parapet caps, soffits, reveals, and fillers. Finish flashing and trim with<br />

same finish system as adjacent metal composite material panels.<br />

METAL COMPOSITE MATERIAL WALL PANELS 074213.23 - 4


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

D. Panel Fasteners: Self-tapping screws designed to withstand design loads. Provide exposed<br />

fasteners with heads matching color of metal composite material panels by means of plastic<br />

caps or factory-applied coating. Provide EPDM or PVC sealing washers for exposed fasteners.<br />

E. Panel Sealants: ASTM C 920; as recommended in writing by metal composite material panel<br />

manufacturer. Provide sealant types recommended by manufacturer that are compatible with<br />

panel materials, are nonstaining, and do not damage panel finish.<br />

2.4 FABRICATION<br />

A. General: Fabricate and finish metal composite material panels and accessories at the factory, by<br />

manufacturer's standard procedures and processes, as necessary to fulfill indicated performance<br />

requirements demonstrated by laboratory testing. Comply with indicated profiles and with<br />

dimensional and structural requirements.<br />

B. Fabricate metal composite material panel joints with factory-installed captive gaskets or<br />

separator strips that provide a weathertight seal and prevent metal-to-metal contact, and that<br />

minimize noise from movements.<br />

C. Sheet Metal Flashing and Trim: Fabricate flashing and trim to comply with manufacturer's<br />

recommendations and recommendations in SMACNA's "Architectural Sheet Metal Manual"<br />

that apply to design, dimensions, metal, and other characteristics of item indicated.<br />

D. System Characteristics<br />

1. System must not generally have any visible fasteners, telegraphing or fastening on the<br />

panel faces or any other compromise of a neat and flat appearance.<br />

2. Fabricate panel system to dimension, size and profile indicated on the drawings based on<br />

a design temperature of 68ºF (20ºC).<br />

3. Fabricate panel system to avoid compressive skin stresses. The installation detailing shall<br />

be such that the panels remain flat regardless of temperature changes and at all times<br />

remain air- and watertight.<br />

4. The finish side of the panel shall have a removable protective film applied prior to<br />

fabrication, which shall remain on the panel during fabrication, shipping and erection to<br />

protect the surface from damage.<br />

2.5 FINISHES<br />

A. Panels and Accessories:<br />

1. Two-Coat Fluoropolymer: AAMA 620. Fluoropolymer finish containing not less than 70<br />

percent PVDF resin by weight in color coat. Prepare, pretreat, and apply coating to<br />

exposed metal surfaces to comply with coating and resin manufacturers' written<br />

instructions.<br />

METAL COMPOSITE MATERIAL WALL PANELS 074213.23 - 5


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

PART 3 - EXECUTION<br />

3.1 PREPARATION<br />

A. Miscellaneous Supports: Install subframing, furring, and other miscellaneous panel support<br />

members and anchorages according to ASTM C 754 and metal composite material panel<br />

manufacturer's written recommendations.<br />

3.2 METAL COMPOSITE MATERIAL PANEL INSTALLATION<br />

A. Attachment Assembly, General: Install attachment assembly required to support metal<br />

composite material wall panels and to provide a complete weathertight wall system, including<br />

subgirts, perimeter extrusions, tracks, drainage channels, panel clips, and anchor channels.<br />

1. Include attachment to supports, panel-to-panel joinery, panel-to-dissimilar-material<br />

joinery, and panel-system joint seals.<br />

B. Installation: Attach metal composite material wall panels to supports at locations, spacings, and<br />

with fasteners recommended by manufacturer to achieve performance requirements specified.<br />

1. Wet Seal Systems: Seal horizontal and vertical joints between adjacent metal composite<br />

material wall panels with sealant backing and sealant. Install sealant backing and sealant<br />

according to requirements specified in Section 079200 "Joint Sealants."<br />

2. Dry Seal Systems: Seal horizontal and vertical joints between adjacent metal composite<br />

materialwall panels with manufacturer's standard gasket system.<br />

3. Rainscreen Systems: Do not apply sealants to joints unless otherwise indicated.<br />

C. Accessory Installation: Install accessories with positive anchorage to building and weathertight<br />

mounting, and provide for thermal expansion. Coordinate installation with flashings and other<br />

components.<br />

D. Flashing and Trim: Comply with performance requirements, manufacturer's written installation<br />

instructions, and SMACNA's "Architectural Sheet Metal Manual." Provide concealed fasteners<br />

where possible, and set units true to line and level as indicated. Install work with laps, joints,<br />

and seams that are permanently watertight.<br />

3.3 CLEANING<br />

A. Remove temporary protective coverings and strippable films, if any, as metal composite<br />

material panels are installed, unless otherwise indicated in manufacturer's written installation<br />

instructions. On completion of metal composite material panel installation, clean finished<br />

surfaces as recommended by metal composite material panel manufacturer. Maintain in a clean<br />

condition during construction.<br />

END OF SECTION 074213.23<br />

METAL COMPOSITE MATERIAL WALL PANELS 074213.23 - 6


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

SECTION 075419 - POLYVINYL-CHLORIDE (PVC) ROOFING<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section Includes:<br />

1. Adhered polyvinyl-chloride (PVC) roofing system.<br />

2. Roof insulation.<br />

1.2 DEFINITIONS<br />

A. Roofing Terminology: Definitions in ASTM D 1079 and glossary in NRCA's "The NRCA<br />

Roofing and Waterproofing Manual" apply to work of this Section.<br />

1.3 PREINSTALLATION MEETINGS<br />

A. Preinstallation Roofing Conference: Conduct conference at Project site<br />

1.4 ACTION SUBMITTALS<br />

A. Product Data: For each type of product.<br />

B. Shop Drawings: For roofing system. Include plans, elevations, sections, details, and attachments<br />

to other work.<br />

C. Samples for Verification: For the following products:<br />

1. Sheet roofing, of color required.<br />

1.5 INFORMATIONAL SUBMITTALS<br />

A. Research/Evaluation Reports: For components of roofing system, from ICC-ES.<br />

B. Sample Warranties: For manufacturer's special warranties.<br />

1.6 CLOSEOUT SUBMITTALS<br />

A. Maintenance Data: For roofing system to include in maintenance manuals.<br />

POLYVINYL-CHLORIDE (PVC) ROOFING 075419 - 1


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

1.7 QUALITY ASSURANCE<br />

A. Installer Qualifications: A qualified firm that is approved, authorized, or licensed by roofing<br />

system manufacturer to install manufacturer's product and that is eligible to receive<br />

manufacturer's special warranty.<br />

1.8 WARRANTY<br />

A. Special Warranty: Manufacturer agrees to repair or replace components of roofing system that<br />

fail in materials or workmanship within specified warranty period.<br />

1. Warranty Period: 10 years from date of Substantial Completion.<br />

PART 2 - PRODUCTS<br />

2.1 MANUFACTURERS<br />

A. Source Limitations: Obtain components including roof insulation, fasteners, for roofing system<br />

from manufacturer approved by membrane roofing manufacturer.<br />

2.2 PERFORMANCE REQUIREMENTS<br />

A. Accelerated Weathering: Roofing system shall withstand 2000 hours of exposure when tested<br />

according to ASTM G 152, ASTM G 154, or ASTM G 155.<br />

B. Impact Resistance: Roofing system shall resist impact damage when tested according to<br />

ASTM D 3746 or ASTM D 4272.<br />

C. Roofing System Design: Tested by a qualified testing agency to resist the following uplift<br />

pressures:<br />

1. Corner Uplift Pressure: See Structural Drawings<br />

2. Perimeter Uplift Pressure: See Structural Drawings<br />

3. Field-of-Roof Uplift Pressure: See Structural Drawings<br />

D. Fire-Resistance Ratings: Comply with fire-resistance-rated assembly designs indicated. Identify<br />

products with appropriate markings of applicable testing agency.<br />

2.3 PVC ROOFING<br />

A. PVC Sheet: ASTM D 4434/D 4434M, Type III, fabric reinforced<br />

1. Basis-of-Design Product: Subject to compliance with requirements, provide Sarnafil Inc.<br />

2. Thickness: 60 mils (1.5 mm) , nominal Retain one color in "Exposed Face Color"<br />

Subparagraph below. Although white is standard, verify availability of other colors with<br />

manufacturers if required.<br />

3. Exposed Face Color: White.<br />

POLYVINYL-CHLORIDE (PVC) ROOFING 075419 - 2


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

2.4 AUXILIARY ROOFING MATERIALS<br />

A. General: Auxiliary materials recommended by roofing system manufacturer for intended use<br />

and compatible with roofing.<br />

1. Liquid-type auxiliary materials shall comply with VOC limits of authorities having<br />

jurisdiction.<br />

a. Plastic Foam Adhesives: 50 g/L.<br />

b. Gypsum Board and Panel Adhesives: 50 g/L.<br />

c. Multipurpose Construction Adhesives: 70 g/L.<br />

d. Fiberglass Adhesives: 80 g/L.<br />

e. Single-Ply Roof Membrane Adhesives: 250 g/L.<br />

f. PVC Welding Compounds: 510 g/L.<br />

g. Adhesive Primer for Plastic: 650 g/L<br />

h. Single-Ply Roof Membrane Sealants: 450 g/L.<br />

i. Nonmembrane Roof Sealants: 300 g/L.<br />

j. Sealant Primers for Nonporous Substrates: 250 g/L.<br />

k. Sealant Primers for Porous Substrates: 775 g/L.<br />

l. Other Adhesives and Sealants: 250 g/L.<br />

B. Sheet Flashing: Manufacturer's standard sheet flashing of same material, type, reinforcement,<br />

thickness, and color as PVC sheet.<br />

C. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with corrosionresistance<br />

provisions in FM Global 4470, designed for fastening roofing to substrate, and<br />

acceptable to roofing system manufacturer.<br />

D. Miscellaneous Accessories: Provide metal termination bars, metal battens, pourable sealers,<br />

preformed cone and vent sheet flashings, preformed inside and outside corner sheet flashings,<br />

T-joint covers, lap sealants, termination reglets, and other accessories.<br />

2.5 ROOF INSULATION<br />

A. Polyisocyanurate Board Insulation: ASTM C 1289, Type II, Class 1, Grade 2 lt or glass-fiber<br />

mat facer on both major surfaces.<br />

1. Manufacturers: Subject to compliance with requirements, provide products by one of the<br />

following<br />

2. Basis-of-Design Product: Subject to compliance with requirements, provide<br />

a. Atlas Roofing Corporation.<br />

b. Carlisle SynTec Incorporated.<br />

c. Dyplast Products.<br />

d. Firestone Building Products.<br />

e. GAF Materials Corporation.<br />

POLYVINYL-CHLORIDE (PVC) ROOFING 075419 - 3


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

f. Hunter Panels.<br />

g. Insulfoam LLC; a Carlisle company.<br />

h. Johns Manville.<br />

i. Rmax, Inc.<br />

B. Provide preformed saddles, crickets, tapered edge strips, and other insulation shapes where<br />

indicated for sloping to drain. Fabricate to slopes indicated.<br />

2.6 INSULATION ACCESSORIES<br />

A. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with corrosionresistance<br />

provisions in FM Global 4470, designed for fastening roof insulation[ and cover<br />

boards] to substrate, and acceptable to roofing system manufacturer.<br />

B. Insulation Adhesive: Insulation manufacturer's recommended adhesive formulated to attach roof<br />

insulation to substrate or to another insulation layer.<br />

PART 3 - EXECUTION<br />

3.1 ROOFING INSTALLATION, GENERAL<br />

A. Install roofing system according to roofing system manufacturer's written instructions.<br />

B. Complete terminations and base flashings and provide temporary seals to prevent water from<br />

entering completed sections of roofing system at end of workday or when rain is forecast.<br />

Remove and discard temporary seals before beginning work on adjoining roofing.<br />

C. Install roofing and auxiliary materials to tie in to existing roofing to maintain weathertightness<br />

of transition<br />

3.2 SUBSTRATE BOARD INSTALLATION<br />

A. Install substrate board with long joints in continuous straight lines, perpendicular to roof slopes<br />

with end joints staggered between rows. Tightly butt substrate boards together.<br />

1. Fasten substrate board to top flanges of steel deck to resist uplift pressure at corners,<br />

perimeter, and field of roof according to roofing system manufacturers' written<br />

instructions.<br />

3.3 INSULATION INSTALLATION<br />

A. Coordinate installing roofing system components so insulation is not exposed to precipitation or<br />

left exposed at the end of the workday.<br />

B. Install tapered insulation under area of roofing to conform to slopes indicated.<br />

POLYVINYL-CHLORIDE (PVC) ROOFING 075419 - 4


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

C. Install insulation under area of roofing to achieve required thickness. Where overall insulation<br />

thickness is 2.7 inches (68 mm) or greater, install two or more layers with joints of each<br />

succeeding layer staggered from joints of previous layer a minimum of 6 inches (150 mm) in<br />

each direction.<br />

1. Where installing composite and noncomposite insulation in two or more layers, install<br />

noncomposite board insulation for bottom layer and intermediate layers, if applicable,<br />

and install composite board insulation for top layer.<br />

D. Adhered Insulation: Install each layer of insulation and adhere to substrate as follows:<br />

1. Prime surface of concrete deck with asphalt primer at rate of 3/4 gal./100 sq. ft.<br />

(0.3 L/sq. m) , and allow primer to dry.<br />

2. Set each layer of insulation in a solid mopping of hot roofing asphalt, applied within plus<br />

or minus 25 deg F (14 deg C) of equiviscous temperature.<br />

3. Set each layer of insulation in insulation adhesive, firmly pressing and maintaining<br />

insulation in place.<br />

E. Mechanically Fastened Insulation: Install each layer of insulation and secure to deck using<br />

mechanical fasteners specifically designed and sized for fastening specified board-type roof<br />

insulation to deck type.<br />

1. Fasten insulation to resist uplift pressure at corners, perimeter, and field of roof.<br />

F. Mechanically Fastened and Adhered Insulation: Install each layer of insulation to deck using<br />

mechanical fasteners specifically designed and sized for fastening specified board-type roof<br />

insulation to deck type.<br />

1. Fasten first layer of insulation to resist uplift pressure at corners, perimeter, and field of<br />

roof.<br />

2. Set each subsequent layer of insulation in insulation adhesive, firmly pressing and<br />

maintaining insulation in place.<br />

3.4 ADHERED ROOFING INSTALLATION<br />

A. Adhere roofing over area to receive roofing according to roofing system manufacturer's written<br />

instructions. Unroll roofing and allow to relax before retaining.<br />

1. Install sheet according to ASTM D 5036.<br />

B. Accurately align roofing, and maintain uniform side and end laps of minimum dimensions<br />

required by manufacturer. Stagger end laps.<br />

C. Bonding Adhesive: Apply to substrate and underside of roofing at rate required by<br />

manufacturer, and allow to partially dry before installing roofing. Do not apply to splice area of<br />

roofing.<br />

D. In addition to adhering, mechanically fasten roofing securely at terminations, penetrations, and<br />

perimeter of roofing.<br />

POLYVINYL-CHLORIDE (PVC) ROOFING 075419 - 5


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

E. Seams: Clean seam areas, overlap roofing, and hot-air weld side and end laps of roofing and<br />

sheet flashings according to manufacturer's written instructions, to ensure a watertight seam<br />

installation.<br />

1. Test lap edges with probe to verify seam weld continuity. Apply lap sealant to seal cut<br />

edges of sheet.<br />

2. Verify field strength of seams a minimum of twice daily, and repair seam sample areas.<br />

3. Repair tears, voids, and lapped seams in roofing that do not comply with requirements.<br />

F. Spread sealant bed over deck-drain flange at roof drains, and securely seal roofing in place with<br />

clamping ring.<br />

3.5 BASE FLASHING INSTALLATION<br />

A. Install sheet flashings and preformed flashing accessories, and adhere to substrates according to<br />

roofing system manufacturer's written instructions.<br />

B. Apply bonding adhesive to substrate and underside of sheet flashing at required rate, and allow<br />

to partially dry. Do not apply to seam area of flashing.<br />

C. Flash penetrations and field-formed inside and outside corners with cured or uncured sheet<br />

flashing.<br />

D. Clean seam areas, overlap, and firmly roll sheet flashings into the adhesive. Hot-air weld side<br />

and end laps to ensure a watertight seam installation.<br />

E. Terminate and seal top of sheet flashings[ and mechanically anchor to substrate through<br />

termination bars].<br />

3.6 PROTECTING AND CLEANING<br />

A. Protect roofing system from damage and wear during remainder of construction period. When<br />

remaining construction does not affect or endanger roofing, inspect roofing for deterioration and<br />

damage, describing its nature and extent in a written report, with copies to Architect and Owner.<br />

B. Correct deficiencies in or remove roofing system that does not comply with requirements, repair<br />

substrates, and repair or reinstall roofing system to a condition free of damage and deterioration<br />

at time of Substantial Completion and according to warranty requirements.<br />

END OF SECTION 075419<br />

POLYVINYL-CHLORIDE (PVC) ROOFING 075419 - 6


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

Rosemary Beach,FL.<br />

SECTION 07 92 00 - JOINT SEALANTS<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. This Section includes joint sealants for the following applications, including those specified by<br />

reference to this Section:<br />

1. Provide sealant/caulk at all dissimilar materials on the exterior and interior surfaces.<br />

When joints or the connection of dissimilar materials are large enough provide backer rod<br />

and sealant.<br />

2. Exterior joints in vertical surfaces and horizontal nontraffic surfaces.<br />

a. Construction joints in cast-in-place concrete.<br />

b. Control and expansion joints in unit masonry.<br />

c. Joints in siding and trim.<br />

d. Joints in stucco systems.<br />

e. Joints between different materials listed above.<br />

f. Perimeter joints between materials listed above and frames of doors, windows and<br />

louvers.<br />

g. Other joints as indicated.<br />

3. Exterior joints in horizontal traffic surfaces.<br />

a. Isolation and contraction joints in cast-in-place concrete slabs.<br />

4. Interior joints in vertical surfaces and horizontal nontraffic surfaces.<br />

a. Control and expansion joints on exposed interior surfaces of exterior walls.<br />

b. Perimeter joints of exterior openings where indicated.<br />

c. Tile control and expansion joints.<br />

d. Perimeter joints between interior wall surfaces and frames of interior<br />

5. Interior joints in horizontal traffic surfaces.<br />

a. Isolation joints in cast-in-place concrete slabs.<br />

b. Control and expansion joints in tile flooring.<br />

B. See Division 08 Section "Glazing" for glazing sealants.<br />

1.2 PERFORMANCE REQUIREMENTS<br />

A. Provide elastomeric joint sealants that establish and maintain watertight and airtight continuous<br />

joint seals without staining or deteriorating joint substrates.<br />

B. Provide joint sealants for interior applications that establish and maintain airtight and waterresistant<br />

continuous joint seals without staining or deteriorating joint substrates.<br />

1.3 SUBMITTALS<br />

A. Product Data: For each joint-sealant product indicated.<br />

B. Samples: For each type and color of joint sealant required, provide Samples with joint sealants<br />

in 1/2-inch- (13-mm-) wide joints formed between two 6-inch- (150-mm-) long strips of material<br />

matching the appearance of exposed surfaces adjacent to joint sealants.<br />

1. Provide a minimum of 6 different colors as selected by Architect from manufacturers full<br />

color range.<br />

2. All sealant colors shall match adjacent material.<br />

C. Preconstruction field test reports.<br />

D. Compatibility and adhesion test reports.<br />

E. Product certificates or test reports.<br />

JOINT SEALANTS 07 92 00 - 1


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

Rosemary Beach,FL.<br />

1.4 QUALITY ASSURANCE<br />

A. Preconstruction Compatibility and Adhesion Testing: Submit samples of materials that will<br />

contact or affect joint sealants to joint-sealant manufacturers for testing according to<br />

ASTM C 1087 manufacturer's standard test method to determine whether priming and other<br />

specific joint preparation techniques are required to obtain rapid, optimum adhesion of joint<br />

sealants to joint substrates.<br />

B. Preconstruction Field-Adhesion Testing: Before installing elastomeric sealants, field test their<br />

adhesion to Project joint substrates according to the method in ASTM C 1193 that is appropriate<br />

for the types of Project joints.<br />

C. Mockups: Build mockups incorporating sealant joints, as follows, to verify selections made<br />

under sample submittals and to demonstrate aesthetic effects and set quality standards for<br />

materials and execution:<br />

1. Joints in mockups of assemblies specified in other Sections that are indicated to receive<br />

elastomeric joint sealants, which are specified by reference to this Section.<br />

1.5 WARRANTY<br />

A. Special Installer's Warranty: Installer's standard form in which Installer agrees to repair or<br />

replace elastomeric joint sealants that do not comply with performance and other requirements<br />

specified in this Section within specified warranty period.<br />

1. Warranty Period: Two years from date of Substantial Completion.<br />

B. Special Manufacturer's Warranty: Manufacturer's standard form in which elastomeric sealant<br />

manufacturer agrees to furnish elastomeric joint sealants to repair or replace those that do not<br />

comply with performance and other requirements specified in this Section within specified<br />

warranty period.<br />

1. Warranty Period: 10 years from date of Substantial Completion.<br />

PART 2 - PRODUCTS<br />

2.1 MATERIALS, GENERAL<br />

A. Compatibility: Provide joint sealants, backings, and other related materials that are compatible<br />

with one another and with joint substrates under conditions of service and application, as<br />

demonstrated by sealant manufacturer, based on testing and field experience.<br />

B. Colors of Exposed Joint Sealants: As selected by Architect from manufacturer's full range.<br />

2.2 ELASTOMERIC JOINT SEALANTS<br />

A. Elastomeric Sealants: Comply with ASTM C 920 and other requirements indicated for each<br />

liquid-applied chemically curing sealant specified, including those referencing ASTM C 920<br />

classifications for type, grade, class, and uses related to exposure and joint substrates.<br />

B. Stain-Test-Response Characteristics: Where elastomeric sealants are specified to be<br />

nonstaining to porous substrates, provide products that have undergone testing according to<br />

ASTM C 1248 and have not stained porous joint substrates indicated for Project.<br />

C. Suitability for Immersion in Liquids. Where elastomeric sealants are indicated for Use I for joints<br />

that will be continuously immersed in liquids, provide products that have undergone testing<br />

according to ASTM C 1247 and qualify for the length of exposure indicated by reference to<br />

ASTM C 920 for Class 1 or 2. Liquid used for testing sealants is deionized water, unless<br />

otherwise indicated.<br />

D. Suitability for Contact with Food: Where elastomeric sealants are indicated for joints that will<br />

come in repeated contact with food, provide products that comply with 21 CFR 177.2600.<br />

E. Multi-component Sealant is permitted but must be compatible and equivalent to specified<br />

sealants.<br />

JOINT SEALANTS 07 92 00 - 2


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

Rosemary Beach,FL.<br />

F. Low-Modulus Neutral-Curing Polyurethane Sealant (JS-1): Where joint sealants of this type are<br />

indicated, provide products complying with the following:<br />

1. Available Products:<br />

a. Pecora Corporation; Dynatrol I-XL.<br />

b. Tremco; Dymonic.<br />

c. Tremco; Vulkem 921.<br />

2. Type and Grade: S (single component) and NS (nonsag).<br />

3. Class: 25.<br />

4. Uses Related to Exposure: NT (nontraffic).<br />

5. Uses Related to Joint Substrates: M, G, A, and, as applicable to joint substrates<br />

indicated, O.<br />

a. Coated glass, aluminum coated with a high-performance coating, color anodic<br />

aluminum, galvanized steel, brick, limestone, marble, granite, plastic, tile, wood.<br />

G. Medium-Modulus Neutral-Curing Silicone Sealant (JS-2): Where joint sealants of this type are<br />

indicated, provide products complying with the following:<br />

1. Available Products:<br />

a. GE Silicones; Silglaze II SCS2800.<br />

b. Tremco; Tremsil 600.<br />

c. Dow Corning Corporation; 795.<br />

d. Pecora Corporation; Pecora 895.<br />

2. Type and Grade: S (single component) and NS (nonsag).<br />

3. Class: 25.<br />

4. Use Related to Exposure: NT (nontraffic).<br />

5. Uses Related to Joint Substrates: M, G, A, and, as applicable to joint substrates<br />

indicated, O.<br />

a. Coated glass, aluminum coated with a high-performance coating, color anodic<br />

aluminum, galvanized steel, brick, limestone, marble, granite, plastic, tile, wood.<br />

6. Stain-Test-Response Characteristics: Nonstaining to porous substrates per ASTM C<br />

1248.<br />

H. Single-Component Mildew-Resistant Acid-Curing Silicone Sealant (JS-3): Where joint sealant<br />

of this type are indicated, provide products formulated with fungicide that are intended for<br />

sealing interior ceramic tile joints and other nonporous substrates that are subject to in-service<br />

exposures of high humidity and temperature extremes, and that comply with the following:<br />

1. Available Products:<br />

a. Dow Corning Corporation; 786 Mildew Resistant.<br />

b. GE Silicones; Sanitary SCS1700.<br />

c. Tremco; Tremsil 200 White.<br />

2. Type and Grade: S (single component) and NS (nonsag).<br />

3. Class: 25.<br />

4. Use Related to Exposure: NT (nontraffic).<br />

5. Uses Related to Joint Substrates: G, A, and, as applicable to joint substrates indicated,<br />

O.<br />

a. Coated glass, aluminum coated with a high-performance coating, color anodic<br />

aluminum galvanized steel, marble, granite, plastic and tile.<br />

I. Single-Component Pourable Urethane Sealant (JS-4): Where joint sealants of this type are<br />

indicated, provide products complying with the following:<br />

1. Available Products:<br />

a. Pecora Corporation; Urexpan NR-201.<br />

b. Polymeric Systems Inc.; Flexiprene 952.<br />

c. Tremco; Tremflex S/L.<br />

d. Tremco; Vulkem 45.<br />

e. Sonneborn Building Products, Div., ChemRex Inc.; SL 1.<br />

2. Type and Grade: S (single component) and P (pourable).<br />

3. Class: 25.<br />

4. Use Related to Exposure: T (traffic) and NT (nontraffic).<br />

JOINT SEALANTS 07 92 00 - 3


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

Rosemary Beach,FL.<br />

5. Uses Related to Joint Substrates: M, A, and, as applicable to joint substrates indicated,<br />

O.<br />

a. Color anodic aluminum, aluminum coated with high-performance coating,<br />

galvanized steel, brick, granite, marble, ceramic tile and wood.<br />

2.3 SOLVENT-RELEASE JOINT SEALANTS<br />

A. Acrylic-Based Solvent-Release Joint Sealant: Comply with ASTM C 1311 or FS TT-S-00230.<br />

1. Available Products:<br />

a. Tremco; Mono 555.<br />

B. Butyl-Rubber-Based Solvent-Release Joint Sealant: Comply with ASTM C 1085.<br />

1. Available Products:<br />

a. Bostik Findley; Bostik 300.<br />

b. Fuller, H. B. Company; SC-0<strong>29</strong>6.<br />

c. Fuller, H. B. Company; SC-0288.<br />

d. Pecora Corporation; BC-158.<br />

e. Polymeric Systems Inc.; PSI-301.<br />

f. Sonneborn, Division of ChemRex Inc.; Sonneborn Multi-Purpose Sealant.<br />

g. Tremco; Tremco Butyl Sealant.<br />

2.4 LATEX JOINT SEALANTS<br />

A. General: For Interior Use Only.<br />

B. Latex Sealant (JS-5): Comply with ASTM C 834, Type OP, Grade NF.<br />

C. Available Products:<br />

1. Bostik Findley; Chem-Calk 600.<br />

2. Pecora Corporation; AC-20+.<br />

3. Sonneborn, Division of ChemRex Inc.; Sonolac.<br />

4. Tremco; Tremflex 834.<br />

2.5 ACOUSTICAL JOINT SEALANTS<br />

A. General: For Interior Use Only.<br />

B. Acoustical Sealant for Exposed and Concealed Joints (JS-6): Manufacturer's standard nonsag,<br />

paintable, nonstaining latex sealant complying with ASTM C 834 that effectively reduces<br />

airborne sound transmission through perimeter joints and openings in building construction as<br />

demonstrated by testing representative assemblies according to ASTM E 90.<br />

1. Available Products:<br />

a. Pecora Corporation; AC-20 FTR Acoustical and Insulation Sealant.<br />

b. United States Gypsum Co.; SHEETROCK Acoustical Sealant.<br />

2.6 JOINT-SEALANT BACKING<br />

A. General: Provide sealant backings of material and type that are nonstaining; are compatible<br />

with joint substrates, sealants, primers, and other joint fillers; and are approved for applications<br />

indicated by sealant manufacturer based on field experience and laboratory testing.<br />

B. Cylindrical Sealant Backings (Backer Rod): ASTM C 1330, Type C (closed-cell material with a<br />

surface skin) polyurethane foam rod, oversized 20 – 50 percent larger than joint width as<br />

approved in writing by joint-sealant manufacturer for joint application indicated, and of size and<br />

density to control sealant depth and otherwise contribute to producing optimum sealant<br />

performance:<br />

C. Bond-Breaker Tape: Polyethylene tape or other plastic tape recommended by sealant<br />

manufacturer for preventing sealant from adhering to rigid, inflexible joint-filler materials or joint<br />

surfaces at back of joint where such adhesion would result in sealant failure. Provide selfadhesive<br />

tape where applicable.<br />

JOINT SEALANTS 07 92 00 - 4


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

Rosemary Beach,FL.<br />

2.7 MISCELLANEOUS MATERIALS<br />

A. Primer: Material recommended by joint-sealant manufacturer where required for adhesion of<br />

sealant to joint substrates indicated, as determined from preconstruction joint-sealant-substrate<br />

tests and field tests.<br />

B. Cleaners for Nonporous Surfaces: Chemical cleaners acceptable to manufacturers of sealants<br />

and sealant backing materials, free of oily residues or other substances capable of staining or<br />

harming joint substrates and adjacent nonporous surfaces in any way, and formulated to<br />

promote optimum adhesion of sealants to joint substrates.<br />

C. Masking Tape: Nonstaining, nonabsorbent material compatible with joint sealants and surfaces<br />

adjacent to joints.<br />

PART 3 - EXECUTION<br />

3.1 PREPARATION<br />

A. Surface Cleaning of Joints: Clean out joints immediately before installing joint sealants.<br />

1. Remove all foreign material from joint substrates that could interfere with adhesion of<br />

joint sealant.<br />

a. Clean porous joint substrate surfaces by brushing, grinding, blast cleaning,<br />

mechanical abrading, or a combination of these methods to produce a clean,<br />

sound substrate capable of developing optimum bond with joint sealants. Remove<br />

loose particles remaining after cleaning operations above by vacuuming or blowing<br />

out joints with oil-free compressed air.<br />

2. Remove laitance and form-release agents from concrete.<br />

a. Clean nonporous surfaces with chemical cleaners or other means that do not stain,<br />

harm substrates, or leave residues capable of interfering with adhesion of joint<br />

sealants.<br />

B. Joint Priming: Prime joint substrates, where recommended in writing by joint-sealant<br />

manufacturer, based on preconstruction joint-sealant-substrate tests or prior experience. Apply<br />

primer to comply with joint-sealant manufacturer's written instructions. Confine primers to areas<br />

of joint-sealant bond; do not allow spillage or migration onto adjoining surfaces.<br />

C. Masking Tape: Use masking tape where required to prevent contact of sealant with adjoining<br />

surfaces that otherwise would be permanently stained or damaged by such contact or by<br />

cleaning methods required to remove sealant smears. Remove tape immediately after tooling<br />

without disturbing joint seal.<br />

3.2 INSTALLATION<br />

A. General: All Dissimilar Materials are to be caulked.<br />

B. Sealant Installation Standard: Comply with recommendations in ASTM C 1193 for use of joint<br />

sealants as applicable to materials, applications, and conditions indicated.<br />

C. Acoustical Sealant Application Standard: Comply with recommendations in ASTM C 919 for<br />

use of joint sealants in acoustical applications as applicable to materials, applications, and<br />

conditions indicated.<br />

D. Install sealant backings of type indicated to support sealants during application and at position<br />

required to produce cross-sectional shapes and depths of installed sealants relative to joint<br />

widths that allow optimum sealant movement capability.<br />

1. Do not leave gaps between ends of sealant backings.<br />

2. Do not stretch, twist, puncture, or tear sealant backings.<br />

3. Remove absorbent sealant backings that have become wet before sealant application<br />

and replace them with dry materials.<br />

E. Install bond-breaker tape behind sealants where sealant backings are not used between<br />

sealants and backs of joints.<br />

JOINT SEALANTS 07 92 00 - 5


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

Rosemary Beach,FL.<br />

F. Install sealants using proven techniques that comply with the following and at the same time<br />

backings are installed:<br />

1. Place sealants so they directly contact and fully wet joint substrates.<br />

2. Completely fill recesses in each joint configuration.<br />

3. Produce uniform, cross-sectional shapes and depths relative to joint widths that allow<br />

optimum sealant movement capability.<br />

G. Tooling of Nonsag Sealants: Immediately after sealant application and before skinning or<br />

curing begins, tool sealants according to requirements specified below to form smooth, uniform<br />

beads of configuration indicated; to eliminate air pockets; and to ensure contact and adhesion of<br />

sealant with sides of joint.<br />

1. Remove excess sealant from surfaces adjacent to joints.<br />

2. Use tooling agents that are approved in writing by sealant manufacturer and that do not<br />

discolor sealants or adjacent surfaces.<br />

3. Provide concave joint configuration per Figure 5A in ASTM C 1193, unless otherwise<br />

indicated.<br />

H. Clean off excess sealant or sealant smears adjacent to joints as the Work progresses by<br />

methods and with cleaning materials approved in writing by manufacturers of joint sealants and<br />

of products in which joints occur.<br />

3.3 JOINT-SEALANT SCHEDULE<br />

A. Joint-Sealant Application: All exterior wall penetrations shall be finished with sealant for a water<br />

and weathertight installation.<br />

1. Joint Sealant: JS-1, Low Modulus-neutral-curing sealant.<br />

2. Joint Sealant Color: As selected by Architect from Manufacturers full color range.<br />

B. Joint-Sealant Application: Exterior siding and trim.<br />

1. Joint Sealant: JS-1, Low-Modulus neutral curing sealant.<br />

2. Joint Sealant Color: As selected by Architect from Manufacturers full color range.<br />

C. Joint-Sealant Application: Exterior vertical and horizontal nontraffic construction joints in cast-inplace<br />

concrete.<br />

1. Joint Sealant: JS-1, Low-Modulus-neutral-curing sealant.<br />

2. Joint-Sealant color: As selected by Architect from Manufacturers full color range.<br />

D. Joint-Sealant Application: Exterior horizontal nontraffic and traffic isolation and contraction joints<br />

in cast-in-place concrete slabs.<br />

1. Joint Sealant: JS-4, Single-component pourable urethane sealant.<br />

2. Joint-Sealant Color: As selected by Architect from Manufacturers full color range.<br />

E. Joint-Sealant Application: Exterior vertical control and expansion joints in unit masonry.<br />

1. Joint Sealant: JS-1, Low-Modulus neutral-curing sealant.<br />

2. Joint-Sealant Color: As selected by Architect from Manufacturers full color range.<br />

F. Joint-Sealant Application: Exterior joints in stucco systems.<br />

1. Joint Sealant: JS-1, Low-Modulus neutral-curing sealant.<br />

2. Joint-Sealant Color: As selected by Architect from Manufacturers full color range.<br />

G. Joint-Sealant Application: Exterior vertical joints between different materials listed above.<br />

1. Joint Sealant: JS-1, Low-Modulus neutral-curing sealant.<br />

2. Joint-Sealant Color: As selected by Architect from Manufacturers full color range.<br />

H. Joint-Sealant Application: Exterior perimeter joints between substrate material and frames of<br />

doors, windows, and louvers.<br />

1. Joint Sealant: JS-1, Low-Modulus neutral-curing sealant.<br />

2. Joint-Sealant Color: As selected by Architect from Manufacturers full color range.<br />

I. Joint-Sealant Application: Exterior control and expansion joints in ceilings and other overhead<br />

surfaces.<br />

1. Joint Sealant: JS-1, Low-Modulus neutral-curing sealant.<br />

2. Joint Sealant Color: As selected by Architect from manufactures full color range.<br />

JOINT SEALANTS 07 92 00 - 6


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

Rosemary Beach,FL.<br />

J. Joint-Sealant Application: Exterior control and expansion joints in horizontal traffic surfaces of<br />

ceramic tile.<br />

1. Joint Sealant: JS-4, Single-component pourable urethane sealant.<br />

2. Joint-Sealant Color: As selected by Architect from Manufacturers full color range.<br />

K. Joint-Sealant Application: Vertical control and expansion joints on exposed interior surfaces of<br />

exterior walls.<br />

1. Joint Sealant: JS-5 Latex sealant.<br />

2. Joint-Sealant Color: As selected by Architect from Manufacturers full color range.<br />

L. Joint-Sealant Application: Interior perimeter joints of exterior openings.<br />

1. Joint Sealant: JS-5, Latex sealant.<br />

2. Joint-Sealant Color: As selected by Architect from Manufacturers full color range.<br />

M. Joint-Sealant Application: Interior ceramic tile expansion, control, contraction, and isolation<br />

joints in horizontal traffic surfaces.<br />

1. Joint Sealant: JS-4, Single-component pourable urethane sealant.<br />

2. Joint-Sealant Color: As selected by Architect from Manufacturers full color range.<br />

N. Joint-Sealant Application: Interior joints between plumbing fixtures and adjoining walls, floors,<br />

and counters.<br />

1. Joint Sealant: Single-component mildew-resistant acid-curing silicone sealant.<br />

2. Joint-Sealant Color: As selected by Architect from Manufacturers full color range.<br />

O. Joint-Sealant Application: Vertical joints on exposed surfaces of interior unit masonry and<br />

partitions.<br />

1. Joint Sealant: JS-5 Latex sealant.<br />

2. Joint-Sealant Color: As selected by Architect from Manufacturers full color range.<br />

P. Joint-Sealant Application: Perimeter joints between interior wall surfaces ad frames of interior<br />

doors, windows, and elevator entrances.<br />

1. Joint Sealant: JS-5 Latex sealant.<br />

2. Joint-Sealant Color: As selected by Architects from Manufacturers full color range.<br />

END OF SECTION 07 92 00<br />

JOINT SEALANTS 07 92 00 - 7


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

Rosemary Beach,FL.<br />

“LEFT BLANK”<br />

JOINT SEALANTS 07 92 00 - 8


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

SECTION 081213 - HOLLOW METAL FRAMES<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section includes hollow-metal frames.<br />

B. Related Requirements:<br />

1. Section 081416 "Flush Wood Doors" for wood doors installed in hollow-metal frames.<br />

1.2 DEFINITIONS<br />

A. Minimum Thickness: Minimum thickness of base metal without coatings according to<br />

NAAMM-HMMA 803 or SDI A250.8.<br />

1.3 ACTION SUBMITTALS<br />

A. Product Data: For each type of product.<br />

B. Shop Drawings: Include elevations, frame profiles, metal thicknesses, preparations for<br />

hardware, and other details.<br />

C. Schedule: Prepared by or under the supervision of supplier, using same reference numbers for<br />

details and openings as those on Drawings.<br />

1.4 INFORMATIONAL SUBMITTALS<br />

A. Product test reports.<br />

PART 2 - PRODUCTS<br />

2.1 MANUFACTURERS<br />

A. Manufacturers: Subject to compliance with requirements, [provide products by the following]<br />

[provide products by one of the following] [available manufacturers offering products that<br />

may be incorporated into the Work include, but are not limited to, the following]:<br />

1. Ceco Door Products; an Assa Abloy Group company.<br />

2. Curries Company; an Assa Abloy Group company.<br />

3. Republic Doors and Frames.<br />

4. Steelcraft; an Ingersoll-Rand company.<br />

HOLLOW METAL FRAMES 081213 - 1


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

2.2 REGULATORY REQUIREMENTS<br />

A. Fire-Rated Assemblies: Complying with NFPA 80 and listed and labeled by a qualified testing<br />

agency acceptable to authorities having jurisdiction for fire-protection ratings and<br />

temperature-rise limits indicated, based on testing at positive pressure according to NFPA 252<br />

or UL 10C.<br />

2.3 INTERIOR FRAMES<br />

A. Standard-Duty Frames: SDI A250.8, Level.<br />

1. Physical Performance: Level C according to SDI A250.4.<br />

2. Materials: Uncoated, cold-rolled steel sheet, minimum thickness of 0.042 inch (1.0 mm) .<br />

3. Construction: Full profile welded.<br />

4. Exposed Finish: Prime.<br />

2.4 EXTERIOR HOLLOW-METAL FRAMES<br />

A. Heavy-Duty Frames: SDI A250.8, Level 2. At locations indicated in the Door and Frame<br />

Schedule.<br />

1. Physical Performance: Level B according to SDI A250.4.<br />

2. Materials: Metallic-coated steel sheet, minimum thickness of 0.053 inch (1.3 mm), with<br />

minimum A40 (ZF120) coating.<br />

3. Construction: Full profile welded.<br />

4. Exposed Finish: Prime.<br />

2.5 FRAME ANCHORS<br />

A. Jamb Anchors:<br />

1. Masonry Type: Adjustable strap-and-stirrup or T-shaped anchors to suit frame size, not<br />

less than 0.042 inch (1.0 mm) thick, with corrugated or perforated straps not less than 2<br />

inches (51 mm) wide by 10 inches (254 mm) long; or wire anchors not less than 0.177<br />

inch (4.5 mm) thick.<br />

2. Stud-Wall Type: Designed to engage stud, welded to back of frames; not less than 0.042<br />

inch (1.0 mm) thick.<br />

B. Floor Anchors: Formed from same material as frames, minimum thickness of 0.042 inch (1.0<br />

mm) , and as follows:<br />

2.6 MATERIALS<br />

A. Cold-Rolled Steel Sheet: ASTM A 1008/A 1008M, Commercial Steel (CS), Type B.<br />

B. Metallic-Coated Steel Sheet: ASTM A 653/A 653M, Commercial Steel (CS), Type B., exterior<br />

applications.<br />

HOLLOW METAL FRAMES 081213 - 2


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

C. Frame Anchors: ASTM A 879/A 879M, Commercial Steel (CS), 04Z (12G)<br />

designation; mill phosphatized.<br />

coating<br />

1. For anchors built into exterior walls, steel sheet complying with ASTM A 1008/A 1008M<br />

or ASTM A 1011/A 1011M, hot-dip galvanized according to ASTM A 153/A 153M,<br />

Class B.<br />

D. Inserts, Bolts, and Fasteners: Hot-dip galvanized according to ASTM A 153/A 153M.<br />

E. Power-Actuated Fasteners in Concrete: From corrosion-resistant materials.<br />

F. Grout: ASTM C 476, except with a maximum slump of 4 inches (102 mm) , as measured<br />

according to ASTM C 143/C 143M.<br />

G. Mineral-Fiber Insulation: ASTM C 665, Type I (blankets without membrane facing).<br />

H. Bituminous Coating: Cold-applied asphalt mastic, compounded for 15-mil (0.4-mm)<br />

thickness per coat.<br />

dry film<br />

2.7 FABRICATION<br />

A. Fabricate hollow-metal work to be rigid and free of defects, warp, or buckle. Accurately form<br />

metal to required sizes and profiles, with minimum radius for metal thickness. Where practical,<br />

fit and assemble units in manufacturer's plant. To ensure proper assembly at Project site, clearly<br />

identify work that cannot be permanently factory assembled before shipment.<br />

B. Hollow-Metal Frames: Where frames are fabricated in sections due to shipping or handling<br />

limitations, provide alignment plates or angles at each joint, fabricated of same thickness metal<br />

as frames.<br />

1. Provide countersunk, flat- or oval-head exposed screws and bolts for exposed fasteners<br />

unless otherwise indicated.<br />

2. Grout Guards: Weld guards to frame at back of hardware mortises in frames to be<br />

grouted.<br />

3. Floor Anchors: Weld anchors to bottoms of jambs with at least four spot welds per<br />

anchor; however, for slip-on drywall frames, provide anchor clips or countersunk holes at<br />

bottoms of jambs.<br />

4. Jamb Anchors: Provide number and spacing of anchors as follows:<br />

a. Masonry Type: Locate anchors not more than 16 inches (406 mm) from top and<br />

bottom of frame. Space anchors not more than 32 inches (813 mm) o.c., to match<br />

coursing.<br />

b. Stud-Wall Type: Locate anchors not more than 18 inches (457 mm) from top and<br />

bottom of frame. Space anchors not more than 32 inches (813 mm) o.c.<br />

5. Door Silencers: Except on weather-stripped frames, drill stops to receive door silencers.<br />

C. Hardware Preparation: Factory prepare hollow-metal work to receive templated mortised<br />

hardware; include cutouts, reinforcement, mortising, drilling, and tapping according to<br />

SDI A250.6, the Door Hardware Schedule, and templates.<br />

HOLLOW METAL FRAMES 081213 - 3


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

1. Reinforce frames to receive nontemplated, mortised, and surface-mounted hardware.<br />

2. Comply with applicable requirements in SDI A250.6 and BHMA A156.115 for<br />

preparation of hollow-metal work for hardware.<br />

2.8 STEEL FINISHES<br />

A. Prime Finish: Clean, pretreat, and apply manufacturer's standard primer.<br />

1. Shop Primer: SDI A250.10.<br />

2.9 ACCESSORIES<br />

A. Grout Guards: Formed from same material as frames, not less than 0.016 inch (0.4 mm) thick.<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION<br />

A. Hollow-Metal Frames: Install hollow-metal frames of size and profile indicated. Comply with<br />

SDI A250.11 or NAAMM-HMMA 840 as required by standards specified.<br />

1. Set frames accurately in position; plumbed, aligned, and braced securely until permanent<br />

anchors are set. After wall construction is complete, remove temporary braces, leaving<br />

surfaces smooth and undamaged.<br />

a. At fire-rated openings, install frames according to NFPA 80.<br />

b. Install frames with removable stops located on secure side of opening.<br />

c. Install door silencers in frames before grouting.<br />

d. Remove temporary braces necessary for installation only after frames have been<br />

properly set and secured.<br />

e. Check plumb, square, and twist of frames as walls are constructed. Shim as<br />

necessary to comply with installation tolerances.<br />

f. Field apply bituminous coating to backs of frames that will be filled with grout<br />

containing antifreezing agents.<br />

2. Floor Anchors: Provide floor anchors for each jamb and mullion that extends to floor,<br />

and secure with postinstalled expansion anchors.<br />

a. Floor anchors may be set with power-actuated fasteners instead of postinstalled<br />

expansion anchors if so indicated and approved on Shop Drawings.<br />

3. Metal-Stud Partitions: Solidly pack mineral-fiber insulation inside frames.<br />

4. Masonry Walls: Coordinate installation of frames to allow for solidly filling space<br />

between frames and masonry with grout.<br />

5. Concrete Walls: Solidly fill space between frames and concrete with mineral-fiber<br />

insulation.<br />

6. In-Place Metal or Wood-Stud Partitions: Secure slip-on drywall frames in place<br />

according to manufacturer's written instructions.<br />

HOLLOW METAL FRAMES 081213 - 4


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

7. Installation Tolerances: Adjust hollow-metal door frames for squareness, alignment,<br />

twist, and plumb to the following tolerances:<br />

a. Squareness: Plus or minus 1/16 inch (1.6 mm) , measured at door rabbet on a line<br />

90 degrees from jamb perpendicular to frame head.<br />

b. Alignment: Plus or minus 1/16 inch (1.6 mm) , measured at jambs on a horizontal<br />

line parallel to plane of wall.<br />

c. Twist: Plus or minus 1/16 inch (1.6 mm) , measured at opposite face corners of<br />

jambs on parallel lines, and perpendicular to plane of wall.<br />

d. Plumbness: Plus or minus 1/16 inch (1.6 mm) , measured at jambs at floor.<br />

3.2 ADJUSTING AND CLEANING<br />

A. Final Adjustments: Remove and replace defective work, including hollow-metal work that is<br />

warped, bowed, or otherwise unacceptable.<br />

B. Remove grout and other bonding material from hollow-metal work immediately after<br />

installation.<br />

C. Prime-Coat Touchup: Immediately after erection, sand smooth rusted or damaged areas of<br />

prime coat and apply touchup of compatible air-drying, rust-inhibitive primer.<br />

D. Metallic-Coated Surface Touchup: Clean abraded areas and repair with galvanizing repair paint<br />

according to manufacturer's written instructions.<br />

E. Touchup Painting: Cleaning and touchup painting of abraded areas of paint are specified in<br />

painting Sections.<br />

END OF SECTION 081213<br />

HOLLOW METAL FRAMES 081213 - 5


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

THIS PAGE LEFT INTENTIONALLY BLANK<br />

HOLLOW METAL FRAMES 081213 - 6


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

SECTION 08 14 16 - FLUSH WOOD DOORS<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section Includes:<br />

1. Solid-core Doors with wood-veneer faces and factory finishing.<br />

2. Factory finishing flush wood doors.<br />

3. Factory machining for hardware.<br />

B. Related Sections<br />

1.2 SUBMITTALS<br />

A. Product Data: For each type of door indicated. Include factory-finishing specifications.<br />

B. Shop Drawings: Indicate location, size, and hand of each door; elevation of each kind of door;<br />

construction details; location and extent of hardware blocking; mortises, holes, and cutouts;<br />

requirements for veneer matching; factory finishing; fire ratings; and other pertinent data.<br />

C. Samples: For factory-finished doors.<br />

D. Florida Product approval Number.<br />

1.3 QUALITY ASSURANCE<br />

A. Quality Standard: In addition to requirements specified, comply with AWI's "Architectural<br />

Woodwork Quality Standards Illustrated."<br />

1.4 DELIVERY, STORAGE AND HANDLING<br />

A. Protect door during transit, storage and handling to prevent damage, soiling, and deterioration.<br />

Comply with requirements of referenced standard and manufacturer’s written instructions.<br />

1. Individually package doors in cardboard cartons and wrap bundles of doors in plastic<br />

sheeting.<br />

B. March each door with individual opening numbers used on Shop Drawings. Use removable<br />

tags of concealed markings.<br />

1.5 <strong>PROJECT</strong> CONDITIONS<br />

A. Environmental Limitations: Do not deliver or install doors until building is enclosed, wet-work is<br />

complete and HVAC system is operating and will maintain temperature and relative humidity at<br />

occupancy level during the remainder of the construction period.<br />

1.6 WARRANTY<br />

A. Special Warranty: Manufacturer’s standard form, signed by manufacturer, Installer, and<br />

Contractor, in which manufacturer agrees to repair or replace doors that are defective in<br />

materials or workmanship, have warped (bow, cup or twist) more than 1/4-inch in a 42-by-84-<br />

inch section, or show telegraphing of core construction in face veneers exceeding 0.01 inch in a<br />

3-inch span.<br />

1. Warranty shall also include installation and finishing that may be required due to repair or<br />

replacement of defective doors.<br />

2. Warranty shall be in effect during the following period of time from date of Substantial<br />

Completion.<br />

a. 2 years.<br />

FLUSH WOOD DOORS 08 14 16 - 1


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

PART 2 - PRODUCTS<br />

2.1 MANUFACTURERS<br />

A. Manufacturers: Subject to compliance with requirements, provide products by one of the<br />

following:<br />

1. Flush Wood Doors:<br />

a. ETO Doors – Impact-Hurricane Approved 2 panel Square V-Groove. FL Approval<br />

No.15125<br />

2.2 DOOR CONSTRUCTION, GENERAL<br />

A. Doors for Transparent Clear Finish:<br />

1. Grade: Premium, except Grade A faces are acceptable.<br />

2. Species and Cut: IPE.<br />

3. Match between Veneer Leaves: Book match.<br />

4. Assembly of Veneer Leaves on Door Faces: Running match.<br />

5. Pair and Set Match: Provide for doors hung in same opening or separated only by<br />

mullions.<br />

2.3 FABRICATION<br />

A. Fabricate doors in sizes indicated for Project-site fitting.<br />

B. Job fit doors to suit frame-opening sizes indicated. Comply with clearance requirements of<br />

referenced quality standard for fitting. Comply with requirements in NFPA 80 for fire-rated<br />

doors.<br />

C. Factory machine doors for hardware that is not surface applied. Locate hardware to comply<br />

with DHI-WDHS-3. Comply with final hardware schedules, door frame Shop Drawings,<br />

DHI A115-W series standards, and hardware templates.<br />

1. Coordinate measurements of hardware mortises in metal frames to verify dimensions and<br />

alignment before factory machining.<br />

D. Openings: Cut and trim openings through doors in factory.<br />

1. Light Openings: Trim openings with moldings of material and profile indicated.<br />

2.4 FINISHING<br />

A. Field Finish – Refer to section 099000<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION<br />

A. Hardware: For installation, see Division 08 Section "Door Hardware."<br />

B. Installation Instructions: Install doors to comply with manufacturer's written instructions and the<br />

referenced quality standard, and as indicated.<br />

C. Job-Fitted Doors: Align and fit doors in frames with uniform clearances and bevels; do not trim<br />

stiles and rails in excess of limits set by manufacturer or permitted for fire-rated doors. Machine<br />

doors for hardware. Seal edges of doors, edges of cutouts, and mortises after fitting and<br />

machining.<br />

1. Clearances: Provide 1/8 inch (3.2 mm) at heads, jambs, and between pairs of doors.<br />

Provide 1/8 inch (3.2 mm) from bottom of door to top of decorative floor finish or covering<br />

unless otherwise indicated. Where threshold is shown or scheduled, provide 1/4 inch<br />

(6.4 mm) from bottom of door to top of threshold unless otherwise indicated.<br />

a. Comply with NFPA 80 for fire-rated doors.<br />

FLUSH WOOD DOORS 08 14 16 - 2


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

D. Factory-Finished Doors: Restore finish before installation if fitting or machining is required at<br />

Project site.<br />

END OF SECTION 08 14 16<br />

FLUSH WOOD DOORS 08 14 16 - 3


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

PAGE LEFT BLANK<br />

FLUSH WOOD DOORS 08 14 16 - 4


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

SECTION 08 41 13 - ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. This Section includes the following:<br />

1. Exterior<br />

a. Glazing is retained mechanically with gaskets on four sides.<br />

2. Exterior manual-swing aluminum doors.<br />

3. Exterior aluminum door frames.<br />

B. Door hardware to be furnished and installed by aluminum framed entrance manufacturer.<br />

1.2 PERFORMANCE REQUIREMENTS<br />

A. General: Provide aluminum-framed systems, including anchorage, capable of withstanding,<br />

without failure, the effects of the following:<br />

1. Structural loads.<br />

2. Thermal movements.<br />

3. Movements of supporting structure indicated on Drawings including, but not limited to,<br />

story drift and deflection from uniformly distributed and concentrated live loads.<br />

4. Dimensional tolerances of building frame and other adjacent construction.<br />

5. Failure includes the following:<br />

a. Deflection exceeding specified limits.<br />

b. Thermal stresses transferred to building structure.<br />

c. Framing members transferring stresses, including those caused by thermal and<br />

structural movements, to glazing.<br />

d. Glazing-to-glazing contact.<br />

e. Noise or vibration created by wind and thermal and structural movements.<br />

f. Loosening or weakening of fasteners, attachments, and other components.<br />

g. Sealant failure.<br />

h. Failure of operating units to function properly.<br />

B. Structural Loads:<br />

1. Wind Loads: As indicated on Structural Drawings.<br />

C. Deflection of Framing Members Normal to Wall Plane: Limited to 1/175 of clear span for<br />

spans up to 13 feet 6 inches (4.1 m) and to 1/240 of clear span plus 1/4 inch (6.35 mm) for<br />

spans greater than 13 feet 6 inches (4.1 m) ]<br />

D. Structural-Test Performance: Systems tested according to ASTM E 330 as follows:<br />

1. When tested at positive and negative wind-load design pressures, systems do not<br />

evidence deflection exceeding specified limits.<br />

2. When tested at 150 percent of positive and negative wind-load design pressures, systems,<br />

including anchorage, do not evidence material failures, structural distress, and permanent<br />

deformation of main framing members exceeding 0.2 percent of span.<br />

3. Test Durations: As required by design wind velocity but not less than 10 seconds.<br />

E. Windborne-Debris-Impact-Resistance-Test Performance: provide aluminum framed entrances<br />

and storefront that pass large missile –impact test and cyclic – pressure test according to the<br />

requirements of the Florida building Code.<br />

ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 08 41 13 - 1


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

F. Temperature Change (Range): Systems accommodate 120 deg F (67 deg C), ambient; 180<br />

deg F (100 deg C) , material surfaces.<br />

G. Air Infiltration: Maximum air leakage through fixed glazing and framing areas of systems of<br />

0.06 cfm/sq. ft. (0.03 L/s per sq. m) of fixed wall area when tested according to ASTM E 283<br />

at a minimum static-air-pressure difference of 6.24 lbf/sq. ft. (300 Pa) .<br />

H. Water Penetration Under Static Pressure: Systems do not evidence water penetration through<br />

fixed glazing and framing areas when tested according to ASTM E 331 at a minimum static-airpressure<br />

difference of 20 percent of positive wind-load design pressure, but not less than 6.24<br />

lbf/sq. ft. (300 Pa) .<br />

1.3 SUBMITTALS<br />

A. Product Data: For each type of product indicated.<br />

B. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work.<br />

1. Include structural analysis data signed and sealed by the qualified professional engineer<br />

responsible for their preparation.<br />

2. For entrances, include hardware schedule and indicate operating hardware types,<br />

functions, quantities, and locations.<br />

C. Samples: For each exposed finish.<br />

D. Product test reports.<br />

E. Field quality-control test and inspection reports.<br />

F. Florida Product Approval Numbers<br />

1.4 QUALITY ASSURANCE<br />

A. Installer Qualifications: Acceptable to manufacturer and capable of preparation of data for<br />

aluminum-framed systems including Shop Drawings based on testing and engineering analysis<br />

of manufacturer's standard units in assemblies similar to those indicated for this Project.<br />

B. Testing Agency Qualifications: An independent agency qualified according to ASTM E 699 for<br />

testing indicated.<br />

C. Mockups: Build mockups to demonstrate aesthetic effects and set quality standards for<br />

fabrication and installation.<br />

1. Build mockups.<br />

2. Approved mockups may become part of the completed Work if undisturbed at time of<br />

Substantial Completion.<br />

1.5 WARRANTY<br />

A. Special Assembly Warranty: Manufacturer's standard form in which manufacturer agrees to<br />

repair or replace components of aluminum-framed systems that do not comply with<br />

requirements or that deteriorate as defined in this Section within specified warranty period.<br />

1. Failures include, but are not limited to, the following:<br />

a. Structural failures including, but not limited to, excessive deflection.<br />

b. Noise or vibration caused by thermal movements.<br />

c. Deterioration of metals, metal finishes, and other materials beyond normal<br />

weathering.<br />

d. Adhesive or cohesive sealant failures.<br />

e. Water leakage through fixed glazing and framing areas.<br />

ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 08 41 13 - 2


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

f. Failure of operating components to function properly.<br />

2. Warranty Period: Two years from date of Substantial Completion.<br />

B. Special Finish Warranty: Manufacturer's standard form in which manufacturer agrees to repair<br />

or replace components on which finishes fail within specified warranty period. Warranty does<br />

not include normal weathering.<br />

1. Warranty Period: 10 years from date of Substantial Completion.<br />

PART 2 - PRODUCTS<br />

2.1 MANUFACTURERS<br />

A. Basis-of-Design Product: The design for aluminum-framed systems is based on Subject to<br />

compliance with requirements, provide the named product or a comparable product by one of<br />

the following:<br />

1. YKK AP America Inc. – (BASIS OF DESIGN)<br />

2. Kawneer Company, Inc.<br />

3. Vistawall Architectural Products<br />

2.2 MATERIALS<br />

A. Aluminum: Alloy and temper recommended by manufacturer for type of use and finish<br />

indicated.<br />

1. Sheet and Plate: ASTM B 209 (ASTM B 209M) .<br />

2. Extruded Bars, Rods, Profiles, and Tubes: ASTM B 221 (ASTM B 221M) .<br />

3. Extruded Structural Pipe and Tubes: ASTM B 4<strong>29</strong>.<br />

4. Structural Profiles: ASTM B 308/B 308M.<br />

B. Steel Reinforcement: With manufacturer's standard corrosion-resistant primer.<br />

1. Structural Shapes, Plates, and Bars: ASTM A 36/A 36M.<br />

2. Cold-Rolled Sheet and Strip: ASTM A 1008/A 1008M.<br />

3. Hot-Rolled Sheet and Strip: ASTM A 1011/A 1011M.<br />

2.3 FRAMING SYSTEMS<br />

A. Framing Members: Manufacturer's standard extruded-aluminum framing members of thickness<br />

required and reinforced as required to support imposed loads.<br />

1. Construction: Non-thermal Framing members are one-piece members that are internally<br />

slotted at regular intervals<br />

B. Brackets and Reinforcements: Manufacturer's standard high-strength aluminum with nonstaining,<br />

nonferrous shims for aligning system components.<br />

C. Fasteners and Accessories: Manufacturer's standard corrosion-resistant, non-staining, nonbleeding<br />

fasteners and accessories compatible with adjacent materials.<br />

1. Where fasteners are subject to loosening or turning out from thermal and structural<br />

movements, wind loads, or vibration, use self-locking devices.<br />

2. Reinforce members as required to receive fastener threads.<br />

3. Use exposed fasteners with countersunk Phillips screw heads, finished to match framing<br />

D. Concrete and Masonry Inserts: Hot-dip galvanized cast-iron, malleable-iron, or steel inserts<br />

complying with ASTM A 123/A 123M or ASTM A 153/A 153M requirements.<br />

ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 08 41 13 - 3


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

E. Flashing: Manufacturer's standard corrosion-resistant, non-staining, non-bleeding flashing<br />

compatible with adjacent materials. Form exposed flashing from sheet aluminum finished to<br />

match framing and of sufficient thickness to maintain a flat appearance without visible<br />

deflection. Providing full sill pans and dams.<br />

F. Framing System Gaskets and Sealants: Manufacturer's standard recommended by manufacturer<br />

for joint type.<br />

2.4 GLAZING SYSTEMS<br />

A. Glazing: As specified in Division 08 Section "Glazing."<br />

B. Glazing Gaskets: Manufacturer's standard compression types, replaceable, molded or extruded,<br />

that maintain uniform pressure and watertight seal.<br />

C. Spacers and Setting Blocks: Manufacturer's standard elastomeric types.<br />

D. Bond-Breaker Tape: Manufacturer's standard TFE-fluorocarbon or polyethylene material to<br />

which sealants will not develop adhesion.<br />

2.5 DOORS<br />

A. Doors: Manufacturer's standard glazed doors, for manual swing operation.<br />

1. Door Construction: 1-3/4-inch (44.5-mm) overall thickness, thick<br />

extruded-aluminum tubular rail and stile members. Mechanically fasten<br />

corners with reinforcing brackets that are deep penetration and fillet welded<br />

or that incorporate concealed tie rods.<br />

2. Door Design: Medium stile; 3-1/2-inch (88.9-mm) nominal width [ (127-mm) nominal<br />

width.<br />

3. Glazing Stops and Gaskets: Beveled, snap-on, extruded-aluminum stops and preformed<br />

gaskets.<br />

a. Provide non-removable glazing stops on outside of door.<br />

2.6 DOOR HARDWARE<br />

A. General: Provide entrance door hardware for each entrance door to comply with requirements<br />

in this Section.<br />

1. Entrance Door Hardware Sets: Provide named manufacturers’ products<br />

2. Opening-Force Requirements:<br />

a. Egress Doors: Not more than 15 lbf (67 N) to release the latch and not more that<br />

30 lbf (133 N) to set the door in motion and not more than 15 lbf (67 N) to open<br />

the door to its minimum required width.<br />

B. Pivot Hinges:<br />

1. Offset-Pivot Hinges: Provide offset pivots top, bottom, and intermediate at each door<br />

leaf.<br />

C. Manual Flush Bolts:<br />

1. Provide one pair of flush bolts in the inactive leaf of a pair doors as required to comply<br />

with large missile impact requirements.<br />

2. Cylinders: As specified in Division 08 Section “Door Hardware.”<br />

D. Strikes: Provide strike with black plastic dust box for each latch or lock bolt; fabricated for<br />

aluminum framing.<br />

ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 08 41 13 - 4


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

E. Operating Trim:<br />

1. Provide Traditional Wire pull and Concealed Vertical Rod Push Pad<br />

F. Closers:<br />

1. Concealed overhead door closer, with accessories required for a complete installation,<br />

sized as required by door size, exposure to weather, and anticipated frequency of use;<br />

adjustable to meet field conditions and requirements for opening force.<br />

G. Weather Stripping: Manufacturer’s standard replaceable components.<br />

H. Weather Sweeps: Manufacturer’s standard exterior door bottom sweep with concealed<br />

fasteners on mounting strip.<br />

I. Silencers: BHMA A156.16. Grade 1<br />

J. Thresholds: A 4” wide raised thresholds beveled with a slope of not more that 1:2, with<br />

maximum Height of ½ inch (13mm).<br />

2.7 DOOR HARDWARE SCHEDULE<br />

A. REFER TO THE DRAWINGS<br />

1. ALL HARDWARE TO BE PART OF A TESTED ASSEMBLY TO COMPLY WITH<br />

HURRICANE CODE AND INDICATED DESIGN PRESSURE.<br />

2.8 ACCESSORY MATERIALS<br />

A. Joint Sealants: For installation at perimeter of aluminum-framed systems, as specified in<br />

Division 07 Section "Joint Sealants."<br />

B. Bituminous Paint: Cold-applied asphalt-mastic paint complying with SSPC-Paint 12<br />

requirements except containing no asbestos, formulated for 30-mil (0.762-mm) thickness per<br />

coat.<br />

2.9 FABRICATION<br />

A. Form aluminum shapes before finishing.<br />

B. Weld in concealed locations to greatest extent possible to minimize distortion or discoloration<br />

of finish. Remove weld spatter and welding oxides from exposed surfaces by descaling or<br />

grinding.<br />

C. Framing Members, General: Fabricate components that, when assembled, have the following<br />

characteristics:<br />

1. Profiles that are sharp, straight, and free of defects or deformations.<br />

2. Accurately fitted joints with ends coped or mitered.<br />

3. Means to drain water passing joints, condensation occurring within framing members,<br />

and moisture migrating within the system to exterior.<br />

4. Physical isolation of glazing from framing members.<br />

5. Accommodations for thermal and mechanical movements of glazing and framing to<br />

maintain required glazing edge clearances.<br />

6. Provisions for field replacement of glazing from exterior. Fasteners, anchors, and<br />

connection devices that are concealed from view to greatest extent possible.<br />

D. Mechanically Glazed Framing Members: Fabricate for flush glazing (without projecting stops).<br />

ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 08 41 13 - 5


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

E. Door Frames: Reinforce as required to support loads imposed by door operation and for<br />

installing hardware.<br />

1. At exterior doors, provide compression weather stripping at fixed stops.<br />

2. At interior doors, provide silencers at stops to prevent metal-to-metal contact. Install<br />

three silencers on strike jamb of single-door frames and two silencers on head of frames<br />

for pairs of doors.<br />

F. Doors: Reinforce doors as required for installing hardware.<br />

1. At pairs of exterior doors, provide sliding weather stripping retained in adjustable strip<br />

mortised into door edge.<br />

2. At exterior doors, provide weather sweeps applied to door bottoms.<br />

G. Hardware Installation: Factory install hardware to the greatest extent possible. Cut, drill, and<br />

tap for factory-installed hardware before applying finishes.<br />

H. After fabrication, clearly mark components to identify their locations in Project according to<br />

Shop Drawings.<br />

2.10 ALUMINUM FINISHES<br />

A. Anodizing conforming to AA-M12C22A31, AAMA 607.1, Anodic Coating. Color shall be<br />

selected by the Architect from the manufacturer’s full range of colors.<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION<br />

A. General:<br />

1. Fit joints to produce hairline joints free of burrs and distortion.<br />

2. Rigidly secure non-movement joints.<br />

3. Install anchors with separators and isolators to prevent metal corrosion and electrolytic<br />

deterioration.<br />

4. Seal joints watertight, unless otherwise indicated.<br />

B. Metal Protection:<br />

1. Where aluminum will contact dissimilar metals, protect against galvanic action by<br />

painting contact surfaces with primer or by applying sealant or tape or installing<br />

nonconductive spacers as recommended by manufacturer for this purpose.<br />

a. Refer to Division 6 Section “Rough Carpentry”.<br />

2. Where aluminum will contact concrete or masonry, protect against corrosion by painting<br />

contact surfaces with bituminous paint.<br />

C. Install components to drain water passing joints, condensation occurring within framing<br />

members, and moisture migrating within the system to exterior.<br />

D. Set continuous sill members and flashing in full sealant bed as specified in Division 07 Section<br />

"Joint Sealants" and to produce weather-tight installation.<br />

E. Install components plumb and true in alignment with established lines and grades, without warp<br />

or rack.<br />

F. Install glazing as specified in Division 08 Section "Glazing."<br />

1. Structural-Sealant Glazing:<br />

ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 08 41 13 - 6


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

a. Prepare surfaces that will contact structural sealant according to sealant<br />

manufacturer's written instructions to ensure compatibility and adhesion.<br />

Preparation includes, but is not limited to, cleaning and priming surfaces.<br />

b. Install weather-seal sealant according to Division 07 Section "Joint Sealants" and<br />

according to sealant manufacturer's written instructions to produce weatherproof<br />

joints. Install joint filler behind sealant as recommended by sealant manufacturer.<br />

G. Entrances: Install to produce smooth operation and tight fit at contact points.<br />

1. Exterior Entrances: Install to produce tight fit at weather stripping and weather-tight<br />

closure.<br />

2. Field-Installed Hardware: Install surface-mounted hardware according to hardware<br />

manufacturers' written instructions using concealed fasteners to greatest extent possible.<br />

H. Install insulation materials as specified in Division 07 Section "Thermal Insulation."<br />

I. Install perimeter joint sealants as specified in Division 07 Section "Joint Sealants" and to<br />

produce weather-tight installation.<br />

J. Erection Tolerances: Install aluminum-framed systems to comply with the following maximum<br />

tolerances:<br />

1. Location and Plane: Limit variation from true location and plane to 1/8 inch in 12 feet<br />

(3 mm in 3.7 m); 1/4 inch (6 mm) over total length.<br />

2. Alignment:<br />

a. Where surfaces abut in line, limit offset from true alignment to 1/16 inch (1.5 mm) .<br />

b. Where surfaces meet at corners, limit offset from true alignment to 1/32 inch<br />

(0.8 mm) .<br />

3. Diagonal Measurements: Limit difference between diagonal measurement to 1/8 inch<br />

(3 mm).<br />

END OF SECTION 08 41 13<br />

ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 08 41 13 - 7


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

THIS PAGE LEFT INTENTIONALLY BLANK<br />

ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 08 41 13 - 8


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

SECTION 087100 - DOOR HARDWARE<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section includes:<br />

1. Mechanical door hardware for the following:<br />

a. Swinging doors.<br />

B. Related Sections:<br />

1. 084113 – Aluminum Framed Storefronts and Entrances.<br />

1.2 ACTION SUBMITTALS<br />

A. Product Data: For each type of product indicated.<br />

B. Shop Drawings<br />

C. Samples: For each exposed product and for each color and texture specified.<br />

D. Other Action Submittals:<br />

1. Door Hardware Schedule: Prepared by or under the supervision of Installer, detailing<br />

fabrication and assembly of door hardware, as well as installation procedures and<br />

diagrams. Coordinate final door hardware schedule with doors, frames, and related work<br />

to ensure proper size, thickness, hand, function, and finish of door hardware.<br />

a. Format: Use same scheduling sequence and format and use same door numbers<br />

as in the Contract Documents.<br />

b. Content: Include the following information:<br />

1) Identification number, location, hand, fire rating, size, and material of each<br />

door and frame.<br />

2) Locations of each door hardware set, cross-referenced to Drawings on floor<br />

plans and to door and frame schedule.<br />

3) Complete designations, including name and manufacturer, type, style,<br />

function, size, quantity, function, and finish of each door hardware product.<br />

4) Description of electrified door hardware sequences of operation and<br />

interfaces with other building control systems.<br />

2. Keying Schedule: Prepared by or under the supervision of Installer, detailing Owner's<br />

final keying instructions for locks.<br />

DOOR HARDWARE 087100 - 1


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

1.3 QUALITY ASSURANCE<br />

A. Installer Qualifications: Supplier of products and an employer of workers trained and approved<br />

by product manufacturers and an Architectural Hardware Consultant who is available during the<br />

course of the Work to consult with Contractor, Architect, and Owner about door hardware and<br />

keying.<br />

B. Architectural Hardware Consultant Qualifications: A person who is experienced in providing<br />

consulting services for door hardware installations that are comparable in material, design, and<br />

extent to that indicated for this Project and who is currently certified by DHI as follows:<br />

1. For door hardware, an Architectural Hardware Consultant (AHC).<br />

C. Fire-Rated Door Assemblies: Where fire-rated door assemblies are indicated, provide door<br />

hardware rated for use in assemblies complying with NFPA 80 that are listed and labeled by a<br />

qualified testing agency, for fire-protection ratings indicated, based on testing at positive<br />

pressure according to NFPA 252 or UL 10C, unless otherwise indicated.<br />

D. Means of Egress Doors: Latches do not require more than 15 lbf (67 N)<br />

Locks do not require use of a key, tool, or special knowledge for operation.<br />

to release the latch.<br />

E. Accessibility Requirements: For door hardware on doors in an accessible route, comply with<br />

the U.S. Architectural & Transportation Barriers Compliance Board's ADA-ABA<br />

Accessibility Guidelines and the FLORIDA BUILDING CODE.<br />

1. Provide operating devices that do not require tight grasping, pinching, or twisting of the<br />

wrist and that operate with a force of not more than 5 lbf (22.2 N) .<br />

2. Comply with the following maximum opening-force requirements:<br />

a. Interior, Non-Fire-Rated Hinged Doors: 5 lbf (22.2 N) applied perpendicular to<br />

door.<br />

b. Fire Doors: Minimum opening force allowable by authorities having jurisdiction.<br />

3. Bevel raised thresholds with a slope of not more than 1:2. Provide thresholds not more<br />

than 1/2 inch (13 mm) high.<br />

4. Adjust door closer sweep periods so that, from an open position of 70 degrees, the door<br />

will take at least 3 seconds to move to a point 3 inches (75 mm) from the latch, measured<br />

to the leading edge of the door.<br />

F. Keying Conference: Conduct conference at Project site to comply with requirements in<br />

Section 013100 "Project Management and Coordination."<br />

1.4 DELIVERY, STORAGE, AND HANDLING<br />

A. Deliver keys to manufacturer of key control system for subsequent delivery to Owner.<br />

B. Deliver keys to Owner by hand delivery, registered mail or overnight package service.<br />

C. Install permanent cores immediately prior to substantial completion.<br />

DOOR HARDWARE 087100 - 2


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

1.5 WARRANTY<br />

A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or<br />

replace components of door hardware that fails in materials or workmanship within specified<br />

warranty period.<br />

1. Warranty Period: One year from date of Substantial Completion, unless otherwise<br />

indicated.<br />

a. Exit Devices: Three years from date of Substantial Completion.<br />

b. Manual Closers: 10 years from date of Substantial Completion.<br />

PART 2 - PRODUCTS<br />

2.1 SCHEDULED DOOR HARDWARE<br />

A. Provide door hardware for each door as scheduled in Part 3 "Door Hardware Schedule"<br />

Article to comply with requirements in this Section.<br />

1. Door Hardware Sets: Provide quantity, item, size, finish or color indicated, and named<br />

manufacturers' products.<br />

B. Designations: Requirements for design, grade, function, finish, size, and other distinctive<br />

qualities of each type of door hardware are indicated in Part 3 "Door Hardware Schedule"<br />

Article. Products are identified by using door hardware designations, as follows:<br />

1. Named Manufacturers' Products: Manufacturer and product designation are listed for<br />

each door hardware type required for the purpose of establishing minimum requirements.<br />

Manufacturers' names are abbreviated in Part 3 "Door Hardware Schedule" Article.<br />

2. References to BHMA Designations: Provide products complying with these designations<br />

and requirements for description, quality, and function.<br />

2.2 HINGES<br />

A. Hinges: BHMA A156.1. Provide template-produced hinges for hinges installed on hollowmetal<br />

doors and hollow-metal frames.<br />

1. Products: Subject to compliance with requirements, provide product indicated in the<br />

schedule or comparable product by one of the following:<br />

a. Stanley Commercial Hardware; Div. of the Stanley Works.<br />

2.3 MECHANICAL LOCKS AND LATCHES<br />

A. Strikes: Provide manufacturer's standard strike for each lock bolt or latchbolt complying with<br />

requirements indicated for applicable lock or latch and with strike box and curved lip extended<br />

to protect frame; finished to match lock or latch.<br />

1. Flat-Lip Strikes: For locks with three-piece antifriction latchbolts, as recommended by<br />

manufacturer.<br />

DOOR HARDWARE 087100 - 3


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

2. Extra-Long-Lip Strikes: For locks used on frames with applied wood casing trim.<br />

3. Aluminum-Frame Strike Box: Manufacturer's special strike box fabricated for aluminum<br />

framing.<br />

4. Rabbet Front and Strike: Provide on locksets for rabbeted meeting stiles.<br />

2.4 SURFACE BOLTS<br />

A. Surface Bolts: BHMA A156.16.<br />

1. Product: Subject to compliance with requirements, provide product indicated in the<br />

schedule or comparable product by one of the following:<br />

a. IVES Hardware; an Ingersoll-Rand company.<br />

2.5 LOCK CYLINDERS<br />

A. Lock Cylinders: Tumbler type, constructed from brass or bronze, stainless steel, or nickel silver.<br />

1. Product: Subject to compliance with requirements, provide the product indicated in the<br />

specification.<br />

a. Best Access Systems; Div. of Stanley Security Solutions, Inc.<br />

B. Construction Cores: Provide construction cores that are replaceable by permanent cores.<br />

Provide 10 construction master keys.<br />

2.6 KEYING<br />

A. Keying System: Factory registered, complying with guidelines in BHMA A156.28,<br />

Appendix A. Incorporate decisions made in keying conference.<br />

1. Change keys, a master key, to operate cylinders.<br />

B. Keys: Brass.<br />

1. Stamping: Permanently inscribe each key with a visual key control number and include<br />

the following notation:<br />

a. Notation: "DO NOT DUPLICATE."<br />

2. Quantity: In addition to one extra key blank for each lock, provide the following:<br />

a. Cylinder Change Keys: Three.<br />

b. Master Keys: Five.<br />

2.7 KEY CONTROL SYSTEM<br />

A. Key Control Cabinet: BHMA A156.5; metal cabinet with baked-enamel finish; containing keyholding<br />

hooks, labels, 2 sets of key tags with self-locking key holders, key-gathering envelopes,<br />

and temporary and permanent markers; with key capacity of 150 percent of the number of locks.<br />

DOOR HARDWARE 087100 - 4


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

1. Manufacturers: Subject to compliance with requirements, provide products by one of<br />

the following:<br />

a. GE Security, Inc.<br />

b. HPC, Inc.<br />

c. MMF Industries.<br />

2. Wall-Mounted Cabinet: Cabinet with hinged-panel door equipped with key-holding<br />

panels and pin-tumbler cylinder door lock.<br />

2.8 SURFACE CLOSERS<br />

A. Surface Closers: BHMA A156.4; rack-and-pinion hydraulic type with adjustable sweep and<br />

latch speeds controlled by key-operated valves and forged-steel main arm. Comply with<br />

manufacturer's written recommendations for size of door closers depending on size of door,<br />

exposure to weather, and anticipated frequency of use. Provide factory-sized closers, adjustable<br />

to meet field conditions and requirements for opening force.All closers shall have parallel arms.<br />

1. Product: Subject to compliance with requirements, provide product indicated in the<br />

schedule or comparable product by one of the following:<br />

2.9 MECHANICAL STOPS AND HOLDERS<br />

A. Wall- and Floor-Mounted Stops: BHMA A156.16; polished cast brass, bronze, or aluminum<br />

base metal.<br />

1. Product: Subject to compliance with requirements, provide product indicated on schedule<br />

or comparable product by one of the following:<br />

a. IVES Hardware; an Ingersoll-Rand company.<br />

2.10 DOOR GASKETING<br />

A. Door Gasketing: BHMA A156.22; air leakage not to exceed 0.50 cfm per foot (0.000774 cu.<br />

m/s per m) of crack length for gasketing other than for smoke control, as tested according to<br />

ASTM E 283; with resilient or flexible seal strips that are easily replaceable and readily<br />

available from stocks maintained by manufacturer.<br />

1. Product: Subject to compliance with requirements, provide product indicated in the<br />

schedule or comparable product by one of the following:<br />

a. National Guard Products. (Basis of Design)<br />

b. Pemko Manufacturing Co.; an ASSA ABLOY Group company.<br />

2.11 THRESHOLDS<br />

A. Thresholds: BHMA A156.21; fabricated to full width of opening indicated.<br />

1. Basis-of-Design Product: Subject to compliance with requirements, provide product<br />

indicated in the schedule or comparable product by one of the following:<br />

a. National Guard Products.<br />

DOOR HARDWARE 087100 - 5


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

2.12 METAL PROTECTIVE TRIM UNITS<br />

A. Metal Protective Trim Units: BHMA A156.6; fabricated from 0.050-inch- (1.3-mm-) thick<br />

stainless steel; with manufacturer's standard machine or self-tapping screw fasteners.<br />

1. Basis-of-Design Product: Subject to compliance with requirements, provide product<br />

indicated in the schedule or comparable product by one of the following:<br />

a. IVES Hardware; an Ingersoll-Rand company.<br />

2.13 AUXILIARY DOOR HARDWARE<br />

A. Auxiliary Hardware: BHMA A156.16.<br />

1. Product: Subject to compliance with requirements, provide product indicated in the<br />

schedule or comparable product by one of the following:<br />

a. IVES Hardware; an Ingersoll-Rand company. (Basis of Design)<br />

b. Stanley Commercial Hardware; Div. of the Stanley Works.<br />

B. Fasteners: Provide door hardware manufactured to comply with published templates prepared<br />

for machine, wood, and sheet metal screws. Provide screws that comply with commercially<br />

recognized industry standards for application intended, except aluminum fasteners are not<br />

permitted. Provide Phillips flat-head screws with finished heads to match surface of door<br />

hardware, unless otherwise indicated.<br />

1. Concealed Fasteners: For door hardware units that are exposed when door is closed,<br />

except for units already specified with concealed fasteners. Do not use through bolts for<br />

installation where bolt head or nut on opposite face is exposed unless it is the only means<br />

of securely attaching the door hardware. Where through bolts are used on hollow door<br />

and frame construction, provide sleeves for each through bolt.<br />

2. Fire-Rated Applications:<br />

a. Wood or Machine Screws: For the following:<br />

1) Hinges mortised to doors or frames.<br />

2) Strike plates to frames.<br />

3) Closers to doors and frames.<br />

b. Steel Through Bolts: For the following unless door blocking is provided:<br />

1) Surface hinges to doors.<br />

2) Closers to doors and frames.<br />

3) Surface-mounted exit devices.<br />

3. Spacers or Sex Bolts: For through bolting of hollow-metal doors.<br />

4. Fasteners for Wood Doors: Comply with requirements in DHI WDHS.2, "Recommended<br />

Fasteners for Wood Doors."<br />

5. Gasketing Fasteners: Provide noncorrosive fasteners for exterior applications and<br />

elsewhere as indicated.<br />

DOOR HARDWARE 087100 - 6


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

2.14 FINISHES<br />

A. Provide finishes complying with BHMA A156.18 as indicated in door hardware schedule.<br />

B. Protect mechanical finishes on exposed surfaces from damage by applying a strippable,<br />

temporary protective covering before shipping.<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION<br />

A. Steel Frames: For surface applied door hardware, drill and tap doors and frames according to<br />

ANSI/SDI A250.6.<br />

B. Wood Doors: Comply with DHI WDHS.5 "Recommended Hardware Reinforcement Locations<br />

for Mineral Core Wood Flush Doors."<br />

C. Mounting Heights: Mount door hardware units at heights to comply with the following unless<br />

otherwise indicated or required to comply with governing regulations.<br />

1. Standard Steel Doors and Frames: ANSI/SDI A250.8.<br />

2. Custom Steel Doors and Frames: HMMA 831.<br />

3. Wood Doors: DHI WDHS.3, "Recommended Locations for Architectural Hardware for<br />

Wood Flush Doors."<br />

D. Install each door hardware item to comply with manufacturer's written instructions. Where<br />

cutting and fitting are required to install door hardware onto or into surfaces that are later to be<br />

painted or finished in another way, coordinate removal, storage, and reinstallation of surface<br />

protective trim units with finishing work. Do not install surface-mounted items until finishes<br />

have been completed on substrates involved.<br />

1. Set units level, plumb, and true to line and location. Adjust and reinforce attachment<br />

substrates as necessary for proper installation and operation.<br />

2. Drill and countersink units that are not factory prepared for anchorage fasteners. Space<br />

fasteners and anchors according to industry standards.<br />

E. Hinges: Install types and in quantities indicated in door hardware schedule but not fewer than<br />

the number recommended by manufacturer for application indicated or one hinge for every 30<br />

inches (750 mm) of door height, whichever is more stringent, unless other equivalent means of<br />

support for door, such as spring hinges or pivots, are provided.<br />

F. Lock Cylinders: Install construction cores to secure building and areas during construction<br />

period.<br />

1. Replace construction cores with permanent cores.<br />

2. Contractor shall furnish and install permanent cores as directed. Coordinate installation<br />

schedule with Architect.<br />

DOOR HARDWARE 087100 - 7


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

G. Key Control System: Tag keys and place them on markers and hooks in key control system<br />

cabinet, as determined by final keying schedule.<br />

H. Thresholds: Set thresholds for exterior doors and other doors indicated in full bed of sealant,<br />

filling all voids in threshold completely with sealant, and complying with requirements<br />

specified in Section 079200 "Joint Sealants."<br />

I. Stops: Provide floor stops for doors unless other type stops are indicated in door hardware<br />

schedule. Do not mount floor stops where they will impede traffic.<br />

J. Perimeter Gasketing: Apply to head and jamb, forming seal between door and frame.<br />

K. Door Bottoms: Apply to bottom of door, forming seal with threshold when door is closed.<br />

L. Adjustment: Adjust and check each operating item of door hardware and each door to ensure<br />

proper operation or function of every unit. Replace units that cannot be adjusted to operate as<br />

intended. Adjust door control devices to compensate for final operation of heating and<br />

ventilating equipment and to comply with referenced accessibility requirements.<br />

3.2 FIELD QUALITY CONTROL<br />

A. Independent Architectural Hardware Consultant: Owner will engage a qualified independent<br />

Architectural Hardware Consultant to perform inspections and to prepare inspection reports.<br />

3.3 DOOR HARDWARE SCHEDULE<br />

A. NOTES: ALL CLOSERS SHALL HAVE PARALLEL ARMS<br />

B. MANUFACTURERS<br />

CODE<br />

BEST<br />

FENC<br />

IVES<br />

KABA<br />

NGP<br />

RUST<br />

STA<br />

MANUFACTURER<br />

Stanley/ Best Access Systems<br />

Fence Max.com<br />

Ives/ Ingersoll Rand<br />

Kaba Ilco<br />

National Guard Products<br />

RusticaHardware<br />

Stanley Commercial Hardware<br />

FINISHES CODE FINISH DESCRIPTION BASE MATERIAL<br />

DOOR HARDWARE 087100 - 8


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

ALUM<br />

Mill Finish Aluminum<br />

GRAY Gray Vinyl<br />

MILL FIN. Mill Finish Aluminum Aluminum<br />

626 Dull (Satin) Chromium Brass<br />

630 Satin Stainless Steel Stainless Steel<br />

689 Aluminum Painted Aluminum<br />

C. HARDWARE SETS<br />

HARDWARE SET NO. 1<br />

Door Opening #<br />

1 EA Lock Cylinder 1E72-BC4-RP3 BEST 626<br />

3 EA HINGES CB1960R<br />

4.5”x4.5” NRP<br />

STA 630<br />

1 EA ENTRANCE<br />

LOCKSET<br />

9K37AB16CSTK BEST 626<br />

1 EA DOOR CLOSER D4551 DA<br />

MC SNB<br />

1 EA KICK PLATE 8400 8”x2”<br />

LDW<br />

STA 689<br />

IVES 630<br />

1 EA FLOOR STOP FS436 IVES 630<br />

1 SET SEALS 362 NGP GRAY<br />

1 EA THRESHOLD 896 x<br />

LENGTH<br />

HARDWARE SET NO. 3<br />

NGP<br />

MILL FIN.<br />

Door Opening #<br />

3 EA HINGES CB1960R 4.5”x 4.5” STA 630<br />

1 EA PASSAGE LOCK 9K37N16CSTK BEST 626<br />

DOOR HARDWARE 087100 - 9


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

1 EA DOOR CLOSER D4551 DA MC SNB STA 689<br />

1 EA KICK PLATE 8400 8”x 2” LDW IVES 630<br />

1 EA FLOOR STOP FS436 IVES 630<br />

1 EA PLUNGER DOOR<br />

HOLDER<br />

FS1153 IVES 630<br />

3 EA SILENCERS SR64 IVES GRAY<br />

HARDWARE SET NO. 4<br />

Door Opening #<br />

3 EA HINGES CB1961R 4.5”x 4.5”NRP STA 630<br />

1 EA SERVICE<br />

STATION LOCK<br />

9K37E16CSTK BEST 626<br />

1 EA DOOR CLOSER D4551 DA MC SNB STA 689<br />

1 EA KICK PLATE 8400 8”x 2” LDW IVES 630<br />

1 EA FLOOR STOP FS436 IVES 630<br />

1 SET SEALS 362 NGP GRAY<br />

1 EA THRESHOLD 896 x LENGTH NGP MILL<br />

FIN.<br />

HARDWARE SET NO. 5<br />

Door Opening #<br />

6 EA HINGES CB1961R 4.5”x 4.5” NRP STA 626<br />

1 EA STORAGE LOCK 45H7D16H BEST 626<br />

2 EA SURFACE BOLTS<br />

TOP/ BOTTOM<br />

(INACTIVE LEAF)<br />

SB453 w/<br />

1 TOP STRIKE & 1<br />

BOTTOM STRIKE<br />

IVES 603<br />

1<br />

SET<br />

SEALS 362 NGP GRAY<br />

DOOR HARDWARE 087100 - 10


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

1 EA THRESHOLD 896 x LENGTH NGP MILL<br />

FIN.<br />

HARDWARE SET NO. 6<br />

Door Opening #<br />

3 EA HINGES CB1961R 4.5”x 4.5” NRP STA 626<br />

1 EA STORAGE LOCK 45H7D16H BEST 626<br />

1 EA FLOOR STOP FS436 IVES 630<br />

1<br />

SET<br />

SEALS 362 NGP GRAY<br />

1 EA THRESHOLD 896 x LENGTH NGP MILL<br />

FIN.<br />

HARDWARE SET NO. 8<br />

Door Opening #<br />

3 EA HINGES CB1961R 4.5”x 4.5” STA 626<br />

1 EA STORAGE LOCK 45H7D16H BEST 626<br />

1 EA FLOOR STOP FS436 IVES 630<br />

3 EA SILENCERS SR64 IVES GRAY<br />

HARDWARE SET NO. 9<br />

Door Opening #<br />

3 EA HINGES CB1961R 4.5”x 4.5”NRP STA 626<br />

1 EA ONE WAY<br />

DEADBOLT<br />

83T7LSTK-CS BEST 626<br />

1 EA PULL PLATE 8302 3/5” x 15”<br />

TYPE F MOUNT<br />

IVES 626<br />

1 EA PUSH PLATE 8200 3.5”x 15” IVES 626<br />

DOOR HARDWARE 087100 - 11


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

1 EA DOOR CLOSER D4551 DA MC SNB STA 689<br />

1 EA KICK PLATE 8400 8”x 2” LDW IVES 626<br />

1 EA FLOOR STOP FS436 IVES 626<br />

1<br />

SET<br />

SEALS 362 NGP GRAY<br />

1 EA THRESHOLD 896 x LENGTH NGP MILL<br />

FIN.<br />

HARDWARE SET NO. 10<br />

Door Opening #<br />

4 EA GATE HINGE 2173.100 FENC ALUM<br />

1 EA *MECHANICAL<br />

PUSHBUTTON<br />

DEADLOCKING<br />

LATCH *<br />

900 SERIES w/ OPTIONAL<br />

EXIT DEVICE ON THE<br />

INTERIOR<br />

KABA 626<br />

2 EA SURFACE BOLT SB453 IVES 652<br />

HARDWARE SET NO. 11<br />

Door Opening #<br />

3 EA GATE HINGE TCHD1AL2-MK2 FENC METAL<br />

1 EA *MECHANICAL<br />

PUSHBUTTON<br />

DEADLOCKING<br />

LATCH *<br />

HARDWARE SET NO. 12<br />

900 SERIES w/ OPTIONAL<br />

EXIT DEVICE ON THE<br />

INTERIOR<br />

KABA 626<br />

Door Opening #<br />

1 EA BARN DOOR<br />

HARDWARE<br />

SET<br />

NOTE: 1.<br />

83T7LSTK-CS RUST 630<br />

DOOR HARDWARE 087100 - 12


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

WEIGHT LIMITED TO 500lbs. PER HANGER PAIR. COORDINATE WEIGHT<br />

OF EA. DOOR PRIOR TO BIDDING AND ORDERING. ADD ADDITIONAL<br />

HANGERS IF REQUIRED.<br />

HARDWARE SET NO. 13<br />

Door Opening #<br />

2 EA CONTINUOUS<br />

HINGE<br />

662HD STA ALUM<br />

1 EA STORAGE LOCK 45H7D16H BEST 626<br />

END OF SECTION 087100<br />

DOOR HARDWARE 087100 - 13


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

This page intentionally blank.<br />

DOOR HARDWARE 087100 - 14


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach FL<br />

SECTION 08 80 00 - GLAZING<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. This Section includes glazing for the following products and applications, including those<br />

specified in other Sections where glazing requirements are specified by reference to this<br />

Section:<br />

1. Windows.<br />

2. Doors.<br />

1.2 DEFINITIONS<br />

A. Interspace: Space between lites of an insulating-glass unit that contains dehydrated air or a<br />

specified gas.<br />

B. Deterioration of Laminated Glass: Defects developed from normal use that are attributed to the<br />

manufacturing process and not to causes other than glass breakage and practices for<br />

maintaining and cleaning laminated glass contrary to manufacturer's written instructions.<br />

Defects include edge separation, delamination materially obstructing vision through glass, and<br />

blemishes exceeding those allowed by referenced laminated-glass standard.<br />

1.3 PERFORMANCE REQUIREMENTS<br />

A. General: Provide glazing systems capable of withstanding normal thermal movement and wind<br />

and impact loads (where applicable) without failure, including loss or glass breakage attributable<br />

to the following: defective manufacture, fabrication, and installation; failure of sealants or<br />

gaskets to remain watertight and airtight; deterioration of glazing materials; or other defects in<br />

construction.<br />

B. Glass Design: Glass thickness designations indicated are minimums and are for detailing only.<br />

Confirm glass thicknesses by analyzing Project loads and in-service conditions. Provide glass<br />

lites in the thickness designations indicated for various size openings, but not less than<br />

thicknesses and in strengths (annealed or heat treated) required to meet or exceed the<br />

following criteria:<br />

1. Glass Thicknesses: Select minimum glass thicknesses to comply with ASTM E 1300,<br />

according to the following requirements:<br />

a. Specified Design Wind Loads: As indicated on structural drawings, but not less<br />

than wind loads applicable to Project as required by ASCE 7 "Minimum Design<br />

Loads for Buildings and Other Structures": Section 6.0 "Wind Loads."<br />

b. Probability of Breakage for Vertical Glazing: 8 lites per 1000 for lites set vertically<br />

or not more than 15 degrees off vertical and under wind action.<br />

c. Probability of Breakage for Sloped Glazing: 1 lite per 1000 for lites set more than<br />

15 degrees off vertical and under wind and snow action.<br />

d. Minimum Glass Thickness for Exterior Lites: Not less than 6.0 mm.<br />

e. Thickness of Tinted and Heat-Absorbing Glass: Provide the same thickness for<br />

each tint color indicated throughout Project.<br />

f. Windborne-Debris-Impact-Resistance-Test Performance: Provide glazing for<br />

aluminum-framed systems that pass large and small missile-impact tests and<br />

cyclic-pressure tests according to the requirements of The Florida Building Code.<br />

C. Thermal Movements: Provide glazing that allows for thermal movements resulting from the<br />

following maximum change (range) in ambient and surface temperatures acting on glass<br />

framing members and glazing components. Base engineering calculation on surface<br />

temperatures of materials due to both solar heat gain and nighttime-sky heat loss.<br />

1. Temperature Change (Range): 120 deg F (67 deg C), ambient; 180 deg F (100 deg C),<br />

material surfaces.<br />

GLAZING 08 80 00 - 1


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach FL<br />

D. Thermal and Optical Performance Properties: Provide glass with performance properties<br />

specified based on manufacturer's published test data, as determined according to procedures<br />

indicated below:<br />

1. For laminated-glass lites, properties are based on products of construction indicated.<br />

2. Center-of-Glass Values: Based on using LBL-44789 WINDOW 5.0 computer program for<br />

the following methodologies:<br />

a. U-Factors: NFRC 100 expressed as Btu/ sq. ft. x h x deg F (W/sq. m x K) .<br />

b. Solar Heat Gain Coefficient: NFRC 200.<br />

c. Solar Optical Properties: NFRC 300.<br />

1.4 SUBMITTALS<br />

A. Product Data: For each glass product and glazing material indicated.<br />

B. Samples: 12-inch- (300-mm-) square, for each type of glass product indicated, other than<br />

monolithic clear float glass.<br />

C. Glazing Schedule: Use same designations indicated on Drawings.<br />

D. Preconstruction Adhesion and Compatibility Test Report: From glazing sealant manufacturer.<br />

1.5 QUALITY ASSURANCE<br />

A. Installer Qualifications: An experienced installer who has completed glazing similar in material,<br />

design and extent to that indicated for this Project; whose work has resulted in glass<br />

installations with a record of successful in-service performance; and who employs glass<br />

installers for this Project who are certified under the National Glass Association’s Program.<br />

B. Preconstruction Adhesion and Compatibility Testing: Submit to elastomeric glazing sealant<br />

manufacturers, for testing according to ASTM c 1087, samples of each glazing material type,<br />

tape sealant, gasket, glazing accessory, and glass-framing member that will contact or affect<br />

elastomeric glazing sealants.<br />

C. Glazing for Fire-Rated Door and Window Assemblies: Glazing for assemblies that comply with<br />

NFPA 80 and that are listed and labeled by a testing and inspecting agency acceptable to<br />

authorities having jurisdiction, for fire ratings indicated, based on testing according to<br />

NFPA 257.<br />

D. Safety Glazing Products: Comply with testing requirements in 16 CFR 1201 for Category II<br />

materials.<br />

E. Glazing Publications: Comply with published recommendations of glass product manufacturers<br />

and organizations below, unless more stringent requirements are indicated. Refer to these<br />

publications for glazing terms not otherwise defined in this Section or in referenced standards.<br />

1. GANA Publications: GANA Laminated Division's "Laminated Glass Design Guide"<br />

and GANA's "Glazing Manual."<br />

1.6 WARRANTY<br />

A. Manufacturer's Special Warranty on Laminated Glass: Manufacturer's standard form, made out<br />

to Owner and signed by laminated-glass manufacturer agreeing to replace laminated-glass<br />

units that deteriorate as defined in "Definitions" Article, f.o.b. the nearest shipping point to<br />

Project site, within specified warranty period indicated below.<br />

1. Warranty Period: Five years from date of Substantial Completion.<br />

GLAZING 08 80 00 - 2


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach FL<br />

PART 2 - PRODUCTS<br />

2.1 GLASS PRODUCTS<br />

A. Annealed Float Glass: ASTM C 1036, Type I (transparent flat glass), Quality-Q3; of class<br />

indicated.<br />

B. Heat-Treated Float Glass: ASTM C 1048; Type I (transparent flat glass); Quality-Q3; of class,<br />

kind, and condition indicated.<br />

1. Fabrication Process: By horizontal (roller-hearth) process with roll-wave distortion<br />

parallel to bottom edge of glass as installed, unless otherwise indicated.<br />

2. Provide Kind HS (heat-strengthened) float glass in place of annealed float glass where<br />

needed to resist thermal stresses induced by differential shading of individual glass lites<br />

and to comply with glass design requirements specified in Part 1 "Performance<br />

Requirements" Article.<br />

3. For uncoated glass, comply with requirements for Condition A.<br />

4. For coated vision glass, comply with requirements for Condition C (other uncoated glass).<br />

5. Provide Kind FT (fully tempered) float glass in place of annealed or Kind HS (heatstrengthened)<br />

float glass where safety glass is indicated.<br />

C. Laminated Glass: ASTM C 1172, and complying with other requirements specified and with the<br />

following:<br />

1. Interlayer: Manufacturer’s standard of required thickness with a proven record of no<br />

tendency to bubble, discolor, or lose physical and mechanical properties after laminating<br />

glass lites and installation.<br />

D. Tempered Glass: ASTM C 1048, Kind FT (Fully tempered), Type I (Transparent flat glass)<br />

Quality-Q-1, Class I (clear).<br />

1. Safety glazing locations are defined by the Florida Building Code for specific required<br />

locations.<br />

2.2 FIRE-RATED GLAZING PRODUCTS<br />

A. Fire-Protection Rating: 20 minute to 90 minute fire-rating, as indicated for the assembly in<br />

which glazing material is installed, and permanently labeled by a testing and inspecting agency<br />

acceptable to authorities having jurisdiction.<br />

B. Supplier: FireLite NT as supplied by Technical Glass Products, Kirkland, Washington ph: 1-<br />

800-426-0279, fax 1-800-451-9857, email: sales@fireglass.com, web site: www.fireglass.com.<br />

1. Architect approved equal.<br />

C. Properties:<br />

1. Thickness: 3/16-inch.<br />

2. Film: 3M Scotchshield Ultra Film or as required per manufacturer.<br />

3. Fire Rating:<br />

a. 20-minutes.<br />

b. 45-minutes.<br />

c. 90-minutes.<br />

4. Surface Finish: Standard (unpolished).<br />

D. Labeling: Permanently label each piece of FireLite NT with the FireLite Logo and fire rating in<br />

sizes up to 3,325 sq. inch, and with the FireLite label only for sizes that exceed the listing (as<br />

approved by the local authority having jurisdiction).<br />

E. Fire Rating: Fire rating listed and labeled by UL for fire rating scheduled at opening on<br />

drawings, when tested in accordance with ASTM E2074, ASTM E2010, NFPA 252, NFPA 257,<br />

UL 9, UL 10B, UL 10C.<br />

F. Glazing compound for Fire-Rated Glazing Materials:<br />

1. Glazing Tape: Closed call polyvinyl chloride (PVC) foam, coiled on release paper over<br />

adhesive on two sides, maximum water absorption by volume of 2 percent. Glass panels<br />

that exceed 1,393 sq. inches for 90-minute ratings must be glazed with fire-rated glazing<br />

tape supplied by manufacturer.<br />

GLAZING 08 80 00 - 3


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach FL<br />

G. Setting Blocks: Neoprene, EPDM, or silicone: tested for compatibility with glazing compound, of<br />

70 to 90 Shore A Hardness.<br />

H. Cleaners, Primers and Sealers: Type recommended by manufacturer of glass and gaskets.<br />

I. Fabrication:<br />

1. Fabricate glass and other glazing products in sizes required to glaze openings indicated<br />

for Project, with edge and face clearances, edge and surface conditions, and bite<br />

complying with system performance requirements.<br />

J. Installation: Install per manufacturer’s recommendations.<br />

2.3 GLAZING GASKETS<br />

A. Lock-Strip Gaskets: Aluminum door and window manufacturer’s standard extrusions in size<br />

and shape required, fabricated into frames with molded corner units and lock stirps, complying<br />

with ASTM C 542, black.<br />

B. Soft Compression Gaskets: Extruded or molded, closed-cell, integral-skinned gaskets of<br />

material indicated below; complying with ASTM C 509, Type II, black; and of profile and<br />

hardness required to maintain watertight seal:<br />

1. Neoprene.<br />

2. EPDM.<br />

3. Silicone.<br />

4. Thermoplastic polyolefin rubber.<br />

5. Any material indicated above.<br />

2.4 GLAZING SEALANTS<br />

A. General: Provide products of type indicated, complying with the following requirements:<br />

1. Compatibility: Select glazing sealants that are compatible with one another and with<br />

other materials they will contact, including glass products, and glazing channel<br />

substrates, under conditions of service and application, as demonstrated by sealant<br />

manufacturer based on testing and field experience.<br />

2. Suitability: Comply with sealant and glass manufacturers' written instructions for<br />

selecting glazing sealants suitable for applications indicated and for conditions existing at<br />

time of installation.<br />

3. Colors of Exposed Glazing Sealants: As selected by Architect from manufacturer's full<br />

range.<br />

B. Elastomeric Glazing Sealants: Comply with ASTM C 920 and other requirements indicated for<br />

each liquid-applied chemically curing sealant specified, including those referencing<br />

ASTM C 920 classifications for type, grade, class, and uses related to exposure and joint<br />

substrates.<br />

1. Single-Component Neutral-Curing Silicone Glazing Sealants:<br />

a. Products:<br />

1) Dow Corning Corporation; 790.<br />

2) GE Silicones; SilPruf LM SCS2700.<br />

3) GE Silicones; SilPruf SCS2000.<br />

4) Pecora Corporation; 964.<br />

5) Pecora Corporation; 890<br />

6) Polymeric Systems Inc.; PSI-641.<br />

7) Soneborn, Div. Of ChemRex, Inc.; Omniseal.<br />

8) Tremco; Spectrem 3.<br />

b. Type and Grade: S (single component) and NS (nonsag).<br />

c. Class: 50.<br />

d. Use Related to Exposure: NT (nontraffic).<br />

e. Uses Related to Glazing Substrates: M, G, A, and, as applicable to glazing<br />

substrates indicated, O.<br />

GLAZING 08 80 00 - 4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach FL<br />

C. Glazing Sealants for Fire-Resistive Glazing Products: Identical to products used in test<br />

assemblies to obtain fire-protection rating.<br />

2.5 GLAZING TAPES<br />

A. Back-Bedding Mastic Glazing Tapes: Preformed, butyl-based elastomeric tape with a solids<br />

content of 100 percent; nonstaining and nonmigrating in contact with nonporous surfaces; with<br />

or without spacer rod as recommended in writing by tape and glass manufacturers for<br />

application indicated; packaged on rolls with a release paper backing; and complying with<br />

ASTM C 1281 and AAMA 800 for products indicated below:<br />

1. AAMA 806.3 tape, for glazing applications in which tape is subject to continuous<br />

pressure.<br />

B. Expanded Cellular Glazing Tapes: Closed-cell, PVC foam tapes; factory coated with adhesive<br />

on both surfaces; packaged on rolls with release liner protecting adhesive; and complying with<br />

AAMA 800 for the following types:<br />

1. Type 2, for glazing applications in which tape is used in combination with a full bead of<br />

liquid sealant.<br />

2.6 MISCELLANEOUS GLAZING MATERIALS<br />

A. General: Provide products of material, size, and shape complying with referenced glazing<br />

standard, requirements of manufacturers of glass and other glazing materials for application<br />

indicated, and with a proven record of compatibility with surfaces contacted in installation.<br />

B. Cleaners, Primers, and Sealers: Types recommended by sealant or gasket manufacturer.<br />

C. Setting Blocks: Elastomeric material with a Shore, Type A durometer hardness of 85, plus or<br />

minus 5.<br />

D. Spacers: Elastomeric blocks or continuous extrusions with a Shore, Type A durometer<br />

hardness required by glass manufacturer to maintain glass lites in place for installation<br />

indicated.<br />

E. Edge Blocks: Elastomeric material of hardness needed to limit glass lateral movement (side<br />

walking).<br />

F. Cylindrical Glazing Sealant Backing: ASTM C 1330, Type C (closed-cell material with a surface<br />

skin)), polyurethane foam rod, oversized 20 to 50 percent larger than joint width, as approved in<br />

writing by joint-sealant manufacturer for joint application indicated, and of size and density to<br />

control glazing sealant depth and otherwise contribute to producing optimum sealant<br />

performance.<br />

G. Perimeter Insulation for Fire-Resistive Glazing: Identical to product used in test assembly to<br />

obtain fire-resistance rating.<br />

2.7 FABRICATION OF GLAZING UNITS<br />

A. Fabricate glazing units in sizes required to glaze openings indicated for Project, with edge and<br />

face clearances, edge and surface conditions, and bite complying with written instructions of<br />

product manufacturer and referenced glazing publications, to comply with system performance<br />

requirements.<br />

PART 3 - EXECUTION<br />

3.1 GLAZING<br />

A. General: Comply with combined written instructions of manufacturers of glass, sealants,<br />

gaskets, and other glazing materials, unless more stringent requirements are indicated,<br />

including those in referenced glazing publications.<br />

GLAZING 08 80 00 - 5


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach FL<br />

1. Glazing channel dimensions, as indicated on Drawings, provide necessary bite on glass,<br />

minimum edge and face clearances, and adequate sealant thicknesses, with reasonable<br />

tolerances. Adjust as required by Project conditions during installation.<br />

2. Protect glass edges from damage during handling and installation. Remove damaged<br />

glass from Project site and legally dispose of off Project site. Damaged glass is glass<br />

with edge damage or other imperfections that, when installed, could weaken glass and<br />

impair performance and appearance.<br />

3. Apply primers to joint surfaces where required for adhesion of sealants, as determined by<br />

preconstruction sealant-substrate testing.<br />

4. Install setting blocks in sill rabbets, sized and located to comply with referenced glazing<br />

publications, unless otherwise required by glass manufacturer. Set blocks in thin course<br />

of compatible sealant suitable for heel bead.<br />

5. Do not exceed edge pressures stipulated by glass manufacturers for installing glass lites.<br />

6. Provide spacers for glass lites where length plus width is larger than 50 inches (1270<br />

mm) .<br />

7. Provide edge blocking where indicated or needed to prevent glass lites from moving<br />

sideways in glazing channel, as recommended in writing by glass manufacturer and<br />

according to requirements in referenced glazing publications.<br />

B. Tape Glazing: Position tapes on fixed stops so that, when compressed by glass, their exposed<br />

edges are flush with or protrude slightly above sightline of stops. Install tapes continuously, but<br />

not necessarily in one continuous length. Do not stretch tapes to make them fit opening.<br />

1. Cover vertical framing joints by applying tapes to heads and sills first and then to jambs.<br />

Cover horizontal framing joints by applying tapes to jambs and then to heads and sills.<br />

2. Place joints in tapes at corners of opening with adjoining lengths butted together, not<br />

lapped. Seal joints in tapes with compatible sealant approved by tape manufacturer.<br />

3. Center glass lites in openings on setting blocks and press firmly against tape by inserting<br />

dense compression gaskets formed and installed to lock in place against faces of<br />

removable stops. Start gasket applications at corners and work toward centers of<br />

openings.<br />

C. Gasket Glazing (Dry): Fabricate compression gaskets in lengths recommended by gasket<br />

manufacturer to fit openings exactly, with allowance for stretch during installation.<br />

1. Insert soft compression gasket between glass and frame or fixed stop so it is securely in<br />

place with joints miter cut and bonded together at corners.<br />

2. Center glass lites in openings on setting blocks and press firmly against soft compression<br />

gasket by inserting dense compression gaskets formed and installed to lock in place<br />

against faces of removable stops. Start gasket applications at corners and work toward<br />

centers of openings. Compress gaskets to produce a weathertight seal without<br />

developing bending stresses in glass. Seal gasket joints with sealant recommended by<br />

gasket manufacturer.<br />

3. Install gaskets so they protrude past face of glazing stops.<br />

D. Sealant Glazing (Wet): Install continuous spacers, or spacers combined with cylindrical sealant<br />

backing, between glass lites and glazing stops to maintain glass face clearances and to prevent<br />

sealant from extruding into glass channel and blocking weep systems until sealants cure.<br />

Secure spacers or spacers and backings in place and in position to control depth of installed<br />

sealant relative to edge clearance for optimum sealant performance.<br />

1. Force sealants into glazing channels to eliminate voids and to ensure complete wetting or<br />

bond of sealant to glass and channel surfaces.<br />

2. Tool exposed surfaces of sealants to provide a substantial wash away from glass.<br />

3.2 CLEANING AND PROTECTION<br />

A. Protect exterior glass from damage immediately after installation by attaching crossed<br />

streamers to framing held away from glass. Do not apply markers to glass surface. Remove<br />

GLAZING 08 80 00 - 6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach FL<br />

nonpermanent labels, and clean surfaces. Protect glass from contact with contaminating<br />

substances resulting from construction operations, including weld splatter. If, despite such<br />

protection, contaminating substances do come into contact with glass, remove substances<br />

immediately as recommended by glass manufacturer.<br />

B. Remove and replace glass that is broken, chipped, cracked, or abraded or that is damaged from<br />

natural causes, accidents, and vandalism, during construction period.<br />

3.3 GLASS SCHEDULE<br />

A. Type “A”: All exterior glazing shall be impact rated laminated glazing as required per The Florida<br />

Building Code.<br />

Nominal Thickness: 9/16-inch thick float glass.<br />

B. Type “B”: All interior non-fire rated locations.<br />

Nominal Thickness: 1/4 inch thick clear fully tempered float glass.<br />

C. Type “D” Provide at interior 20 to 90 minute fire-rated openings.<br />

Nominal 3/16-inch thick glazing, impact safety rated, which meets ANSI Z97.1 and CPSC 16 CFR<br />

1201 (Category I and II) clear glass.<br />

See Paragraph 2.2, Fire-Rated Glazing Products.<br />

END OF SECTION 08 80 00<br />

GLAZING 08 80 00 - 7


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach FL<br />

“LEFT BLANK”<br />

GLAZING 08 80 00 - 8


DAG Architects Inc.<br />

12042 Rosemary Beach Owners Center<br />

Rosemary Beach, FL<br />

SECTION 08 90 00 - LOUVERS AND VENTS<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section Includes:<br />

1. Fixed galvanized hollow metal louvers.<br />

B. See Division 23 Sections for louvers that are a part of mechanical equipment.<br />

1.2 PERFORMANCE REQUIREMENTS<br />

A. Delegated Design: Design louvers, including comprehensive engineering analysis by a<br />

qualified professional engineer, using structural performance requirements and design criteria<br />

indicated.<br />

B. Structural Performance: Louvers shall withstand the effects of gravity loads and the following<br />

loads and stresses within limits and under conditions indicated without permanent deformation<br />

of louver components, noise or metal fatigue caused by louver blade rattle or flutter, or<br />

permanent damage to fasteners and anchors.<br />

1. Wind Loads: Determine loads based on pressures as indicated on Drawings.<br />

2. Comply with Florida Building Code & Wind Loads.<br />

C. Louver Performance Ratings: Provide louvers complying with requirements specified, as<br />

demonstrated by testing manufacturer's stock units identical to those provided, except for length<br />

and width according to AMCA 500-L.<br />

1.3 SUBMITTALS<br />

A. Product Data: For each type of product indicated.<br />

1. For louvers specified to bear AMCA seal, include printed catalog pages showing<br />

specified models with appropriate AMCA Certified Ratings Seals.<br />

B. Shop Drawings: For louvers and accessories. Include plans, elevations, sections, details, and<br />

attachments to other work. Show frame profiles and blade profiles, angles, and spacing.<br />

C. Samples: For each type of metal finish required.<br />

D. Delegated-Design Submittal: For louvers indicated to comply with structural performance<br />

requirements and design criteria, including analysis data signed and sealed by the qualified<br />

professional engineer responsible for their preparation.<br />

E. Product Test Reports: Based on tests performed according to AMCA 500-L.<br />

1.4 QUALITY ASSURANCE<br />

A. Source Limitations: Obtain louvers and vents through one source from a single manufacturer.<br />

1.5 <strong>PROJECT</strong> CONDITIONS<br />

A. Field Measurements: Verify louver openings by field measurements before fabrication and<br />

indicated measurements of Shop Drawings. Coordinate fabrication schedule with construction<br />

progress to avoid delaying the work.<br />

1. Established Dimensions: Where field measurements cannot be made without delaying<br />

the Work, establish opening dimensions and proceed with fabricating louvers without field<br />

measurements. Coordinate construction to ensure that actual opening dimensions<br />

correspond to established dimensions.<br />

LOUVERS AND VENTS 08 90 00 - 1


DAG Architects Inc.<br />

12042 Rosemary Beach Owners Center<br />

Rosemary Beach, FL<br />

PART 2 - PRODUCTS<br />

2.1 MATERIALS<br />

A. Galvanized-Steel Sheet: ASTM A 653/A 653M, G90 (Z275) zinc coating, mill phosphatized.<br />

B. Fasteners: Use types and sizes to suit unit installation conditions.<br />

1. For fastening galvanized steel, use 300 series stainless-steel fasteners.<br />

2. For color-finished louvers, use fasteners with heads that match color of louvers.<br />

C. Bituminous Paint: Cold-applied asphalt emulsion complying with ASTM D 1187.<br />

2.2 FABRICATION, GENERAL<br />

A. Fabricate frames, including integral sills, to fit in openings of sizes indicated, with allowances<br />

made for fabrication and installation tolerances, adjoining material tolerances, and perimeter<br />

sealant joints.<br />

B. Join frame members to each other and to fixed louver blades with fillet welds concealed from<br />

view unless otherwise indicated or size of louver assembly makes bolted connections between<br />

frame members necessary.<br />

2.3 FIXED LOUVERS<br />

A. Storm-Resistant Louver:<br />

1. Manufacturer’s: Subject to compliance with requirements, provide products by one of the<br />

following:<br />

a. Arrow United Industries; a division of Mestek Inc.<br />

b. Construction Specialists, Inc.<br />

c. Ruskin Company; Tompkins PLC.<br />

2. Louver Depth: 5 inches (125 mm).<br />

3. Frame and Blade Nominal Thickness: Not less than 0.080 inch (2.52 mm) for blades and<br />

0.080 inch (2.03 mm) for frames.<br />

4. Louver Performance Ratings: Maximum standard airflow not less than 8500 cfm with not<br />

more than 0/20-inch static pressure loss.<br />

2.4 LOUVER SCREENS<br />

A. General: Provide screen at each exterior louver.<br />

B. Louver Screen Frames: Same kind and form of metal as indicated for louver to which screens<br />

are attached.<br />

C. Louver Screening:<br />

1. Bird Screening: Galvanized steel, 1/2-inch- (13-mm-) square mesh, 0.041-inch (1.04-<br />

mm) wire.<br />

2.5 GALVANIZED-STEEL SHEET FINISHES<br />

A. Surface Preparation: Clean surfaces with nonpetroleum solvent so surfaces are free of oil and<br />

other contaminants. After cleaning, apply a conversion coating suited to the organic coating to<br />

be applied over it. Clean welds, mechanical connections, and abraded areas and repair<br />

according to ASTM A 780.<br />

B. Baked-Enamel or Powder-Coat Finish: Immediately after cleaning and pretreating, apply<br />

manufacturer's standard 2-coat, baked-on finish consisting of prime coat and thermosetting<br />

topcoat, with a minimum dry film thickness of 1 mil (0.025 mm) for topcoat. Comply with coating<br />

manufacturer's written instructions for applying and baking to achieve a minimum dry film<br />

thickness of 2 mils (0.05 mm) .<br />

1. Color and Gloss: As selected by Architect from manufacturer's full range.<br />

LOUVERS AND VENTS 08 90 00 - 2


DAG Architects Inc.<br />

12042 Rosemary Beach Owners Center<br />

Rosemary Beach, FL<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION<br />

A. Locate and place louvers and vents level, plumb, and at indicated alignment with adjacent work.<br />

B. Use concealed anchorages where possible. Provide brass or lead washers fitted to screws<br />

where required to protect metal surfaces and to make a weathertight connection.<br />

C. Provide perimeter reveals and openings of uniform width for sealants and joint fillers, as<br />

indicated.<br />

D. Repair damaged finishes so no evidence remains of corrective work. Return items that cannot<br />

be refinished in the field to the factory and refinish entire unit or provide new units.<br />

E. Protect galvanized and nonferrous-metal surfaces that will be in contact with concrete, masonry,<br />

or dissimilar metals from corrosion and galvanic action by applying a heavy coating of<br />

bituminous paint.<br />

F. Caulk around perimeter of louver to provide a weather and water tight installation.<br />

END OF SECTION 08 90 00<br />

LOUVERS AND VENTS 08 90 00 - 3


DAG Architects Inc.<br />

12042 Rosemary Beach Owners Center<br />

Rosemary Beach, FL<br />

“LEFT BLANK”<br />

LOUVERS AND VENTS 08 90 00 - 4


DAG Architects<br />

Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

SECTION 092216 - NON-STRUCTURAL METAL FRAMINGGENERAL<br />

1.1 SUMMARY<br />

A. Section Includes:<br />

1. Non-load-bearing steel framing systems for interior gypsum board assemblies.<br />

2. Suspension systems for interior gypsum ceilings and soffits.<br />

1.2 ACTION SUBMITTALS<br />

A. Product Data: For each type of product.<br />

PART 2 - PRODUCTS<br />

2.1 PERFORMANCE REQUIREMENTS<br />

A. Fire-Test-Response Characteristics: Provide materials and construction identical to those tested<br />

according to ASTM E 119.<br />

B. STC-Rated Assemblies: Provide materials and construction identical to those tested in assembly<br />

indicated according to ASTM E 90 and classified according to ASTM E 413.<br />

2.2 FRAMING SYSTEMS<br />

A. Steel Studs and Runners: ASTM C 645. Use either steel studs and runners or dimpled steel<br />

studs and runners of equivalent minimum base-metal thickness.<br />

1. Minimum Base-Metal Thickness: 0.033 inch (0.84 mm) .<br />

2. Depth: As indicated on Drawings.<br />

a. Products: Subject to compliance with requirements, [provide one of the<br />

following:<br />

1) Dietrich Metal Framing; SLP-TRK Slotted Deflection Track.<br />

2) Superior Metal Trim; Superior Flex Track System (SFT).<br />

B. Cold-Rolled Channel Bridging: Steel, 0.053-inch (1.34-mm) minimum base-metal thickness,<br />

with minimum 1/2-inch- (13-mm-) wide flanges.<br />

1. Depth -1/2 inches .<br />

2. Clip Angle: Not less than 1-1/2 by 1-1/2 inches (38 by 38 mm) , thick, galvanized steel.<br />

C. Hat-Shaped, Rigid Furring Channels: ASTM C 645.<br />

1. Minimum Base-Metal Thickness: [As indicated on Drawings] [0.018 inch (0.45 mm)]<br />

NON-STRUCTURAL METAL FRAMING 092216 - 1


DAG Architects<br />

Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

2. Depth: 7/8 inch (22.2 mm<br />

D. Cold-Rolled Furring Channels: 0.053-inch (1.34-mm) uncoated-steel thickness, with minimum<br />

1/2-inch- (13-mm-) wide flanges.<br />

1. Depth: As indicated on Drawings<br />

2. Furring Brackets: Adjustable, corrugated-edge type of steel sheet with minimum<br />

uncoated-steel thickness of 0.033 inch (0.8 mm) .<br />

3. Tie Wire: ASTM A 641/A 641M, Class 1 zinc coating, soft temper, 0.062-inch- (1.59-<br />

mm-) diameter wire, or double strand of 0.048-inch- (1.21-mm-) diameter wire.<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION, GENERAL<br />

A. Installation Standard: ASTM C 754.<br />

1. Gypsum Board Assemblies: Also comply with requirements in ASTM C 840 that apply<br />

to framing installation.<br />

B. Install supplementary framing, and blocking to support fixtures, equipment services, heavy trim,<br />

grab bars, toilet accessories, furnishings, or similar construction.<br />

C. Install bracing at terminations in assemblies.<br />

D. Do not bridge building control and expansion joints with non-load-bearing steel framing<br />

members. Frame both sides of joints independently.<br />

3.2 INSTALLING FRAMED ASSEMBLIES<br />

A. Install framing system components according to spacings indicated, but not greater than<br />

spacings required by referenced installation standards for assembly types.<br />

B. Where studs are installed directly against exterior masonry walls or dissimilar metals at exterior<br />

walls, install isolation strip between studs and exterior wall.<br />

C. Install studs so flanges within framing system point in same direction.<br />

D. Install tracks (runners) at floors and overhead supports. Extend framing full height to structural<br />

supports or substrates above suspended ceilings, except where partitions are indicated to<br />

terminate at suspended ceilings. Continue framing around ducts penetrating partitions above<br />

ceiling.<br />

1. Slip-Type Head Joints: Where framing extends to overhead structural supports, install to<br />

produce joints at tops of framing systems that prevent axial loading of finished<br />

assemblies.<br />

2. Door Openings: Screw vertical studs at jambs to jamb anchor clips on door frames; install<br />

runner track section (for cripple studs) at head and secure to jamb studs.<br />

a. Install two studs at each jamb unless otherwise indicated.<br />

NON-STRUCTURAL METAL FRAMING 092216 - 2


DAG Architects<br />

Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

b. Install cripple studs at head adjacent to each jamb stud, with a minimum 1/2-inch<br />

(13-mm) clearance from jamb stud to allow for installation of control joint in<br />

finished assembly.<br />

c. Extend jamb studs through suspended ceilings and attach to underside of overhead<br />

structure.<br />

3. Other Framed Openings: Frame openings other than door openings the same as required<br />

for door openings unless otherwise indicated. Install framing below sills of openings to<br />

match framing required above door heads.<br />

4. Sound-Rated Partitions: Install framing to comply with sound-rated assembly indicated.<br />

E. Direct Furring:<br />

1. Attach to concrete or masonry with stub nails, screws designed for masonry attachment,<br />

or powder-driven fasteners spaced 24 inches (610 mm) o.c.<br />

F. Installation Tolerance: Install each framing member so fastening surfaces vary not more than<br />

1/8 inch (3 mm) from the plane formed by faces of adjacent framing.<br />

G. Fire-Resistance-Rated Assemblies: Wire tie furring channels to supports.<br />

H. Installation Tolerances: Install suspension systems that are level to within 1/8 inch in 12 feet (3<br />

mm in 3.6 m) measured lengthwise on each member that will receive finishes and transversely<br />

between parallel members that will receive finishes.<br />

END OF SECTION 092216<br />

NON-STRUCTURAL METAL FRAMING 092216 - 3


DAG Architects<br />

Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

THIS PAGE LEFT INTENTIONALLY BLANK<br />

NON-STRUCTURAL METAL FRAMING 092216 - 4


DAG Architects<br />

12040 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

SECTION 092400 - CEMENT PLASTERING<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section Includes:<br />

1. Exterior portland cement plasterwork (stucco) on unit masonry and monolithic<br />

concrete.<br />

1.2 ACTION SUBMITTALS<br />

A. Product Data: For each type of product indicated.<br />

B. Shop Drawings: Show locations and installation of control and expansion joints including plans,<br />

elevations, sections, details of components, and attachments to other work.<br />

C. Samples: For each type of factory-prepared finish coat indicated.<br />

1.3 QUALITY ASSURANCE<br />

A. Mockups: Before plastering, install mockups of at least 100 sq. ft. (9.3 sq. m) in surface area to<br />

demonstrate aesthetic effects and set quality standards for materials and execution.<br />

1. Approved mockups may become part of the completed Work if undisturbed at time of<br />

Substantial Completion.<br />

1.4 <strong>PROJECT</strong> CONDITIONS<br />

A. Comply with ASTM C 926 requirements.<br />

B. Factory-Prepared Finishes: Comply with manufacturer's written recommendations for<br />

environmental conditions for applying finishes.<br />

PART 2 - PRODUCTS<br />

2.1 METAL LATH<br />

A. Expanded-Metal Lath: ASTM C 847 with ASTM A 653/A 653M, G60 (Z180), hot-dip<br />

galvanized zinc coating.<br />

1. Diamond-Mesh Lath Self-furring, 2.5 lb/sq. yd. (1.4 kg/sq. mRib lath is more rigid than<br />

diamond lath; it is not suitable for contour lathing.<br />

CEMENT PLASTERING 092400 - 1


DAG Architects<br />

12040 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

2.2 ACCESSORIES<br />

A. General: Comply with ASTM C 1063 and coordinate depth of trim and accessories with<br />

thicknesses and number of plaster coats required.<br />

B. Metal Accessories:<br />

1. Foundation Weep Screed: Fabricated from hot-dip galvanized-steel sheet,<br />

ASTM A 653/A 653M, G60 (Z180) zinc coating.<br />

2. Cornerite: Fabricated from metal lath with ASTM A 653/A 653M, G60 (Z180), hot-dip<br />

galvanized zinc coating.<br />

3. External-Corner Reinforcement: Fabricated from metal lath with ASTM A 653/A 653M,<br />

G60 (Z180), hot-dip galvanized zinc coating.<br />

4. Cornerbeads: Fabricated from zinc-coated (galvanized) steel.<br />

a. Small-nose style; use unless otherwise indicated.<br />

5. Casing Beads: Fabricated from [zinc-coated (galvanized) steel; square-edged style; with<br />

expanded flanges.<br />

6. Control Joints: Fabricated from zinc-coated (galvanized) steel; one-piece-type, folded<br />

pair of unperforated screeds in M-shaped configuration; with perforated flanges and<br />

removable protective tape on plaster face of control joint.<br />

7. Expansion Joints: Fabricated from zinc-coated (galvanized) steel; folded pair of<br />

unperforated screeds in M-shaped configuration; with expanded flanges.<br />

2.3 MISCELLANEOUS MATERIALS<br />

A. Water for Mixing: Potable and free of substances capable of affecting plaster set or of damaging<br />

plaster, lath, or accessories.<br />

B. Fiber for Base Coat: Alkaline-resistant glass or polypropylene fibers, 1/2 inch (13 mm)<br />

free of contaminants, manufactured for use in portland cement plaster.<br />

long,<br />

C. Bonding Compound: ASTM C 932.<br />

D. Steel Drill Screws: For metal-to-metal fastening, ASTM C 1002 or ASTM C 954, as required<br />

by thickness of metal being fastened; with pan head that is suitable for application; in lengths<br />

required to achieve penetration through joined materials of no fewer than three exposed threads.<br />

E. Fasteners for Attaching Metal Lath to Substrates: Complying with ASTM C 1063.<br />

F. Wire: ASTM A 641/A 641M, Class 1 zinc coating, soft temper, not less than 0.0475-inch (1.21-<br />

mm) diameter, unless otherwise indicated.<br />

2.4 PLASTER MATERIALS<br />

A. Portland Cement: ASTM C 150, Type I<br />

1. Color for Finish Coats: White.<br />

CEMENT PLASTERING 092400 - 2


DAG Architects<br />

12040 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

B. Masonry Cement: ASTM C 91, Type N.<br />

1. Color for Finish Coats: White.<br />

C. Lime: ASTM C 206, Type S; or ASTM C 207, Type S.<br />

D. Ready-Mixed Finish-Coat Plaster: Mill-mixed portland cement, aggregates, coloring agents, and<br />

proprietary ingredients.<br />

1. Color: As selected by Architect from manufacturer's full range.<br />

E. Acrylic-Based Finish Coatings: Factory-mixed acrylic-emulsion coating systems, formulated<br />

with colorfast mineral pigments and fine aggregates; for use over portland cement plaster base<br />

coats. Include manufacturer's recommended primers and sealing topcoats for acrylic-based<br />

finishes.<br />

1. Color: As selected by Architect from manufacturer's full range.<br />

2.5 PLASTER MIXES<br />

A. General: Comply with ASTM C 926 for applications indicated.<br />

1. Fiber Content: Add fiber to base-coat mixes after ingredients have mixed at least two<br />

minutes. Comply with fiber manufacturer's written instructions for fiber quantities in<br />

mixes, but do not exceed 1 lb of fiber/cu. yd. (0.6 kg of fiber/cu. m) of cementitious<br />

materials.<br />

B. Base-Coat Mixes for Use over Metal Lath: Scratch and brown coats for three-coat plasterwork<br />

as follows:<br />

1. Portland Cement Mixes:<br />

a. Scratch Coat: For cementitious material, mix 1 part portland cement and [0 to 3/4]<br />

[3/4 to 1-1/2] parts lime. Use 2-1/2 to 4 parts aggregate per part of cementitious<br />

material.<br />

b. Brown Coat: For cementitious material, mix 1 part portland cement and [0 to 3/4]<br />

[3/4 to 1-1/2] parts lime. Use 3 to 5 parts aggregate per part of cementitious<br />

material, but not less than volume of aggregate used in scratch coat.<br />

2. Masonry Cement Mixes:<br />

a. Scratch Coat: 1 part masonry cement and 2-1/2 to 4 parts aggregate.<br />

b. Brown Coat: 1 part masonry cement and 3 to 5 parts aggregate, but not less than<br />

volume of aggregate used in scratch coat.<br />

3. Portland and Masonry Cement Mixes:<br />

a. Scratch Coat: For cementitious material, mix 1 part portland cement and 1 part<br />

masonry cement. Use 2-1/2 to 4 parts aggregate per part of cementitious material.<br />

CEMENT PLASTERING 092400 - 3


DAG Architects<br />

12040 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

b. Brown Coat: For cementitious material, mix 1 part portland cement and 1 part<br />

masonry cement. Use 3 to 5 parts aggregate per part of cementitious material, but<br />

not less than volume of aggregate used in scratch coat.<br />

4. Portland and Plastic Cement Mixes:<br />

a. Scratch Coat: For cementitious material, mix 1 part plastic cement and 1 part<br />

portland cement. Use 2-1/2 to 4 parts aggregate per part of cementitious material.<br />

b. Brown Coat: For cementitious material, mix 1 part plastic cement and 1 part<br />

portland cement. Use 3 to 5 parts aggregate per part of cementitious material, but<br />

not less than volume of aggregate used in scratch coat.<br />

C. Base-Coat Mixes: Single base coats for two-coat plasterwork as follows:<br />

1. Portland Cement Mix: For cementitious material, mix 1 part portland cement and 0 to 3/4<br />

part lime. Use 2-1/2 to 4 parts aggregate per part of cementitious material.<br />

2. Portland and Masonry Cement Mix: For cementitious material, mix 1 part portland<br />

cement and 1 part masonry cement. Use 2-1/2 to 4 parts aggregate per part of<br />

cementitious material.<br />

3. Plastic Cement Mix: Use 1 part plastic cement and 2-1/2 to 4 parts aggregate.<br />

D. Base-Coat Mixes: Single base coats for two-coat plasterwork as follows:<br />

1. Portland Cement Mix: For cementitious material, mix 1 part portland cement and 3/4 to<br />

1-1/2 parts lime. Use 2-1/2 to 4 parts aggregate per part of cementitious material.<br />

2. Masonry Cement Mix: Use 1 part masonry cement and 2-1/2 to 4 parts aggregate.<br />

3. Plastic Cement Mix: Use 1 part plastic cement and 2-1/2 to 4 parts aggregate.<br />

E. Job-Mixed Finish-Coat Mixes:<br />

1. Portland Cement Mix: For cementitious materials, mix 1 part portland cement and [3/4 to<br />

1-1/2] [1-1/2 to 2] parts lime. Use 1-1/2 to 3 parts aggregate per part of cementitious<br />

material.<br />

2. Masonry Cement Mix: 1 part masonry cement and 1-1/2 to 3 parts aggregate.<br />

3. Portland and Masonry Cement Mix: For cementitious materials, mix 1 part portland<br />

cement and 1 part masonry cement. Use 1-1/2 to 3 parts aggregate per part of<br />

cementitious material.<br />

4. Plastic Cement Mix: 1 part plastic cement and 1-1/2 to 3 parts aggregate.<br />

F. Factory-Prepared Finish-Coat Mixes: For acrylic-based finish coatings, comply with<br />

manufacturer's written instructions.<br />

PART 3 - EXECUTION<br />

3.1 PREPARATION<br />

A. Protect adjacent work from soiling, spattering, moisture deterioration, and other harmful effects<br />

caused by plastering.<br />

CEMENT PLASTERING 092400 - 4


DAG Architects<br />

12040 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

B. Prepare solid substrates for plaster that are smooth or that do not have the suction capability<br />

required to bond with plaster according to ASTM C 926.<br />

3.2 INSTALLING METAL LATH<br />

A. Expanded-Metal Lath: Install according to ASTM C 1063.<br />

1. Partition Framing and Vertical Furring: Install flat diamond-meshlath.<br />

2. Flat-Ceiling and Horizontal Framing: Install flat diamond-meshlath.<br />

3. On Solid Surfaces, Not Otherwise Furred: Install self-furring, diamond-meshlath.<br />

3.3 INSTALLING ACCESSORIES<br />

A. Install according to ASTM C 1063 and at locations indicated on Drawings.<br />

B. Reinforcement for External Corners:<br />

1. Install lath-type, external-corner reinforcement at exterior locations.<br />

2. Install cornerbead at interior and exterior locations.<br />

C. Control Joints: Install control joints in specific locations approved by Architect for visual<br />

effect as follows:<br />

1. As required to delineate plasterwork into areas (panels) of the following maximum sizes:<br />

a. Vertical Surfaces: 144 sq. ft. (13.4 sq. m) .<br />

b. Horizontal and other Nonvertical Surfaces:<br />

100 sq. ft. (9.3 sq. m) .<br />

2. At distances between control joints of not greater than 18 feet (5.5 m) o.c.<br />

3. Where control joints occur in surface of construction directly behind plaster.<br />

4. Where plasterwork areas change dimensions, to delineate rectangular-shaped areas<br />

(panels) and to relieve the stress that occurs at the corner formed by the dimension<br />

change.<br />

3.4 PLASTER APPLICATION<br />

A. General: Comply with ASTM C 926.<br />

B. Bonding Compound: Apply on unit masonry and concrete] plaster bases.<br />

C. Walls; Base-Coat Mixes for Use over Metal Lath: Scratch and brown coats for three-coat on<br />

masonry , on concrete ; 3/4-inch (19-mm) thickness.<br />

1. Portland cement mixes.<br />

2. Masonry cement mixes.<br />

3. Portland and masonry cement mixes.<br />

4. Portland and plastic cement mixes.<br />

CEMENT PLASTERING 092400 - 5


DAG Architects<br />

12040 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

D. Walls; Base-Coat Mix: Scratch coat for two-coat plasterwork[, 3/8 inch (10 mm) thick on<br />

concrete masonry , 1/4 inch (6 mm) thick on concrete.<br />

1. Portland cement mixes.<br />

2. Masonry cement mixes.<br />

3. Portland and masonry cement mixes.<br />

E. Plaster Finish Coats: Apply to provide floatfinish to match Architect's sample.<br />

F. Acrylic-Based Finish Coatings: Apply coating system, including primers, finish coats, and<br />

sealing topcoats, according to manufacturer's written instructions.<br />

G. Concealed Exterior Plasterwork: Where plaster application will be used as a base for adhered<br />

finishes, omit finish coat.<br />

3.5 PLASTER REPAIRS<br />

A. Repair or replace work to eliminate cracks, dents, blisters, buckles, crazing and check cracking,<br />

dry outs, efflorescence, sweat outs, and similar defects and where bond to substrate has failed.<br />

END OF SECTION 092400<br />

CEMENT PLASTERING 092400 - 6


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

SECTION 09<strong>29</strong>00 - GYPSUM BOARD GENERAL<br />

1.1 SUMMARY<br />

A. Section Includes:<br />

1. Interior gypsum board.<br />

1.2 ACTION SUBMITTALS<br />

A. Product Data: For each type of product.<br />

PART 2 - PRODUCTS<br />

2.1 PERFORMANCE REQUIREMENTS<br />

A. Fire-Resistance-Rated Assemblies: For fire-resistance-rated assemblies, provide materials and<br />

construction identical to those tested in assembly indicated according to ASTM E 119 by an<br />

independent testing agency.<br />

B. STC-Rated Assemblies: For STC-rated assemblies, provide materials and construction identical<br />

to those tested in assembly indicated according to ASTM E 90 and classified according to<br />

ASTM E 413 by an independent testing agency.<br />

2.2 GYPSUM BOARD, GENERAL<br />

A. Regional Materials: Gypsum panel products shall be manufactured within 500 miles (800 km)<br />

of Project site.<br />

2.3 INTERIOR GYPSUM BOARD<br />

A. Manufacturers: Subject to compliance with requirements, provide products by one of the<br />

following:<br />

1. CertainTeed Corp.<br />

2. National Gypsum Company.<br />

3. USG Corporation.<br />

B. Gypsum Wallboard: ASTM C 1396/C 1396M.<br />

1. Thickness: Type ‘X’ - 5/8 inch<br />

2. Long Edges: Tapered.<br />

C. Gypsum Ceiling Board: ASTM C 1396/C 1396M.<br />

1. Thickness: 5/8 inch.<br />

GYPSUM BOARD 09<strong>29</strong>00 - 1


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

2. Long Edges: Tapered.<br />

D. Moisture- and Mold-Resistant Gypsum Board: ASTM C 1396/C 1396M. With moisture- and<br />

mold-resistant core and paper surfaces.<br />

1. Core: regular type 5/8 inch.<br />

2. Long Edges: Tapered.<br />

3. Mold Resistance: ASTM D 3273, score of 10 as rated according to ASTM D 3274.<br />

E. Interior Trim: ASTM C 1047.<br />

1. Material: Galvanized or aluminum-coated steel sheet, rolled zinc, plastic, or paperfaced<br />

galvanized steel sheet.<br />

2.4 TILE BACKING PANELS<br />

A. Cementitious Backer Units: ANSI A118.9 and ASTM C 1288 or 1325, with manufacturer's<br />

standard edges.<br />

1. Products: Subject to compliance with requirements provide one of the following:<br />

a. CertainTeed Corp.; FiberCement BackerBoard.<br />

b. National Gypsum Company, Permabase Cement Board.<br />

c. USG Corporation; DUROCK Cement Board.<br />

2. Thickness: 5/8 inch.<br />

3. Mold Resistance: ASTM D 3273, score of 10 as rated according to ASTM D 3274.<br />

2.5 According to the 2006 International Building Code, water-resistant gypsum backing board is<br />

not permitted for use as a backing board for tile in tub and shower areas or as wall board or<br />

ceiling panels in JOINT TREATMENT MATERIALS<br />

A. General: Comply with ASTM C 475/C 475M.<br />

B. Joint Tape:<br />

1. Interior Gypsum Board: Paper.<br />

C. Joint Compound for Interior Gypsum Board: For each coat use formulation that is compatible<br />

with other compounds applied on previous or for successive coats.<br />

2.6 AUXILIARY MATERIALS<br />

1. ."<br />

B. Sound Attenuation Blankets: ASTM C 665, Type I (blankets without membrane facing).<br />

1. Recycled Content of Blankets: Postconsumer recycled content plus one-half of preconsumer<br />

recycled content.<br />

GYPSUM BOARD 09<strong>29</strong>00 - 2


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

C. Acoustical Joint Sealant: ASTM C 834. Product effectively reduces airborne sound transmission<br />

through perimeter joints and openings as demonstrated by testing according to ASTM E 90.<br />

1. Products: Subject to compliance with requirements, [provide the following] [provide<br />

one of the following] [available products that may be incorporated into the Work<br />

include, but are not limited to, the following]:<br />

a. Pecora Corporation; [AC-20 FTR] [AIS-919].<br />

b. USG Corporation; SHEETROCK Acoustical Sealant.<br />

2. Acoustical joint sealant shall have a VOC content of 250 g/L or less when calculated<br />

according to 40 CFR 59, Subpart D (EPA Method 24).<br />

D. Thermal Insulation: As specified in Section 072100 "Thermal Insulation."<br />

PART 3 - EXECUTION<br />

3.1 APPLYING AND FINISHING PANELS<br />

A. Comply with ASTM C 840.<br />

B. Examine panels before installation. Reject panels that are wet, moisture damaged, and mold<br />

damaged.<br />

C. Isolate perimeter of gypsum board applied to non-load-bearing partitions at structural<br />

abutments, except floors. Provide 1/4- to 1/2-inch- (6.4- to 12.7-mm-) wide spaces at these<br />

locations and trim edges with edge trim where edges of panels are exposed. Seal joints between<br />

edges and abutting structural surfaces with acoustical sealant.<br />

D. Install trim with back flanges intended for fasteners, attach to framing with same fasteners used<br />

for panels. Otherwise, attach trim according to manufacturer's written instructions.<br />

1. Control Joints: Install control joints according to ASTM C 840 and in specific<br />

locations approved by Architect for visual effect.<br />

E. Prefill open joints, rounded or beveled edges, and damaged surface areas.<br />

F. Apply joint tape over gypsum board joints, except for trim products specifically indicated as not<br />

intended to receive tape.<br />

G. Gypsum Board Finish Levels: Finish panels to levels indicated below and according to<br />

ASTM C 840:<br />

1. Level 5:At panel surfaces that will be exposed to view unless otherwise indicated.<br />

a. Primer and its application to surfaces are specified in Section 099123 "Interior<br />

Painting."<br />

H. Protect adjacent surfaces from drywall compound and texture finishes and promptly remove<br />

from floors and other non-drywall surfaces. Repair surfaces stained, marred, or otherwise<br />

damaged during drywall application.<br />

GYPSUM BOARD 09<strong>29</strong>00 - 3


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

I. Remove and replace panels that are wet, moisture damaged, and mold damaged.<br />

END OF SECTION 09<strong>29</strong>00<br />

THIS PAGE INTENTIONALLY LEFT BLANK<br />

GYPSUM BOARD 09<strong>29</strong>00 - 4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach FL.<br />

SECTION 09 30 00 - TILING<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section Includes:<br />

1. Ceramic tile.<br />

2. Stone thresholds.<br />

1.2 SUBMITTALS<br />

A. Product Data: For each type of product indicated.<br />

B. Samples:<br />

1. Each type and composition of tile and for each color and finish required.<br />

2. Assembled samples, with grouted joints, for each type and composition of tile and for<br />

each color and finish required.<br />

3. Stone thresholds and window stools in 6-inch (150-mm) lengths.<br />

1.3 EXTRA MATERIALS<br />

A. Furnish extra materials that match and are from same production runs as products installed and<br />

that are packaged with protective covering and identified with labels describing contents.<br />

1. Tile and Trim Units: Furnish quantity of full-size units equal to 3 percent of amount<br />

installed for each type, composition, color, pattern, and size indicated.<br />

PART 2 - PRODUCTS<br />

2.1 TILE PRODUCTS<br />

A. ANSI Ceramic Tile Standard: Provide Standard grade tile that complies with ANSI A137.1 for<br />

types, compositions, and other characteristics indicated.<br />

B. Floor Tile: Factory-mounted unglazed ceramic mosaic tile.<br />

1. See Floor Finish Plan for product.<br />

C. Wall Tile: Glazed wall tile.<br />

1. See Floor Finish Plan for product<br />

TILING 09 30 00 - 1/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach FL.<br />

2.2 SETTING MATERIALS<br />

A. Portland Cement Mortar (Thickset) Installation Materials: ANSI A108.02.<br />

B. Latex-Portland Cement Mortar (Thin Set): ANSI A118.4.<br />

1. Manufacturers: Subject to compliance with requirements, provide products by one of the<br />

following:<br />

a. C-Cure.<br />

b. Custom Building Products.<br />

c. Laticrete International, Inc.<br />

d. MAPEI Corporation.<br />

e. Southern Grouts & Mortars, Inc.<br />

2. Prepackaged, dry-mortar mix to which only water must be added.<br />

3. For wall applications, provide nonsagging mortar.<br />

2.3 GROUT MATERIALS<br />

A. Sand-Portland Cement Grout: ANSI A108.10.<br />

B. Polymer-Modified Tile Grout: ANSI A118.7.<br />

1. Manufacturers: Subject to compliance with requirements, provide products by one of the<br />

following:<br />

a. C-Cure.<br />

b. Custom Building Products.<br />

c. Laticrete International, Inc.<br />

d. MAPEI Corporation.<br />

e. Southern Grouts & Mortars, Inc.<br />

2. Polymer Type: Liquid-latex form for addition to prepackaged dry-grout mix.<br />

PART 3 - EXECUTION<br />

3.1 EXAMINATION<br />

A. Examine substrates, areas, and conditions where tile will be installed, with Installer present, for<br />

compliance with requirements for installation tolerances and other conditions affecting<br />

performance of installed tile.<br />

1. Verify that substrates for setting tile are firm, dry, clean, free of coatings that are<br />

incompatible with tile-setting materials including curing compounds and other substances<br />

that contain soap, wax, oil, or silicone; and comply with flatness tolerances required by<br />

ANSI A108.01 for installations indicated.<br />

TILING 09 30 00 - 2/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach FL.<br />

3.2 PREPARATION<br />

A. Blending: For tile exhibiting color variations, use factory blended tile or blend tiles at Project site<br />

before installing.<br />

3.3 INSTALLATION<br />

A. Comply with TCA's "Handbook for Ceramic Tile Installation" for TCA installation methods<br />

specified in tile installation schedules. Comply with parts of the ANSI A108 Series<br />

"Specifications for Installation of Ceramic Tile" that are referenced in TCA installation methods,<br />

specified in tile installation schedules, and apply to types of setting and grouting materials used.<br />

B. Extend tile work into recesses and under or behind equipment and fixtures to form complete<br />

covering without interruptions unless otherwise indicated. Terminate work neatly at<br />

obstructions, edges, and corners without disrupting pattern or joint alignments.<br />

C. Accurately form intersections and returns. Perform cutting and drilling of tile without marring<br />

visible surfaces. Carefully grind cut edges of tile abutting trim, finish, or built-in items for straight<br />

aligned joints. Fit tile closely to electrical outlets, piping, fixtures, and other penetrations so<br />

plates, collars, or covers overlap tile.<br />

D. Jointing Pattern: Lay tile in grid pattern unless otherwise indicated. Lay out tile work and center<br />

tile fields in both directions in each space or on each wall area. Lay out tile work to minimize<br />

the use of pieces that are less than half of a tile. Provide uniform joint widths unless otherwise<br />

indicated.<br />

E. Joint Widths: Unless otherwise indicated, install tile with the following joint widths:<br />

1. Ceramic Mosaic Tile: 1/16 inch (1.6 mm) .<br />

2. Glazed Wall Tile: 1/16 inch (1.6 mm) .<br />

F. Expansion Joints: Provide expansion joints and other sealant-filled joints, including control,<br />

contraction, and isolation joints, where indicated. Form joints during installation of setting<br />

materials, mortar beds, and tile. Do not saw-cut joints after installing tiles.<br />

1. Where joints occur in concrete substrates, locate joints in tile surfaces directly above<br />

them.<br />

2. Prepare joints and apply sealants to comply with requirements in Division 07 Section<br />

"Joint Sealants."<br />

G. Stone Thresholds: Install stone thresholds in same type of setting bed as adjacent floor unless<br />

otherwise indicated.<br />

1. At locations where mortar bed (thickset) would otherwise be exposed above adjacent<br />

floor finishes, set thresholds in latex-portland cement mortar (thin set).<br />

H. Stone Window Stools: Install stone window stools in bed of construction adhesive.<br />

3.4 INTERIOR TILE INSTALLATION SCHEDULE<br />

A. Interior Floor Installations, Concrete Subfloor:<br />

1. Tile Installation F112: Cement mortar bed (thickset) bonded to concrete; TCA F112.<br />

TILING 09 30 00 - 3/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach FL.<br />

a. Tile Type: Floor tile.<br />

b. Thin-Set Mortar for Cured-Bed Method: Latex-] portland cement mortar.<br />

c. Grout: Polymer-modified unsanded grout.<br />

B. Interior Wall Installations, Masonry or Concrete:<br />

1. Tile Installation W202: Thin-set mortar; TCA W202.<br />

a. Tile Type: Wall tile.<br />

b. Thin-Set Mortar: Latex- portland cement mortar.<br />

c. Grout: Polymer-modified unsanded grout.<br />

END OF SECTION 09 30 00<br />

TILING 09 30 00 - 4/4


DAG Architects<br />

Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

SECTION 099123 - INTERIOR PAINTING GENERAL<br />

1.1 SUMMARY<br />

A. Section includes surface preparation and the application of paint systems on interior substrates.<br />

1. Concrete.<br />

2. Steel.<br />

3. Wood.<br />

4. Gypsum board.<br />

1.2 DEFINITIONS<br />

1.3 ACTION SUBMITTALS<br />

A. Product Data: For each type of product. Include preparation requirements and application instructions.<br />

1.4 QUALITY ASSURANCE<br />

A. Mockups: Apply mockups of each paint system indicated and each color and finish selected to verify<br />

preliminary selections made under Sample submittals and to demonstrate aesthetic effects and set<br />

quality standards for materials and execution.<br />

1. Architect will select one surface to represent surfaces and conditions for application of each paint<br />

system specified in Part 3.<br />

a. Vertical and Horizontal Surfaces: Provide samples of at least 100 sq. ft. (9 sq. m) .<br />

b. Other Items: Architect will designate items or areas required.<br />

2. Final approval of color selections will be based on mockups.<br />

a. If preliminary color selections are not approved, apply additional mockups of additional<br />

colors selected by Architect at no added cost to Owner.<br />

PART 2 - PRODUCTS<br />

2.1 MANUFACTURERS<br />

A. Products: Subject to compliance with requirements, provide product listed in other Part 2 articles for the<br />

paint category indicated.<br />

1. SHERWIN WILLIAMS – NO SUBSTITUTIONS.<br />

INTERIOR PAINTING 099123 - 1


DAG Architects<br />

Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

2.2 PAINT, GENERAL<br />

A. Material Compatibility:<br />

1. Provide materials for use within each paint system that are compatible with one another and<br />

substrates indicated, under conditions of service and application as demonstrated by<br />

manufacturer, based on testing and field experience.<br />

2. For each coat in a paint system, provide products recommended in writing by manufacturers of<br />

topcoat for use in paint system and on substrate indicated.<br />

B. Colors: As indicated in a color schedule.<br />

PART 3 - EXECUTION<br />

3.1 EXAMINATION<br />

A. Examine substrates and conditions, with Applicator present, for compliance with requirements for<br />

maximum moisture content and other conditions affecting performance of the Work.<br />

B. Maximum Moisture Content of Substrates: When measured with an electronic moisture meter as follows:<br />

1. Concrete: 12 percent.<br />

2. Wood: 15 percent.<br />

3. Gypsum Board: 12 percent.<br />

C. Verify suitability of substrates, including surface conditions and compatibility with existing finishes and<br />

primers.<br />

D. Proceed with coating application only after unsatisfactory conditions have been corrected.<br />

1. Application of coating indicates acceptance of surfaces and conditions.<br />

3.2 PREPARATION<br />

A. Comply with manufacturer's written instructions and recommendations in "MPI Manual" applicable to<br />

substrates indicated.<br />

B. Remove hardware, covers, plates, and similar items already in place that are removable and are not to be<br />

painted. If removal is impractical or impossible because of size or weight of item, provide surfaceapplied<br />

protection before surface preparation and painting.<br />

1. After completing painting operations, use workers skilled in the trades involved to reinstall items<br />

that were removed. Remove surface-applied protection if any.<br />

C. Clean substrates of substances that could impair bond of paints, including dust, dirt, oil, grease, and<br />

incompatible paints and encapsulants.<br />

1. Remove incompatible primers and reprime substrate with compatible primers or apply tie coat as<br />

required to produce paint systems indicated.<br />

INTERIOR PAINTING 099123 - 2


DAG Architects<br />

Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

3.3 APPLICATION<br />

A. Apply paints according to manufacturer's written instructions and to recommendations in "MPI Manual."<br />

B. Apply paints to produce surface films without cloudiness, spotting, holidays, laps, brush marks, roller<br />

tracking, runs, sags, ropiness, or other surface imperfections. Cut in sharp lines and color breaks.<br />

3.4 CLEANING AND PROTECTION<br />

A. Protect work of other trades against damage from paint application. Correct damage to work of other<br />

trades by cleaning, repairing, replacing, and refinishing, as approved by Architect, and leave in an<br />

undamaged condition.<br />

B. At completion of construction activities of other trades, touch up and restore damaged or defaced painted<br />

surfaces.<br />

3.5 INTERIOR PAINTING SCHEDULE<br />

ROOF DECK IN SALES AREA<br />

EXPOSED<br />

ROOF<br />

STRUCTURE<br />

EXPOSED<br />

HVAC<br />

COLOR SURFACE<br />

B42W2 -<br />

Tint to SW<br />

6106 Kilim<br />

Beige<br />

B42W2 -<br />

Tint to SW<br />

6106 Kilim<br />

Beige<br />

Steel -<br />

Red Iron<br />

Galvanize<br />

d Metal<br />

Aluminu<br />

m<br />

Galvanize<br />

d Metal<br />

PRIMER<br />

DESCRIPTION<br />

DTM Acrylic<br />

Primer B66W1<br />

DTM Acrylic<br />

Primer B66W1<br />

DTM Acrylic<br />

Primer B66W1<br />

DTM Acrylic<br />

Primer B66W1<br />

Steel DTM Acrylic<br />

Primer B66W1<br />

# FINISH<br />

COATS DESCRIPTION<br />

1 Waterborne<br />

Acrylic Dryfall<br />

Eg-Shel<br />

1 Waterborne<br />

Acrylic Dryfall<br />

Eg-Shel<br />

1 Waterborne<br />

Acrylic Dryfall<br />

Eg-Shel<br />

1 Waterborne<br />

Acrylic Dryfall<br />

Eg-Shel<br />

1 Waterborne<br />

Acrylic Dryfall<br />

Eg-Shel<br />

#<br />

COATS<br />

2<br />

2<br />

2<br />

2<br />

2<br />

INTERIOR PAINTING 099123 - 3


DAG Architects<br />

Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

WALLS<br />

ROOMS WALLS COLOR SURFACE PRIMER<br />

101 & 102<br />

Sales/Service<br />

Area<br />

102 Service<br />

Area<br />

101 & 102<br />

T-Wall and<br />

Half Wall<br />

103 & 104<br />

Office &<br />

Restroom<br />

Hall<br />

105 & 106<br />

Restrooms<br />

107 & 108<br />

Stockroom<br />

& J. Closet<br />

Front &<br />

Side<br />

Walls<br />

incl.<br />

Outside<br />

Office<br />

Walls<br />

Back<br />

Wall<br />

Only<br />

T-Wall<br />

Front<br />

Only<br />

Half<br />

Wall<br />

Both<br />

Sides<br />

All<br />

Walls<br />

All<br />

Finished<br />

Drywall<br />

All<br />

Finished<br />

Drywall<br />

SW 6408 -<br />

Wheat<br />

Grass<br />

SW 6349 -<br />

Pennywise<br />

SW 6221 -<br />

Moody<br />

Blue<br />

SW 6408 -<br />

Wheat<br />

Grass<br />

SW 6106 -<br />

Kilim<br />

Beige<br />

White<br />

Gypsum<br />

Board<br />

Gypsum<br />

Board<br />

Gypsum<br />

Board<br />

Gypsum<br />

Board<br />

Gypsum<br />

Board<br />

Gypsum<br />

Board<br />

DESCRIPTION<br />

High Build<br />

Interior Latex<br />

Primer<br />

B28 W 8601<br />

High Build<br />

Interior Latex<br />

Primer<br />

B28 W 8601 –<br />

Must Tint to<br />

Color Prime<br />

System P5<br />

High Build<br />

Interior Latex<br />

Primer<br />

B28 W 8601<br />

High Build<br />

Interior Latex<br />

Primer<br />

B28 W 8601<br />

High Build<br />

Interior Latex<br />

Primer B28 W<br />

8601<br />

High Build<br />

Interior Latex<br />

Primer<br />

B28 W 8601<br />

#<br />

COAT<br />

FINISH<br />

DESCRIPTION<br />

1 Duration Home<br />

Interior Latex<br />

Matte A96<br />

1 Duration Home<br />

Interior Latex<br />

Matte A96<br />

1 Duration Home<br />

Interior Latex<br />

Matte A96<br />

1 Duration Home<br />

Interior Latex<br />

Satin A97<br />

1 Duration Home<br />

Interior Latex<br />

Satin A97<br />

1 ProMar 400<br />

Interior Latex<br />

EgShel<br />

(B20W400)<br />

#<br />

COAT<br />

2<br />

2<br />

2<br />

2<br />

2<br />

1<br />

INTERIOR PAINTING 099123 - 4


DAG Architects<br />

Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

DOORS AND TRIM<br />

ROOM COLOR SURFACE FINISH<br />

All except room 107<br />

Note: For Eliason or<br />

Rubbair door, only<br />

paint doorframe.<br />

Includes trim on Halfwall<br />

& T-wall<br />

Stockroom, EXIT and<br />

Receiving Doors -<br />

Inside and Outside<br />

SW 7038 -<br />

Tony<br />

Taupe<br />

Match<br />

Building<br />

Exterior<br />

Wood<br />

Metal<br />

Metal<br />

DESCRIPTION<br />

Wall & Wood<br />

Primer B49W2<br />

If not factory<br />

primed, use Alkyd<br />

metal primer<br />

If not factory<br />

primed, use Alkyd<br />

metal primer<br />

# FINISH<br />

COATS DESCRIPTION<br />

1 ProClassic Interior<br />

Alkyd Semi-<br />

Gloss B34<br />

1 Pro Classic Interior<br />

Alkyd Semi<br />

Gloss B34<br />

1 Industrial Enamel<br />

B54- Custom<br />

Match<br />

#<br />

COATS<br />

2<br />

2<br />

2<br />

FLOORS<br />

ROOM COLOR SURFACE FINISH # COATS<br />

DESCRIPTION<br />

NOTES<br />

Service Area<br />

Haze Gray Concrete B65A60-<br />

Armorseal<br />

Rexthane<br />

Urethane<br />

Coating<br />

I<br />

Floor<br />

2 May apply first coat w/<br />

up to 10% Reduction<br />

using R7K65<br />

Add H&C Shark-Grip<br />

in 2 nd coat as anti-skid<br />

additive.<br />

Stockroom<br />

Haze Gray Concrete B65A60-<br />

Armorseal<br />

Rexthane<br />

Urethane<br />

Coating<br />

I<br />

Floor<br />

2 May apply first coat w/<br />

up to 10% Reduction<br />

using R7K65<br />

Add H&C Shark-Grip<br />

in 2 nd coat as anti-skid<br />

additive<br />

END OF SECTION 099123<br />

INTERIOR PAINTING 099123 - 5


DAG Architects<br />

Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

THIS PAGE LEFT INTENTIONALLY BLANK.<br />

INTERIOR PAINTING 099123 - 6


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>, FL<br />

SECTION 102113.17 - PHENOLIC-CORE TOILET COMPARTMENTS<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section Includes:<br />

1. Phenolic-core toilet compartments configured as toilet enclosures and urinal screens..<br />

1.2 ACTION SUBMITTALS<br />

A. Product Data: For each type of product.<br />

B. Shop Drawings: For toilet compartments. Include plans, elevations, sections, details, and<br />

attachment details.<br />

C. Samples for each type of toilet compartment material indicated.<br />

1.3 INFORMATIONAL SUBMITTALS<br />

A. Product certificates.<br />

1.4 CLOSEOUT SUBMITTALS<br />

A. Maintenance data.<br />

PART 2 - PRODUCTS<br />

2.1 PERFORMANCE REQUIREMENTS<br />

A. Surface-Burning Characteristics: Comply with ASTM E 84; testing by a qualified testing<br />

agency. Identify products with appropriate markings of applicable testing agency.<br />

1. Flame-Spread Index: 25 or less.<br />

2. Smoke-Developed Index: 450 or less.<br />

B. Regulatory Requirements: Comply with applicable provisions in the U.S. Architectural &<br />

Transportation Barriers Compliance Board's ADA-ABA Accessibility Guidelines for<br />

Buildings and Facilities and ICC A117.1 for toilet compartments designated as accessible.<br />

PHENOLIC-CORE TOILET COMPARTMENTS 102113.17 - 1


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>, FL<br />

2.2 PHENOLIC-CORE TOILET COMPARMENTS<br />

A. Basis-of-Design Product: Subject to compliance with requirements, provide Bobrick Washroom<br />

Equipment, Inc or comparable product by one of the following:<br />

1. Accurate Partitions Corporation.<br />

2. All American Metal Corp.<br />

3. American Sanitary Partition Corporation.<br />

4. Ampco, Inc.<br />

5. Bobrick Washroom Equipment, Inc.<br />

6. Bradley Corporation; Mills Partitions.<br />

7. Flush Metal Partition Corp.<br />

8. General Partitions Mfg. Corp.<br />

9. Knickerbocker Partition Corporation.<br />

10. Marlite.<br />

11. Partition Systems Incorporated of South Carolina; Columbia Partitions.<br />

12. Tex-Lam Manufacturing, Inc.<br />

B. Toilet-Enclosure Style: Overhead braced<br />

C. Urinal-Screen Style: Wall hung<br />

D. Door, Panel, Screen] and Pilaster Construction: Solid phenolic-core panel material with<br />

melamine facing on both sides fused to substrate during panel manufacture (not separately<br />

laminated), and with eased and polished edges and no-sightline system Provide minimum 3/4-<br />

inch- (19-mm-) thick doors and pilasters and minimum 1/2-inch- (13-mm-) thick panels.<br />

E. Pilaster Shoes and Sleeves Caps: Formed from stainless-steel sheet, not less than 0.031-inch<br />

(0.79-mm) nominal thickness and 3 inches (76 mm) high, finished to match hardware.<br />

F. Brackets (Fittings):<br />

1. Stirrup Type: Ear or U-brackets, [chrome-plated zamac] [clear-anodized aluminum]<br />

[stainless steel] [chrome-plated brass].<br />

2. Full-Height (Continuous) Type: Manufacturer's standard design; [stainless steel]<br />

[aluminum].<br />

G. Phenolic-Panel Finish:<br />

1. Facing Sheet Finish: Same color and pattern in each room.<br />

2. Color and Pattern: As indicated, with manufacturer's standard through-color core<br />

matching face sheet.<br />

3. Edge Color: Through-color matching facing sheet color.<br />

2.3 HARDWARE AND ACCESSORIES<br />

A. Hardware and Accessories: Manufacturer's standard operating hardware and accessories.<br />

1. Material: Stainless steel.<br />

PHENOLIC-CORE TOILET COMPARTMENTS 102113.17 - 2


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>, FL<br />

2. Provide units that comply with regulatory requirements for accessibility at compartments<br />

designated as accessible.<br />

B. Hardware and Accessories: Manufacturer's heavy-duty stainless steel operating hardware and<br />

accessories.<br />

1. Provide units that comply with regulatory requirements for accessibility at compartments<br />

designated as accessible.<br />

C. Overhead Bracing: Manufacturer's standard continuous, extruded-aluminum head rail with<br />

antigrip profile and in manufacturer's standard finish.<br />

D. Anchorages and Fasteners: Manufacturer's standard exposed fasteners of stainless steel, finished<br />

to match the items they are securing, with theft-resistant-type heads. Provide sex-type bolts for<br />

through-bolt applications. For concealed anchors, use stainless-steel, hot-dip galvanized-steel,<br />

or other rust-resistant, protective-coated steel compatible with related materials.<br />

2.4 FABRICATION<br />

A. Fabrication, General: Fabricate toilet compartment components to sizes indicated. Coordinate<br />

requirements and provide cutouts for through-partition toilet accessories where required for<br />

attachment of toilet accessories.<br />

B. Overhead-Braced Units: Provide manufacturer's standard corrosion-resistant supports, leveling<br />

mechanism, and anchors at pilasters to suit floor conditions. Provide shoes at pilasters to<br />

conceal supports and leveling mechanism.<br />

C. Floor-Anchored Units: Provide manufacturer's standard corrosion-resistant anchoring<br />

assemblies with leveling adjustment nuts at pilasters for structural connection to floor. Provide<br />

shoes at pilasters to conceal anchorage.<br />

D. Ceiling-Hung Units: Provide manufacturer's standard corrosion-resistant anchoring assemblies<br />

with leveling adjustment nuts at pilasters for connection to structural support above finished<br />

ceiling. Provide assemblies that support pilasters from structure without transmitting load to<br />

finished ceiling. Provide sleeves (caps) at tops of pilasters to conceal anchorage.<br />

E. Floor-and-Ceiling-Anchored Units: Provide manufacturer's standard corrosion-resistant<br />

anchoring assemblies with leveling adjustment nuts at tops and bottoms of pilasters. Provide<br />

shoes and sleeves (caps) at pilasters to conceal anchorage.<br />

F. Urinal-Screen Posts: Provide manufacturer's standard corrosion-resistant anchoring assemblies<br />

with leveling adjustment nuts at[ tops and] bottoms of posts. Provide shoes[ and sleeves<br />

(caps)] at posts to conceal anchorage.<br />

G. Door Size and Swings: Unless otherwise indicated, provide 24-inch- (610-mm-) wide inswinging<br />

doors for standard toilet compartments and 36-inch- (914-mm-) wide out-swinging<br />

doors with a minimum 32-inch- (813-mm-) wide clear opening for compartments designated as<br />

accessible.<br />

PHENOLIC-CORE TOILET COMPARTMENTS 102113.17 - 3


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>, FL<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION<br />

A. General: Comply with manufacturer's written installation instructions. Install units rigid,<br />

straight, level, and plumb. Secure units in position with manufacturer's recommended anchoring<br />

devices.<br />

1. Maximum Clearances:<br />

a. Pilasters and Panels: 1 inch (13 mm) .<br />

b. Panels and Walls: 1 inch (25 mm) .<br />

2. Stirrup Brackets: Secure panels to walls and to pilasters with no fewer than three<br />

brackets attached at midpoint and near top and bottom of panel.<br />

a. Locate wall brackets so holes for wall anchors occur in masonry or tile joints.<br />

b. Align brackets at pilasters with brackets at walls.<br />

3. Full-Height (Continuous) Brackets: Secure panels to walls and to pilasters with fullheight<br />

brackets.<br />

a. Locate bracket fasteners so holes for wall anchors occur in masonry or tile joints.<br />

b. Align brackets at pilasters with brackets at walls.<br />

3.2 ADJUSTING<br />

A. Hardware Adjustment: Adjust and lubricate hardware according to hardware manufacturer's<br />

written instructions for proper operation. Set hinges on in-swinging doors to hold doors open<br />

approximately 30 degrees from closed position when unlatched. Set hinges on out-swinging<br />

doors[ to return doors to fully closed position.<br />

END OF SECTION 102113.17<br />

PHENOLIC-CORE TOILET COMPARTMENTS 102113.17 - 4


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

SECTION 10 28 00 - TOILET ACCESSORIES<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. This Section includes the following:<br />

1. Public-use washroom accessories.<br />

2. Underlavatory guards.<br />

3. Custodial accessories.<br />

1.2 SUBMITTALS<br />

A. Product Data: For each type of product indicated.<br />

B. Product Schedule:<br />

1. Identify locations using room designations indicated on Drawings.<br />

2. Identify products using designations indicated on Drawings.<br />

PART 2 - PRODUCTS<br />

2.1 PUBLIC-USE WASHROOM ACCESSORIES<br />

A. Manufacturers: Subject to compliance with requirements, provide products by one of the<br />

following:<br />

1. Bobrick Washroom Equipment, Inc.<br />

2. Bradley Corporation.<br />

3. Architect approved equal.<br />

B. Refer to the drawings for the accessories noted on the enlarged plans and elevations.<br />

2.2 UNDERLAVATORY GUARDS<br />

A. Manufacturers: Subject to compliance with requirements, provide products by one of the<br />

following:<br />

1. Plumberex Specialty Products, Inc.<br />

2. TCI Products.<br />

3. Truebro, Inc.<br />

B. Under-lavatory Guard:<br />

1. Description: Provide insulating pipe covering for supply and drain piping assemblies, that<br />

prevent direct contact with and burns from piping, and allow service access without<br />

removing coverings at all exposed under counter lavatories.<br />

2. Material and Finish: Antimicrobial, molded-plastic, white.<br />

2.3 CUSTODIAL ACCESSORIES<br />

A. Basis-of-Design Product: The design for accessories is based on products indicated. Subject<br />

to compliance with requirements, provide the named product or a comparable product by one of<br />

the following:<br />

1. Bobrick Washroom Equipment, Inc.<br />

2. Bradley Corporation.<br />

3. Architect approved equal.<br />

B. Utility Shelf:<br />

1. Basis-of-Design Product: Bobrick B-239.<br />

2. Description: With exposed edges turned down not less than 1/2 inch (12.7 mm) and<br />

supported by two triangular brackets welded to shelf underside.<br />

TOILET, BATH, AND LAUNDRY ACCESSORIES 10 28 00 - 1


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

2.4 FABRICATION<br />

A. Keys: Provide universal keys for internal access to accessories for servicing and resupplying.<br />

Provide minimum of six keys to Owner's representative.<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION<br />

A. Install accessories according to manufacturers' written instructions, using fasteners appropriate<br />

to substrate indicated and recommended by unit manufacturer. Install units level, plumb, and<br />

firmly anchored in locations and at heights indicated.<br />

END OF SECTION 10 28 00<br />

TOILET, BATH, AND LAUNDRY ACCESSORIES 10 28 00 - 2


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

SECTION 10 44 13 - FIRE EXTINGUISHER CABINETS<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section includes fire protection cabinets for fire extinguishers.<br />

1.2 SUBMITTALS<br />

A. Product Data: For each type of product indicated.<br />

B. Shop Drawings: For fire protection cabinets. Include plans, elevations, sections, details, and<br />

attachments to other work.<br />

C. Samples: For each exposed product and for each color and texture specified.<br />

D. Maintenance data.<br />

1.3 QUALITY ASSURANCE<br />

A. Fire-Rated, Fire Protection Cabinets: Listed and labeled to comply with requirements in<br />

ASTM E 814 for fire-resistance rating of walls where they are installed.<br />

B. Coordinate size of fire protection cabinets to ensure that type and capacity of fire extinguishers<br />

indicated are accommodated.<br />

C. Coordinate sizes and locations of fire protection cabinets with wall depths.<br />

PART 2 - PRODUCTS<br />

2.1 MATERIALS<br />

A. Cold-Rolled Steel Sheet: ASTM A 1008/A 1008M, Commercial Steel (CS), Type B.<br />

B. Tempered Float Glass: ASTM C 1048, Kind FT, Condition A, Type I, Quality q3, 3 mm thick,<br />

Class 1 (clear).<br />

2.2 FIRE PROTECTION CABINET<br />

A. Cabinet Type: Suitable for fire extinguisher.<br />

1. Basis of Design Products: J L Industries, Inc., Ambassador 1017F with FE Letters and<br />

SAF-T-LOK. Provide products by one of the following:<br />

a. J. L. Industries, Inc., a division of Activar Construction Products Group.<br />

b. Larsen's Manufacturing Company.<br />

c. Watrous Division, American Specialties, Inc.<br />

B. Cabinet Construction: Rated or non-rated as indicated on drawings.<br />

1. Fire-Rated Cabinets: Construct fire-rated cabinets with double walls fabricated from<br />

0.0428-inch- (1.1-mm-) thick, cold-rolled steel sheet lined with minimum 5/8-inch- (16-<br />

mm-) thick, fire-barrier material. Provide factory-drilled mounting holes.<br />

C. Cabinet Material: Steel sheet.<br />

D. Semi-recessed Cabinet: Cabinet box partially recessed in walls of sufficient depth to suit style<br />

of trim indicated; with one-piece combination trim and perimeter door frame overlapping<br />

surrounding wall surface with exposed trim face and wall return at outer edge (backbend).<br />

Provide where walls are of insufficient depth for recessed cabinets but are of sufficient depth to<br />

accommodate semi-recessed cabinet installation.<br />

1. Rolled-Edge Trim: 1-1/4- to 1-1/2-inch (32- to 38-mm)<br />

E. Cabinet Trim Material: Steel sheet.<br />

F. Door Material: Steel sheet/Tempered Glass.<br />

backbend depth.<br />

FIRE EXTINGUISHER CABINETS 10 44 13 - 1


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

G. Door Style: Steel-Framed with Full Glass.<br />

H. Door Hardware: Manufacturer's standard door-operating hardware of proper type for cabinet<br />

type, trim style, and door material and style indicated.<br />

I. Accessories:<br />

1. Mounting Bracket: Manufacturer's standard steel, designed to secure fire extinguisher to<br />

fire protection cabinet, of sizes required for types and capacities of fire extinguishers<br />

indicated, with plated or baked-enamel finish.<br />

2. Door Lock: Cam lock that allows door to be opened during emergency by pulling sharply<br />

on door handle. Provide SAF-T-LOK offered by J.L. Industries or approved equal.<br />

3. Identification: Lettering complying with authorities having jurisdiction for letter style,<br />

size, spacing, and location.<br />

a. Identify fire extinguisher in fire protection cabinet with the words "FIRE<br />

EXTINGUISHER”.<br />

1) Location: Applied to cabinet door.<br />

2) Application Process: Decals.<br />

3) Lettering Color: Red.<br />

4) Orientation: Vertical.<br />

J. Finishes: Baked enamel or Powder coat factory finish.<br />

1. Color: White.<br />

2.3 FABRICATION<br />

A. Fire Protection Cabinets: Provide manufacturer's standard box (tub), with trim, frame, door,<br />

and hardware to suit cabinet type, trim style, and door style indicated. Miter and weld joints<br />

and grind smooth.<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION<br />

A. Examine walls and partitions for suitable framing depth and blocking where semi-recessed<br />

cabinets will be installed and prepare recesses as required by type and size of cabinet and trim<br />

style.<br />

B. Install fire protection cabinets in locations and at mounting heights indicated or, if not<br />

indicated, at heights indicated below:<br />

1. Fire Protection Cabinets: 54 inches above finished floor to top of cabinet.<br />

2. Mounting Brackets: 54 inches above finished floor to top of fire extinguisher.<br />

C. Fire Protection Cabinets: Fasten cabinets to structure, square and plumb.<br />

D. Identification: Apply decals as approved on shop drawings by Architect.<br />

E. Adjust fire protection cabinet doors to operate easily without binding. Verify that integral<br />

locking devices operate properly.<br />

F. Replace fire protection cabinets that have been damaged or have deteriorated beyond<br />

successful repair by finish touchup or similar minor repair procedures.<br />

END OF SECTION 10 44 13<br />

FIRE EXTINGUISHER CABINETS 10 44 13 - 2


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL<br />

SECTION 10 44 16 - FIRE EXTINGUISHERS<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section includes portable, hand-carried fire extinguishers and mounting brackets for fire<br />

extinguishers.<br />

1.2 SUBMITTALS<br />

A. Product Data: For each type of product indicated.<br />

B. Warranty: Sample of special warranty.<br />

1.3 QUALITY ASSURANCE<br />

A. NFPA Compliance: Fabricate and label fire extinguishers to comply with NFPA 10, "Portable Fire<br />

Extinguishers."<br />

B. Fire Extinguishers: Listed and labeled for type, rating, and classification by an independent<br />

testing agency acceptable to authorities having jurisdiction.<br />

C. Coordinate type and capacity of fire extinguishers with fire protection cabinets to ensure fit and<br />

function.<br />

1.4 WARRANTY<br />

A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or<br />

replace fire extinguishers that fail in materials or workmanship within specified warranty period.<br />

1. Failures include, but are not limited to, the following:<br />

a. Failure of hydrostatic test according to NFPA 10.<br />

b. Faulty operation of valves or release levers.<br />

2. Warranty Period: Six years from date of Substantial Completion.<br />

PART 2 - PRODUCTS<br />

2.1 PORTABLE, HAND-CARRIED FIRE EXTINGUISHERS<br />

A. Fire Extinguishers: Type, size, and capacity for each fire protection cabinet and mounting<br />

bracket indicated.<br />

1. Manufacturers: Subject to compliance with requirements, provide products by one of the<br />

following:<br />

a. Badger Fire Protection; a Kidde company.<br />

b. Buckeye Fire Equipment Company.<br />

c. Fire End & Croker Corporation.<br />

d. J. L. Industries, Inc.; a division of Activar Construction Products Group.<br />

e. Larsen's Manufacturing Company.<br />

f. Potter Roemer LLC.<br />

g. Watrous; Division of American Specialties, Inc.<br />

2. Instruction Labels: Include pictorial marking system complying with NFPA 10,<br />

Appendix B and bar coding for documenting fire extinguisher location, inspections,<br />

maintenance, and recharging.<br />

3. All portable fire extinguishers shall be tested, serviced and maintained in accordance with<br />

NFPA 10, 1994. LSC 7-7.4, 1.3.13.1.<br />

FIRE EXTINGUISHERS 10 44 16 - 1


DAG Architects Inc<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL<br />

a. All fire extinguishers shall be serviced, sealed and tagged by a certified fire<br />

extinguisher company.<br />

B. General: Provide fire extinguishers of type, size and capacity for each fire-protection cabinet<br />

and mounting bracket indicated.<br />

1. Valves: Manufacturer’s standard.<br />

2. Handles and levers: Manufacturer’s standard.<br />

C. Multipurpose Dry-Chemical Type: UL-rated 2-A: 10-BC, 5-lb (2.3 kg) nominal capacity, with<br />

mono-ammonium phosphate-based dry chemical in manufacturer's standard enameled<br />

container.<br />

2.2 MOUNTING BRACKETS<br />

A. Mounting Brackets: Manufacturer's standard steel, designed to secure fire extinguisher to wall<br />

or structure, of sizes required for types and capacities of fire extinguishers indicated, with<br />

plated or black baked-enamel finish.<br />

1. Manufacturers: Subject to compliance with requirements, provide products by one of the<br />

following:<br />

a. Amerex Corporation.<br />

b. Ansul Incorporated; Tyco International Ltd.<br />

c. Badger Fire Protection; a Kidde company.<br />

d. Buckeye Fire Equipment Company.<br />

e. Fire End & Croker Corporation.<br />

f. J. L. Industries, Inc.; a division of Activar Construction Products Group.<br />

g. Larsen's Manufacturing Company.<br />

h. Potter Roemer LLC.<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION<br />

A. Examine fire extinguishers for proper charging and tagging.<br />

1. Remove and replace damaged, defective, or undercharged fire extinguishers.<br />

B. Install fire extinguishers and mounting brackets in locations indicated and in compliance with<br />

requirements of authorities having jurisdiction.<br />

1. Mounting Brackets: 54 inches (1372 mm)<br />

above finished floor to top of fire extinguisher.<br />

C. Mounting Brackets: Fasten mounting brackets to surfaces, square and plumb, at locations<br />

indicated.<br />

END OF SECTION 10 44 16<br />

FIRE EXTINGUISHERS 10 44 16 - 2


DAG Architects<br />

12040 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

SECTION 113100 - RESIDENTIAL APPLIANCES<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section Includes:<br />

1. Refrigeration appliances.<br />

2. Dishwasher<br />

1.2 ACTION SUBMITTALS<br />

A. Product Data: For each type of product indicated.<br />

1.3 INFORMATIONAL SUBMITTALS<br />

A. Product certificates.<br />

1.4 CLOSEOUT SUBMITTALS<br />

A. Operation and maintenance data.<br />

1.5 WARRANTY<br />

A. Special Warranties: Manufacturer's standard form in which manufacturer agrees to repair or<br />

replace residential appliances or components that fail in materials or workmanship within<br />

specified warranty period.<br />

PART 2 - PRODUCTS<br />

2.1 MANUFACTURERS<br />

A. Manufacturers: Subject to compliance with requirements, provide products by one of the<br />

following:<br />

B. Basis-of-Design Product: Subject to compliance with requirements, provide product indicated<br />

or comparable product by one of the following:<br />

1. Amana; a division of Whirlpool Corporation.<br />

2. General Electric Company (GE). (BASIS OF DESIGN)<br />

3. Maytag; a division of Whirlpool Corporation.<br />

RESIDENTIAL APPLIANCES 113100 - 1


DAG Architects<br />

12040 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

2.2 REFRIGERATOR/FREEZERS<br />

A. Refrigerator/Freezer Two-door refrigerator/freezer with freezer on top and complying with<br />

AHAM HRF-1.<br />

1. Basis-of-Design Product: General Electric 21.7 Cu. Ft. (total) Stainless Top-Freezer<br />

Refrigerator Model # GTS22SBXSS<br />

2. Type: Freestanding.<br />

3. Storage Capacity:<br />

a. Refrigeration Compartment Volume15.38 CU. FT><br />

b. Freezer Volume: 6.35 CU. FT.<br />

4. General Features:<br />

a. Interior light in refrigeration compartment.<br />

b. \Automatic defrost.<br />

c. Interior light in freezer compartment.<br />

5. Energy Performance, ENERGY STAR: Provide appliances that qualify for the EPA/DOE<br />

ENERGY STAR product labeling program.<br />

2.3 DISHWASHER<br />

A. Dishwasher, under counter with front controls<br />

1. Basis-of-Design Product: General Electric Stainless Steel under counter Dishwasher<br />

Model no. GDF520PSDSS<br />

2. Type: Under counter.<br />

3. Energy Performance, ENERGY STAR: Provide appliances that qualify for the EPA/DOE<br />

ENERGY STAR product labeling program.<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION, GENERAL<br />

A. Built-in Equipment: Verify that clearances are adequate for proper functioning and that rough<br />

openings are completely concealed.<br />

B. Freestanding Equipment: Place units in final locations after finishes have been completed in<br />

each area. Verify that clearances are adequate to properly operate equipment.<br />

C. Utilities: Comply with electrical requirements.<br />

RESIDENTIAL APPLIANCES 113100 - 2


DAG Architects<br />

12040 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

3.2 FIELD QUALITY CONTROL<br />

A. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and<br />

components.<br />

END OF SECTION 113100<br />

RESIDENTIAL APPLIANCES 113100 - 3


DAG Architects<br />

12040 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

PAGE LEFT BLANK<br />

RESIDENTIAL APPLIANCES 113100 - 4


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

SECTION 142100 - ELECTRIC TRACTION ELEVATORS<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section includes electric traction passenger elevators.<br />

1.2 ACTION SUBMITTALS<br />

A. Product Data: Include capacities, sizes, performances, operations, safety features, finishes, and<br />

similar information.<br />

B. Shop Drawings:<br />

1. Include plans, elevations, sections, and large-scale details indicating service at each<br />

landing, machine room layout, coordination with building structure, relationships with<br />

other construction, and locations of equipment.<br />

2. Indicate maximum dynamic and static loads imposed on building structure at points of<br />

support, and maximum and average power demands.<br />

C. Samples: For exposed finishes.<br />

1.3 INFORMATIONAL SUBMITTALS<br />

A. Manufacturer Certificates: Signed by elevator manufacturer certifying that hoistway, pit, and<br />

machine room control closet layout and dimensions, as shown on Drawings, and electrical<br />

service, as shown and specified, are adequate for elevator system being provided.<br />

1.4 CLOSEOUT SUBMITTALS<br />

A. Operation and Maintenance Data: For elevators to include in emergency, operation, and<br />

maintenance manuals.<br />

B. Inspection and Acceptance Certificates and Operating Permits: As required by authorities<br />

having jurisdiction for normal, unrestricted elevator use.<br />

C. Continuing Maintenance Proposal: Submit a continuing maintenance proposal from Installer to<br />

Owner, in the form of a standard two-year maintenance agreement, starting on date initial<br />

maintenance service is concluded.<br />

1.5 WARRANTY<br />

A. Manufacturer's Special Warranty: Manufacturer agrees to repair, restore, or replace elevator<br />

work that fails in materials or workmanship within specified warranty period.<br />

ELECTRIC TRACTION ELEVATORS 142100 - 1


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

1. Warranty Period: one (1) year from date of Substantial Completion.<br />

PART 2 - PRODUCTS<br />

2.1 MANUFACTURERS<br />

A. Basis-of-Design Product: Subject to compliance with requirements, provide or comparable<br />

product by one of the following:<br />

1. .KONE Inc. ECOSTAR (BASIS OF DESIGN)<br />

2. .Schindler Elevator Corp.<br />

3. .ThyssenKrupp Elevator.<br />

2.2 PERFORMANCE REQUIREMENTS<br />

A. Regulatory Requirements: Comply with ASME A17.1/CSA B44.<br />

B. Florida Elevator Code.<br />

C. Accessibility Requirements: Comply Florida Building Code and with Section 407 in the U.S.<br />

Architectural & Transportation Barriers Compliance Board's ADA-ABA Accessibility<br />

Guidelines and with ICC A117.1.<br />

2.3 ELEVATORS<br />

A. Elevator System, General: Manufacturer's standard elevator systems. Unless otherwise<br />

indicated, manufacturer's standard components shall be used, as included in standard elevator<br />

systems and as required for complete system.<br />

B. Elevator Description:<br />

1. Elevator Number(s): ‘ONE’ as shown on Drawings>.<br />

2. Machine Location: Machine room (see drawings)<br />

3. Machine Type: Geared traction.<br />

4. Rated Load: 2500 lb.<br />

5. Rated Speed: 150 fpm.<br />

6. Operation System: Selective-collective automatic operation.<br />

7. Auxiliary Operations:<br />

a. Battery-powered lowering.<br />

b. Inside Depth: Refer to the drawings.<br />

c. Inside Height: 92 inches to underside of ceiling.<br />

d. Front Walls (Return Panels): Satin stainless steel, No. 4 finish.<br />

e. Car Fixtures: Satin stainless steel, No. 4 finish.<br />

f. Side and Rear Wall Panels: Satin stainless steel, No. 4 finish.<br />

g. Door Faces (Interior): Polished stainless steel, No. 8 finish.<br />

h. Ceiling: Polished stainless steel, No. 8 finish.<br />

i. Handrails: 1-1/2 inches round satin stainless steel, No. 4 finish, at sides<br />

j. Floor prepared to receive Resilient Tile Flooring LVT.<br />

ELECTRIC TRACTION ELEVATORS 142100 - 2


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

8. Hoistway Entrances:<br />

a. Width: 42 inches.<br />

b. Height: 84 inches.<br />

c. Type: Single-speed side sliding.<br />

d. Frames at First Floor and at Other Floors Polished stainless steel, No. 8 finish.<br />

e. Doors and Transoms at First Floor and at Other Floors, Polished stainless<br />

steel, No. 8 finish.<br />

9. Hall Fixtures at First Floor, at Other Floors: Polished stainless steel, No. 8 finish<br />

10. Additional Requirements:<br />

a. Provide inspection certificate in each car, mounted under acrylic cover with frame<br />

made from polished stainless steel, No. 8 finish.<br />

2.4 TRACTION SYSTEMS<br />

A. Elevator Machines: Variable-voltage, variable-frequency, ac-type hoisting machines and solidstate<br />

power converters.<br />

1. Limit total harmonic distortion of regenerated power to 5 percent per IEEE 519.<br />

B. Machine Beams: Provide framing to support elevator hoisting machine and deflector sheaves<br />

from the building structure. Comply with Section 055000 "Metal Fabrications" for materials and<br />

fabrication.<br />

C. Guides: Roller guides or polymer-coated, nonlubricated sliding guides . Provide guides at<br />

top and bottom of car and counterweight frames.<br />

D. General: Provide manufacturer's standard microprocessor operation systems as required to<br />

provide type of operation indicated.<br />

E. Group Automatic Operation with Demand-Based Dispatching: Provide reprogrammable<br />

group automatic system that assigns cars to hall calls based on a dispatching program designed<br />

to minimize passenger waiting time. System automatically adjusts to demand changes for<br />

different traffic conditions including heavy incoming, heavy two-way, heavy outgoing, and light<br />

off-hours as variations of normal two-way traffic.<br />

1. Products: Subject to compliance with requirements, available products that may be<br />

incorporated into the Work include, but are not limited to, the following:<br />

a. KONE Inc.; KCM 831.<br />

b. Schindler Elevator Corp.; Miconic TX.<br />

c. ThyssenKrupp Elevator; Traflomatic.<br />

F. Auxiliary Operations: In addition to primary operation system features, provide the following<br />

operational features for elevators where indicated:<br />

ELECTRIC TRACTION ELEVATORS 142100 - 3


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

1. Single-Car Battery-Powered Lowering: If power fails and car is at a floor, it remains at<br />

that floor, opens its doors, and shuts down. If car is between floors, it is lowered to the<br />

next floor below, opens its doors, and shuts down. System includes rechargeable battery<br />

and automatic recharging system.<br />

G. Security Feature: Security feature shall not affect emergency firefighters' service.<br />

1. Keyswitch Operation: Push buttons are activated and deactivated by security keyswitches<br />

at car-control stations.<br />

2.5 DOOR REOPENING DEVICES<br />

A. Infrared Array: Provide door reopening device with uniform array of 36 or more<br />

microprocessor-controlled, infrared light beams projecting across car entrance. Interruption of<br />

one or more light beams shall cause doors to stop and reopen.<br />

B. Nudging Feature: After car doors are prevented from closing for predetermined adjustable time,<br />

through activating door reopening device, a loud buzzer shall sound and doors shall begin to<br />

close at reduced kinetic energy.<br />

2.6 CAR ENCLOSURES<br />

A. General: steel-framed car enclosures with nonremovable wall panels, with removable car<br />

roof, access doors, power door operators, and ventilation.<br />

1. Provide standard railings complying with ASME A17.1/CSA B44 on car tops where<br />

required by ASME A17.1/CSA B44.<br />

B. Materials and Finishes: Manufacturer's standards, but not less than the following:<br />

1. Stainless-Steel Wall Panels: Flush, hollow-metal construction; fabricated from stainlesssteel<br />

sheet.<br />

2. Stainless-Steel Doors: Flush, hollow-metal construction; fabricated from stainless-steel<br />

sheet.<br />

3. .Sight Guards: Provide sight guards on car doors.<br />

4. Sills: Extrudedaluminum, with grooved surface, 1/4 inch (6.4 mm) thick.<br />

5. Luminous Ceiling: Fluorescent light fixtures and ceiling panels of translucent acrylic or<br />

other permanent rigid plastic.<br />

6. Metal Ceiling: Flush panels, with four low-voltage downlights in each panel. Align<br />

ceiling panel joints with joints between wall panels.<br />

7. Handrails: Manufacturer's standard handrails, of shape, metal, and finish indicated.<br />

2.7 HOISTWAY ENTRANCES<br />

A. Hoistway Entrance Assemblies: Manufacturer's standard horizontal-sliding, door-and-frame<br />

hoistway entrances complete with track systems, hardware, sills, and accessories. Frame size<br />

and profile shall accommodate hoistway wall construction.<br />

B. Materials and Fabrication: Manufacturer's standards, but not less than the following:<br />

ELECTRIC TRACTION ELEVATORS 142100 - 4


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

1. Stainless-Steel Frames: Formed from stainless-steel sheet.<br />

2. Stainless-Steel Doors and Transoms]: Flush, hollow-metal construction; fabricated from<br />

stainless-steel sheet.<br />

3. Sight Guards: Provide sight guards on doors matching door edges.<br />

4. Sills: Extruded aluminum, with grooved surface, 1/4 inch (6.4 mm)<br />

thick.<br />

5. Nonshrink, Nonmetallic Grout: Factory-packaged, nonstaining, noncorrosive, nongaseous<br />

grout complying with ASTM C 1107/C 1107M.<br />

2.8 SIGNAL EQUIPMENT<br />

A. General: Provide hall-call and car-call buttons that light when activated and remain lit until call<br />

has been fulfilled. Fabricate lighted elements with LEDs.<br />

B. Car-Control Stations: Provide manufacturer's standard recessed car-control stations. Mount in<br />

return panel adjacent to car door unless otherwise indicated.<br />

1. Provide "No Smoking" sign matching car-control station, with text and graphics as<br />

required by authorities having jurisdiction.<br />

C. Emergency Communication System: Two-way voice communication system, with visible<br />

signal, which dials preprogrammed number of monitoring station and does not require handset<br />

use. System is contained in flush-mounted cabinet, with identification, instructions for use, and<br />

battery backup power supply.<br />

D. Car Position Indicator: Provide illuminated, digital-type car position indicator, located above<br />

car door or above car-control station. Also, provide audible signal to indicate to passengers that<br />

car is either stopping at or passing each of the floors served. Include travel direction arrows if<br />

not provided in car-control station.<br />

E. Hall Push-Button Stations: Provide hall push-button stations at each landing as indicated.<br />

F. Hall Lanterns: Units with illuminated arrows; but provide single arrow at terminal landings.<br />

Provide one of the following:<br />

1. Units mounted in both jambs of entrance frame[ for each elevator].<br />

G. Hall Annunciator: With each hall lantern, provide audible signals indicating car arrival and<br />

direction of travel. Signals sound once for up and twice for down.<br />

H. Standby Power Elevator Selector Switches: Provide switches, as required by<br />

ASME A17.1/CSA B44, where indicated. Adjacent to switches, provide illuminated signal that<br />

indicates when normal power supply has failed. For each elevator, provide illuminated<br />

signals that indicate when they are operational and when they are at the designated<br />

emergency return level with doors open.<br />

I. Emergency Pictorial Signs: Fabricate from materials matching hall push-button stations, with<br />

text and graphics as required by authorities having jurisdiction. Provide one sign at each hall<br />

push-button station unless otherwise indicated.<br />

J. Emergency Access Door at approximately mid-height of shaft. Provide a relay that operates in<br />

conjunction with elevator power so that when the elevator has power the mag-lock (provided by<br />

ELECTRIC TRACTION ELEVATORS 142100 - 5


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

others) has power to secure the shaft door. When the elevator does not have power, power to the<br />

mag lock is cut off allowing emergency personnel to access the shaft.<br />

2.9 FINISH MATERIALS<br />

A. Cold-Rolled Steel Sheet: ASTM A 1008/A 1008M, commercial steel, Type B, exposed, matte<br />

finish.<br />

B. Hot-Rolled Steel Sheet: ASTM A 1011/A 1011M, commercial steel, Type B, pickled.<br />

C. Stainless-Steel Sheet: ASTM A 240/A 240M, Type 304.<br />

D. Stainless-Steel Tubing: ASTM A 554, Grade MT 304.<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION<br />

A. Sound Isolation: Mount rotating and vibrating equipment on vibration-isolating mounts to<br />

minimize vibration transmission to structure and structure-borne noise due to elevator system.<br />

B. Lubricate operating parts of systems, including ropes, as recommended by manufacturers.<br />

C. Leveling Tolerance: 1/8 inch (3 mm) , up or down, regardless of load and travel direction.<br />

D. Set sills flush with finished floor surface at landing. Fill space under sill solidly with nonshrink,<br />

nonmetallic grout.<br />

E. Locate hall signal equipment for elevators as follows unless otherwise indicated:<br />

1. For groups of elevators, locate hall push-button stations to the right side of the elevator<br />

car door and most convenient for approaching passengers.<br />

2. Place hall lanterns either above or beside each hoistway entrance.<br />

3. Mount hall lanterns at a minimum of 72 inches (18<strong>29</strong> mm) above finished floor.<br />

3.2 FIELD QUALITY CONTROL<br />

A. Acceptance Testing: On completion of elevator installation and before permitting elevator use<br />

(either temporary or permanent), perform acceptance tests as required and recommended by<br />

ASME A17.1/CSA B44 and by governing regulations and agencies.<br />

3.3 PROTECTION<br />

A. Temporary Use: Limit temporary use for construction purposes to one elevator. Comply<br />

with the following requirements for each elevator used for construction purposes:<br />

ELECTRIC TRACTION ELEVATORS 142100 - 6


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

1. Provide car with temporary enclosure, either within finished car or in place of finished<br />

car, to protect finishes from damage.<br />

2. Provide other protective coverings, barriers, devices, signs, and procedures as needed to<br />

protect elevator and elevator equipment.<br />

3. Engage elevator Installer to provide full maintenance service.<br />

4. Engage elevator Installer to restore damaged work, if any, so no evidence remains of<br />

correction. Return items that cannot be refinished in the field to the shop, make required<br />

repairs and refinish entire unit, or provide new units as required.<br />

3.4 DEMONSTRATION<br />

A. Engage a factory-authorized service representative to train Owner's maintenance personnel to<br />

operate, adjust, and maintain elevator(s).<br />

3.5 MAINTENANCE<br />

A. Initial Maintenance Service: Beginning at Substantial Completion, maintenance service shall<br />

include twelve (12) months' full maintenance by skilled employees of elevator Installer. Include<br />

monthly preventive maintenance, repair or replacement of worn or defective components,<br />

lubrication, cleaning, and adjusting as required for proper elevator operation at rated speed and<br />

capacity.<br />

END OF SECTION 142100<br />

ELECTRIC TRACTION ELEVATORS 142100 - 7


DAG Architects<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL.<br />

THIS PAGE LEFT INTENTIONALLY BLANK<br />

ELECTRIC TRACTION ELEVATORS 142100 - 8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 21 13 13 - BUILDING SPRINKLER AND STANDPIPE SYSTEM<br />

1 GENERAL<br />

1.1 Drawings and General provisions of Contract, including General and Supplementary<br />

Conditions and Division-1 Specification sections, apply to work of this section.<br />

1.2 Division-15 Basic Mechanical Requirements and Basic Mechanical Materials and Methods<br />

sections apply to work of this section.<br />

1.3 Provide for the design and installation of a wet pipe sprinkler system and all underground<br />

piping out to and including the post indicator valve and backflow preventer.<br />

1.4 Codes and Standards:<br />

1.4.1 NFPA Compliance: Install fire protection systems in accordance with NFPA 13 "Standard for<br />

the Installation of Sprinkler Systems".<br />

1.4.2 UL Compliance: Provide fire protection products in accordance with UL standards; provide UL<br />

label on each product.<br />

1.4.3 Fire Department/Marshal Compliance: Install fire protection systems in accordance with local<br />

regulations of fire department or fire marshal.<br />

1.4.4 Screw Thread Connections: Comply with local Fire Department/Fire Marshal regulations for<br />

sizes, threading and arrangement of connections for fire department equipment to sprinkler<br />

systems.<br />

1.5 Test Reports and Verification Submittals:<br />

1.5.1 Certificate: Submit certificates of Aboveground and Underground Installation upon completion<br />

of fire protection piping work which indicates that work has been tested in accordance with<br />

NFPA 13 and that system is operational, complete, and has no defects.<br />

1.5.2 Tag: Submit a copy of the sprinkler system tag. The installing fire sprinkler contractor shall be<br />

licensed in accordance with State Fire Marshal (SFM) Rule 4A-46. At the conclusion of the<br />

project and prior to the final inspection by the SFM the Contractor shall tag the fire sprinkler<br />

system in accordance with 4A-46.041.<br />

1.6 O&M Data Submittals:<br />

1.6.1 Record Drawings: At project closeout, submit record drawings of installed fire protection piping<br />

and products.<br />

1.6.2 Maintenance Data: Submit a copy of all approval submittals. Submit maintenance data and<br />

parts lists for basic valves, special valves.<br />

1.6.3 NFPA 25: Provide a copy of NFPA 25 in each O&M Manual.<br />

2 PRODUCTS<br />

BUILDING SPRINKLER AND STANDPIPE SYSTEM 21 13 13 - 1/2


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

2.1 General: Provide materials and factory-fabricated products of sizes, types, pressure ratings,<br />

temperature ratings, and capacities as required. Provide proper selection as determined by<br />

Installer to comply with installation requirements. Provide sizes and types matching piping and<br />

equipment connections; provide fittings of materials which match pipe materials used in fire<br />

protection systems.<br />

3 EXECUTION<br />

3.1 General: Examine areas and conditions under which fire protection materials and products are<br />

to be installed. Do not proceed with work until unsatisfactory conditions have been corrected<br />

in manner acceptable to Installer. Install the system per NFPA-13 and the requirements of the<br />

Authority Having Jurisdiction. Any installation, modification, or alteration of the sprinkler<br />

system shall be performed only by a person under a certificate of competency issued by the<br />

State Fire Marshal.<br />

3.2 All sprinkler heads in acoustical tile ceilings shall be installed in the center of the tile both ways.<br />

3.3 All sprinklers in finished spaces shall utilize pendant heads. Coordinate type with Architect.<br />

3.4 Extra Stock:<br />

3.4.1 Heads: For each style and temperature range required, furnish additional sprinkler heads,<br />

amounting to one unit for every 100 installed units, but not less than 5 units of each.<br />

3.4.2 Wrenches: Furnish 2 spanner wrenches for each type and size of valve connection and fire<br />

hose coupling. Obtain receipt from Owner that extra stock has been received.<br />

3.4.3 Testing: Refer to Division 22 for pressure testing requirements.<br />

3.5 Owner Instruction: Provide technical services for one 4-hour period to instruct Owner’s<br />

personnel in operation and maintenance of building sprinkler systems. Schedule training date<br />

with Owner. Provide at least 7-day notice to Engineer and Owner of training date.<br />

END OF SECTION 21 13 13<br />

BUILDING SPRINKLER AND STANDPIPE SYSTEM 21 13 13 - 2/2


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 22 01 00 - PLUMBING GENERAL<br />

1 GENERAL<br />

1.1 The work covered by this division consists of providing all labor, equipment and materials and<br />

performing all operations necessary for the installation of the plumbing work as herein called<br />

for and shown on the drawings.<br />

1.2 Related Documents:<br />

1.2.1 Drawings and general provisions of the Contract, including General and Supplementary<br />

Conditions and Division 1 Specification sections, apply to work of this section.<br />

1.2.2 This is a Basic Plumbing Requirements Section. Provisions of this section apply to work of all<br />

Division 22 sections.<br />

1.2.3 Review all other contract documents to be aware of conditions affecting work herein.<br />

1.2.4 Definitions:<br />

1.2.4.1 Provide: Furnish and install, complete and ready for intended use.<br />

1.2.4.2 Furnish: Supply and deliver to project site, ready for subsequent requirements.<br />

1.2.4.3 Install: Operations at project site, including unloading, unpacking, assembly, erection, placing,<br />

anchoring, applying, working to dimension, finishing, curing, protecting, cleaning, and similar<br />

requirements.<br />

1.3 Permits and Fees: Contractor shall obtain all necessary permits, meters, and inspections<br />

required for his work and pay all fees and charges incidental thereto.<br />

1.4 Verification of Owner's Data: Prior to commencing any work the Contractor shall satisfy<br />

himself as to the accuracy of all data as indicated in these plans and specifications and/or as<br />

provided by the Owner. Should the Contractor discover any inaccuracies, errors, or omissions<br />

in the data, he shall immediately notify the Architect/Engineer in order that proper adjustments<br />

can be anticipated and ordered. Commencement by the Contractor of any work shall be held<br />

as an acceptance of the data by him after which time the Contractor has no claim against the<br />

Owner resulting from alleged errors, omissions or inaccuracies of the said data.<br />

1.5 Delivery and Storage of Materials: Materials delivered to site shall be inspected for damage,<br />

unloaded, and stored with a minimum of handling. All material shall be stored to provide<br />

protection from the weather and accidental damage.<br />

1.6 Extent of work is indicated by the drawings, schedules, and the requirements of the<br />

specifications. Singular references shall not be constructed as requiring only one device if<br />

multiple devices are shown on the drawings or are required for proper system operation.<br />

1.7 Field Measurements and Coordination:<br />

1.7.1 The intent of the drawings and specifications is to obtain a complete and satisfactory<br />

installation. Separate divisional drawings and specifications shall not relieve the Contractor or<br />

subcontractors from full compliance of work of his trade indicated on any of the drawings or in<br />

any section of the specifications.<br />

PLUMBING GENERAL 22 01 00 - 1/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

1.7.2 Verify all field dimensions and locations of equipment to insure close, neat fit with other trades'<br />

work. Make use of all contract documents and approved shop drawings to verify exact<br />

dimension and locations.<br />

1.7.3 Coordinate work in this division with all other trades in proper sequence to insure that the total<br />

work is completed within contract time schedule and with a minimum cutting and patching.<br />

1.7.4 Locate all apparatus symmetrical with architectural elements. Install to exact height and<br />

locations when shown on architectural drawings. When locations are shown only on plumbing<br />

drawings, be guided by architectural details and conditions existing at job and correlate this<br />

work with that of others.<br />

1.7.5 Install work as required to fit structure, avoid obstructions, and retain clearance, headroom,<br />

openings and passageways. Cut no structural members without written approval.<br />

1.7.6 Carefully examine any existing conditions, piping, and premises. Compare drawings with<br />

existing conditions. Report any observed discrepancies. It shall be the Contractor's<br />

responsibility to properly coordinate the work and to identify problems in a timely manner.<br />

Written instructions will be issued to resolve discrepancies.<br />

1.7.7 Because of the small scale of the drawings, it is not possible to indicate all offsets and fittings<br />

or to locate every accessory. Drawings are essentially diagrammatic. Study carefully the sizes<br />

and locations of structural members, wall and partition locations, trusses, and room<br />

dimensions and take actual measurements on the job. Locate piping, equipment and<br />

accessories with sufficient space for installing and servicing. Contractor is responsible for<br />

accuracy of his measurements and for coordination with all trades. Contractor shall not order<br />

materials or perform work without such verification. No extra compensation will be allowed<br />

because field measurements vary from the dimensions on the drawings. If field measurements<br />

show that equipment or piping cannot be fitted, the Architect/Engineer shall be consulted.<br />

Remove and relocate, without additional compensation, any item that is installed and is later<br />

found to encroach on space assigned to another use.<br />

1.8 Guarantee:<br />

1.8.1 The Contractor shall guarantee labor, materials and equipment for a period of one (1) year<br />

from Substantial Completion, or from Owner's occupancy, whichever is earlier. Contractor<br />

shall make good any defects and shall include all necessary adjustments to and replacement<br />

of defective items without expense to the Owner.<br />

1.8.2 Owner reserves right to make emergency repairs as required to keep equipment in operation<br />

without voiding Contractor's Guarantee Bond nor relieving Contractor of his responsibilities<br />

during guarantee period.<br />

1.9 Approval Submittals:<br />

1.9.1 When approved, the submittal control log and submittals shall be an addition to the<br />

specifications herewith, and shall be of equal force in that no deviation will be permitted except<br />

with the approval of the Architect/Engineer.<br />

1.9.1.1 Shop drawings, product literature, and other approval submittals will only be reviewed if they<br />

are submitted in full accordance with the General and Supplementary Conditions and Division<br />

1 Specification sections and the following.<br />

1.9.1.1.1 Submittals shall be properly organized in accordance with the approved submittal control log.<br />

PLUMBING GENERAL 22 01 00 - 2/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

1.9.1.1.2 Submittals shall not include items from more than one specification section in the same<br />

submittal package unless approved in the submittal control log.<br />

1.9.1.1.3 Submittals shall be properly identified by a cover sheet showing the project name, Architect<br />

and Engineer names, submittal control number, specification section, a list of products or item<br />

names with model numbers in the order they appear in the package, and spaces for approval<br />

stamps. A sample cover sheet is included at the end of this section.<br />

1.9.1.1.4 Submittals shall have been reviewed and approved by the General Contractor (or Prime<br />

Contractor). Evidence of this review and approval shall be an "Approved" stamp with a<br />

signature and date on the cover sheet.<br />

1.9.1.1.5 Submittals that include a series of fixtures or devices (such as plumbing fixtures or valves)<br />

shall be organized by the fixture number or valve type and be marked accordingly. Each<br />

fixture must include all items associated with that fixture regardless of whether or not those<br />

items are used on other fixtures.<br />

1.9.1.1.6 The electrical design shown on the drawings supports the plumbing equipment basis of design<br />

specifications at the time of design. If plumbing equipment is submitted with different electrical<br />

requirements, it is the responsibility of the plumbing contractor to resolve all required electrical<br />

design changes (wire and conduit size, type of disconnect or overload protection, point(s) of<br />

connection, etc.) and clearly show the new electrical design on the plumbing submittal with a<br />

written statement that this change will be provided at no additional cost. Plumbing submittals<br />

made with no written reference to the electrical design will be presumed to work with the<br />

electrical design. Any corrections required will be at no additional cost.<br />

1.9.2 If the shop drawings show variation from the requirements of contract because of standard<br />

shop practice or other reasons, the Contractor shall make specific mention of such variation in<br />

writing in his letter of transmittal and on the submittal cover sheet in order that, if acceptable,<br />

Contractor will not be relieved of the responsibility for executing the work in accordance with<br />

the contract.<br />

1.9.3 Review of shop drawings, product literature, catalog data, or schedules shall not relieve the<br />

Contractor from responsibility for deviations from contract drawings or specifications, unless he<br />

has in writing called to the attention of the Architect/Engineer each such deviation in writing at<br />

the time of submission, nor shall it relieve him from responsibility for errors of any sort in shop<br />

drawings, product literature, catalog data, or schedules. Any feature or function specified but<br />

not mentioned in the submittal shall be assumed to be included per the specification.<br />

1.9.4 Submit shop drawings as called for in other sections after award of the contract and before any<br />

material is ordered or fabricated. Shop drawings shall consist of plans, sections, elevations<br />

and details to scale (not smaller than ¼" per foot), with dimensions clearly showing the<br />

installation. Direct copies of small scale project drawings issued to the Contractor are not<br />

acceptable. Drawings shall take into account equipment furnished under other sections and<br />

shall show space allotted for it. Include construction details and materials.<br />

1.10 Test Reports and Verification Submittals: Submit test reports, certifications and verification<br />

letters as called for in other sections. Contractor shall coordinate the required testing and<br />

documentation of system performance such that sufficient time exists to prepare the reports,<br />

submit the reports, review the reports and take corrective action within the scheduled contract<br />

time.<br />

1.11 O&M Data Submittals: Submit Operation and Maintenance data as called for in other sections.<br />

When a copy of approval submittals is included in the O&M Manual, only the final “Approved”<br />

or “Approved as Noted” copy shall be used. Contractor shall organize these data in the O&M<br />

PLUMBING GENERAL 22 01 00 - 3/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

Manuals tabbed by specification number. Prepare O&M Manuals as required by Division 1<br />

and as described herein.. Submit manuals at the Substantial Completion inspection.<br />

2 PRODUCTS<br />

2.1 All materials shall be new or Owner-supplied reused as shown on the drawings, the best of<br />

their respective kinds, suitable for the conditions and duties imposed on them at the building<br />

and shall be of reputable manufacturers. The description, characteristics, and requirements of<br />

materials to be used shall be in accordance with qualifying conditions established in the<br />

following sections.<br />

2.2 Equipment and Materials:<br />

2.2.1 Shall be new and the most suitable grade for the purpose intended. Equipment furnished<br />

under this division shall be the product of a manufacturer regularly engaged in the manufacture<br />

of such items for a period of three years. Where practical, all of the components shall be<br />

products of a single manufacturer in order to provide proper coordination and responsibility.<br />

Where required, Contractor shall furnish proof of installation of similar units or equipment.<br />

2.2.2 Each item of equipment shall bear a name plate showing the manufacturer's name, trade<br />

name, model number, serial number, ratings and other information necessary to fully identify it.<br />

This plate shall be permanently mounted in a prominent location and shall not be concealed,<br />

insulated or painted.<br />

2.2.3 The label of the approving agency, such as UL, IBR, ASME, ARI, AMCA, by which a standard<br />

has been established for the particular item shall be in full view.<br />

2.2.4 The equipment shall be essentially the standard product of a manufacturer regularly engaged<br />

in the production of such equipment and shall be a product of the manufacturer's latest design.<br />

2.2.5 A service organization with personnel and spare parts shall be available within two hours for<br />

each type of equipment furnished.<br />

2.2.6 Install in accordance with manufacturer's recommendations. Place in service by a factory<br />

trained representative where required.<br />

2.2.7 Materials and equipment are specified herein by a single or by multiple manufacturers to<br />

indicate quality, material and type of construction desired. Manufacturer's products shown on<br />

the drawings have been used as basis for design; it shall be the Contractor's responsibility to<br />

ascertain that alternate manufacturer's products, or the particular products of named<br />

manufacturers, meet the detailed specifications and that size and arrangement of equipment<br />

are suitable for installation.<br />

2.2.8 Model Numbers: Catalog numbers and model numbers indicated in the drawings and<br />

specifications are used as a guide in the selection of the equipment and are only listed for the<br />

contractor's convenience. The contractor shall determine the actual model numbers for<br />

ordering materials in accordance with the written description of each item and with the intent of<br />

the drawings and specifications.<br />

2.3 Requests for Substitution:<br />

2.3.1 Where a particular system, product or material is specified by name, consider it as standard<br />

basis for bidding, and base proposal on the particular system, product or material specified.<br />

PLUMBING GENERAL 22 01 00 - 4/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

2.3.2 Requests by Contractor for substitution will be considered only when reasonable, timely, fully<br />

documented, and qualifying under one or more of the following circumstances.<br />

2.3.2.1 Required product cannot be supplied in time for compliance with Contract time requirements.<br />

2.3.2.2 Required product is not acceptable to governing authority, or determined to be non-compatible,<br />

or cannot be properly coordinated, warranted or insured, or has other recognized disability as<br />

certified by Contractor.<br />

2.3.2.3 Substantial cost advantage is offered Owner after deducting offsetting disadvantages including<br />

delays, additional compensation for redesign, investigation, evaluation and other necessary<br />

services and similar considerations.<br />

2.3.3 All requests for substitution shall contain a "Comparison Schedule" and clearly and specifically<br />

indicate any and all differences or omissions between the product specified as the basis of<br />

design and the product proposed for substitution. Differences shall include but shall not be<br />

limited to data as follows for both the specified and substituted products:<br />

Principal of operation.<br />

Materials of construction or finishes.<br />

Thickness of gauge of materials.<br />

Weight of item.<br />

Deleted features or items.<br />

Added features or items.<br />

Changes in other work caused by the substitution.<br />

Performance curves.<br />

If the approved substitution contains differences or omissions not specifically called to the<br />

attention of the Architect/Engineer, the Owner reserves the right to require equal or similar<br />

features to be added to the substituted products (or to have the substituted products replaced)<br />

at the Contractor's expense.<br />

3 EXECUTION<br />

3.1 Workmanship: All materials and equipment shall be installed and completed in a first-class<br />

workmanlike manner and in accordance with the best modern methods and practice. Any<br />

materials installed which do not present an orderly and reasonably neat and/or workmanlike<br />

appearance, or do not allow adequate space for maintenance, shall be removed and replaced<br />

when so directed by the Architect/Engineer.<br />

3.2 Coordination:<br />

3.2.1 The Contractor shall be responsible for full coordination of the plumbing systems with shop<br />

drawings of the building construction so the proper openings and sleeves or supports are<br />

provided for piping or other equipment passing through slabs or walls.<br />

3.2.2 Any additional steel supports required for the installation of any plumbing equipment or piping<br />

shall be furnished and installed under the section of the specifications requiring the additional<br />

supports.<br />

3.2.3 It shall be the Contractor's responsibility to see that all equipment such as valves, dampers,<br />

filters and such other apparatus or equipment that may require maintenance and operation are<br />

made easily accessible, regardless of the diagrammatic location shown on the drawings.<br />

PLUMBING GENERAL 22 01 00 - 5/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

3.2.4 All connections to fixtures and equipment shown on the drawings shall be considered<br />

diagrammatic unless otherwise indicated by detail. The actual connections shall be made to<br />

fully suit the requirements of each case and adequately provide for expansion and servicing.<br />

3.2.5 The contractor shall protect equipment, material, and fixtures at all times. He shall replace all<br />

equipment, material, and fixtures which are damaged as a result of inadequate protection.<br />

3.2.6 Prior to starting and during progress of work, examine work and materials installed by others<br />

as they apply to work in this division. Report conditions which will prevent satisfactory<br />

installation.<br />

3.2.7 Start of work will be construed as acceptance of suitability of work of others.<br />

3.3 Interruption of Service: Before any equipment is shut down for disconnecting or tie-ins,<br />

arrangements shall be made with the Architect/Engineer and this work shall be done at the<br />

time best suited to the Owner. This will typically be on weekends and/or holidays and/or after<br />

normal working hours. Services shall be restored the same day unless prior arrangements are<br />

made. All overtime or premium costs associated with this work shall be included in the base<br />

bid.<br />

3.4 Phasing: Provide all required temporary valves, piping, equipment and devices as required.<br />

Maintain temporary services to areas as required. Remove all temporary material and<br />

equipment on completion of work unless Engineer concurs that such material and equipment<br />

would be beneficial to the Owner on a permanent basis.<br />

3.5 Cutting and Patching: Notify General Contractor to do all cutting and patching of all holes,<br />

chases, sleeves, and other openings required for installation of equipment furnished and<br />

installed under this section. Utilize experienced trades for cutting and patching. Obtain<br />

permission from Architect/Engineer before cutting any structural items.<br />

3.6 Equipment Setting: Bolt equipment directly to concrete pads or vibration isolators as required,<br />

using hot-dipped galvanized anchor bolts, nuts and washers. Level equipment.<br />

3.7 Painting: Touch-up factory finishes on equipment located inside and outside shall be done<br />

under Division 22. Obtain matched color coatings from the manufacturer and apply as<br />

directed. If corrosion is found during inspection on the surface of any equipment, clean, prime,<br />

and paint, as required.<br />

3.8 Clean-up: Thoroughly clean all exposed parts of apparatus and equipment of cement, plaster,<br />

and other materials and remove all oil and grease spots. Repaint or touch up as required to<br />

look like new. During progress of work, contractor is to carefully clean up and leave premises<br />

and all portions of building free from debris and in a clean and safe condition.<br />

3.9 Start-up and Operational Test: Start each item of equipment in strict accordance with the<br />

manufacturer's instructions; or where noted under equipment specification, start-up shall be<br />

done by a qualified representative of the manufacturer. Alignment, lubrication, safety, and<br />

operating control shall be included in start-up check.<br />

3.10 Record Drawings:<br />

3.10.1 During the progress of the work the Contractor shall record on their field set of drawings the<br />

exact location, as installed, of all piping, equipment, and other systems which are not installed<br />

exactly as shown on the contract drawings.<br />

PLUMBING GENERAL 22 01 00 - 6/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

3.10.2 Upon completion of the work, record drawings shall be prepared as described in the General<br />

Conditions, Supplementary Conditions, and Division 1 sections.<br />

3.11 Acceptance:<br />

3.11.1 Punch List: Submit written confirmation that all punch lists have been checked and the<br />

required work completed.<br />

3.11.2 Instructions: At completion of the work, provide a competent and experienced person who is<br />

thoroughly familiar with project, for one day to instruct permanent operating personnel in<br />

operation of equipment and control systems. This is in addition to any specific equipment<br />

operation and maintenance training.<br />

3.11.3 Operation and Maintenance Manuals: Furnish four complete manuals bound in ring binders<br />

with Table of Contents, organized, and tabbed by specification section. Manuals shall contain:<br />

Detailed operating instructions and instructions for making minor adjustments.<br />

Complete wiring and control diagrams.<br />

Routine maintenance operations.<br />

Manufacturer's catalog data, service instructions, and parts lists for each piece of operating<br />

equipment.<br />

Copies of approved submittals.<br />

Copies of all manufacturer's warranties.<br />

Copies of test reports and verification submittals.<br />

3.11.4 Record Drawings: Submit record drawings.<br />

END OF SECTION 22 01 00<br />

PLUMBING GENERAL 22 01 00 - 7/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

This page intentionally left blank.<br />

PLUMBING GENERAL 22 01 00 - 8/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 22 05 23 - VALVES<br />

1 GENERAL<br />

1.1 Drawings and general provisions of Contract, including General and Supplementary Conditions<br />

and Division-1 Specification sections, apply to the work of this section.<br />

1.2 This section is a Division-22 Basic Materials and Methods section, and is part of each Division-22<br />

section making reference to or requiring valves specified herein.<br />

1.3 Extent of valves required by this section is indicated on drawings and/or specified in other<br />

Division-22 sections.<br />

1.4 Quality Assurance:<br />

1.4.1 Valve Dimensions: For face-to-face and end-to-end dimensions of flanged or welding-end valve<br />

bodies, comply with ANSI B16.10.<br />

1.4.2 Valve Types: Provide valves of same type by same manufacturer.<br />

1.5 Approval Submittals: When required by other Division-22 sections, submit product data, catalog<br />

cuts, specifications, and dimensioned drawings for each type of valve. Include pressure drop<br />

curve or chart for each type and size of valve. Submit valves with Division-22 section using the<br />

valves, not as a separate submittal. For each valve, identify systems where the valve is intended<br />

for use.<br />

1.5.1 Gate Valves. Type GA.<br />

1.5.2 Ball Valves. Type BA.<br />

1.6 O&M Data Submittals: Submit a copy of approval submittals. Submit installation instructions,<br />

maintenance data and spare parts lists for each type of valve. Include this data in the O&M<br />

Manual.<br />

2 PRODUCTS<br />

2.1 General: Provide factory-fabricated valves recommended by manufacturer for use in service<br />

indicated. Provide valves of types and pressure ratings indicated; provide proper selection as<br />

determined by Installer to comply with specifications and installation requirements. Provide sizes<br />

as indicated, and connections which properly mate with pipe, tube, and equipment connections.<br />

2.2 Acceptable Manufacturers: Subject to compliance with requirements, provide valves of one of the<br />

producers listed for each valve type. The model numbers are listed for contractor’s convenience<br />

only. In the case of a model number discrepancy, the written description shall govern.<br />

2.3 Gate Valves:<br />

2.3.1 Packing: Select valves designed for repacking under pressure when fully opened, equipped with<br />

non-asbestos packing suitable for intended service. Select valves designed so back seating<br />

protects packing and stem threads from fluid when valve is fully opened, and equipped with gland<br />

follower.<br />

2.3.2 Comply with the following standards:<br />

Cast Iron Valves: MSS SP-70. Cast Iron Gate Valves, Flanged and Threaded Ends.<br />

Bronze Valves: MSS SP-80. Bronze Gate, Globe, Angle and Check Valves.<br />

VALVES 22 05 23 - 1/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

Steel Valves: ANSI B16.34. Steel Standard Class Valve Ratings.<br />

2.3.3 Types of gate (GA) valves:<br />

1 Threaded Ends 2" and Smaller (GA1): Class 125, bronze body, screwed bonnet, rising<br />

stem, solid wedge. Stockham B-100. Nibco T-111. Crane 428. Milwaukee 148.<br />

2 Soldered Ends 2" and Smaller (GA2): Class 125, bronze body, screwed bonnet, nonrising<br />

stem, solid wedge. Stockham B-108 or B-109. Nibco S-111. Crane 1334.<br />

Milwaukee 149.<br />

3 Flanged Ends 2½" and Larger (GA3): Class 125, iron body, bronze mounted, bolted<br />

bonnet, rising stem, OS&Y, solid wedge. Stockham G-623. Nibco F617-0. Crane 465½.<br />

Milwaukee F2885.<br />

4 Threaded Ends 2" and Smaller (GA4): Class 150, bronze body, screwed bonnet, rising<br />

stem, solid wedge. Stockham B-122. Nibco T-131. Crane 431. Milwaukee 1150.<br />

5 Soldered Ends 2" and Smaller (GA5): Class 150, bronze body, screwed bonnet, rising<br />

stem, solid wedge. Stockham B-124. Nibco S-134. Milwaukee 1169.<br />

6 Threaded Ends 2" and Smaller (GA6): 175 WWP, bronze body, screwed bonnet, rising<br />

stem, OS&Y, solid wedge, UL-listed. Stockham B-133. Nibco T-104-0.<br />

7 Flanged Ends 2½" and Larger (GA7): 175 WWP, iron body, bolted bonnet, rising stem,<br />

OS&Y, solid wedge, UL listed. Stockham G-634. Nibco F-607-0TS<br />

8 Threaded Ends 2" and Smaller (GA8): Class 200, bronze body, union bonnet, rising<br />

stem, solid wedge, renewable seat. Stockham B-132. Nibco T-154-SS. Milwaukee<br />

1174.<br />

9 Flanged Ends 2½" and Larger (GA9): Class 250, iron body bronze mounted, bolted<br />

bonnet, rising stem, OS&Y, solid wedge. Stockham F-667. Nibco F-667-0. Crane 7½E.<br />

Milwaukee F-2894.<br />

10 Threaded Ends 2" and Smaller (GA10): Class 300, bronze body, union bonnet, rising<br />

stem, solid wedge, renewable seat. Stockham B-145. Nibco T-174-SS. Crane 634E.<br />

Milwaukee 1184.<br />

11 Flanged Ends 2½" and Larger (GA11): Class 300, cast steel body, bolted bonnet, rising<br />

stem, solid wedge, seal-welded seat rings. Provide trim to match use. Stockham 30-0F.<br />

Crane 33.<br />

12 Flanged Ends 2½" and Larger (GA12): 300 WWP, iron body, bolted bonnet, bronze<br />

mounted, rising stem, OS&Y, solid wedge, UL-listed. Stockham F-670. Nibco F-697-0.<br />

2.4 Ball Valves:<br />

2.6.1 General: Select with port area equal to or greater than connecting pipe area, include seat ring<br />

designed to hold sealing material.<br />

2.6.2 Construction: Ball valves shall be rated for 150 psi saturated steam and 600 psi non-shock cold<br />

water. Pressure containing parts shall be constructed of ASTM B-584 alloy 844, or ASTM B-124<br />

alloy 377. Valves shall be furnished with blow-out proof bottom loaded stem constructed of<br />

ASTM B-371 alloy 694 or other approved low zinc material. Provide TFE packing, TFE thrust<br />

washer, chrome-plated ball and reinforced teflon seats. Valves 1" and smaller shall be full port<br />

VALVES 22 05 23 - 2/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

design. Valves 1¼" and larger shall be conventional port design. Stem extensions shall be<br />

furnished for use in insulated piping where insulation exceeds ½” thickness.<br />

2.6.3 Comply with the following standards:<br />

MSS SP-72. Ball Valves with Flanged or Butt Welding Ends for General Service.<br />

MSS SP-110. Ball Valves Threaded, Socket-Welding, Solder Joint, Grooved and Flared Ends.<br />

2.6.4 Types of ball (BA) valves:<br />

1 Threaded Ends 2" and Smaller (BA1): Bronze two-piece full port body with adjustable<br />

stem packing. Nibco T-585-70. Stockham S216-BR-R-T. Milwaukee BA125. Apollo 77-<br />

100.<br />

2 Soldered Ends 2" and Smaller (BA2): Bronze three-piece full port body with adjustable<br />

stem packing. Nibco S-595-Y-66. Milwaukee BA350. Apollo 82-200.<br />

3 Threaded Ends 1" and Smaller (BA3): Bronze two-piece full port body, UL listed (UL<br />

842) for use with flammable liquids and LP gas. Nibco T-585-70-UL.<br />

4 Threaded Ends 2" and Smaller (BA4): 175 WWP, bronze two-piece body, UL listed for<br />

fire protection service. Nibco KT-585-70-UL and KT-580-70-UL.<br />

5 Threaded Ends 2" and Smaller (BA5): 400 WWP, bronze two-piece body, for fire<br />

protection service. Nibco KT-580.<br />

6 Threaded Ends 2½" and Smaller (BA6): 300 WWP, bronze three-piece body, gear<br />

operator with handwheel, indicator flag, accepts tamper switch, for fire protection, UL<br />

listed. Nibco T-505-4 and G-505-4.<br />

7 Flanged Ends 2½” and Larger (BA7): Class 150, carbon steel full bore two-piece body<br />

with adjustable stem packing. Nibco F515-CS series. Apollo 88-240.<br />

2.5 Valve Features:<br />

2.8.1 General: Provide valves with features indicated and, where not otherwise indicated, provide<br />

proper valve features as determined by Installer for installation requirements. Comply with ANSI<br />

B31.1<br />

2.8.2 Valve features specified or required shall comply with the following:<br />

1 Flanged: Provide valve flanges complying with ANSI B16.1 (cast iron), ANSI B16.5<br />

(steel), or ANSI B16.24 (bronze).<br />

2 Threaded: Provide valve ends complying with ANSI B2.1.<br />

3 Solder-Joint: Provide valve ends complying with ANSI B16.18.<br />

4 Trim: Fabricate pressure-containing components of valve, including stems (shafts) and<br />

seats from brass or bronze materials, of standard alloy recognized in valve manufacturing<br />

industry unless otherwise specified.<br />

5 Non-Metallic Disc: Provide non-metallic material selected for service indicated in<br />

accordance with manufacturer's published literature.<br />

6 Renewable Seat: Design seat of valve with removable disc, and assemble valve so disc<br />

VALVES 22 05 23 - 3/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

can be replaced when worn.<br />

7 Extended Stem: Increase stem length by 2" minimum, to accommodate insulation<br />

applied over valve.<br />

3 EXECUTION<br />

3.1 Installation:<br />

3.1.1 General: Install valves where required for proper operation of piping and equipment, including<br />

valves in branch lines to isolate sections of piping. Locate valves so as to be accessible and so<br />

that separate support can be provided when necessary. Install valves with stems pointed up, in<br />

vertical position where possible, but in no case with stems pointed downward below horizontal<br />

plane.<br />

3.1.2 Insulation: Where insulation is indicated, install extended-stem valves, arranged in proper<br />

manner to receive insulation.<br />

3.1.3 Applications Subject to Corrosion: Do not install bronze valves and valve components in direct<br />

contact with steel, unless bronze and steel are separated by dielectric insulator.<br />

3.1.4 Mechanical Actuators: Install mechanical actuators as recommended by valve manufacturer.<br />

3.2 Selection of Valve Ends (Pipe Connections): Except as otherwise indicated, select and install<br />

valves with the following ends or types of pipe/tube connections:<br />

3.2.1 Tube Size 2" and Smaller: Threaded valves.<br />

3.2.2 Pipe Size 2" and Smaller: Threaded valves.<br />

3.2.3 Pipe Size 2½" and Larger: Flanged valves.<br />

3.3 Non-Metallic Disc: Limit selection and installation of valves with non-metallic disc to locations<br />

indicated and where foreign material in piping system can be expected to prevent tight shutoff of<br />

metal seated valves.<br />

3.4 Renewable Seats: Select and install valves with renewable seats, except where otherwise<br />

indicated.<br />

END OF SECTION 22 05 23<br />

VALVES 22 05 23 - 4/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 22 05 48 - SUPPORTS, ANCHORS, AND SEALS<br />

1 GENERAL<br />

1.1 Drawings and general provisions of Contract, including General Supplementary Conditions and<br />

Division-1 Specification sections, apply to work of this section.<br />

1.2 This section is a Division-22 Basic Materials and Methods section, and is a part of each<br />

Division-22 section making reference to or requiring supports, anchors, and seals specified<br />

herein.<br />

1.3 Extent of supports, anchors, and seals required by this section is indicated on drawings and/or<br />

specified in other Division-22 sections.<br />

1.4 Code Compliance: Comply with applicable codes pertaining to product materials and<br />

installation of supports, anchors, and seals.<br />

1.5 MSS Standard Compliance:<br />

1.5.1 Provide pipe hangers and supports of which materials, design, and manufacture comply with<br />

ANSI/MSS SP-58.<br />

1.5.2 Select and apply pipe hangers and supports, complying with MSS SP-69.<br />

1.5.3 Fabricate and install pipe hangers and supports, complying with MSS SP-89.<br />

1.5.4 Terminology used in this section is defined in MSS SP-90.<br />

2 PRODUCTS<br />

2.1 Acceptable Manufacturers: Subject to compliance with requirements, provide supports and<br />

hangers by Grinnel, Michigan Hanger Company, B-Line Systems, or approved equal.<br />

2.2 Horizontal-Piping Hangers and Supports: Except as otherwise indicated, provide factoryfabricated<br />

horizontal-piping hangers and supports complying with ANSI/MSS SP-58, of one of<br />

the following MSS types listed, selected by Installer to suit horizontal-piping systems, in<br />

accordance with MSS SP-69 and manufacturer's published product information. Use only one<br />

type by one manufacturer for each piping service. Select size of hangers and supports to<br />

exactly fit pipe size for bare piping, and to exactly fit around piping insulation with saddle or<br />

shield for insulated piping. Provide copper-plated hangers and supports for copper-piping<br />

systems.<br />

2.2.1 Adjustable Steel Clevises: MSS Type 1.<br />

2.2.2 Steel Double Bolt Pipe Clamps: MSS Type 3.<br />

2.2.3 Adjustable Steel Band Hangers: MSS Type 7.<br />

2.2.4 Steel Pipe Clamps: MSS Type 4.<br />

2.2.5 Pipe Stanchion Saddles: MSS Type 37, including steel pipe base support and cast-iron floor<br />

flange.<br />

2.2.6 Single Pipe Rolls: MSS Type 41.<br />

2.2.7 Adjustable Roller Hanger: MSS Type 43.<br />

SUPPORTS, ANCHORS, AND SEALS 22 05 48 - 1/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

2.2.8 Pipe Roll Stands: MSS Type 44 or Type 47.<br />

2.3 Vertical-Piping Clamps: Except as otherwise indicated, provide factory-fabricated verticalpiping<br />

clamps complying with ANSI/MSS SP-58, of one of the following MSS types listed,<br />

selected by Installer to suit vertical piping systems, in accordance with MSS SP-69 and<br />

manufacturer's published product information. Select size of vertical piping clamps to exactly<br />

fit pipe size of bare pipe. Provide copper-plated clamps for copper-piping systems.<br />

2.3.1 Two-Bolt Riser Clamps: MSS Type 8.<br />

2.3.2 Four-Bolt Riser Clamps: MSS Type 42.<br />

2.4 Hanger-Rod Attachments: Except as otherwise indicated, provide factory-fabricated hangerrod<br />

attachments complying with ANSI/MSS SP-58, of one of the following MSS types listed,<br />

selected by Installer to suit horizontal-piping hangers and building attachments, in accordance<br />

with MSS SP-69 and manufacturer's published product information. Use only one type by one<br />

manufacturer for each piping service. Select size of hanger-rod attachments to suit hanger<br />

rods. Provide copper-plated hanger-rod attachments for copper-piping systems.<br />

2.4.1 Steel Turnbuckles: MSS Type 13.<br />

2.4.2 Malleable Iron Sockets: MSS Type 16.<br />

2.5 Building Attachments: Except as otherwise indicated, provide factory-fabricated building<br />

attachments complying with ANSI/MSS SP-58, of one of the following MSS types listed,<br />

selected by Installer to suit building substrate conditions, in accordance with MSS SP-69 and<br />

manufacturer's published product information. Select size of building attachments to suit<br />

hanger rods.<br />

2.5.1 Center Beam Clamps: MSS Type 21.<br />

2.5.2 C-Clamps: MSS Type 23.<br />

2.5.3 Malleable Beam Clamps: MSS Type 30.<br />

2.5.4 Side Beam Brackets: MSS Type 34.<br />

2.5.5 Concrete Inserts: MSS Type 18.<br />

2.6 Saddles and Shields: Except as otherwise indicated, provide saddles or shields under piping<br />

hangers and supports, factory-fabricated, for all insulated piping. Size saddles and shields for<br />

exact fit to mate with pipe insulation.<br />

2.6.1 Protection Shields: MSS Type 40; of length recommended by manufacturer to prevent<br />

crushing of insulation.<br />

2.6.2 Protection Saddles: MSS Type 39; use with rollers, fill interior voids with segments of<br />

insulation matching adjoining insulation.<br />

2.7 Miscellaneous Materials:<br />

2.7.1 Metal Framing: Provide products complying with NEMA STD ML 1.<br />

2.7.2 Steel Plates, Shapes and Bars: Provide products complying with ANSI/ASTM A 36.<br />

SUPPORTS, ANCHORS, AND SEALS 22 05 48 - 2/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

2.7.3 Cement Grout: Portland cement (ANSI/ASTM C 150, Type I or Type III) and clean uniformly<br />

graded, natural sand (ANSI/ASTM C 404, Size No. 2). Mix at a ratio of 1.0 part cement to 3.0<br />

parts sand, by volume, with minimum amount of water required for placement and hydration.<br />

2.7.4 Heavy-Duty Steel Trapezes: Fabricate from steel shapes or continuous channel struts<br />

selected for loads required; weld steel in accordance with AWS standards.<br />

3 EXECUTION<br />

3.1 Preparation<br />

3.1.1 Proceed with installation of hangers, supports and anchors only after required building<br />

structural work has been completed in areas where the work is to be installed. Correct<br />

inadequacies including (but not limited to) proper placement of inserts, anchors and other<br />

building structural attachments.<br />

3.1.2 Prior to installation of hangers, supports, anchors and associated work, Installer shall meet at<br />

project site with Contractor, installer of each component of associated work, and installers of<br />

other work requiring coordination with work of this section for purpose of reviewing material<br />

selections and procedures to be followed in performing the work in compliance with<br />

requirements specified.<br />

3.2 Installation of Building Attachments:<br />

3.2.1 Install building attachments at required locations within concrete or on structural steel for<br />

proper piping support. Space attachments within maximum piping span length indicated in<br />

MSS SP-69. Install additional building attachments where support is required for additional<br />

concentrated loads, including valves, flanges, guides, strainers, expansion joints, and at<br />

changes in direction of piping. Install concrete inserts before concrete is placed; fasten insert<br />

securely to forms. Where concrete with compressive strength less than 2500 psi is indicated,<br />

install reinforcing bars through openings at top of inserts.<br />

3.2.2 In areas of work requiring attachments to existing concrete, use self drilling rod inserts, Phillips<br />

Drill Co., "Red-Head" or equal.<br />

3.3 Installation of Hangers and Supports:<br />

3.3.1 General: Install hangers, supports, clamps and attachments to support piping properly from<br />

building structure; comply with MSS SP-69. Arrange for grouping of parallel runs of horizontal<br />

piping to be supported together on trapeze type hangers where possible. Install supports with<br />

maximum spacings complying with MSS SP-69 or as listed herein, whichever is most limiting.<br />

Where piping of various sizes is to be supported together by trapeze hangers, space hangers<br />

for smallest pipe size or install intermediate supports for smaller diameter pipe. Do not use<br />

wire or perforated metal to support piping, and do not support piping from other piping.<br />

3.3.1.1 Horizontal steel pipe and copper tube 1-1/4" diameter and smaller: support on 6 foot centers.<br />

3.3.1.2 Horizontal steel pipe and copper tube 1-1/2" diameter and larger: support on 10 foot centers.<br />

3.3.1.3 Vertical steel pipe and copper tube: support at each floor.<br />

3.3.1.4 Plastic pipe: support in accordance with manufacturer's recommendations.<br />

3.3.2 Install hangers and supports complete with necessary inserts, bolts, rods, nuts, washers and<br />

other accessories.<br />

SUPPORTS, ANCHORS, AND SEALS 22 05 48 - 3/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

3.3.3 Paint all black steel hangers with black enamel. Galvanized steel and copper clad hangers do<br />

not require paint.<br />

3.3.4 Prevent electrolysis in support of copper tubing by use of hangers and supports which are<br />

copper plated, or by other recognized industry methods.<br />

3.3.5 Provision for Movement:<br />

3.3.5.1 Install hangers and supports to allow controlled movement of piping systems and to permit<br />

freedom of movement between pipe anchors, and to facilitate action of expansion joints,<br />

expansion loops, expansion bends and similar units.<br />

3.3.5.2 Load Distribution: Install hangers and supports so that piping live and dead loading and<br />

stresses from movement will not be transmitted to connected equipment.<br />

3.3.5.3 Pipe Slopes: Install hangers and supports to provide indicated pipe slopes, and so that<br />

maximum pipe deflections allowed by ANSI B31 are not exceeded.<br />

3.3.6 Insulated Piping: Comply with the following installation requirements.<br />

3.3.6.1 Shields: Where low-compressive-strength insulation or vapor barriers are indicated, install<br />

coated protective shields.<br />

3.3.6.2 Clamps: Attach clamps, including spacers (if any), to piping with clamps projecting through<br />

insulation; do not exceed pipe stresses allowed by ANSI B31.<br />

3.4 Installation of Anchors:<br />

3.4.1 Install anchors at proper locations to prevent stresses from exceeding those permitted by ANSI<br />

B31, and to prevent transfer of loading and stresses to connected equipment.<br />

3.4.2 Fabricate and install anchors by welding steel shapes, plates and bars to piping and to<br />

structure. Comply with ANSI B31 and with AWS standards.<br />

3.4.3 Anchor Spacings: Where not otherwise indicated, install anchors at ends of principal piperuns,<br />

at intermediate points in pipe-runs between expansion loops and elbows. Make<br />

provisions for preset of anchors as required to accommodate both expansion and contraction<br />

of piping.<br />

3.4.4 Where expansion compensators are indicated, install anchors in accordance with expansion<br />

unit manufacturer's written instructions to limit movement of piping and forces to maximums<br />

recommended by manufacturer for each unit.<br />

END OF SECTION 22 05 48<br />

SUPPORTS, ANCHORS, AND SEALS 22 05 48 - 4/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 22 05 56 - ACCESS DOORS<br />

1 GENERAL<br />

1.1 Drawings and general provisions of Contract, including General and Supplementary Conditions<br />

and Division-1 Specification sections, apply to work of this section.<br />

1.2 This section is a Division-22 Basic Plumbing Materials and Methods section, and is part of<br />

each Division-22 section making reference to or requiring access panels specified herein.<br />

1.3 Approval Submittals:<br />

1.3.1 Product Data: When required by other Division-22 sections, submit product data for access<br />

doors. Submit with Division-22 section using access doors, not as a separate submittal.<br />

Include rating data.<br />

1.4 O&M Data Submittals: Submit a copy of approval submittal. Include this data in O&M<br />

Manuals.<br />

2 PRODUCTS<br />

2.1 Acceptable Manufacturers: Subject to compliance with requirements, provide access doors by<br />

Milcor, Jay R. Smith, Zurn, BOICO, Elmdor, or approved equal.<br />

2.2 General: Where floors, walls and ceilings must be penetrated for access to plumbing work,<br />

provide types of access doors indicated. Furnish sizes indicated or, where not otherwise<br />

indicated, furnish adequate size for intended and necessary access. Furnish manufacturer's<br />

complete units, of type recommended for application in indicated substrate construction, in<br />

each case, complete with anchorages and hardware.<br />

2.3 Access Door Construction: Except as otherwise indicated, fabricate wall/ceiling door units of<br />

welded stainless steel construction with welds ground smooth; 16-gauge frames and 14-gauge<br />

flush panel doors; 175° swing with concealed spring hinges; flush screw-driver-operated cam<br />

locks; brushed stainless finish.<br />

2.4 Locks: Where indicated, provide 5-pin or 5-disc type cylinder locks, individually keyed unless<br />

otherwise indicated, 2 keys.<br />

3 EXECUTION<br />

3.1 Access doors shall be installed to operate and service all plumbing equipment including<br />

valves, dampers, duct access panels, and other items requiring maintenance that are<br />

concealed above or behind finished construction. Access doors shall be installed in walls,<br />

chase and floors as necessary, but are not required in accessible suspended ceiling systems.<br />

Access doors shall have factory applied protective phosphate coating and baked enamel<br />

primer suitable for field painting.<br />

3.2 Access doors shall be installed by the Division installing the substrate construction. However,<br />

responsibility for furnishing and determining location of access doors is part of this Division's<br />

work. The style of access door shall be suitable for construction into which installed.<br />

ACCESS DOORS 22 05 56 - 1/2


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

3.3 Access doors shall be sized and located as required to provide proper maintenance and<br />

service access in accordance with the manufacturer's recommendations and code authority<br />

requirements for all devices and equipment.<br />

END OF SECTION 22 05 56<br />

ACCESS DOORS 22 05 56 - 2/2


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 22 05 59 - TESTING, CLEANING, AND STERILIZATION OF PIPING<br />

SYSTEMS<br />

1 GENERAL<br />

1.1 Drawings and general provisions of Contract, including General and Supplementary Conditions<br />

and Division-1 Specification sections, apply to work of this section.<br />

1.2 This section is a Division-22 Basic Mechanical Materials and Methods section, and is part of<br />

each Division-22 section making reference to or requiring the testing and other procedures<br />

specified herein.<br />

1.3 Notify the Architect/Engineer when system tests are ready to be witnessed at least 24 hours<br />

prior to the test.<br />

1.4 All materials, test equipment, and devices required for cleaning, testing, sterilizing or purging<br />

shall be provided by the Contractor.<br />

2 PRESSURE TESTS<br />

2.1 General: Provide temporary equipment for testing, including pump and gauges. Test piping<br />

systems before insulation is installed wherever feasible, and remove control devices before<br />

testing. Test each natural section of each piping system independently but do not use piping<br />

system valves to isolate sections where test pressure exceeds valve pressure rating. Fill each<br />

section with indicated medium and pressurize for indicated pressure and time.<br />

2.2 Required test period is four hours.<br />

2.3 No piping, fixtures, or equipment shall be concealed or covered until they have been tested.<br />

The contractor shall apply each test and ensure that it is satisfactory for the period specified<br />

before calling the Architect/Engineer to observe the test. Test shall be repeated upon request<br />

to the satisfaction of those making the inspection.<br />

2.4 Observe each test section for leakage at the end of the test period. Test fails if leakage is<br />

observed or if pressure drop exceeds 5% of the test pressure.<br />

2.5 Check of systems during application of test pressures should include visual check for water<br />

leakage and soap bubble or similar check for air and nitrogen leakage.<br />

2.6 During heating and cooling cycles, linear expansion shall be checked at all elbows and<br />

expansion joints for proper clearance.<br />

2.7 Repair piping systems sections which fail required piping test. Disassemble and re-install<br />

using new materials to extent required to overcome leakage. Do not use chemicals, stop-leak<br />

compounds, mastics, or other temporary repair methods.<br />

2.8 Pressure Test Requirements:<br />

2.8.1 Soil, Waste, and Vent Test all piping within the building with a 10 foot head of water. Test<br />

piping in sections so that all joints are tested. Provide test tees as required.<br />

2.8.2 Domestic Water: Perform hydrostatic test on all piping within the building at twice the normal<br />

static pressure at service point, but not less than 100 psig. Once tested, flush out piping and<br />

leave under pressure of the supply main or 40 psig for the balance of the construction period.<br />

TESTING, CLEANING, AND STERILIZATION OF PIPING SYSTEMS 22 05 59 - 1/2


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

2.8.3 Storm Water: Test rain leaders and all piping within the building with a 10 foot head of water.<br />

Test piping in sections so that all joints are tested. Provide test tees as required.<br />

2.8.4 Fire Sprinkler System: Perform hydrostatic test at 200 psig.<br />

2.8.5 Gas: Test with air or nitrogen at 150% of normal working pressure, but not less than 25 psig.<br />

The test and check for leaks shall be in accordance with NFPA-54.<br />

3 CLEANING AND STERILIZATION<br />

3.1 General: Clean exterior surfaces of installed piping systems of superfluous materials, and<br />

prepare for application of specified coatings (if any). Flush out piping systems with clean water<br />

or blowdown with air before proceeding with required tests. Inspect each run of each system<br />

for completion of joints, supports and accessory items.<br />

3.2 Flush and drain all water systems at least three times. Reverse flush systems from smallest<br />

piping to largest piping. Replace startup strainers with operating strainers.<br />

3.3 Blowdown all gas systems with air or nitrogen (at a rate of flow exceeding design) at least<br />

three times or until no residue shows at each outlet. Reverse blowdown systems from<br />

smallest piping to largest piping.<br />

3.4 Sterilization of Domestic Water Systems:<br />

3.4.1 Prerequisites: All new hot and cold water piping installed (complete), all fixtures connected,<br />

system flushed out, and system filled with water.<br />

3.4.2 The shut off valve at the point of connection shall be closed, all fixture outlets opened slightly,<br />

and a sterilizing solution shall be introduced at a manifold connection installed by the<br />

Contractor the point of connection.<br />

3.4.3 The solution shall contain 50 parts per million of available chlorine. The chlorinating material<br />

shall be either liquid chlorine or calcium hypochlorite. The solution shall be allowed to stand in<br />

the system for at least eight hours after which the entire system shall be flushed.<br />

3.4.4 After final flushing, all aerators shall be removed, cleaned, and reinstalled. After final flush the<br />

residual chlorine shall not exceed 0.2 parts per million.<br />

3.4.5 The Architect/Engineer shall be notified 24 hours prior to the procedure so that it can be<br />

witnessed.<br />

3.4.6 Provide sampling and certified report by an independent testing lab. Provide written Health<br />

Department approval of disinfection samples.<br />

3.5 Fuel Gas: Purge all fuel gas systems in accordance with NFPA 54.<br />

END OF SECTION 22 05 59<br />

TESTING, CLEANING, AND STERILIZATION OF PIPING SYSTEMS 22 05 59 - 2/2


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 22 05 63 - EXCAVATION & BACKFILL<br />

1 GENERAL<br />

1.1 Drawings and general provisions of Contract, including General and Supplementary Conditions<br />

and Division-1 Specification sections, apply to work of this section.<br />

1.2 This section is a Division-22 Basic Plumbing Materials and Methods section, and is part of<br />

each Division-22 section making reference to or requiring excavation and backfill specified<br />

herein.<br />

1.3 Refer to other Division-22 sections and/or drawings for specific requirements of the particular<br />

piping system being installed. Where another Division-22 section or the drawings conflict with<br />

requirements of this section, the other Division-22 section or the drawings shall take<br />

precedence over the general requirements herein.<br />

1.4 OSHA: Contractor employee worker protection for all trenching and excavation operations<br />

shall comply with <strong>29</strong> CFR 1926.650 Subpart P and all current OSHA requirements.<br />

1.5 Trench Safety Act: Contractor shall comply with all requirements of Florida Statutes Chapter<br />

553, including the requirement to provide a separate line item to identify the cost to comply on<br />

a per lineal foot of trench and per square foot of shoring.<br />

2 PRODUCTS<br />

2.1 Sand: Clean, hard, uncoated grains free from organic matter or other deleterious substances.<br />

Sand for backfill shall be of a grade equal to mortar sand.<br />

2.2 Gravel: Clean, well graded hard stone or gravel, free from organic material. Size range to be<br />

from No. 4 screen retentions to 1".<br />

2.3 Earth: Fill free of clay, muck, stones, wood, roots or rubbish.<br />

2.4 Identification Tape: Polyethylene 6 inches wide, 0.004 inches thick, continuously printed with<br />

"CAUTION" in large letters and type of pipe below.<br />

2.5 Copper Identification Wire: 14-gauge.<br />

3 EXECUTION<br />

3.1 Ditching and Excavation: Shall be performed by hand wherever there is a possibility of<br />

encountering obstacles or any existing utility lines of any nature whatsoever. Where clear and<br />

unobstructed areas are to be excavated, appropriate machine excavation methods may be<br />

employed. Avoid use of machine excavators within the limits of the building lines.<br />

3.2 Bedding: Excavate to bottom grade of pipe to be installed, and shape bed of undisturbed earth<br />

to contour of pipe for a width of at least 50% of pipe diameter. If earth conditions necessitate<br />

excavation below grade of the pipe, such as due to the presence of clay, muck, or roots,<br />

subcut and bring bed up to proper elevation with clean, new sand (as described in paragraph<br />

2.1), deposited in 6" layers and tamped. Notify Architect/Engineer if subcut exceeds 12", or if<br />

bed is of an unstable nature. In this case a 6" minimum layer of gravel will be required before<br />

sand bedding begins. Submit cost proposal if the earth conditions require subcut in excess of<br />

12" or if gravel is required to achieve proper bedding.<br />

3.3 Placing: Pipe shall be carefully handled into place. Avoid knocking loose soil from the banks<br />

of the trench into the pipe bed. Rig heavier sections with nylon slings in lieu of wire rope to<br />

EXCAVATION & BACKFILL 22 05 63 -1/2


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

avoid crushing or chipping. Pipe which is handled with insulation in place, coated pipe, and<br />

jacketed pipe shall have special handling slings as required to prevent damage to the material.<br />

3.4 Backfilling: Deposit clean new sand (as described in paragraph 2.1) to 6" above the pipe and<br />

tamp. Then deposit sand or earth carefully in 6" layers, maintaining adequate side support,<br />

especially on nonferrous piping materials. Compact fill in 6" layers, using mechanical means,<br />

up to the top elevation of the pipe, and in 12" layers to rough or finish grade as required. Fine<br />

grade and restore surface to original condition.<br />

3.5 Special: Excavations shall be installed and maintained in satisfactory condition during the<br />

progress of the work. Subsurface structures are to be constructed in adequately sized<br />

excavations. De-watering equipment shall be installed and properly maintained where<br />

required. Shoring shall be employed in the event of unstable soil condition, and in all cases<br />

where required by OSHA regulations and necessary to protect materials and personnel from<br />

injury.<br />

3.6 Identification: Install identification tape directly above all underground piping, one tape for<br />

each pipe where multiple pipes are installed. Depth of tape shall be at least 6 inches below<br />

finished grade and 24" above buried pipe. Install copper wire above non-metallic pipes.<br />

3.7 Depth of Cover: Minimum cover for underground piping is two feet unless indicated otherwise.<br />

END OF SECTION 22 05 63<br />

EXCAVATION & BACKFILL 22 05 63 -2/2


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 22 07 00 - INSULATION FOR PLUMBING EQUIPMENT AND PIPING<br />

1 GENERAL<br />

1.1 Drawings and general provisions of Contract, including General and Supplementary Conditions<br />

and Division-1 Specification sections, apply to work of this section.<br />

1.2 Division-22 Basic Plumbing Materials and Methods Sections apply to work of this section.<br />

1.3 Approval Submittals:<br />

1.3.1 Product Data: Submit a producer's data sheets and installation instructions on each insulation<br />

system including insulation, coverings, adhesives, sealers, protective finishes, and other<br />

material recommended by the manufacturer for applications indicated. Submit for:<br />

1.3.1.1 Fiberglass pipe insulation<br />

1.4 O&M Data Submittals: Submit a copy of all approval submittals. Include in O&M Manual.<br />

2 PRODUCTS<br />

2.1 Acceptable Manufacturers: Subject to compliance with requirements, provide insulation<br />

products by Armstrong, Johns Manville, Knauf, Owens Corning, Pittsburgh Corning, U.S.<br />

Rubber, or approved equal. All products shall be asbestos-free.<br />

2.2 Flame/Smoke Ratings: Provide composite mechanical insulation (insulation, jackets,<br />

coverings, sealers, mastics, and adhesive) with a flame-spread rating of 25 or less, and a<br />

smoke-developed rating of 50 or less, as tested by ANSI/ASTM E84.<br />

2.3 Pipe Insulation Materials:<br />

2.3.1 Fiberglass Pipe Insulation: ASTM C547, Class 1 unless otherwise indicated. (Preformed<br />

sleeving with white all-service jacket, suitable for temperatures up to 450°F)<br />

2.3.2 Staples, Bands, Wires, and Cement: As recommended by the insulation manufacturer for<br />

applications indicated.<br />

2.3.3 Adhesives, Sealers, Protective Finishes: Products recommended by the insulation<br />

manufacturer for the application indicated.<br />

2.3.4 Jackets: ASTM C921, Type I (vapor barrier) for piping below ambient temperature, Type II<br />

(vapor permeable) for piping above ambient temperature. Type I may be used for all piping at<br />

Installer's option.<br />

3 EXECUTION<br />

3.1 General:<br />

3.1.1 Install thermal insulation products in accordance with manufacturer's written instructions, and<br />

in compliance with recognized industry practices to ensure that insulation serves intended<br />

purpose.<br />

3.1.2 Install insulation materials with smooth and even surfaces and on clean and dry surfaces.<br />

Redo poorly fitted joints. Do not use mastic or joint sealer as filler for gapping joints and<br />

excessive voids resulting from poor workmanship.<br />

INSULATION FOR PLUMBING PIPE AND EQUIPMENT 22 07 00 - 1/2


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

3.1.3 Maintain integrity of vapor-barrier on insulation and protect it to prevent puncture and other<br />

damage. Label all insulation "ASBESTOS FREE".<br />

3.1.4 Do not apply insulation to surfaces while they are hot or wet.<br />

3.1.5 Do not install insulation until systems have been checked and found free of leaks. Surfaces<br />

shall be clean and dry before attempting to apply insulation. A professional insulator with<br />

adequate experience and ability shall install insulation.<br />

3.1.6 Do not install insulation on pipe systems until acceptance tests have been completed except<br />

for flexible unicellular insulation. Do not install insulation until the building is "dried-in".<br />

3.2 Fiberglass Pipe Insulation:<br />

3.2.1 Insulate the following piping systems (indoor locations):<br />

3.2.1.1 Domestic hot water, 180° F: up to 2" pipe - 1½" thick, over 2" pipe 2" thick.<br />

3.2.1.2 Domestic hot water, 140° F: up to 3" pipe - 1½" thick, over 3" pipe - 2" thick.<br />

3.2.1.3 Cold water pipe in areas not freeze protected: ½" thick.<br />

3.2.2 Apply insulation to pipe with all side and end joints butted tightly. Seal longitudinal lap by<br />

pressurizing with plastic sealing tool. Apply 3 inch wide self sealing butt strips to joints<br />

between insulation sections. Insulate all fittings, flanges, valves and strainers with premolded<br />

insulation. Apply coat of insulating cement to fittings and wrap with glass cloth overlapping<br />

each wrap 1" and adjacent pipe 2". Finish with heavy coat of general purpose mastic.<br />

Premolded PVC covers may also be used, but no flexible inserts are allowed.<br />

3.2.3 Provide hanger or pipe support shields of 16 gauge (minimum) galvanized steel over the<br />

insulation which extends halfway up the pipe insulation cover and at least 6" on each side of<br />

the hanger.<br />

3.2.4 Omit insulation on exposed plumbing fixture runouts from faces of wall or floor to fixture; on<br />

unions, flanges, strainer blowoffs, flexible connections and expansion joints.<br />

END OF SECTION 22 07 00<br />

INSULATION FOR PLUMBING PIPE AND EQUIPMENT 22 07 00 - 2/2


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 22 11 13 - POTABLE WATER SYSTEM<br />

1 GENERAL<br />

1.1 Drawings and general provisions of Contract, including General and Supplementary Conditions<br />

and Division-1 Specification sections, apply to work of this section.<br />

1.2 Division-22 Basic Plumbing Requirements and Basic Plumbing Materials and Methods<br />

sections apply to work of this section.<br />

1.3 Extent of potable water systems work, is indicated on drawings and schedules, and by<br />

requirements of this section.<br />

1.4 Refer to other Division-22 sections for site water distribution system; not work of this section<br />

unless noted.<br />

1.5 Refer to appropriate Division-2 sections for exterior potable water system; not work of this<br />

section unless noted.<br />

1.6 Insulation for potable water piping is specified in other Division-22 sections, and is included as<br />

work of this section. Insulation requirements include:<br />

Domestic hot water piping<br />

Cold water piping as noted.<br />

1.7 Excavation and backfill required in conjunction with water piping is specified in other Division-<br />

22 sections, and is included as work of this section.<br />

1.8 Code Compliance: Comply with applicable portions of Florida Building Code-Plumbing<br />

pertaining to selection and installation of plumbing materials and products. Comply with local<br />

utility requirements.<br />

1.9 Approval Submittals:<br />

1.9.1 Product Data: Submit manufacturer's technical product data and installation instructions for:<br />

Valves<br />

Hose bibbs<br />

Wall hydrants<br />

Water hammer arresters<br />

Trap primers<br />

Access doors<br />

1.10 Test Reports and Verification Submittals:<br />

1.10.1 Disinfection: Submit report by Health Department.<br />

1.11 O&M Data Submittals: Submit a copy of all approval submittals. Submit maintenance data<br />

and parts lists for valves, trap primers. Include these data in O&M manual.<br />

2 PRODUCTS<br />

2.1 General: Provide piping materials and factory-fabricated piping products of sizes, types,<br />

pressure ratings, temperature ratings, and capacities as indicated. Where not indicated,<br />

provide proper selection as determined by Installer to comply with installation requirements.<br />

Provide materials and products complying with Florida Building Code-Plumbing where<br />

POTABLE WATER SYSTEM 22 11 13 - 1/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

applicable. Provide sizes and types matching pipe materials used in potable water systems.<br />

Where more than one type of materials or products is indicated, selection is Installer's option.<br />

2.2 Acceptable Manufacturers: Subject to compliance with requirements, provide products of one<br />

of the following listed for each item.<br />

2.3 Identification: Provide identification complying with Division-22 Basic Plumbing Materials and<br />

Methods section "Plumbing Identification". Provide manufacturer's standard permanent,<br />

bright-colored, continuous-printed plastic tape, intended for direct burial service; not less than<br />

6" wide x 4 mils thick. Provide blue tape with black printing reading "CAUTION WATER LINE<br />

BURIED BELOW".<br />

2.4 Pipes and Fittings: Provide pipes and pipe fittings complying with Division-22 Basic Plumbing<br />

Materials and Methods section "Pipes and Pipe Fittings", in accordance with the following<br />

listing:<br />

2.4.1 Interior Water Piping:<br />

2.4.1.1 Above Grade: Copper tube; Type L, hard-drawn temper; wrought-copper fittings, solder-joints.<br />

2.4.1.2 Below Grade: Copper tube; Type L, soft-annealed temper; no joints below floor.<br />

2.4.2 Exterior Water Piping:<br />

2.4.2.1 Copper tube; Type L, hard-drawn temper; wrought-copper fittings, solder-joints.<br />

2.4.2.2 Polyvinyl chloride pipe (PVC), Schedule 80; PVC socket fittings, solvent cement joints.<br />

2.4.3 Solder joints shall be made with 95-5 solder.<br />

2.5 Piping Specialties: Provide piping specialties complying with Division-22 Basic Plumbing<br />

Materials and Methods section “Piping Specialties".<br />

2.6 Supports and Anchors: Provide supports and anchors complying with Division-22 Basic<br />

Plumbing Materials and Methods section "Supports and Anchors".<br />

2.7 Interior Valves: Provide valves complying with Division-22 Basic Plumbing Materials and<br />

Methods section "Valves", in accordance with the following listing:<br />

2.7.1 Sectional and Shutoff Valves: GA1, GA2, GA3, BA1, BA2.<br />

2.7.2 Drain Valves: GA1, GA2, BA1, BA2.<br />

2.8 Exterior Valves: Provide as indicated, gate valves, AWWA C500, 175 psi working pressure.<br />

Provide threaded, flanged, hub, or other end configurations to suit size of valve and piping<br />

connections. Provide inside screw type for use with curb valve box, iron body, bronzemounted,<br />

double disc, parallel seat, non-rising stem. Clow Corp., Dresser Mfg., Fairbanks Co.,<br />

Kennedy, Stockham.<br />

2.9 Hose Bibbs: Provide rough nickel plated hose bibbs with lock shield compression stop and<br />

lose key handle, solid flange, female connection with ¾" male threaded hose end, and straight<br />

line type non-removable vacuum breaker with ¾" male threaded hose end. Acorn 8121 RCP<br />

or equal model by Woodford.<br />

2.10 Wall Hydrants: Provide ¾" wall hydrant with bronze casing, satin bronze box, straight inlet<br />

connection, lose key handle, and integral vacuum breaker backflow preventer. Wade W-8635-<br />

POTABLE WATER SYSTEM 22 11 13 - 2/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

89 or approved equal.<br />

2.11 Water Hammer Arresters: Provide bellows type water hammer arresters, stainless steel<br />

casing and bellows, pressure rated for 250 psi, tested and certified in accordance with PDI<br />

Standard WH-201. Precision Plumbing Products, Josam, Zurn, Amtrol, Wade, Jay R. Smith,<br />

or approved equal.<br />

2.12 Trap Primers: Provide brass trap primers and distribution units to seal floor drains indicated on<br />

drawings. Trap primer valves shall be automatic, self contained type with no springs or<br />

diaphragms and shall not require adjustment. Trap primer valves shall be the type that can be<br />

installed anywhere on cold water piping. Distribution units shall supply 1-4 floor drains. Trap<br />

primer valves shall comply with ASSE 1018. Precision Plumbing Products PR-500, or<br />

approved equal. Where P-trap primers are indicated use "Prime-Eze" by Jay R. Smith, or<br />

approved equal.<br />

2.13 Access Doors: Provide access doors to service all valves and other devices as required in<br />

accordance with Division-22 Basic Materials and Methods Section “Access Doors”.<br />

3 EXECUTION<br />

3.1 General: Examine areas and conditions under which potable water systems are to be<br />

installed. Do not proceed with work until unsatisfactory conditions have been corrected in<br />

manner acceptable to Installer.<br />

3.2 Install plumbing identification in accordance with Division-22 Basic Plumbing Materials and<br />

Methods section "Plumbing Identification". Install underground plastic pipe markers during<br />

backfill, 6"-8" below grade.<br />

3.3 Install water distribution piping in accordance with Division-22 Basic Plumbing Materials and<br />

Methods section "Pipes and Pipe Fittings".<br />

3.3.1 Install piping with 1/32" per foot (¼%) downward slope towards drain point.<br />

3.3.2 Locate groups of pipes parallel to each other, spaced to permit applying full insulation and<br />

servicing of valves.<br />

3.4 Install piping specialties in accordance with Division-22 Basic Plumbing Materials and Methods<br />

section "Piping Specialties".<br />

3.5 Install supports and anchors in accordance with Division-22 Basic Plumbing Materials and<br />

Methods section "Supports and Anchors".<br />

3.6 Install valves in accordance with Division-22 Basic Plumbing Materials and Methods section<br />

"Valves".<br />

3.6.1 Sectional Valves: Install on each branch and riser, close to main, where branch or riser serves<br />

two or more plumbing fixtures or equipment connections, and elsewhere as indicated.<br />

3.6.2 Shutoff Valves: Install on inlet of each plumbing equipment item, and on inlet of each<br />

plumbing fixture, and elsewhere as indicated.<br />

3.6.3 Drain Valves: Install on each plumbing equipment item located to completely drain equipment<br />

for service or repair. Install at base of each riser, at base of each rise or drop in piping system,<br />

and elsewhere where indicated or required to completely drain potable water system.<br />

3.7 Hose Bibbs and Wall Hydrants: Install on concealed piping where indicated with vacuum<br />

POTABLE WATER SYSTEM 22 11 13 - 3/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

breaker. Mount 18 inches above grade or finished floor.<br />

3.8 Piping Runouts to Fixtures: Provide hot and cold water piping runouts to fixtures of sizes<br />

indicated, but in no case smaller than required by Florida Building Code-Plumbing.<br />

3.9 Install water hammer arresters in upright position, in locations and of sizes indicated in<br />

accordance with PDI Standard WH-201.<br />

3.10 Install trap primers as indicated, and in accordance with manufacturer's installation<br />

instructions. Provide access panels to all trap primers unless accessible through a lay-in<br />

ceiling.<br />

3.11 Locate and coordinate installation of access doors for all valves and devices in accordance<br />

with Division-22 Basic Plumbing Materials and Methods section “Access Doors”.<br />

3.12 Piping Tests: Test, clean, and sterilize potable water piping in accordance with testing<br />

requirements of Division-22 Basic Plumbing Materials and Methods section "Testing, Cleaning,<br />

and Sterilization of Piping Systems".<br />

END OF SECTION 22 11 13<br />

POTABLE WATER SYSTEM 22 11 13 - 4/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 22 11 16 - PIPES AND PIPE FITTINGS<br />

1 GENERAL<br />

1.1 Drawings and general provisions of Contract, including General and Supplementary Conditions<br />

and Division-1 Specification sections, apply to work of this section.<br />

1.2 This section is a Division-22 Basic Plumbing Materials and Methods section, and is part of<br />

each Division-22 section making reference to pipes and pipe fittings specified herein.<br />

1.3 Extent of pipes and pipe fittings required by this section is indicated on drawings and/or<br />

specified in other Division-22 sections.<br />

1.4 Codes and Standards:<br />

1.4.1 Welding: Qualify welding procedures, welders and operators in accordance with ASME B31.1,<br />

or ASME B31.9, as applicable, for shop and project site welding of piping work.<br />

1.4.2 Brazing: Certify brazing procedures, brazers, and operators in accordance with ASME Boiler<br />

and Pressure Vessel Code, Section IX, for shop and job-site brazing of piping work.<br />

1.4.3 NSF Labels: Where plastic piping is indicated to transport potable water, provide pipes and<br />

pipe fittings bearing approval label by National Sanitation Foundations (NSF).<br />

1.5 Test Report and Verification Submittals:<br />

1.5.1 Submit welding certification for all welding installers.<br />

1.5.2 Submit brazing certification for all brazing installers.<br />

2 PRODUCTS<br />

2.1 Piping Materials: Provide pipe and tube of type, joint type, grade, size and weight (wall<br />

thickness or Class) indicated for each service. Where type, grade or class is not indicated,<br />

provide proper selection as determined by Installer for installation requirements, and comply<br />

with governing regulations and industry standards.<br />

2.2 Pipe/Tube Fittings: Provide factory-fabricated fittings of type, materials, grade, class and<br />

pressure rating indicated for each service and pipe size. Provide sizes and types matching<br />

pipe, tube, valve or equipment connection in each case. Where not otherwise indicated,<br />

comply with governing regulations and industry standards for selections, and with pipe<br />

manufacturer's recommendations where applicable.<br />

2.3 Piping Materials/Products:<br />

2.3.1 Soldering Materials:<br />

2.3.1.1 Tin-Antimony (95-5) Solder: ASTM B-32, Grade 95TA.<br />

2.3.1.2 Silver-Phosphorus Solder: ASTM B-32, Grade 96TS.<br />

2.3.2 Pipe Thread Tape: Teflon tape.<br />

2.3.3 Protective Coating: Koppers Bitumastic No. 505 or equal.<br />

PIPES AND PIPE FITTINGS 22 11 16 - 1/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

2.3.4 Gaskets for Flanged Joints: ANSI B16.21; full-faced for cast iron flanges; raised-face for steel<br />

flanges, unless otherwise noted.<br />

2.3.5 Welding Materials: Comply with Section II, Part C, ASME Boiler and Pressure Vessel Code for<br />

welding materials. Materials shall be determined by installer to comply with installation<br />

requirements.<br />

2.3.6 Brazing Materials: Silver content of not less than 15%. Materials shall be determined by<br />

installer to comply with installation requirements.<br />

2.4 Copper Tube and Fittings:<br />

2.4.1 Copper Tube:<br />

2.4.1.1 Copper Tube: ASTM B88; Type K or L as indicated for each service; hard-drawn temper<br />

unless specifically noted as annealed.<br />

2.4.2 Fittings:<br />

2.4.2.1 Wrought-Copper Solder-Joint Fittings: ANSI B16.22.<br />

2.4.2.2 Copper Tube Unions: Provide standard products recommended by manufacturer for use in<br />

service indicated.<br />

2.5 Steel Pipes and Pipe Fittings<br />

2.5.1 Pipes:<br />

2.5.1.1 Black Steel Pipe: ASTM A-53 or A-120, seamless.<br />

2.5.1.2 Galvanized Steel Pipe: ASTM A-53 or A-120, seamless.<br />

2.5.2 Pipe Fittings:<br />

2.5.2.1 Threaded Cast Iron: ANSI B16.4.<br />

2.5.2.2 Threaded Malleable Iron: ANSI B16.3; plain or galvanized as indicated.<br />

2.5.2.3 Malleable Iron Threaded Unions: ANSI B16.39; selected by installer for proper piping<br />

fabrication and service requirements including style, end connections, and metal-to-metal<br />

seats (iron, bronze or brass); plain or galvanized as indicated.<br />

2.5.2.4 Threaded Pipe Plugs: ANSI B16.14.<br />

2.5.2.5 Flanged Cast Iron: ANSI B16.1, including bolting.<br />

2.5.2.6 Steel Flanges/Fittings: ANSI B16.5, including bolting and gasketing.<br />

2.5.2.7 Wrought-Steel Buttwelding Fittings: ANSI B16.9, except ANSI B16.28 for short radius elbows<br />

and returns, rated to match connected pipe.<br />

2.5.2.8 Pipe Nipples: Fabricated from same pipe as used for connected pipe; except do not use less<br />

than schedule 80 pipe where length remaining unthreaded is less than 1 ½ inches, and where<br />

pipe size is less than 1 ½ inches, and do not thread nipples full length (no close-nipples).<br />

2.6 Plastic Pipes and Fittings:<br />

PIPES AND PIPE FITTINGS 22 11 16 - 2/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

2.6.1 Pipes:<br />

2.6.1.1 PVC DWV Pipe: ASTM D-2665, Schedule 40.<br />

2.6.1.2 PVC Sewer Pipe: ASTM D-3034.<br />

2.6.1.3 PVC Pressure Pipe: ASTM D-1785, Schedule 40 or 80.<br />

2.6.2 Fittings:<br />

2.6.2.1 PVC Solvent Cement: ASTM D-2564.<br />

2.6.2.2 PVC DWV Socket: ASTM D-2665.<br />

2.6.2.3 PVC Sewer Socket: ASTM D-3034.<br />

2.6.2.4 PVC Schedule 40 Socket: ASTM D-2466.<br />

2.6.2.5 PVC Schedule 80 Socket: ASTM D-2467.<br />

2.6.2.6 PVC Schedule 80 Threaded: ASTM D-2464.<br />

3 EXECUTION<br />

3.1 Installation<br />

3.1.1 General: Install pipes and pipe fittings in accordance with recognized industry practices which<br />

will achieve permanently-leak proof piping systems, capable of performing each indicated<br />

service without piping failure. Install each run with minimum joints and couplings, but with<br />

adequate and accessible unions for disassembly and maintenance or replacement of valves<br />

and equipment. Reduce sizes (where indicated) by use of reducing fittings, not bushings.<br />

Align piping accurately at connections, within 1/16" misalignment tolerance.<br />

3.1.2 Comply with ANSI B31 Code for Pressure Piping.<br />

3.1.3 Locate piping runs, except as otherwise indicated, vertically and horizontally (pitched to drain)<br />

and avoid diagonal runs wherever possible. Orient horizontal runs parallel with walls and<br />

column lines. Locate runs as shown or described by diagrams, details and notations or, if not<br />

otherwise indicated, run piping in shortest route which does not obstruct usable space or block<br />

access for servicing building and its equipment. Hold piping close to walls, overhead<br />

construction, columns and other structural and permanent-enclosure elements of building; limit<br />

clearance to ½" where furring is shown for enclosure or concealment of piping, but allow for<br />

insulation thickness, if any. Where possible, locate insulated piping for 1" clearance outside<br />

insulation.<br />

3.1.4 Concealed Piping: Unless specifically noted as “Exposed” on the drawings, conceal piping<br />

from view in finished and occupied spaces, by locating in column enclosures, chases, in hollow<br />

wall construction or above suspended ceilings; do not encase horizontal runs in solid<br />

partitions, except as indicated.<br />

3.1.5 Electrical Equipment Spaces: Do not run piping through transformer vaults and other<br />

electrical, communications, or data equipment spaces and enclosures unless shown. Install<br />

drip pan under piping that must run through electrical spaces.<br />

PIPES AND PIPE FITTINGS 22 11 16 - 3/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

3.1.5.1 Cut pipe from measurements taken at the site, not from drawings. Keep pipes free of contact<br />

with building construction and installed work.<br />

3.2 Piping System Joints: Provide joints of the type indicated in each piping system.<br />

3.2.1 Solder copper tube-and-fitting joints where indicated, in accordance with recognized industry<br />

practice. Cut tube ends squarely, ream to full inside diameter, and clean outside of tube ends<br />

and inside of fittings. Apply non-acid type solder flux to joint areas of both tubes and fittings.<br />

Insert tube full depth into fitting, and solder in manner which will draw solder full depth and<br />

circumference of joint. Wipe excess solder from joint before it hardens.<br />

3.2.2 Thread pipe in accordance with ANSI B2.1; cut threads full and clean using sharp dies. Ream<br />

threaded ends to remove burrs and restore full inside diameter. Apply pipe joint compound, or<br />

pipe joint tape (Teflon) where recommended by pipe/fitting manufacturer, on male threads at<br />

each joint and tighten joint to leave not more than 3 threads exposed. Paint exposed threads<br />

to retard rusting.<br />

3.2.3 Flanged Joints: Match flanges within piping system, and at connection with valves and<br />

equipment. Clean flange faces and install gaskets. Tighten bolts to provide uniform<br />

compression of gaskets. Bolts shall project 1/8" to 3/8" beyond nut face when tight.<br />

3.2.4 Weld pipe joints in accordance with recognized industry practice and as follows. Be guided by<br />

ANSI B.31.<br />

3.2.4.1 Weld pipe joints only when ambient temperature is above 0°F.<br />

3.2.4.2 Bevel pipe ends at a 37.5° angle where possible, smooth rough cuts, and clean to remove<br />

slag, metal particles and dirt.<br />

3.2.4.3 Use pipe clamps or tack-weld joints; 4 welds for pipe sizes to 10". All welds shall be open-butt.<br />

3.2.4.4 Build up welds with root pass, followed by filler pass and then a cover pass. Eliminate valleys<br />

at center and edges of each weld. Weld by procedures which will ensure elimination of<br />

unsound or unfused metal, cracks, oxidation, blow-holes and non-metallic inclusions.<br />

3.2.4.5 Do not weld-out piping system imperfections by tack-welding procedures; refabricate to comply<br />

with requirements.<br />

3.2.4.6 At Installer's option, install forged branch-connection fittings wherever branch pipe is less than<br />

3" and at least two pipe sizes smaller than main pipe indicated; or install regular "T" fitting.<br />

Weld-O-Let or equal.<br />

3.2.4.7 All field welding and cutting using oxygen-acetylene methods within the building shall be<br />

performed in accordance with NFPA-51B (1994).<br />

3.2.5 Plastic Pipe Joints: Comply with manufacturer's instructions and recommendations, and with<br />

applicable industry standards.<br />

3.2.5.1 Solvent-cemented joints shall be made in accordance with ASTM D-2235 and ASTM F-402.<br />

3.2.5.2 PVC sewer pipe bell/gasket joints shall be installed in accordance with ASTM D-2321.<br />

3.2.6 Braze copper tube-and-fitting joints where indicated, in accordance with ANSI B.31.<br />

3.3 Piping Installation<br />

PIPES AND PIPE FITTINGS 22 11 16 - 4/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

3.3.1 Install piping to allow for expansion and contraction.<br />

3.3.2 Isolate all copper tubing from steel and concrete by wrapping the pipe at the contact point, and<br />

for one inch on each side, with a continuous plastic sleeve. Isolate all copper tubing installed<br />

in block walls with a continuous plastic sleeve.<br />

3.3.3 Underground Piping:<br />

3.3.3.1 Provide plastic tape markers over all underground piping. Provide copper wire over all<br />

underground plastic piping. Locate markers 18" above piping.<br />

3.3.3.2 Coat the following underground (uninsulated) pipes with a heavy coat of bitumastic or provide<br />

an 8 mil polyvinyl sleeve: black steel pipe, galvanized steel pipe, copper tubing.<br />

END OF SECTION 22 11 16<br />

PIPES AND PIPE FITTINGS 22 11 16 - 5/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

This page intentionally left blank.<br />

PIPES AND PIPE FITTINGS 22 11 16 - 6/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 22 11 19 - PIPING SPECIALTIES<br />

1 GENERAL<br />

1.1 Drawings and general provisions of contract, including General and Supplementary Conditions<br />

and Division-1 Specification sections, apply to work of this section.<br />

1.2 This section is a Division-22 Basic Plumbing Materials and Methods section, and is part of<br />

each Division-22 section making reference to or requiring piping specialties specified herein.<br />

2 PRODUCTS<br />

2.1 General: Provide factory-fabricated piping specialties recommended by manufacturer for use<br />

in service indicated. Provide piping specialties of types and pressure ratings indicated for each<br />

service, or if not indicated, provide proper selection as determined by Installer to comply with<br />

installation requirements. Provide sizes as indicated, and connections, which properly mate<br />

with pipe, tube, and equipment connections. Where more than one type is indicated, selection<br />

is Installer's option.<br />

2.2 Escutcheons:<br />

2.2.1 General: Provide pipe escutcheons as specified herein with inside diameter closely fitting pipe<br />

outside diameter, or outside of pipe insulation where pipe is insulated. Select outside diameter<br />

of escutcheon to completely cover pipe penetration hole in floors, walls, or ceilings; and pipe<br />

sleeve extension, if any. Furnish pipe escutcheons with nickel or chrome finish for occupied<br />

areas, prime paint finish for unoccupied areas.<br />

2.2.2 Pipe Escutcheons for Moist Areas: For waterproof floors, and areas where water and<br />

condensation can be expected to accumulate, provide cast brass or sheet brass escutcheons,<br />

solid or split hinged.<br />

2.2.3 Pipe Escutcheons for Dry Areas: Provide sheet steel escutcheons, solid or split hinged.<br />

2.3 Fabricated Piping Specialties:<br />

2.3.1 Pipe Sleeves: Provide pipe sleeves of one of the following:<br />

2.3.1.1 Sheet-Metal: Fabricate from galvanized sheet metal; round tube closed with snaplock joint,<br />

welded spiral seams, or welded longitudinal joint. Fabricate from the following gages: 3" and<br />

smaller, 20 gage; 4" to 6" 16 gage; over 6", 14 gage.<br />

2.3.1.2 Steel-Pipe: Fabricate from Schedule 40 galvanized steel pipe; remove burrs.<br />

2.3.1.3 Iron-Pipe: Fabricate from cast-iron or ductile-iron pipe; remove burrs.<br />

2.3.2 Sleeve Seals: Provide sleeve seals for sleeves located in foundation walls below grade, or in<br />

exterior walls, of one of the following:<br />

2.3.2.1 Caulking and Sealant: Provide foam or caulking and sealant compatible with piping materials<br />

used.<br />

3 EXECUTION<br />

3.1 Pipe Escutcheons: Install pipe escutcheons on each pipe penetration through floors, walls,<br />

partitions, and ceilings where penetration is exposed to view; and on exterior of building.<br />

PIPING SPECIALTIES 22 11 19 - 1/2


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

Secure escutcheon to pipe or insulation so escutcheon covers penetration hole, and is flush<br />

with adjoining surface.<br />

3.2 Fire Barrier Penetration Seals: Provide pipe sleeve as required. Refer to Division 7.<br />

3.3 Pipe Sleeves: Install pipe sleeves of types indicated where piping passes through walls,<br />

floors, ceilings, and roofs. Do not install sleeves through structural members of work, except<br />

as detailed on drawings, or as reviewed by Architect/Engineer. Install sleeves accurately<br />

centered on pipe runs. Size sleeves so that piping and insulation (if any) will have free<br />

movement in sleeve, including allowance for thermal expansion; but not less than 2 pipe sizes<br />

larger than piping run. Where insulation includes vapor-barrier jacket, provide sleeve with<br />

sufficient clearance for installation. Install length of sleeve equal to thickness of construction<br />

penetrated, and finish flush to surface; except floor sleeves. Extend floor sleeves ¼" above<br />

level floor finish, and ¾" above floor finish sloped to drain. Provide temporary support of<br />

sleeves during placement of concrete and other work around sleeves, and provide temporary<br />

closure to prevent concrete and other materials from entering sleeves.<br />

3.3.1 Install sleeves in fire-rated assemblies in accordance with the listing of the assembly and the<br />

fire barrier sealant.<br />

3.3.2 Install sheet-metal sleeves at interior partitions and ceilings other than suspended ceilings. Fill<br />

annular space with caulking or fire barrier sealant as required.<br />

3.3.3 Install steel-pipe sleeves at floor penetrations. Fill annular space with caulking or fire barrier<br />

sealant as required.<br />

3.3.4 Install iron-pipe sleeves at all foundation wall penetrations and at exterior penetrations; both<br />

above and below grade. Fill annular space with caulking or mechanical sleeve seals.<br />

END OF SECTION 22 11 19<br />

PIPING SPECIALTIES 22 11 19 - 2/2


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 22 13 16 - SOIL, WASTE AND VENT SYSTEM<br />

1 GENERAL<br />

1.1 Drawings and general provisions of Contract, including General and Supplementary Conditions<br />

and Division-1 Specification sections, apply to work of this section.<br />

1.2 Division-22 Basic Plumbing Requirements and Basic Plumbing Materials and Methods sections<br />

apply to work of this section.<br />

1.3 Extent of soil waste and vent systems work is indicated on drawings and schedules, and by<br />

requirements of this section.<br />

1.4 Refer to appropriate Division-2 sections for exterior sanitary sewer system required in conjunction<br />

with soil and waste systems; not work of this section.<br />

1.5 Excavation and backfill required in conjunction with soil, waste and vent piping is specified in<br />

other Division-22 sections and is included as work of this section.<br />

1.6 Refer to Division-7 section "Flashing and Sheet Metal" for flashings required in conjunction with<br />

soil and waste systems; not work of this section.<br />

1.7 Code Compliance: Comply with applicable portions of Florida Building Code-Plumbing pertaining<br />

to plumbing materials, construction and installation of products. Comply with local utility<br />

requirements.<br />

1.8 Approval Submittals:<br />

1.8.1 Product Data: Submit manufacturer's technical product data for:<br />

Cleanouts<br />

Floor drains<br />

2 PRODUCTS<br />

2.1 General: Provide piping materials and factory-fabricated piping products of sizes, types, pressure<br />

ratings, and capacities as indicated. Where not indicated, provide proper selection as determined<br />

by Installer to comply with installation requirements. Provide sizes and types matching piping and<br />

equipment connections; provide fittings of materials which match pipe materials used in soil and<br />

waste systems. Where more than one type of materials or products is indicated, selection is<br />

Installer's option.<br />

Underground-Type Plastic Line Marker: Manufacturer's standard permanent, bright-colored,<br />

continuous-printed plastic tape, intended for direct-burial service; not less than 6" wide x 4 mils<br />

thick. Provide green tape with black printing reading "CAUTION SEWER LINE BURIED<br />

BELOW".<br />

2.2 Acceptable Manufacturers: Subject to compliance with requirements, provide products of one of<br />

the following listed for each item.<br />

2.3 Pipes and Fittings: Provide pipes and pipe fittings complying with Division-22 Basic Plumbing<br />

Materials and Methods section "Pipes and Pipe Fittings", in accordance with the following listing:<br />

2.3.1 Above Ground Soil, Waste, and Vent Piping:<br />

2.3.1.1 Polyvinyl chloride plastic pipe (PVC); Type DWV; PVC plastic type DWV socket-type fitting,<br />

SOIL, WASTE, AND VENT SYSTEM 22 13 16 - 1/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

solvent cement joints. Do not use in fire-rated assemblies or return air plenums.<br />

2.3.2 Underground Building Drain Piping (within 5 feet of the building):<br />

2.3.2.1 Pipe Size 6" and Smaller: Polyvinyl chloride sewer pipe (PVC); Type DWV; PVC plastic type<br />

DWV socket-type.<br />

2.4 Pipe Specialties: Provide piping specialties complying with Division-22 Basic Materials and<br />

Methods section "Piping Specialties".<br />

2.5 Supports and Anchors: Provide supports and anchors complying with Division-22 Basic<br />

Plumbing Materials and Methods section "Supports and Anchors".<br />

2.6 Cleanouts: Provide factory-fabricated drainage piping products of size and type indicated.<br />

Where not indicated, provide proper selection as determined by Installer to comply with<br />

installation requirements and governing regulations. Josam, Jay R. Smith, Wade, Zurn.<br />

2.6.1 Cleanout Plugs: Cast-bronze or brass, threads complying with ANSI B2.1 countersunk head.<br />

2.6.2 Cleanout for PVC Systems:<br />

2.6.2.1 Floor Cleanouts: Cast-iron body with adjustable head, brass plug, and scoriated nick-brass<br />

cover. Furnish with carpet flange for carpeted floors. Furnish with recessed cover for tile floors.<br />

Furnish with clamping ring for floors with membrane. Wade W-6030 hub outlet for push-on.<br />

2.6.2.2 Cleanouts in Piping: PVC cleanout adaptor with threaded PVC plug.<br />

2.6.2.3 Wall Cleanouts: PVC cleanout adaptor with tapped, countersunk, threaded brass plug. Square<br />

8.75”x8.75” hinged wall access cover, with scoriated nickel bronze finish.<br />

2.6.2.4 Grade Cleanouts: PVC cleanout adaptor with countersunk, threaded brass plug. Wade W-8590-<br />

D plug. In sidewalks and other finished concrete, provide access cover frames with a non-tilting<br />

tractor cover. Wade W-7035-Z or equal.<br />

2.6.2.5 Cleanouts in Paved Areas: Cast iron body, adjustable housing, ferrule with plug and round loose<br />

scoriated tractor cover. Wade W-8300-MF. Coordinate concrete depth at site with adjustable<br />

flange.<br />

2.7 Floor Drains: Provide floor drains of size as indicated on drawings; and type, including features,<br />

as specified herein. Josam, Jay R. Smith, Wade, Zurn.<br />

2.7.1 Floor Drains: Provide inside caulk bottom outlet or TY-Seal hub outlet with adaptor for cast iron<br />

trap installation and a 4" deep trap seal. Provide clamping rings for floors with membrane.<br />

2.7.2 Strainer: Provide 5" satin-nickel bronze strainer.<br />

2.7.3 Trap Primer Connection: Provide ½" trap primer tapping.<br />

2.7.4 Basis of Design: Wade Series 1100.<br />

3 EXECUTION<br />

3.1 Examine substrates and conditions under which soil and waste systems are to be installed. Do<br />

not proceed with work until unsatisfactory conditions have been corrected.<br />

3.2 Piping Installation:<br />

SOIL, WASTE, AND VENT SYSTEM 22 13 16 - 2/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

3.2.1 Install above grade soil and waste piping in accordance with Division-22 Basic Plumbing<br />

Materials and Methods section "Pipes and Pipe Fittings", and with Florida Building Code-<br />

Plumbing.<br />

3.2.2 Install underground soil and waste pipes as indicated and in accordance with Florida Building<br />

Code-Plumbing. Lay underground piping beginning at low point of systems, true to grades and<br />

alignment indicated with unbroken continuity of invert. Place bell ends of piping facing upstream.<br />

Install required gaskets in accordance with manufacturer's recommendations for use of<br />

lubricants, cements, and other special installation requirements. Clean interior of piping of dirt<br />

and other superfluous material as work progresses. Maintain swab or drag in line and pull past<br />

each joint as it is completed. Place plugs in ends of uncompleted piping at end of day or<br />

whenever work stops.<br />

3.2.3 Install building soil and vent piping pitched to drain at minimum slope of ¼" per foot (2%) for<br />

piping smaller than 3", and 1/8" per foot (1%) for piping 3" and larger.<br />

3.3 Install piping specialties in accordance with Division-22 Basic Plumbing Materials and Methods<br />

section "Piping Specialties".<br />

3.4 Install supports and anchors in accordance with Division-22 Basic Plumbing Materials and<br />

Methods section "Supports and Anchors".<br />

3.5 Installation of Cleanouts: Install in above ground piping and building drain piping as indicated, as<br />

required by Florida Building Code-Plumbing; and at each change in direction of piping greater<br />

than 45°; at minimum intervals of 50' for piping 4" and smaller and 100' for larger piping; and at<br />

base of each vertical soil or waste stack. Install floor and wall cleanout covers for concealed<br />

piping, select type to match adjacent building finish.<br />

3.5.1 Size: Cleanouts shall be full size up to 4". Piping over 4" shall have a reducing fitting to<br />

accommodate a 4" cleanout unless indicated otherwise on drawings.<br />

3.5.2 Install cleanouts to allow adequate clearance for rodding.<br />

3.5.3 Protect all finished surfaces of cleanouts with a suitable adhesive covering until construction is<br />

completed.<br />

3.5.4 Cleanouts to Grade: Provide an 18" x 18" x 8" thick concrete pad around the cleanout. Set the<br />

cleanout ferrule, adapter, or access cover frame in the concrete as required. The cleanout shall<br />

be extended to the finished grade. The concrete pad shall slope away from the cleanout in all<br />

directions approximately one inch. Cover pad with fill to finished grade.<br />

3.5.5 Cleanouts in Paved Areas: Provide concrete pad similar to cleanout to grade and coordinate<br />

concrete depth at site with adjustable flange. Access cover frames are required.<br />

3.6 Flashing Flanges: Install flashing flange and clamping device with each stack and cleanout<br />

passing through waterproof membranes.<br />

3.7 Vent Flashing Sleeves: Install on stack passing through roof, secure to stack flashing in<br />

accordance with manufacturer’s instructions. For metal roofs, sleeves and flashing are by<br />

Division-7.<br />

3.8 Installation of Floor Drains: Install floor drains in accordance with manufacturer's written<br />

instructions and in locations indicated.<br />

3.8.1 Coordinate flashing work with work of waterproofing and adjoining substrate work.<br />

SOIL, WASTE, AND VENT SYSTEM 22 13 16 - 3/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

3.8.2 Install floor drains at low points of surface areas to be drained, or as indicated. Set tops of drains<br />

flush with finished floor.<br />

3.8.3 Install drain flashing collar or flange so that no leakage occurs between drain and adjoining<br />

flooring. Maintain integrity of waterproof membranes, where penetrated.<br />

3.8.4 Position drains so that they are accessible and easy to maintain.<br />

3.9 Connection of Trap Primers: Connect trap primers as indicated, and in accordance with<br />

manufacturer's installation instructions. Pitch piping towards drain trap, minimum of 1/8" per foot<br />

(1%). Adjust trap primer for proper flow.<br />

3.10 Piping Runouts to Fixtures: Provide soil and waste piping runouts to plumbing fixtures and<br />

drains, with approved trap, of sizes indicated, but in no case smaller than required by Florida<br />

Building Code-Plumbing.<br />

3.11 Test, clean, flush, and inspect soil and waste piping in accordance with requirements of Division-<br />

22 Basic Plumbing Materials and Methods section "Testing, Cleaning and Sterilization of Piping<br />

Systems".<br />

END OF SECTION 22 13 16<br />

SOIL, WASTE, AND VENT SYSTEM 22 13 16 - 4/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 15420 - STORM WATER SYSTEM<br />

1 GENERAL<br />

1.1 Drawings and general provisions of Contract, including General and Supplementary Conditions<br />

and Division-1 Specification sections, apply to work of this section.<br />

1.2 Division 22 Basic Mechanical Requirements and Basic Mechanical Materials and Methods<br />

sections apply to work of this section.<br />

1.3 Extent of storm water systems work, is indicated on drawings and by requirements of this<br />

section.<br />

1.4 Refer to other Division 22 sections for site storm water systems; not work of this section.<br />

1.5 Refer to appropriate Division-2 sections for exterior storm sewer system required in<br />

conjunction with storm water systems; not work of this section.<br />

1.6 Insulation for storm water systems is specified in other Division 22 sections, and is included as<br />

work of this section. Insulation requirements include:<br />

Storm water piping above ceilings.<br />

1.7 Excavation and backfill required in conjunction with storm water piping is specified in other<br />

Division 22 sections, and is included as work of this section.<br />

1.8 Refer to Division-7 section "Flashing and Sheet metal" for flashings required in conjunction<br />

with storm water systems; not work of this section.<br />

1.9 Code Compliance: Comply with applicable portions of Florida Building Code-Plumbing<br />

pertaining to plumbing materials construction and installation of products. Comply with local<br />

utility requirements.<br />

1.10 Approval Submittals:<br />

1.10.1 Product Data: Submit manufacturer's technical product data for:<br />

Cleanouts<br />

Roof drains<br />

1.11 O&M Data Submittals: Submit a copy of all approval submittals. Include these data in O&M<br />

manual.<br />

2 PRODUCTS<br />

2.1 General: Provide piping materials and factory-fabricated piping products of sizes, types,<br />

pressure ratings, and capacities as indicated. Where not indicated, provide proper selection<br />

as determined by Installer to comply with installation requirements. Provide sizes and types<br />

matching piping and equipment connections; provide fittings of materials which match pipe<br />

materials used in storm water systems. Where more than one type of materials or products is<br />

indicated, selection is Installer's option.<br />

Underground-Type Plastic Line Marker: Manufacturer's standard permanent, bright-colored,<br />

continuous-printed plastic tape, intended for direct-burial service; not less than 6" wide x 4 mils<br />

thick. Provide green tape with black printing reading "CAUTION SEWER LINE BURIED<br />

BELOW".<br />

STORM WATER SYSTEM 22 14 00 - 1/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

2.2 Acceptable Manufacturers: Subject to compliance with requirements, provide products of one<br />

of the following listed for each item.<br />

2.3 Pipes and Fittings: Provide pipes and pipe fittings complying with Division 22 Basic<br />

Mechanical Materials and Methods section "Pipes and Pipe Fittings", in accordance with the<br />

following listing:<br />

2.3.1 Above Ground Conductor Piping:<br />

2.3.1.1 Polyvinyl chloride plastic pipe (PVC); Type DWV; PVC plastic type DWV socket-type fittings,<br />

solvent cement joints. Do not use in fire-rated assemblies or return air plenums.<br />

2.3.2 Underground Building Drain Piping (within 5 feet of the building):<br />

2.3.2.1 Polyvinyl chloride plastic pipe (PVC); Type DWV; PVC plastic type DWV socket-type fittings,<br />

solvent cement joints.<br />

2.4 Piping Specialties: Provide piping specialties complying with Division 22 Basic Mechanical<br />

Materials and Methods section "Piping Specialties".<br />

2.5 Supports and Anchors: Provide supports and anchors, complying with Division 22 Basic<br />

Mechanical Materials and Methods section "Supports, and Anchors".<br />

2.6 Cleanouts: Provide factory-fabricated drainage piping products of size and type indicated.<br />

Where not indicated, provide proper selection as determined by Installer to comply with<br />

installation requirements and governing regulations. Josam, Jay R. Smith, Wade, Zurn.<br />

2.6.1 Cleanout Plugs: Cast-bronze or brass, threads complying with ANSI B2.1, countersunk head.<br />

2.6.2 Cleanouts for PVC Systems:<br />

2.6.2.1 Floor Cleanouts: Cast iron body with adjustable head, brass plug, and scoriated nickel-brass<br />

cover. Furnish with recessed cover for tile floors. Furnish with clamping ring for floors with<br />

membrane. Wade W-6030 hub outlet for push-on.<br />

2.6.2.2 Cleanouts in Piping: PVC cleanout adaptor with threaded PVC plug.<br />

2.6.2.3 Grade Cleanouts: PVC cleanout adaptor with countersunk, threaded brass plug. Wade W-<br />

8590-D plug. In sidewalks and other finished concrete, provide access cover frames with a<br />

non-tilting tractor cover. Wade W-7035-Z or equal.<br />

2.6.2.4 Cleanouts in Paved Areas: Cast iron body, adjustable housing, ferrule with plug and round<br />

loose scoriated tractor cover. Wade W-8300-MF. Coordinate concrete depth at site with<br />

adjustable flange.<br />

2.7 Roof Drains: Provide roof drains of size as indicated on drawings; and type, including<br />

features, as specified herein. Josam, Jay R. Smith, Wade, Zurn. Basis of design: Zurn ZRB-<br />

100 cast iron roof drain with adjustable extension and reversible deck ring, gravel stop integral<br />

with flashing collar, underdeck clamp, and plain bronze mushroom dome. Plastic dome not<br />

acceptable. Furnish 36" x 36", 16 oz. copper or 4 lb. sheet lead roof flashing for each drain.<br />

3 EXECUTION<br />

3.1 Examine substrate and conditions under which storm water system is to be installed. Do not<br />

proceed with work until unsatisfactory conditions have been corrected in manner acceptable to<br />

STORM WATER SYSTEM 22 14 00 - 2/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

Installer.<br />

3.2 Piping Installation:<br />

3.2.1 Install above grade storm water piping in accordance with Division 22 Basic Mechanical<br />

Materials and Methods section, "Pipes and Pipe Fittings", and with Florida Building Code-<br />

Plumbing.<br />

3.2.2 Install underground storm water piping as indicated and in accordance with Florida Building<br />

Code-Plumbing. Lay underground storm water piping beginning at low point of systems, true<br />

to grade and alignment indicated with unbroken continuity of invert. Place bell ends of piping<br />

facing upstream. Install required gaskets in accordance with manufacturer's recommendations<br />

for use of lubricants, cements, and other special installation requirements. Clear interior of<br />

piping of dirt and other superfluous material as work progresses. Maintain swab or drag in line<br />

and pull past each joint as it is completed. Place plugs in ends of uncompleted piping at end of<br />

day or whenever work stops.<br />

3.2.3 Install building storm water piping pitched to drain at minimum slope of 1/8" per foot (1%) or as<br />

shown on the drawings.<br />

3.3 Install piping specialties in accordance with requirements of Division 22 Basic Mechanical<br />

Materials and Methods section "Piping Specialties".<br />

3.4 Install supports and anchors, in accordance with Division 22 Basic Mechanical Materials and<br />

Methods section "Supports and Anchors".<br />

3.5 Install expansion joints on vertical risers as indicated, and as required by Florida Building<br />

Code-Plumbing.<br />

3.6 Installation of Cleanouts: Install in conductor piping and storm drain piping as indicated, as<br />

required by Florida Building Code-Plumbing; at each change in direction of piping greater than<br />

45°; at minimum intervals of 50' for piping 4" and smaller and 100' for larger piping; and at<br />

base of each conductor. Install floor and wall cleanout covers for concealed piping, select type<br />

to match adjacent building finish.<br />

3.6.1 Size: Cleanouts shall be full size up to 4". Piping over 4" shall have a reducing fitting to<br />

accommodate a 4" cleanout unless indicated otherwise on drawings.<br />

3.6.2 Install cleanouts to allow adequate clearance for rodding.<br />

3.6.3 Protect all finished surfaces of cleanouts with a suitable adhesive covering until construction is<br />

completed.<br />

3.6.4 Cleanouts to Grade: Provide an 18" x 18" x 8" thick concrete pad around the cleanout. Set<br />

the cleanout ferrule, adapter, or access cover frame in the concrete as required. The cleanout<br />

shall be extended to the finished grade. The concrete pad shall slope away from the cleanout<br />

in all directions approximately one inch. Cover pad with fill to finished grade.<br />

3.6.5 Cleanouts in Paved Areas: Provide concrete pad similar to cleanout to grade and coordinate<br />

concrete depth at site with adjustable flange. Access cover frames are required.<br />

3.6.6 Flashing Flanges: Install flashing flange and clamping device with each cleanout passing<br />

through waterproof membrane.<br />

3.7 Installation of Roof Drains: Install roof drains in accordance with manufacturer's written<br />

instructions and in locations indicated.<br />

STORM WATER SYSTEM 22 14 00 - 3/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

3.7.1 Coordinate flashing work with work of roofing, water-proofing and adjoining substrate work.<br />

3.7.2 Coordinate with roofing as necessary to interface roof drains with roofing work.<br />

3.7.3 Install roof drains at low points of surface areas to be drained, or as indicated.<br />

3.7.4 Install drain flashing collar or flange so that no leakage occurs between roof drain and<br />

adjoining roofing. Maintain integrity of waterproof membranes, where penetrated.<br />

3.7.5 Position roof drains so that they are accessible and easy to maintain.<br />

3.8 Test, clean, flush, and inspect storm water piping in accordance with requirements of Division<br />

22 Basic Mechanical Materials and Methods section "Testing, Cleaning and Sterilization of<br />

Piping Systems".<br />

END OF SECTION 22 14 00<br />

STORM WATER SYSTEM 22 14 00 - 4/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 22 16 00 - GAS SYSTEM<br />

1 GENERAL<br />

1.1 Drawings and general provisions of Contract, including General and Supplementary Conditions<br />

and Division-1 Specifications sections, apply to work of this section.<br />

1.2 Division 22 Basic Mechanical Requirements and Basic Mechanical Materials and Methods<br />

sections apply to work of this section.<br />

1.3 Extent of gas systems work, is indicated on drawings and schedules, and by requirements of<br />

this section.<br />

1.4 Excavation and backfill required in conjunction with gas service piping is specified in Division-<br />

22 sections, and is included as work of this section.<br />

1.5 Codes and Standards<br />

1.5.1 NFPA Compliance: Fabricate and install gas systems in accordance with NFPA 54 "National<br />

Fuel Gas Code".<br />

1.5.2 Utility Compliance: Fabricate and install gas systems in accordance with local gas utility<br />

company requirements and standards.<br />

1.6 Approval Submittals:<br />

1.6.1 Product Data: Submit manufacturer's technical product data and installation instructions as<br />

follows:<br />

Gas cocks and/or ball valves<br />

Gas appliance connectors<br />

Access doors<br />

1.7 O&M Data Submittals: Submit a copy of approval submittals. Submit maintenance data and<br />

parts lists for gas cocks and ball valves. Include these data in O&M manual.<br />

2 PRODUCTS<br />

2.1 General: Provide piping materials and factory-fabricated piping products of sizes, types,<br />

pressure ratings, and capacities as indicated. Where not indicated, provide proper selection<br />

as determined by Installer to comply with installation requirements. Provide materials and<br />

products complying with NFPA 54 where applicable. Base pressure rating on gas piping<br />

system maximum design pressures. Provide sizes and types matching piping and equipment<br />

connections; provide fittings of materials which match pipe materials used in gas systems.<br />

Where more than one type of materials or products are indicated, selection is Installer's option.<br />

2.2 Identification: Provide identification complying with Division 22 Basic Mechanical Materials<br />

and Methods section "Mechanical Identification".<br />

2.3 Pipes and Fittings: Provide pipes and pipe fittings complying with Division 22 Basic<br />

Mechanical Materials and Methods section "Pipes and Pipe Fittings", in accordance with the<br />

following listing:<br />

2.3.1 Gas Service Piping:<br />

2.3.1.1 All Pipe Sizes: Black steel pipe; Schedule 40; wrought-steel buttwelding fittings.<br />

GAS SYSTEM 22 16 00 - 1/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

2.3.1.2 Wrapping: Machine wrap pipe using 50% overlap wrap, with polyvinyl chloride tape. Hand<br />

wrap fittings using 100% overlap wrap extending 6" beyond fitting onto wrapped pipe. Comply<br />

with tape manufacturer's installation instructions.<br />

2.3.1.3 Pipe Sizes ½" Through 12": Thermoplastic gas pressure pipe, tubing, and fittings complying<br />

with ASTM D 2513.<br />

2.3.1.4 Pipe Sizes 2" Through 12": Reinforced epoxy resin gas pressure pipe and fittings complying<br />

with ASTM D 2517.<br />

2.3.2 Building Distribution Piping:<br />

2.3.2.1 Pipe Size 2" and Smaller: Black steel pipe; Schedule 40; malleable-iron threaded fittings.<br />

2.3.2.2 Pipe Size 2½" and Larger: Black steel pipe; Schedule 40; wrought-steel buttwelding fittings.<br />

2.4 Piping Specialties: Provide piping specialties complying with Division 22 Basic Mechanical<br />

Materials and Methods section "Piping Specialties".<br />

2.5 Sealants: Provide UL-listed or AGA approved sealants for gas piping.<br />

2.6 Supports and Anchors: Provide supports and anchors complying with Division 22 Basic<br />

Mechanical Materials and Methods section "Supports and Anchors".<br />

2.7 Valves: Provide valves complying with Division 22 Basic Mechanical Materials and Methods<br />

section “Valves” and in accordance with the following listing.<br />

2.7.1 Gas Cocks 2" and Smaller: UL-listed, AGA approved, 150 psi non-shock WOG, full port,<br />

bronze straightway cock, flat or square head, threaded ends.<br />

2.7.2 Gas Cocks 2½" and Larger: UL-listed, CGA approved, MSS SP-78; 175 psi, lubricated plug<br />

type, full port, semi-steel body, single gland, wrench operated, flanged ends.<br />

2.7.3 Acceptable Manufacturers for gas cocks: Subject to compliance with requirements, provide<br />

products of one of the following: Resun R1430 and R1431, Milliken 200M and 201M or<br />

approved equal.<br />

2.8 Gas Appliance Tube Connectors: Provide commercial grade appliance connectors with a 2<br />

year manufacturer’s warranty. Tubing shall be Type 304 stainless steel tubing with type 304<br />

stainless steel braiding to protect tubing from elongation. Tubing shall be complete with<br />

factory installed end connectors. Provide products that are AGA or CGA approved. Indicate<br />

maximum BTU input for each length and size used on submittal.<br />

2.9 Gas Meter and Regulator: Provided by local utility company.<br />

2.10 Access Doors: Provide access doors to service all valves and other devices as required in<br />

accordance with Division 22 Basic Materials and Methods Section “Access Doors”.<br />

3 EXECUTION<br />

3.1 Examine areas and conditions under which gas systems materials and products are to be<br />

installed. Do not proceed with work until unsatisfactory conditions have been corrected in<br />

manner acceptable to Installer. Coordinate with gas supplier prior to starting work.<br />

3.2 Install mechanical identification in accordance with Division 22 Basic Mechanical Materials and<br />

GAS SYSTEM 22 16 00 - 2/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

Methods section "Mechanical Identification".<br />

3.3 Install gas piping in accordance with Division 22 Basic Mechanical Materials and Methods<br />

section "Pipes and Pipe Fittings".<br />

3.3.1 Use sealants on metal gas piping threads which are chemically resistant to gas. Use sealants<br />

sparingly, and apply to only male threads of metal joints.<br />

3.3.2 Remove cutting and threading burrs before assembling piping.<br />

3.3.3 Do not install defective piping or fittings. Do not use pipe with threads which are chipped,<br />

stripped or damaged. Do not use bushings in the gas system.<br />

3.3.4 Plug each gas outlet, including valves, with threaded plug or cap immediately after installation<br />

and retain until continuing piping, or equipment connections are completed.<br />

3.3.5 Ground gas piping electrically and continuously within project, and bond tightly to grounding<br />

connection.<br />

3.3.6 Install drip-legs in gas piping where indicated, and where required by code or gas company<br />

requirements.<br />

3.3.7 Install "Tee" fitting with bottom outlet plugged or capped, at bottom of pipe risers.<br />

3.3.8 Use dielectric unions where dissimilar metals are joined together.<br />

3.3.9 Install piping with 1/64" per foot downward slope in direction of flow.<br />

3.3.10 Install piping parallel to other piping, but maintain minimum of 12" clearance between gas<br />

piping and steam or hydronic piping above 200°F.<br />

3.4 Gas Service: Arrange with utility company to provide gas service to indicated location with<br />

meter, pressure regulator and shutoff at terminus. Consult with utility as to extent of its work,<br />

costs, fees, and permits involved. The Contractor shall pay such costs and fees and obtain<br />

permits.<br />

3.5 Install piping specialties in accordance with Division 22 Basic Mechanical Materials and<br />

Methods section "Piping Specialties".<br />

3.6 Install supports and anchors in accordance with Division 22 Basic Mechanical Materials and<br />

Methods section "Supports and Anchors".<br />

3.7 Installation of Valves:<br />

3.7.1 Gas Cocks: Provide at connection to gas train for each gas-fired equipment item; and on<br />

risers and branches where indicated.<br />

3.7.2 Locate gas cocks where easily accessible, and where they will be protected from possible<br />

injury.<br />

3.7.3 Control Valves: Install as indicated. Refer to Division 16 for wiring; not work of this section.<br />

3.8 Equipment Connections: Connect gas piping to each gas-fired equipment item, with drip leg<br />

and shutoff gas cock. Comply with equipment manufacturer's instructions.<br />

3.9 Appliance Connectors: Install tubing, valves, connectors, fittings in accordance with their<br />

GAS SYSTEM 22 16 00 - 3/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

listing. Hose, fittings and valves shall not restrict gas flow and shall be rated for the capacity of<br />

the appliance they serve. Hoses shall not be crimped. Hoses behind movable appliances<br />

shall not be crimped when appliance is extended from wall or when appliance is set in working<br />

position. Appliance restraining device shall set to engage just prior to the connector being fully<br />

extended. Check all tubing, piping, fittings & valves for leakage at less than 50 part per million.<br />

3.10 Locate and coordinate installation of access doors for all valves and devices in accordance<br />

with Division 22 Basic Mechanical Materials and Methods section “Access Doors”.<br />

3.11 Piping Tests: Inspect, test, and purge gas systems in accordance with NFPA 54, local utility<br />

requirements, and Division 22 Basic Mechanical Materials and Methods section "Testing,<br />

Cleaning and Sterilization of Piping Systems".<br />

END OF SECTION 22 16 00<br />

GAS SYSTEM 22 16 00 - 4/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 22 30 00 - PLUMBING FIXTURES, EQUIPMENT, TRIM & SCHEDULE<br />

1 GENERAL<br />

1.1 Drawings and general provisions of Contract, including General and Supplementary Conditions<br />

and Division-1 Specification sections, apply to work of this section.<br />

1.2 Division-22 Basic Plumbing Requirements and Basic Plumbing Materials and Methods<br />

sections apply to work of this section.<br />

1.3 Extent of plumbing fixtures work required by this section is indicated on drawings and<br />

schedules, and by requirements of this section.<br />

1.4 Refer to Division-26 sections for field-installed electrical wiring required for plumbing fixtures;<br />

not work of this section.<br />

1.5 Codes and Standards:<br />

1.5.1 Plumbing Fixture Standards: Comply with applicable portions of Florida Building Code-<br />

Plumbing pertaining to materials and installation of plumbing fixtures.<br />

1.5.2 ANSI Standards: Comply with applicable ANSI standards pertaining to plumbing fixtures and<br />

systems.<br />

1.5.3 PDI Compliance: Comply with standards established by PDI pertaining to plumbing fixture<br />

supports.<br />

1.5.4 UL Listing: Construct plumbing fixtures requiring electrical power in accordance with UL<br />

standards and provide UL-listing and label.<br />

1.5.5 ARI Compliance: Construct and install water coolers in accordance with ARI Standard 1010<br />

"Drinking-Fountains and Self-Contained Mechanically-Refrigerated Drinking-Water Coolers",<br />

and provide Certification Symbol.<br />

1.5.6 ANSI Compliance: Construct and install barrier-free plumbing fixtures in accordance with<br />

ANSI Standard A117.1 "Specifications for Making Buildings and Facilities Accessible To and<br />

Usable By Physically Handicapped People".<br />

1.6 Approval Submittals:<br />

1.6.1 Product Data: Submit manufacturer's technical product data, including rated capacities of<br />

selected model clearly indicated, furnished specialties and accessories; and installation<br />

instructions. Submit manufacturer's assembly-type drawings indicating dimensions, roughingin<br />

requirements, required clearances, and methods of assembly of components and<br />

anchorages. The submittal shall be organized by “fixture number” and each fixture package<br />

shall be so identified. Each fixture package shall include all of the required fitting and trim,<br />

even if such devices are used for more than one fixture.<br />

1.7 O&M Data Submittals: Submit a copy of approval submittals. Submit maintenance data and<br />

parts lists for each type of plumbing fixture and accessory; including "trouble-shooting"<br />

maintenance guide. Include these data in O&M manual.<br />

1.8 Handle plumbing fixtures carefully to prevent breakage, chipping and scoring fixture finish. Do<br />

not install damaged plumbing fixtures; replace and return damaged units to equipment<br />

manufacturer.<br />

PLUMBING FIXTURES, EQUIPMENT, TRIM & SCHEDULE 22 30 00 - 1/10


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

2 PRODUCTS<br />

2.1 General: Provide factory-fabricated fixtures of type, style and material indicated. For each<br />

type fixture, provide trim, carrier, seats, and valves as specified. Where not specified, provide<br />

products as recommended by manufacturer, and as required for complete installation. Where<br />

more than one type is indicated, selection is Installer's option; but, all fixtures of same type<br />

must be furnished by single manufacturer. Where type is not otherwise indicated, provide<br />

fixtures complying with governing regulations.<br />

2.2 Model Numbers: Basis of design model numbers of a particular manufacturer are listed in the<br />

fixture schedule as an aid to contractors. Where conflicts between the model number and the<br />

written description occur, the written description shall govern. Where acceptable<br />

manufacturers are listed, products are subject to compliance with requirements.<br />

2.3 Materials:<br />

2.3.1 Provide materials which have been selected for their surface flatness and smoothness.<br />

Exposed surfaces which exhibit pitting seam marks, roller marks, foundry sand holes, stains,<br />

decoloration, or other surface imperfections on finished units are not acceptable.<br />

2.3.2 All fixtures shall be white vitreous china unless otherwise specifically noted. Where enameled<br />

iron fixtures are specified, they shall be furnished with acid resisting enamel.<br />

2.3.3 Where fittings, trim and accessories are exposed or semi-exposed provide bright chromeplated<br />

or polished stainless steel units. Provide copper or brass where not exposed.<br />

2.3.4 Stainless Steel Sheets: ASTM A 167, Type 302/304, hardest workable temper. Finish shall be<br />

No. 4, bright, directional polish on exposed surfaces.<br />

2.3.5 Vitreous China: High quality, free from fire cracks, spots, blisters, pinholes and specks; glaze<br />

exposed surfaces, and test for crazing resistance in accordance with ASTM C 554.<br />

2.3.6 Synthetic Stone: High quality, free from defects, glaze on exposed surfaces, stain resistant.<br />

2.4 Plumbing Fittings, Trim and Accessories:<br />

2.4.1 Faucets: At locations where water is supplied (by manual, automatic or remote control),<br />

provide commercial quality chrome-plated, cast-brass faucets, valves, or other dispensing<br />

devices, of type and size indicated, and as required to operate as indicated.<br />

2.4.1.1 Aerators: Provide aerators of types approved by Health Department having jurisdiction.<br />

2.4.1.2 Acceptable Manufacturers: Subject to compliance with requirements, provide products of one<br />

of the following for each item. American Standard, Chicago Faucet Co., Kohler Co.,<br />

Speakman Co., T & S Brass and Bronze Works, Water Saver Faucet Co.<br />

2.4.2 Stops: Provide chrome-plated brass, angle type, manual shutoff valves and 3/8" chromeplated<br />

flexible supply pipes to permit fixture servicing without shutdown of water supply piping<br />

systems for all fixtures. Coordinate with fixture requirements.<br />

2.4.2.1 Provide loose key stops.<br />

2.4.2.2 Acceptable Manufacturers: Subject to compliance with requirements, provide products of one<br />

of the following for each item. Zurn or approved equal.<br />

2.4.3 Waste Outlets: Provide removable P-traps, drains, waste arms, tailpieces and wastes-to-wall<br />

PLUMBING FIXTURES, EQUIPMENT, TRIM & SCHEDULE 22 30 00 - 2/10


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

where drains are indicated for direct connection to drainage system for all fixtures unless<br />

otherwise noted. Provide drains, tailpieces and waste arms where indirect drains are<br />

indicated. Waste outlets shall be full size of fixture drain connection.<br />

2.4.3.1 Provide chrome-plated cast-brass P-traps and drains with cleanout.<br />

2.4.3.2 P-traps, wastes and drains of all types shall be 17-gauge.<br />

2.4.3.3 Acceptable Manufacturers: Subject to compliance with requirements, provide products of one<br />

of the following for each item. Zurn, or approved equal.<br />

2.4.4 Flush Valves: Provide quiet-flush, chrome-plated, cast-brass flush valves with vacuum breaker<br />

and screwdriver stop. Where handicap service is indicated, provide ADA compliant handles<br />

with the handle on the wide side of the stall.<br />

2.4.4.1 Acceptable Manufacturers: Subject to compliance with requirements, provide products of one<br />

of the following for each item. Sloan Valve Co. or Zurn.<br />

2.4.5 Carriers: Provide cast-iron supports for fixtures of either graphitic gray iron, ductile iron, or<br />

malleable iron or steel as indicated. Coordinate with specific fixture requirements and<br />

conditions of the project.<br />

2.4.5.1 Acceptable Manufacturers: Subject to compliance with requirements, provide products of one<br />

of the following for each item. Josam, Wade, Zurn, J.R. Smith.<br />

2.4.6 Fixture Bolt Caps: Provide manufacturer's standard exposed fixture bolt caps finished to<br />

match fixture finish.<br />

2.4.7 Escutcheons: Where fixture supplies and drains penetrate walls in exposed locations, provide<br />

chrome-plated brass escutcheons with friction clips.<br />

2.4.8 Comply with additional fixture requirements listed for each fixture and as required for a<br />

complete and functional system.<br />

2.5 Water Closets:<br />

2.5.1 General: Provide white china siphon jet type unless otherwise noted.<br />

2.5.1.1 Acceptable Manufacturers: Subject to compliance with requirements, provide products of one<br />

of the following for each item. American Standard, Crane, Kohler, or Zurn.<br />

2.5.2 Fixture Seats: Provide white, heavy molded plastic fixture seats with stainless steel selfsustaining<br />

check hinges.<br />

2.5.2.1 Acceptable Manufacturers: Subject to compliance with requirements, provide products of one<br />

of the following for each item. Bemis Mfg. Co., Beneke Corp., Church or Comfort Seats.<br />

2.5.3 Water Closet Schedule:<br />

WC-1<br />

WATER CLOSET, FLOOR-MOUNT (STANDARD, TANK TYPE):<br />

Vitreous china low consumption 1.6 GPF, elongated, siphon jet action, closed-coupled tank,<br />

complete with float valve, valve and chrome plated trip lever, bolt caps, color “white”, chrome<br />

plated angle stop with flexible supply. Solid plastic closed front seat with cover.<br />

Water closet<br />

Zurn Z5530<br />

PLUMBING FIXTURES, EQUIPMENT, TRIM & SCHEDULE 22 30 00 - 3/10


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

Supply w/stop<br />

Seat<br />

Closet Bolt/Wax Ring Kit<br />

Zurn Z8800CRLK-PC<br />

Z5955SS-EL-STS<br />

Z5972-COMB<br />

WC-2<br />

WATER CLOSET, FLOOR-MOUNT (HANDICAP, TANK TYPE):<br />

Vitreous china low consumption 1.6 GPF, elongated, siphon jet action, closed-coupled tank,<br />

complete with float valve, valve and chrome plated trip lever, bolt caps, color “white”, chrome<br />

plated angle stop with flexible supply. Solid plastic closed front seat with cover.<br />

Water closet<br />

Supply w/stop<br />

Seat<br />

Closet Bolt/Wax Ring Kit<br />

Zurn Z5550<br />

Zurn Z8800CRLK-PC<br />

Z5955SS-EL-STS<br />

Z5972-COMB<br />

2.6 Urinals:<br />

2.6.1 General: Provide white china siphon jet wall hung type with ¾” top spud and 2" outlet unless<br />

otherwise noted. Provide short foot carrier with top and bottom hanger plates.<br />

2.6.2 Acceptable Manufacturers: Subject to compliance with requirements, provide products of one<br />

of the following for each item. American Standard, Crane, Kohler, or Zurn.<br />

2.6.3 Urinal Schedule:<br />

UR-1<br />

URINAL, WALL-MOUNT (HANDICAP, <strong>MANUAL</strong> VALVE):<br />

Vitreous china, 1.0 gallons per flush, siphon jet flush, 3/4" top spud, and 2" outlet urinal.<br />

Exposed chrome plated flush valve with screwdriver stop, vacuum breaker and quiet flush<br />

feature. Mount to satisfy ADA requirements, coordinate with Architectural drawings (toilet<br />

room elevations) for final mounting height. Furnish floor mounted single carrier with hanger<br />

plate, bearing plate, adjustable supporting rods, structural uprights and block bases, secure<br />

base to floor for rigid connection with 1/2" x 3-3/4" threaded zinc plated steel heavy duty<br />

wedge anchors, complete with stainless steel clip, washer and threaded nut, conforming to<br />

federal spec. FF-S-325.<br />

Urinal<br />

Zurn Z5730<br />

Valve<br />

Zurn Z6003-WS1-YB-YC<br />

Carrier Zurn Z-1222<br />

Base Anchorage<br />

B-Line Anchors AWA-50-375<br />

2.7 Lavatories:<br />

2.7.1 General: Provide white china lavatories.<br />

2.7.2 Acceptable Manufacturers: Subject to compliance with requirements, provide products of one<br />

of the following for each item. American Standard, Crane, Kohler, or Zurn.<br />

2.7.3 Lavatory Schedule:<br />

L-1 LAVATORY, COUNTERTOP:<br />

Fire clay 24”x22”x4-3/4” lavatory, oval, color “white”, 8”centers. Provide chrome plated angle<br />

stop to wall with chrome plated 3/8" flexible supply and loose key operator, integral perforated<br />

cast brass strainer with 1-1/4" tailpiece, chrome plated 17 gauge cast brass P-trap with<br />

PLUMBING FIXTURES, EQUIPMENT, TRIM & SCHEDULE 22 30 00 - 4/10


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

cleanout and tube waste to wall. Polished chrome plated cast brass deck mounted water<br />

faucet with straight lever handles, and quarter-turn washerless ceramic disk valves.<br />

Lavatory Porcher 26060-03<br />

Faucet<br />

Kallista P24405-LV<br />

Supply w/stop<br />

Zurn 8800LRLK-PC<br />

P-Trap<br />

Zurn Z8700-PC<br />

Drain<br />

Zurn Z8743-PC<br />

Aerator Zurn -5M<br />

L-2 LAVATORY, WALL-MOUNT (HANDICAP):<br />

Vitreous china 20" x 18", color “white”, center hole setting, front overflow, for concealed arm<br />

support. Furnish floor-mounted single carrier with concealed arms, leveling and securing<br />

screws, structural uprights and block bases, secure base to floor for rigid connection with 1/2"<br />

x 3-3/4" threaded zinc plated steel heavy duty wedge anchors, complete with stainless steel<br />

clip, washer and threaded nut, conforming to federal spec. FF-S-325. Provide chrome plated<br />

angle stop to wall with chrome plated 3/8" flexible supply and loose key operator, integral<br />

perforated strainer with 1-1/4" offset tailpiece, chrome plated 17 gauge cast brass P-trap with<br />

cleanout and tube waste to wall. Polished chrome plated cast brass water faucet with straight<br />

lever handles, with aerator. Lavatory P-trap and angle valve assemblies shall be insulated<br />

with fully molded insulation kit, and light gray color with 3-piece interlocking rap assembly and<br />

2-piece interlocking angle valve assembly. Fasteners shall be nylon-type supplied with kit.<br />

Lavatory shall be mounted with a clearance of at least 28" from floor to bottom of the apron.<br />

Knee and toe clearances shall be as follows: 27" clear height shall be provided from finished<br />

floor to a point on underside of bowl 8" in from front apron. Toe clearance shall be a minimum<br />

height of 9" under P-trap and supplies or stops. See Architectural drawings for final mounting<br />

height.<br />

Lavatory<br />

Zurn Z5341<br />

Faucet<br />

Zurn Z81101z e<br />

Supply w/stop<br />

Zurn Z8800LRLK-PC<br />

P-Trap<br />

Zurn Z8700-PC<br />

Strainer/tailpiece<br />

Zurn Z8746<br />

Insulation kit<br />

Zurn Z8946-3-NT<br />

Aerator Zurn -5M<br />

Carrier<br />

Zurn Z1231<br />

Base Anchorage<br />

B-Line Anchors AWA-50-375<br />

2.8 Drinking Fountains:<br />

2.8.1 General: Provide 18-gauge stainless steel drinking fountain with the entire water system free<br />

of lead. Where handicap units are indicated, the bubbler and fountain shall be ADA compliant.<br />

2.8.2 Acceptable Manufacturers: Subject to compliance with requirements, provide products of one<br />

of the following for each item. Elkay Mfg. Co., Halsey Taylor Div., Haws Drinking Faucet Co.,<br />

Sunroc, Oasis.<br />

2.8.3 Drinking Fountain Schedule:<br />

DF-1<br />

DRINKING FOUNTAIN (BUBBLER):<br />

Single level stainless steel face mount, push bar, bubbler with anti-squirt hood. Mount to<br />

satisfy ADA requirements, verify final location, mounting height and finish with Architectural<br />

drawings. Provide self-closing stop assembly in recessed wall box complete with water supply<br />

valve and waste piping (P-Trap).<br />

PLUMBING FIXTURES, EQUIPMENT, TRIM & SCHEDULE 22 30 00 - 5/10


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

Bubbler<br />

Halsey Taylor OVL-II<br />

2.9 Mop Receptors:<br />

2.9.1 General: Provide one piece mop receptors with 3" integral stainless steel grid drain. Provide<br />

wall-mounted faucet with arm handles, vacuum breaker, stops, hose connection and hose<br />

bracket. Provide 30" hose.<br />

2.9.2 Acceptable Manufacturers: Subject to compliance with requirements, provide products of one<br />

of the following for each item. Stern-Williams Co., or Acorn.<br />

2.9.3 Mop Receptor Schedule:<br />

MR-1<br />

SERVICE SINK (FLOOR TYPE):<br />

24” x 24” x 12” deep, floor mount, terrazzo with 20 gauge stainless steel integral cast cap, 3”<br />

cast brass outlet drain with stainless steel strainer. Rough chrome plated 8” faucet with top<br />

brace, straight lever handles, swivel inlets, bucket hook, vacuum breaker, stops and hose end.<br />

Chrome plated loose key angle stop to wall with 3/8" chrome plated flexible hot and cold water<br />

supplies.<br />

Sink<br />

Faucet<br />

Supply<br />

Acorn TSH24<br />

Zurn Z843 M1 RC<br />

Zurn Z8800-LRLK<br />

2.10 Stainless Steel Sinks:<br />

2.10.1 General: Provide Type 304, 18 gauge self-rimming stainless steel back ledge with No. 4 finish .<br />

Provide sound deadening material on the sides and bottom of the sink. Provide grid drain or<br />

strainer with removable crumb cup and stopper as indicated.<br />

2.10.2 Acceptable Manufacturers: Subject to compliance with requirements, provide products of one<br />

of the following for each item. Elkay, Just<br />

2.10.3 Stainless Steel Sink Schedule:<br />

SK-1<br />

DOUBLE COMPARTMENT STAINLESS STEEL SINK (MATERIAL STORAGE):<br />

33" x 22" x 10" deep (bowl is 13-1/2x16x10-1/8), type 304, 18 gauge, 8” centers, self rimming<br />

single compartment, (18-8) nickel bearing stainless steel, back ledge sink with satin finish and<br />

sound deadening materials on side and bottom of sink. Provide polished chrome plated top<br />

mount swing gooseneck spout and vacuum breaker, straight lever handles, pressure<br />

compensating aerator, strainer with removable crumb cup and stopper, 1-1/2 tailpiece, acid<br />

resistant P-trap with cleanout and tube waste to wall. bottom access interceptor trap. Chrome<br />

plated loose key angle stop to wall with 3/8" chrome plated flexible hot and cold water supplies.<br />

Coordinate with cabinet shop drawings, base cabinet must be a true minimum 24" deep back<br />

to front in order for sink to drop into countertop opening. Sink drillings shall accommodate<br />

fitting installation, only, no other capped openings will be allowed.<br />

Sink<br />

Faucet<br />

Strainer<br />

Supplies<br />

P-trap<br />

Elkay DLR-3322-10<br />

Zurn Z-871 B1<br />

Elkay LK-35<br />

Zurn Z-8800-LR-LK<br />

Zurn 8702 PC<br />

PLUMBING FIXTURES, EQUIPMENT, TRIM & SCHEDULE 22 30 00 - 6/10


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

2.11 Showers:<br />

2.11.1 General:<br />

2.11.2 Acceptable Manufacturers: Subject to compliance with requirements, provide products of one<br />

equal to the manufacturer specified.<br />

2.11.3 Shower Schedule:<br />

SH-1<br />

SHOWER:<br />

PM-750-CHV, Wall-Mounted Stainless Steel Shower with ADA-Compliant, Slow-Closing<br />

Metering Valves, Hose Bib and Foot Shower. 4" Stainless Steel Raincan Shower Head.<br />

Shower<br />

Showerhead<br />

Aquamasters USA PM-750-ADA<br />

Aquamasters USA GL150-4<br />

2.12 Water Heaters:<br />

2.12.1 Electric Water Heaters:<br />

2.12.2 Acceptable Manufacturers: Subject to compliance with requirements, provide products of one<br />

of the following for each item. AO Smith, Rheem, Chronomite, Seisco, EeMax<br />

2.12.3 Water Heater Schedule:<br />

EWH-1<br />

ELECTRIC WATER HEATER:<br />

ASHRAE Standard 90, glass lined tank Suitable for 150 psi working pressure, 300-psi test.<br />

Finish of durable high gloss baked enamel. Blanket glass fiber insulation over entire tank.<br />

ASME pressure and temperature relief valve. Water heater shall be acceptable for commercial<br />

application by manufacturer. Provide 3 full year warranty, snap action automatic surface<br />

mounted thermostats, immersion type heating elements and magnesium anode rod. Provide<br />

unit mounted disconnect switch. Provide thermal expansion tank on cold water inlet side of<br />

heater for thermal expansion control. Provide galvanized steel drip pan. Phase 1/120v, 2 kw,<br />

20 gallon storage capacity.<br />

Water Heater A. O. Smith DEL 20<br />

Vacuum Relief<br />

Watts 36A<br />

Expansion Tank<br />

Amtrol “Therm-X-Trol”<br />

IWH-1<br />

INSTANTANEOUS WATER HEATER:<br />

5 KW at 240V/1 phase. Commercial electric water heaters shall be controlled by an integrated<br />

microprocessor that employs a proportional/integral/derivative (PID) control scheme using<br />

thermistors for sensing temperature and flow. Heat elements shall simultaneously vary KW<br />

input across all elements from 1% to maximum input. Stepping of individual elements is not<br />

acceptable. Heater shall include dual water level sensors, high limit control via the<br />

microprocessor, and dual high limit cutoff switches, one manual and one automatic. Heaters<br />

shall include self-diagnostics with an LED and speaker and must visually and audibly signal<br />

the status of all monitored functions. Heaters shall include a built-in leak detector. All water<br />

passages must be constructed of a high temperature resistant DuPont Resin. Clean-cut<br />

access for removing sediment must be provided without removing plumbing connections or<br />

exposing electrical components of the water heater. Provide 5 year limited warranty.<br />

PLUMBING FIXTURES, EQUIPMENT, TRIM & SCHEDULE 22 30 00 - 7/10


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

Water Heater<br />

Seisco CA-5<br />

IWH-2<br />

INSTANTANEOUS WATER HEATER:<br />

11 KW at 240V/1 phase. Commercial electric water heaters shall be controlled by an<br />

integrated microprocessor that employs a proportional/integral/derivative (PID) control scheme<br />

using thermistors for sensing temperature and flow. Heat elements shall simultaneously vary<br />

KW input across all elements from 1% to maximum input. Stepping of individual elements is<br />

not acceptable. Heater shall include dual water level sensors, high limit control via the<br />

microprocessor, and dual high limit cutoff switches, one manual and one automatic. Heaters<br />

shall include self-diagnostics with an LED and speaker and must visually and audibly signal<br />

the status of all monitored functions. Heaters shall include a built-in leak detector. All water<br />

passages must be constructed of a high temperature resistant DuPont Resin. Clean-cut<br />

access for removing sediment must be provided without removing plumbing connections or<br />

exposing electrical components of the water heater. Provide 5 year limited warranty.<br />

Water Heater<br />

Seisco CA-11<br />

2.13 Other Fixtures:<br />

2.13.1 Utility Boxes:<br />

UB-1<br />

ICE MAKER HOOK-UP (REFRIGERATOR SPACE):<br />

Recessed metal wall box constructed and suitable for fire rated partitions, complete with<br />

factory installed shank valve with 1/4" O.D. copper outlet tested @ 100 P.S.I. Provide<br />

approximately 5'-0" of 1/4" O.D. soft copper tubing with compression fitting in tight coil. Anchor<br />

box to wall structure. Verify location and mounting height with Architectural drawings or mount<br />

to manufacturers recommendations.<br />

Wall box Guy Gray BIM 875<br />

2.14 Kitchen Fixtures:<br />

2.14.1 General:<br />

2.14.2 Acceptable Manufacturers: Subject to compliance with requirements, provide products of one<br />

of the following for each item.<br />

2.14.3 Kitchen Fixture Schedule:<br />

FS Floor Sink<br />

12" x 12" x 8" deep, enameled cast iron (inside only enameled) with chrome plated brass<br />

beehive strainer (less grate), 3" outlet connection. Provide running trap under floor with<br />

cleanout flush to floor finish material, coordinate with architectural finish schedule.<br />

Floor sink<br />

Zurn Z-1901-1<br />

3 EXECUTION<br />

3.1 Examine roughing-in work of potable water and waste piping systems to verify actual locations<br />

of piping connections prior to installing fixtures. Also examine floors and substrates, and<br />

conditions under which fixture work is to be accomplished. Correct any incorrect locations of<br />

piping, and other unsatisfactory conditions for installation of plumbing fixtures. Do not proceed<br />

with work until unsatisfactory conditions have been corrected in manner acceptable to Installer.<br />

PLUMBING FIXTURES, EQUIPMENT, TRIM & SCHEDULE 22 30 00 - 8/10


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

3.2 Install plumbing fixtures of types indicated where shown and at indicated heights. Install in<br />

accordance with fixture manufacturer's written instructions, roughing-in drawings, and with<br />

recognized industry practices. Install in accordance with ADA and applicable handicap code<br />

requirements. Ensure that plumbing fixtures comply with requirements and serve intended<br />

purposes. Comply with applicable requirements of Florida Building Code-Plumbing pertaining<br />

to installation of plumbing fixtures. Furnish templates for cut-outs in countertops. Coordinate<br />

exact fixture locations with countertop shop drawings.<br />

3.3 Fasten plumbing fixtures securely to indicated supports or building structure; and ensure that<br />

fixtures are level and plumb. Secure plumbing supplies behind or within wall construction so<br />

as to be rigid, and not subject to pull or push movement. Mount at heights shown on the<br />

drawings. Fixture heights are floor-to-rim distance. Fitting heights are to centerline.<br />

3.4 Install stop valve in water supply to each fixture.<br />

3.5 After fixtures are set, the crack between the fixture and wall shall be caulked with DAP<br />

silicone-based caulking, or approved equal.<br />

3.6 Protect installed fixtures from damage during remainder of construction period.<br />

3.7 Upon completion of installation of plumbing fixtures and after units are water pressurized, test<br />

fixtures to demonstrate capability and compliance with requirements. When possible, correct<br />

malfunctioning units at site, then retest to demonstrate compliance; otherwise, remove and<br />

replace with new units and proceed with retesting.<br />

3.8 Inspect each installed unit for damage to finish. If feasible, restore and match finish to original<br />

at site; otherwise, remove fixture and replace with new unit. Feasibility and match to be judged<br />

by Architect/Engineer. Remove cracked or dented units and replace with new units.<br />

3.9 Clean plumbing fixtures, trim, aerators, and strainers of dirt and debris upon completion of<br />

installation.<br />

3.10 Adjust water pressure at drinking fountains, faucets, shower valves, and flush valves to provide<br />

proper flow stream and specified gpm.<br />

3.11 Adjust or replace washers to prevent leaks at faucets and stops.<br />

END OF SECTION 22 30 00<br />

PLUMBING FIXTURES, EQUIPMENT, TRIM & SCHEDULE 22 30 00 - 9/10


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

This page intentionally left blank.<br />

PLUMBING FIXTURES, EQUIPMENT, TRIM & SCHEDULE 22 30 00 - 10/10


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 23 01 00 - MECHANICAL GENERAL<br />

1 GENERAL<br />

1.1 The work covered by this division consists of providing all labor, equipment and materials and<br />

performing all operations necessary for the installation of the mechanical work as herein called<br />

for and shown on the drawings.<br />

1.2 Related Documents:<br />

1.2.1 Drawings and general provisions of the Contract, including General and Supplementary<br />

Conditions and Division 1 Specification sections, apply to work of this section.<br />

1.2.2 This is a Basic Mechanical Requirements Section. Provisions of this section apply to work of<br />

all Division 23 sections.<br />

1.2.3 Review all other contract documents to be aware of conditions affecting work herein.<br />

1.2.4 Definitions:<br />

1.2.4.1 Provide: Furnish and install, complete and ready for intended use.<br />

1.2.4.2 Furnish: Supply and deliver to project site, ready for subsequent requirements.<br />

1.2.4.3 Install: Operations at project site, including unloading, unpacking, assembly, erection, placing,<br />

anchoring, applying, working to dimension, finishing, curing, protecting, cleaning, and similar<br />

requirements.<br />

1.3 Permits and Fees: Contractor shall obtain all necessary permits, meters, and inspections<br />

required for his work and pay all fees and charges incidental thereto.<br />

1.4 Verification of Owner's Data: Prior to commencing any work the Contractor shall satisfy<br />

himself as to the accuracy of all data as indicated in these plans and specifications and/or as<br />

provided by the Owner. Should the Contractor discover any inaccuracies, errors, or omissions<br />

in the data, he shall immediately notify the Architect/Engineer in order that proper adjustments<br />

can be anticipated and ordered. Commencement by the Contractor of any work shall be held<br />

as an acceptance of the data by him after which time the Contractor has no claim against the<br />

Owner resulting from alleged errors, omissions or inaccuracies of the said data.<br />

1.5 Delivery and Storage of Materials: Materials delivered to site shall be inspected for damage,<br />

unloaded, and stored with a minimum of handling. All material shall be stored to provide<br />

protection from the weather and accidental damage.<br />

1.6 Extent of work is indicated by the drawings, schedules, and the requirements of the<br />

specifications. Singular references shall not be constructed as requiring only one device if<br />

multiple devices are shown on the drawings or are required for proper system operation.<br />

1.7 Field Measurements and Coordination:<br />

1.7.1 The intent of the drawings and specifications is to obtain a complete and satisfactory<br />

installation. Separate divisional drawings and specifications shall not relieve the Contractor or<br />

subcontractors from full compliance of work of his trade indicated on any of the drawings or in<br />

any section of the specifications.<br />

MECHANICAL GENERAL 23 01 00 - 1/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

1.7.2 Verify all field dimensions and locations of equipment to insure close, neat fit with other trades'<br />

work. Make use of all contract documents and approved shop drawings to verify exact<br />

dimension and locations.<br />

1.7.3 Coordinate work in this division with all other trades in proper sequence to insure that the total<br />

work is completed within contract time schedule and with a minimum cutting and patching.<br />

1.7.4 Locate all apparatus symmetrical with architectural elements. Install to exact height and<br />

locations when shown on architectural drawings. When locations are shown only on<br />

mechanical drawings, be guided by architectural details and conditions existing at job and<br />

correlate this work with that of others.<br />

1.7.5 Install work as required to fit structure, avoid obstructions, and retain clearance, headroom,<br />

openings and passageways. Cut no structural members without written approval.<br />

1.7.6 Carefully examine any existing conditions, piping, and premises. Compare drawings with<br />

existing conditions. Report any observed discrepancies. It shall be the Contractor's<br />

responsibility to properly coordinate the work and to identify problems in a timely manner.<br />

Written instructions will be issued to resolve discrepancies.<br />

1.7.7 Because of the small scale of the drawings, it is not possible to indicate all offsets and fittings<br />

or to locate every accessory. Drawings are essentially diagrammatic. Study carefully the sizes<br />

and locations of structural members, wall and partition locations, trusses, and room<br />

dimensions and take actual measurements on the job. Locate piping, ductwork, equipment<br />

and accessories with sufficient space for installing and servicing. Contractor is responsible for<br />

accuracy of his measurements and for coordination with all trades. Contractor shall not order<br />

materials or perform work without such verification. No extra compensation will be allowed<br />

because field measurements vary from the dimensions on the drawings. If field measurements<br />

show that equipment or piping cannot be fitted, the Architect/Engineer shall be consulted.<br />

Remove and relocate, without additional compensation, any item that is installed and is later<br />

found to encroach on space assigned to another use.<br />

1.8 Guarantee:<br />

1.8.1 The Contractor shall guarantee labor, materials and equipment for a period of one (1) year<br />

from Substantial Completion, or from Owner's occupancy, whichever is earlier. Contractor<br />

shall make good any defects and shall include all necessary adjustments to and replacement<br />

of defective items without expense to the Owner.<br />

1.8.2 Owner reserves right to make emergency repairs as required to keep equipment in operation<br />

without voiding Contractor's Guarantee Bond nor relieving Contractor of his responsibilities<br />

during guarantee period.<br />

1.9 Approval Submittals:<br />

1.9.1 When approved, the submittal control log and submittals shall be an addition to the<br />

specifications herewith, and shall be of equal force in that no deviation will be permitted except<br />

with the approval of the Architect/Engineer.<br />

1.9.1.1 Shop drawings, product literature, and other approval submittals will only be reviewed if they<br />

are submitted in full accordance with the General and Supplementary Conditions and Division<br />

1 Specification sections and the following.<br />

1.9.1.1.1 Submittals shall be properly organized in accordance with the approved submittal control log.<br />

MECHANICAL GENERAL 23 01 00 - 2/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

1.9.1.1.2 Submittals shall not include items from more than one specification section in the same<br />

submittal package unless approved in the submittal control log.<br />

1.9.1.1.3 Submittals shall be properly identified by a cover sheet showing the project name, Architect<br />

and Engineer names, submittal control number, specification section, a list of products or item<br />

names with model numbers in the order they appear in the package, and spaces for approval<br />

stamps. A sample cover sheet is included at the end of this section.<br />

1.9.1.1.4 Submittals shall have been reviewed and approved by the General Contractor (or Prime<br />

Contractor). Evidence of this review and approval shall be an "Approved" stamp with a<br />

signature and date on the cover sheet.<br />

1.9.1.1.5 Submittals that include a series of fixtures or devices (such as plumbing fixtures or valves)<br />

shall be organized by the fixture number or valve type and be marked accordingly. Each<br />

fixture must include all items associated with that fixture regardless of whether or not those<br />

items are used on other fixtures.<br />

1.9.1.1.6 The electrical design shown on the drawings supports the mechanical equipment basis of<br />

design specifications at the time of design. If mechanical equipment is submitted with different<br />

electrical requirements, it is the responsibility of the mechanical contractor to resolve all<br />

required electrical design changes (wire and conduit size, type of disconnect or overload<br />

protection, point(s) of connection, etc.) and clearly show the new electrical design on the<br />

mechanical submittal with a written statement that this change will be provided at no additional<br />

cost. Mechanical submittals made with no written reference to the electrical design will be<br />

presumed to work with the electrical design. Any corrections required will be at no additional<br />

cost.<br />

1.9.2 If the shop drawings show variation from the requirements of contract because of standard<br />

shop practice or other reasons, the Contractor shall make specific mention of such variation in<br />

writing in his letter of transmittal and on the submittal cover sheet in order that, if acceptable,<br />

Contractor will not be relieved of the responsibility for executing the work in accordance with<br />

the contract.<br />

1.9.3 Review of shop drawings, product literature, catalog data, or schedules shall not relieve the<br />

Contractor from responsibility for deviations from contract drawings or specifications, unless he<br />

has in writing called to the attention of the Architect/Engineer each such deviation in writing at<br />

the time of submission, nor shall it relieve him from responsibility for errors of any sort in shop<br />

drawings, product literature, catalog data, or schedules. Any feature or function specified but<br />

not mentioned in the submittal shall be assumed to be included per the specification.<br />

1.9.4 Submit shop drawings as called for in other sections after award of the contract and before any<br />

material is ordered or fabricated. Shop drawings shall consist of plans, sections, elevations<br />

and details to scale (not smaller than ¼" per foot), with dimensions clearly showing the<br />

installation. Direct copies of small scale project drawings issued to the Contractor are not<br />

acceptable. Drawings shall take into account equipment furnished under other sections and<br />

shall show space allotted for it. Include construction details and materials.<br />

1.10 Test Reports and Verification Submittals: Submit test reports, certifications and verification<br />

letters as called for in other sections. Contractor shall coordinate the required testing and<br />

documentation of system performance such that sufficient time exists to prepare the reports,<br />

submit the reports, review the reports and take corrective action within the scheduled contract<br />

time.<br />

1.11 O&M Data Submittals: Submit Operation and Maintenance data as called for in other sections.<br />

When a copy of approval submittals is included in the O&M Manual, only the final “Approved”<br />

or “Approved as Noted” copy shall be used. Contractor shall organize these data in the O&M<br />

MECHANICAL GENERAL 23 01 00 - 3/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

Manuals tabbed by specification number. Prepare O&M Manuals as required by Division 1<br />

and as described herein.. Submit manuals at the Substantial Completion inspection.<br />

2 PRODUCTS<br />

2.1 All materials shall be new or Owner-supplied reused as shown on the drawings, the best of<br />

their respective kinds, suitable for the conditions and duties imposed on them at the building<br />

and shall be of reputable manufacturers. The description, characteristics, and requirements of<br />

materials to be used shall be in accordance with qualifying conditions established in the<br />

following sections.<br />

2.2 Equipment and Materials:<br />

2.2.1 Shall be new and the most suitable grade for the purpose intended. Equipment furnished<br />

under this division shall be the product of a manufacturer regularly engaged in the manufacture<br />

of such items for a period of three years. Where practical, all of the components shall be<br />

products of a single manufacturer in order to provide proper coordination and responsibility.<br />

Where required, Contractor shall furnish proof of installation of similar units or equipment.<br />

2.2.2 Each item of equipment shall bear a name plate showing the manufacturer's name, trade<br />

name, model number, serial number, ratings and other information necessary to fully identify it.<br />

This plate shall be permanently mounted in a prominent location and shall not be concealed,<br />

insulated or painted.<br />

2.2.3 The label of the approving agency, such as UL, IBR, ASME, ARI, AMCA, by which a standard<br />

has been established for the particular item shall be in full view.<br />

2.2.4 The equipment shall be essentially the standard product of a manufacturer regularly engaged<br />

in the production of such equipment and shall be a product of the manufacturer's latest design.<br />

2.2.5 A service organization with personnel and spare parts shall be available within two hours for<br />

each type of equipment furnished.<br />

2.2.6 Install in accordance with manufacturer's recommendations. Place in service by a factory<br />

trained representative where required.<br />

2.2.7 Materials and equipment are specified herein by a single or by multiple manufacturers to<br />

indicate quality, material and type of construction desired. Manufacturer's products shown on<br />

the drawings have been used as basis for design; it shall be the Contractor's responsibility to<br />

ascertain that alternate manufacturer's products, or the particular products of named<br />

manufacturers, meet the detailed specifications and that size and arrangement of equipment<br />

are suitable for installation.<br />

2.2.8 Model Numbers: Catalog numbers and model numbers indicated in the drawings and<br />

specifications are used as a guide in the selection of the equipment and are only listed for the<br />

contractor's convenience. The contractor shall determine the actual model numbers for<br />

ordering materials in accordance with the written description of each item and with the intent of<br />

the drawings and specifications.<br />

2.3 Requests for Substitution:<br />

2.3.1 Where a particular system, product or material is specified by name, consider it as standard<br />

basis for bidding, and base proposal on the particular system, product or material specified.<br />

2.3.2 Requests by Contractor for substitution will be considered only when reasonable, timely, fully<br />

documented, and qualifying under one or more of the following circumstances.<br />

MECHANICAL GENERAL 23 01 00 - 4/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

2.3.2.1 Required product cannot be supplied in time for compliance with Contract time requirements.<br />

2.3.2.2 Required product is not acceptable to governing authority, or determined to be non-compatible,<br />

or cannot be properly coordinated, warranted or insured, or has other recognized disability as<br />

certified by Contractor.<br />

2.3.2.3 Substantial cost advantage is offered Owner after deducting offsetting disadvantages including<br />

delays, additional compensation for redesign, investigation, evaluation and other necessary<br />

services and similar considerations.<br />

2.3.3 All requests for substitution shall contain a "Comparison Schedule" and clearly and specifically<br />

indicate any and all differences or omissions between the product specified as the basis of<br />

design and the product proposed for substitution. Differences shall include but shall not be<br />

limited to data as follows for both the specified and substituted products:<br />

Principal of operation.<br />

Materials of construction or finishes.<br />

Thickness of gauge of materials.<br />

Weight of item.<br />

Deleted features or items.<br />

Added features or items.<br />

Changes in other work caused by the substitution.<br />

Performance curves.<br />

If the approved substitution contains differences or omissions not specifically called to the<br />

attention of the Architect/Engineer, the Owner reserves the right to require equal or similar<br />

features to be added to the substituted products (or to have the substituted products replaced)<br />

at the Contractor's expense.<br />

3 EXECUTION<br />

3.1 Workmanship: All materials and equipment shall be installed and completed in a first-class<br />

workmanlike manner and in accordance with the best modern methods and practice. Any<br />

materials installed which do not present an orderly and reasonably neat and/or workmanlike<br />

appearance, or do not allow adequate space for maintenance, shall be removed and replaced<br />

when so directed by the Architect/Engineer.<br />

3.2 Coordination:<br />

3.2.1 The Contractor shall be responsible for full coordination of the mechanical systems with shop<br />

drawings of the building construction so the proper openings and sleeves or supports are<br />

provided for piping, ductwork, or other equipment passing through slabs or walls.<br />

3.2.2 Any additional steel supports required for the installation of any mechanical equipment, piping,<br />

or ductwork shall be furnished and installed under the section of the specifications requiring<br />

the additional supports.<br />

3.2.3 It shall be the Contractor's responsibility to see that all equipment such as valves, dampers,<br />

filters and such other apparatus or equipment that may require maintenance and operation are<br />

made easily accessible, regardless of the diagrammatic location shown on the drawings.<br />

3.2.4 All connections to fixtures and equipment shown on the drawings shall be considered<br />

diagrammatic unless otherwise indicated by detail. The actual connections shall be made to<br />

fully suit the requirements of each case and adequately provide for expansion and servicing.<br />

MECHANICAL GENERAL 23 01 00 - 5/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

3.2.5 The contractor shall protect equipment, material, and fixtures at all times. He shall replace all<br />

equipment, material, and fixtures which are damaged as a result of inadequate protection.<br />

3.2.6 Prior to starting and during progress of work, examine work and materials installed by others<br />

as they apply to work in this division. Report conditions which will prevent satisfactory<br />

installation.<br />

3.2.7 Start of work will be construed as acceptance of suitability of work of others.<br />

3.3 Interruption of Service: Before any equipment is shut down for disconnecting or tie-ins,<br />

arrangements shall be made with the Architect/Engineer and this work shall be done at the<br />

time best suited to the Owner. This will typically be on weekends and/or holidays and/or after<br />

normal working hours. Services shall be restored the same day unless prior arrangements are<br />

made. All overtime or premium costs associated with this work shall be included in the base<br />

bid.<br />

3.4 Phasing: Provide all required temporary valves, piping, ductwork, equipment and devices as<br />

required. Maintain temporary services to areas as required. Remove all temporary material<br />

and equipment on completion of work unless Engineer concurs that such material and<br />

equipment would be beneficial to the Owner on a permanent basis.<br />

3.5 Cutting and Patching: Notify General Contractor to do all cutting and patching of all holes,<br />

chases, sleeves, and other openings required for installation of equipment furnished and<br />

installed under this section. Utilize experienced trades for cutting and patching. Obtain<br />

permission from Architect/Engineer before cutting any structural items.<br />

3.6 Equipment Setting: Bolt equipment directly to concrete pads or vibration isolators as required,<br />

using hot-dipped galvanized anchor bolts, nuts and washers. Level equipment.<br />

3.7 Painting: Touch-up factory finishes on equipment located inside and outside shall be done<br />

under Division 23. Obtain matched color coatings from the manufacturer and apply as<br />

directed. If corrosion is found during inspection on the surface of any equipment, clean, prime,<br />

and paint, as required.<br />

3.8 Clean-up: Thoroughly clean all exposed parts of apparatus and equipment of cement, plaster,<br />

and other materials and remove all oil and grease spots. Repaint or touch up as required to<br />

look like new. During progress of work, contractor is to carefully clean up and leave premises<br />

and all portions of building free from debris and in a clean and safe condition.<br />

3.9 Start-up and Operational Test: Start each item of equipment in strict accordance with the<br />

manufacturer's instructions; or where noted under equipment specification, start-up shall be<br />

done by a qualified representative of the manufacturer. Alignment, lubrication, safety, and<br />

operating control shall be included in start-up check.<br />

3.10 Climate Control: Operate heating and cooling systems as required after initial startup to<br />

maintain temperature and humidity conditions to avoid freeze damage and warping or sagging<br />

of ceilings and carpet.<br />

3.11 Record Drawings:<br />

3.11.1 During the progress of the work the Contractor shall record on their field set of drawings the<br />

exact location, as installed, of all piping, ductwork, equipment, and other systems which are<br />

not installed exactly as shown on the contract drawings.<br />

3.11.2 Upon completion of the work, record drawings shall be prepared as described in the General<br />

Conditions, Supplementary Conditions, and Division 1 sections.<br />

MECHANICAL GENERAL 23 01 00 - 6/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

3.12 Acceptance:<br />

3.12.1 Punch List: Submit written confirmation that all punch lists have been checked and the<br />

required work completed.<br />

3.12.2 Instructions: At completion of the work, provide a competent and experienced person who is<br />

thoroughly familiar with project, for one day to instruct permanent operating personnel in<br />

operation of equipment and control systems. This is in addition to any specific equipment<br />

operation and maintenance training.<br />

3.12.3 Operation and Maintenance Manuals: Furnish four complete manuals bound in ring binders<br />

with Table of Contents, organized, and tabbed by specification section. Manuals shall contain:<br />

Detailed operating instructions and instructions for making minor adjustments.<br />

Complete wiring and control diagrams.<br />

Routine maintenance operations.<br />

Manufacturer's catalog data, service instructions, and parts lists for each piece of operating<br />

equipment.<br />

Copies of approved submittals.<br />

Copies of all manufacturer's warranties.<br />

Copies of test reports and verification submittals.<br />

3.12.4 Record Drawings: Submit record drawings.<br />

3.12.5 Test and Balance Report: Submit four certified copies. The Report shall be submitted for<br />

review prior to the Substantial Completion Inspection unless otherwise required by Division 1.<br />

3.12.6 Acceptance will be made on the basis of tests and inspections of job. A representative of firm<br />

that performed test and balance work shall be in attendance to assist. Contractor shall furnish<br />

necessary mechanics to operate system, make any necessary adjustments and assist with<br />

final inspection.<br />

END OF SECTION 23 01 00<br />

MECHANICAL GENERAL 23 01 00 - 7/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

This page intentionally left blank.<br />

MECHANICAL GENERAL 23 01 00 - 8/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 23 05 20 - PIPES AND PIPE FITTINGS<br />

1 GENERAL<br />

1.1 Drawings and general provisions of Contract, including General and Supplementary Conditions<br />

and Division-1 Specification sections, apply to work of this section.<br />

1.2 This section is a Division-23 Basic Mechanical Materials and Methods section, and is part of<br />

each Division-23 section making reference to pipes and pipe fittings specified herein.<br />

1.3 Extent of pipes and pipe fittings required by this section is indicated on drawings and/or<br />

specified in other Division-23 sections.<br />

1.4 Codes and Standards:<br />

1.4.1 Brazing: Certify brazing procedures, brazers, and operators in accordance with ASME Boiler<br />

and Pressure Vessel Code, Section IX, for shop and job-site brazing of piping work.<br />

1.5 Test Report and Verification Submittals:<br />

1.5.1 Submit brazing certification for all brazing installers.<br />

2 PRODUCTS<br />

2.1 Piping Materials: Provide pipe and tube of type, joint type, grade, size and weight (wall<br />

thickness or Class) indicated for each service. Where type, grade or class is not indicated,<br />

provide proper selection as determined by Installer for installation requirements, and comply<br />

with governing regulations and industry standards.<br />

2.2 Pipe/Tube Fittings: Provide factory-fabricated fittings of type, materials, grade, class and<br />

pressure rating indicated for each service and pipe size. Provide sizes and types matching<br />

pipe, tube, valve or equipment connection in each case. Where not otherwise indicated,<br />

comply with governing regulations and industry standards for selections, and with pipe<br />

manufacturer's recommendations where applicable.<br />

2.3 Piping Materials/Products:<br />

2.3.1 Soldering Materials:<br />

2.3.1.1 Tin-Antimony (95-5) Solder: ASTM B-32, Grade 95TA.<br />

2.3.1.2 Silver-Phosphorus Solder: ASTM B-32, Grade 96TS.<br />

2.3.2 Protective Coating: Koppers Bitumastic No. 505 or equal.<br />

2.3.3 Brazing Materials: Silver content of not less than 15%. Materials shall be determined by<br />

installer to comply with installation requirements.<br />

2.4 Copper Tube and Fittings:<br />

2.4.1 Copper Tube:<br />

2.4.1.1 Copper Tube: ASTM B88; Type K or L as indicated for each service; hard-drawn temper<br />

unless specifically noted as annealed.<br />

2.4.1.2 ACR Copper Tube: ASTM B280.<br />

PIPES AND PIPE FITTINGS 23 05 20 -1/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

2.4.1.3 DWV Copper Tube: ASTM B306.<br />

2.4.2 Fittings:<br />

2.4.2.1 Wrought-Copper Solder-Joint Fittings: ANSI B16.22.<br />

2.4.2.2 Copper Tube Unions: Provide standard products recommended by manufacturer for use in<br />

service indicated.<br />

2.4.2.3 Cast-Copper Flared Tube Fittings: ANSI B16.26.<br />

3 EXECUTION<br />

3.1 Installation<br />

3.1.1 General: Install pipes and pipe fittings in accordance with recognized industry practices which<br />

will achieve permanently-leak proof piping systems, capable of performing each indicated<br />

service without piping failure. Install each run with minimum joints and couplings, but with<br />

adequate and accessible unions for disassembly and maintenance or replacement of valves<br />

and equipment. Reduce sizes (where indicated) by use of reducing fittings, not bushings.<br />

Align piping accurately at connections, within 1/16" misalignment tolerance.<br />

3.1.2 Comply with ANSI B31 Code for Pressure Piping.<br />

3.1.3 Locate piping runs, except as otherwise indicated, vertically and horizontally (pitched to drain)<br />

and avoid diagonal runs wherever possible. Orient horizontal runs parallel with walls and<br />

column lines. Locate runs as shown or described by diagrams, details and notations or, if not<br />

otherwise indicated, run piping in shortest route which does not obstruct usable space or block<br />

access for servicing building and its equipment. Hold piping close to walls, overhead<br />

construction, columns and other structural and permanent-enclosure elements of building; limit<br />

clearance to ½" where furring is shown for enclosure or concealment of piping, but allow for<br />

insulation thickness, if any. Where possible, locate insulated piping for 1" clearance outside<br />

insulation.<br />

3.1.4 Concealed Piping: Unless specifically noted as “Exposed” on the drawings, conceal piping<br />

from view in finished and occupied spaces, by locating in column enclosures, chases, in hollow<br />

wall construction or above suspended ceilings; do not encase horizontal runs in solid<br />

partitions, except as indicated.<br />

3.1.5 Electrical Equipment Spaces: Do not run piping through transformer vaults and other<br />

electrical, communications, or data equipment spaces and enclosures unless shown. Install<br />

drip pan under piping that must run through electrical spaces.<br />

3.1.5.1 Cut pipe from measurements taken at the site, not from drawings. Keep pipes free of contact<br />

with building construction and installed work.<br />

3.2 Piping System Joints: Provide joints of the type indicated in each piping system.<br />

3.2.1 Solder copper tube-and-fitting joints where indicated, in accordance with recognized industry<br />

practice. Cut tube ends squarely, ream to full inside diameter, and clean outside of tube ends<br />

and inside of fittings. Apply non-acid type solder flux to joint areas of both tubes and fittings.<br />

Insert tube full depth into fitting, and solder in manner which will draw solder full depth and<br />

circumference of joint. Wipe excess solder from joint before it hardens.<br />

3.2.2 Braze copper tube-and-fitting joints where indicated, in accordance with ANSI B.31.<br />

PIPES AND PIPE FITTINGS 23 05 20 -2/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

3.3 Piping Installation<br />

3.3.1 Install piping to allow for expansion and contraction.<br />

3.3.2 Isolate all copper tubing from steel and concrete by wrapping the pipe at the contact point, and<br />

for one inch on each side, with a continuous plastic sleeve. Isolate all copper tubing installed<br />

in block walls with a continuous plastic sleeve.<br />

END OF SECTION 23 01 00<br />

PIPES AND PIPE FITTINGS 23 05 20 -3/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

This page intentionally left blank.<br />

PIPES AND PIPE FITTINGS 23 05 20 -4/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 23 05 21 - PIPING SPECIALTIES<br />

1 GENERAL<br />

1.1 Drawings and general provisions of contract, including General and Supplementary Conditions<br />

and Division-1 Specification sections, apply to work of this section.<br />

1.2 This section is a Division-23 Basic Mechanical Materials and Methods section, and is part of<br />

each Division-23 section making reference to or requiring piping specialties specified herein.<br />

2 PRODUCTS<br />

2.1 General: Provide factory-fabricated piping specialties recommended by manufacturer for use<br />

in service indicated. Provide piping specialties of types and pressure ratings indicated for each<br />

service, or if not indicated, provide proper selection as determined by Installer to comply with<br />

installation requirements. Provide sizes as indicated, and connections, which properly mate<br />

with pipe, tube, and equipment connections. Where more than one type is indicated, selection<br />

is Installer's option.<br />

2.2 Fabricated Piping Specialties:<br />

2.2.1 Pipe Sleeves: Provide pipe sleeves of one of the following:<br />

2.2.1.1 Sheet-Metal: Fabricate from galvanized sheet metal; round tube closed with snaplock joint,<br />

welded spiral seams, or welded longitudinal joint. Fabricate from the following gages: 3" and<br />

smaller, 20 gage; 4" to 6" 16 gage; over 6", 14 gage.<br />

2.2.1.2 Steel-Pipe: Fabricate from Schedule 40 galvanized steel pipe; remove burrs.<br />

2.2.1.3 Iron-Pipe: Fabricate from cast-iron or ductile-iron pipe; remove burrs.<br />

2.2.2 Sleeve Seals: Provide sleeve seals for sleeves located in foundation walls below grade, or in<br />

exterior walls, of one of the following:<br />

2.2.2.1 Caulking and Sealant: Provide foam or caulking and sealant compatible with piping materials<br />

used.<br />

3 EXECUTION<br />

3.1 Pipe Escutcheons: Install pipe escutcheons on each pipe penetration through floors, walls,<br />

partitions, and ceilings where penetration is exposed to view; and on exterior of building.<br />

Secure escutcheon to pipe or insulation so escutcheon covers penetration hole, and is flush<br />

with adjoining surface.<br />

3.2 Fire Barrier Penetration Seals: Provide pipe sleeve as required. Refer to Division 7.<br />

3.3 Pipe Sleeves: Install pipe sleeves of types indicated where piping passes through walls,<br />

floors, ceilings, and roofs. Do not install sleeves through structural members of work, except<br />

as detailed on drawings, or as reviewed by Architect/Engineer. Install sleeves accurately<br />

centered on pipe runs. Size sleeves so that piping and insulation (if any) will have free<br />

movement in sleeve, including allowance for thermal expansion; but not less than 2 pipe sizes<br />

larger than piping run. Where insulation includes vapor-barrier jacket, provide sleeve with<br />

sufficient clearance for installation. Install length of sleeve equal to thickness of construction<br />

penetrated, and finish flush to surface; except floor sleeves. Extend floor sleeves ¼" above<br />

level floor finish, and ¾" above floor finish sloped to drain. Provide temporary support of<br />

PIPING SPECIALTIES 23 05 21 -1/2


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

sleeves during placement of concrete and other work around sleeves, and provide temporary<br />

closure to prevent concrete and other materials from entering sleeves.<br />

3.3.1 Install sleeves in fire-rated assemblies in accordance with the listing of the assembly and the<br />

fire barrier sealant.<br />

3.3.2 Install sheet-metal sleeves at interior partitions and ceilings other than suspended ceilings. Fill<br />

annular space with caulking or fire barrier sealant as required.<br />

3.3.3 Install steel-pipe sleeves at floor penetrations. Fill annular space with caulking or fire barrier<br />

sealant as required.<br />

3.3.4 Install iron-pipe sleeves at all foundation wall penetrations and at exterior penetrations; both<br />

above and below grade. Fill annular space with caulking or mechanical sleeve seals.<br />

END OF SECTION 23 05 21<br />

PIPING SPECIALTIES 23 05 21 -2/2


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 23 05 <strong>29</strong> - SUPPORTS, ANCHORS, AND SEALS<br />

1 GENERAL<br />

1.1 Drawings and general provisions of Contract, including General Supplementary Conditions and<br />

Division-1 Specification sections, apply to work of this section.<br />

1.2 This section is a Division-23 Basic Materials and Methods section, and is a part of each<br />

Division-23 section making reference to or requiring supports, anchors, and seals specified<br />

herein.<br />

1.3 Extent of supports, anchors, and seals required by this section is indicated on drawings and/or<br />

specified in other Division-23 sections.<br />

1.4 Code Compliance: Comply with applicable codes pertaining to product materials and<br />

installation of supports, anchors, and seals.<br />

1.5 MSS Standard Compliance:<br />

1.5.1 Provide pipe hangers and supports of which materials, design, and manufacture comply with<br />

ANSI/MSS SP-58.<br />

1.5.2 Select and apply pipe hangers and supports, complying with MSS SP-69.<br />

1.5.3 Fabricate and install pipe hangers and supports, complying with MSS SP-89.<br />

1.5.4 Terminology used in this section is defined in MSS SP-90.<br />

2 PRODUCTS<br />

2.1 Acceptable Manufacturers: Subject to compliance with requirements, provide supports and<br />

hangers by Grinnel, Michigan Hanger Company, B-Line Systems, or approved equal.<br />

2.2 Horizontal-Piping Hangers and Supports: Except as otherwise indicated, provide factoryfabricated<br />

horizontal-piping hangers and supports complying with ANSI/MSS SP-58, of one of<br />

the following MSS types listed, selected by Installer to suit horizontal-piping systems, in<br />

accordance with MSS SP-69 and manufacturer's published product information. Use only one<br />

type by one manufacturer for each piping service. Select size of hangers and supports to<br />

exactly fit pipe size for bare piping, and to exactly fit around piping insulation with saddle or<br />

shield for insulated piping. Provide copper-plated hangers and supports for copper-piping<br />

systems.<br />

2.2.1 Adjustable Steel Clevises: MSS Type 1.<br />

2.2.2 Steel Double Bolt Pipe Clamps: MSS Type 3.<br />

2.2.3 Adjustable Steel Band Hangers: MSS Type 7.<br />

2.2.4 Steel Pipe Clamps: MSS Type 4.<br />

2.2.5 Pipe Stanchion Saddles: MSS Type 37, including steel pipe base support and cast-iron floor<br />

flange.<br />

2.2.6 Single Pipe Rolls: MSS Type 41.<br />

2.2.7 Adjustable Roller Hanger: MSS Type 43.<br />

SUPPORTS, ANCHORS, AND SEALS 23 05 <strong>29</strong> -1/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

2.2.8 Pipe Roll Stands: MSS Type 44 or Type 47.<br />

2.3 Vertical-Piping Clamps: Except as otherwise indicated, provide factory-fabricated verticalpiping<br />

clamps complying with ANSI/MSS SP-58, of one of the following MSS types listed,<br />

selected by Installer to suit vertical piping systems, in accordance with MSS SP-69 and<br />

manufacturer's published product information. Select size of vertical piping clamps to exactly<br />

fit pipe size of bare pipe. Provide copper-plated clamps for copper-piping systems.<br />

2.3.1 Two-Bolt Riser Clamps: MSS Type 8.<br />

2.3.2 Four-Bolt Riser Clamps: MSS Type 42.<br />

2.4 Hanger-Rod Attachments: Except as otherwise indicated, provide factory-fabricated hangerrod<br />

attachments complying with ANSI/MSS SP-58, of one of the following MSS types listed,<br />

selected by Installer to suit horizontal-piping hangers and building attachments, in accordance<br />

with MSS SP-69 and manufacturer's published product information. Use only one type by one<br />

manufacturer for each piping service. Select size of hanger-rod attachments to suit hanger<br />

rods. Provide copper-plated hanger-rod attachments for copper-piping systems.<br />

2.4.1 Steel Turnbuckles: MSS Type 13.<br />

2.4.2 Malleable Iron Sockets: MSS Type 16.<br />

2.5 Building Attachments: Except as otherwise indicated, provide factory-fabricated building<br />

attachments complying with ANSI/MSS SP-58, of one of the following MSS types listed,<br />

selected by Installer to suit building substrate conditions, in accordance with MSS SP-69 and<br />

manufacturer's published product information. Select size of building attachments to suit<br />

hanger rods.<br />

2.5.1 Center Beam Clamps: MSS Type 21.<br />

2.5.2 C-Clamps: MSS Type 23.<br />

2.5.3 Malleable Beam Clamps: MSS Type 30.<br />

2.5.4 Side Beam Brackets: MSS Type 34.<br />

2.5.5 Concrete Inserts: MSS Type 18.<br />

2.6 Saddles and Shields: Except as otherwise indicated, provide saddles or shields under piping<br />

hangers and supports, factory-fabricated, for all insulated piping. Size saddles and shields for<br />

exact fit to mate with pipe insulation.<br />

2.6.1 Protection Shields: MSS Type 40; of length recommended by manufacturer to prevent<br />

crushing of insulation.<br />

2.6.2 Protection Saddles: MSS Type 39; use with rollers, fill interior voids with segments of<br />

insulation matching adjoining insulation.<br />

2.7 Miscellaneous Materials:<br />

2.7.1 Metal Framing: Provide products complying with NEMA STD ML 1.<br />

2.7.2 Steel Plates, Shapes and Bars: Provide products complying with ANSI/ASTM A 36.<br />

SUPPORTS, ANCHORS, AND SEALS 23 05 <strong>29</strong> -2/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

2.7.3 Cement Grout: Portland cement (ANSI/ASTM C 150, Type I or Type III) and clean uniformly<br />

graded, natural sand (ANSI/ASTM C 404, Size No. 2). Mix at a ratio of 1.0 part cement to 3.0<br />

parts sand, by volume, with minimum amount of water required for placement and hydration.<br />

2.7.4 Heavy-Duty Steel Trapezes: Fabricate from steel shapes or continuous channel struts<br />

selected for loads required; weld steel in accordance with AWS standards.<br />

3 EXECUTION<br />

3.1 Preparation<br />

3.1.1 Proceed with installation of hangers, supports and anchors only after required building<br />

structural work has been completed in areas where the work is to be installed. Correct<br />

inadequacies including (but not limited to) proper placement of inserts, anchors and other<br />

building structural attachments.<br />

3.1.2 Prior to installation of hangers, supports, anchors and associated work, Installer shall meet at<br />

project site with Contractor, installer of each component of associated work, and installers of<br />

other work requiring coordination with work of this section for purpose of reviewing material<br />

selections and procedures to be followed in performing the work in compliance with<br />

requirements specified.<br />

3.2 Installation of Building Attachments:<br />

3.2.1 Install building attachments at required locations within concrete or on structural steel for<br />

proper piping support. Space attachments within maximum piping span length indicated in<br />

MSS SP-69. Install additional building attachments where support is required for additional<br />

concentrated loads, including valves, flanges, guides, strainers, expansion joints, and at<br />

changes in direction of piping. Install concrete inserts before concrete is placed; fasten insert<br />

securely to forms. Where concrete with compressive strength less than 2500 psi is indicated,<br />

install reinforcing bars through openings at top of inserts.<br />

3.2.2 In areas of work requiring attachments to existing concrete, use self drilling rod inserts, Phillips<br />

Drill Co., "Red-Head" or equal.<br />

3.3 Installation of Hangers and Supports:<br />

3.3.1 General: Install hangers, supports, clamps and attachments to support piping properly from<br />

building structure; comply with MSS SP-69. Arrange for grouping of parallel runs of horizontal<br />

piping to be supported together on trapeze type hangers where possible. Install supports with<br />

maximum spacings complying with MSS SP-69 or as listed herein, whichever is most limiting.<br />

Where piping of various sizes is to be supported together by trapeze hangers, space hangers<br />

for smallest pipe size or install intermediate supports for smaller diameter pipe. Do not use<br />

wire or perforated metal to support piping, and do not support piping from other piping.<br />

3.3.1.1 Horizontal steel pipe and copper tube 1-1/4" diameter and smaller: support on 6 foot centers.<br />

3.3.1.2 Horizontal steel pipe and copper tube 1-1/2" diameter and larger: support on 10 foot centers.<br />

3.3.1.3 Vertical steel pipe and copper tube: support at each floor.<br />

3.3.2 Install hangers and supports complete with necessary inserts, bolts, rods, nuts, washers and<br />

other accessories.<br />

3.3.3 Paint all black steel hangers with black enamel. Galvanized steel and copper clad hangers do<br />

not require paint.<br />

SUPPORTS, ANCHORS, AND SEALS 23 05 <strong>29</strong> -3/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

3.3.4 Prevent electrolysis in support of copper tubing by use of hangers and supports which are<br />

copper plated, or by other recognized industry methods.<br />

3.3.5 Provision for Movement:<br />

3.3.5.1 Install hangers and supports to allow controlled movement of piping systems and to permit<br />

freedom of movement between pipe anchors, and to facilitate action of expansion joints,<br />

expansion loops, expansion bends and similar units.<br />

3.3.5.2 Load Distribution: Install hangers and supports so that piping live and dead loading and<br />

stresses from movement will not be transmitted to connected equipment.<br />

3.3.5.3 Pipe Slopes: Install hangers and supports to provide indicated pipe slopes, and so that<br />

maximum pipe deflections allowed by ANSI B31 are not exceeded.<br />

3.3.6 Insulated Piping: Comply with the following installation requirements.<br />

3.3.6.1 Shields: Where low-compressive-strength insulation or vapor barriers are indicated, install<br />

coated protective shields.<br />

3.3.6.2 Clamps: Attach clamps, including spacers (if any), to piping with clamps projecting through<br />

insulation; do not exceed pipe stresses allowed by ANSI B31.<br />

3.4 Installation of Anchors:<br />

3.4.1 Install anchors at proper locations to prevent stresses from exceeding those permitted by ANSI<br />

B31, and to prevent transfer of loading and stresses to connected equipment.<br />

3.4.2 Fabricate and install anchors by welding steel shapes, plates and bars to piping and to<br />

structure. Comply with ANSI B31 and with AWS standards.<br />

3.4.3 Anchor Spacings: Where not otherwise indicated, install anchors at ends of principal piperuns,<br />

at intermediate points in pipe-runs between expansion loops and elbows. Make<br />

provisions for preset of anchors as required to accommodate both expansion and contraction<br />

of piping.<br />

3.4.4 Where expansion compensators are indicated, install anchors in accordance with expansion<br />

unit manufacturer's written instructions to limit movement of piping and forces to maximums<br />

recommended by manufacturer for each unit.<br />

END OF SECTION 23 05 <strong>29</strong><br />

SUPPORTS, ANCHORS, AND SEALS 23 05 <strong>29</strong> -4/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 23 05 53 - MECHANICAL IDENTIFICATION<br />

1 GENERAL<br />

1.1 Drawings and general provisions of Contract, including General and Supplementary Conditions<br />

and Division-1 Specification sections, apply to work of this section.<br />

1.2 This section is a Division-23 Basic Mechanical Materials and Methods section, and is part of<br />

each Division-23 section making reference to or requiring identification devices specified<br />

herein.<br />

1.3 Extent of mechanical identification work required by this section is indicated on drawings<br />

and/or specified in other Division-23 sections.<br />

1.4 Refer to Division-26 sections for identification requirements of electrical work; not work of this<br />

section. Refer to other Division-23 sections for identification requirements for controls; not<br />

work of this section.<br />

1.5 Codes and Standards: Comply with ANSI A13.1 for lettering size, length of color field, colors,<br />

and viewing angles of identification devices.<br />

2 PRODUCTS<br />

2.1 General: Provide manufacturer's standard products of categories and types required for each<br />

application as referenced in other Division-23 sections. Where more than single type is<br />

specified for application, selection is Installer's option, but provide single selection for each<br />

product category.<br />

2.2 Painted Identification Materials<br />

2.2.1 Stencils: Standard fiberboard stencils, prepared for required applications with letter sizes<br />

generally complying with recommendations of ANSI A13.1 for piping and similar applications,<br />

but not less than 1-¼" high letters for ductwork and not less than ¾" high letters for access<br />

door signs and similar operational instructions.<br />

2.2.2 Stencil Paint: Standard exterior type stenciling enamel; black, except as otherwise indicated;<br />

either brushing grade or pressurized spray-can form and grade.<br />

2.2.3 Identification Paint: Standard identification enamel.<br />

2.3 Engraved Plastic-Laminate Signs:<br />

2.3.1 General: Provide engraving stock melamine plastic laminate, in the sizes and thicknesses<br />

indicated, engraved with engraver's standard letter style a minimum of 3/4" tall and wording<br />

indicated, punched for mechanical fastening except where adhesive mounting is necessary<br />

because of substrate.<br />

2.3.2 Thickness: 1/16" for units up to 20 sq. in. or 8" length; 1/8” for larger units.<br />

2.3.3 Fasteners: Self-tapping stainless steel screws, except contact-type permanent adhesive<br />

where screws cannot or should not penetrate the substrate.<br />

2.4 Stamped Nameplates: Provide equipment manufacturer's standard stamped nameplates for<br />

motors, AHUs, pumps, etc.<br />

3 EXECUTION<br />

MECHANICAL IDENTIFICATION 23 05 53 -1/2


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

3.1 Coordination: Where identification is to be applied to surfaces which require insulation,<br />

painting or other covering or finish, install identification after completion of covering and<br />

painting. Install identification prior to installation of acoustical ceilings and similar removable<br />

concealment.<br />

3.2 Ductwork Identification:<br />

3.2.1 General: Identify air supply, return, exhaust, intake and relief ductwork with stenciled signs<br />

and arrows, showing ductwork service and direction of flow, in black or white.<br />

3.2.2 Location: In each space where ductwork is exposed, or concealed only by removable ceiling<br />

system, locate signs near points where ductwork originates or continues into concealed<br />

enclosures, and at 50' spacings along exposed runs.<br />

3.2.3 Access Doors: Provide stenciled signs on each access door in ductwork and housings,<br />

indicating purpose of access (to what equipment) and other maintenance and operating<br />

instructions, and appropriate and procedural information.<br />

3.3 Mechanical Equipment Identification: Install engraved plastic laminate sign on a vertical<br />

surface on or near each major item of mechanical equipment and each operational device.<br />

Label shall indicate type of system and area served. Provide signs for the following general<br />

categories of equipment and operational devices:<br />

3.3.1 Fans (inside housing or above ceiling for ceiling mounted fans), blowers, primary balancing<br />

dampers and VAV boxes.<br />

3.3.2 HVAC air handlers and fan coil units.<br />

3.3.3 Air conditioning indoor and outdoor units.<br />

3.4 Stamped Nameplates: Equipment manufacturers to provide standard stamped nameplates on<br />

all major equipment items such as motors, pumps, AHUs, etc. Where motors are hidden from<br />

view (within equipment casing, or otherwise not easily accessible, etc.), the equipment supplier<br />

shall furnish a duplicate motor data nameplate to be affixed to the equipment casing in an<br />

easily visible location, unless data is already included on the equipment nameplate.]<br />

3.5 Adjusting and Cleaning:<br />

3.5.1 Adjusting: Relocate any mechanical identification device which has become visually blocked<br />

by work of this division or other divisions.<br />

3.5.2 Cleaning: Clean face of identification devices.<br />

END OF SECTION 23 05 53<br />

MECHANICAL IDENTIFICATION 23 05 53 -2/2


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 23 05 93 - TESTING AND BALANCING OF MECHANICAL SYSTEMS<br />

1 GENERAL<br />

1.1 Drawings and general provisions of Contract, including General and Supplementary Conditions<br />

and Division-1 Specification sections, apply to work of this section. Division-23 Basic<br />

Mechanical Materials Sections apply to work of this section.<br />

1.2 Description of Work:<br />

1.2.1 Extent of testing, adjusting, and balancing work (TAB) is indicated by requirements of this<br />

section, and also by drawings and schedules, and is defined to include, but is not necessarily<br />

limited to, air distribution systems, hydronic distribution systems and associated equipment<br />

and apparatus of mechanical work. The work consists of setting speed and volume (flow)<br />

adjusting facilities provided for systems, recording data, conducting tests, preparing and<br />

submitting reports, and recommending modifications to work as required.<br />

1.2.2 Coordination: Coordinate with the General Contractor and Mechanical Contractor responsible<br />

for the HVAC system installation as required to complete the TAB work.<br />

1.3 The intent of this specification is to balance HVAC systems within the tolerances listed,<br />

maintaining the pressure relationships indicated, with a minimum of noise.<br />

1.3.1 Airflow Tolerances:<br />

1.3.1.1 Air Handling: The supply air, return air and outdoor air quantities shall be balanced within 5%<br />

of design values.<br />

1.3.1.2 Exhaust Fans: The exhaust fan quantities shall be set as required to maintain the design<br />

exhaust terminal flows within 5% of design values. If no exhaust terminals exist, exhaust fan<br />

air quantities shall be balanced within 10% of design values.<br />

1.3.1.3 Terminal Units: The air quantities associated with VAV boxes, fan coil units, self-regulating air<br />

valves, unit heaters and other similar devices shall be balanced within 5% of design values.<br />

1.3.1.4 Ceiling Diffusers, Supply Registers, Return and Exhaust Inlets: Balance to an air quantity<br />

within 10% of the design values.<br />

1.3.2 Temperature Tolerances:<br />

1.3.2.1 Air Handling Temperatures: The controlled temperatures at AHUs shall be verified to be under<br />

control within 1ºF of design values.<br />

1.3.2.2 Room Temperatures: Balance systems and controls within 2ºF of indicated settings.<br />

1.4 Quality Assurance: The TAB Contractor shall be certified by one of the following means:<br />

1.4.1 Tester: A firm certified by National Environmental Balancing Bureau (NEBB) in those testing<br />

and balancing disciplines required for this project, who is not the Installer of the systems to be<br />

tested and is otherwise independent of the project. Comply with NEBB's "Procedural<br />

Standards for Testing, Adjusting and Balancing of Environmental Systems" as applicable to<br />

this work.<br />

1.4.2 Tester: A firm certified by Associated Air Balance Council (AABC) in those testing and<br />

balancing disciplines required for this project. AABC-certified firms are independent by<br />

definition. Comply with AABC's Manual MN-1 "AABC National Standards", as applicable to<br />

TESTING AND BALANCING OF MECHANICAL SYSTEMS 23 05 93 - 1/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

this work.<br />

1.4.3 Industry Standards: Comply with American Society of Heating, Refrigerating and Air-<br />

Conditioning Engineers, Inc. (ASHRAE) recommendations pertaining to measurements,<br />

instruments and testing, adjusting and balancing, except as otherwise indicated.<br />

1.5 Job Conditions:<br />

1.5.1 Do not proceed with testing, adjusting, and balancing work until HVAC work (including<br />

Controls) has been completed and is operable. Ensure that there is no residual work still to be<br />

completed.<br />

1.5.2 Do not proceed until work scheduled for testing, adjusting, and balancing is clean and free<br />

from debris, dirt and discarded building materials.<br />

1.5.3 Do not proceed until architectural work that would affect balancing (walls, ceiling, windows,<br />

doors) have been installed.<br />

1.5.4 Testing may proceed system by system, but each HVAC system must be complete as<br />

describe herein.<br />

1.5.5 The mechanical contractor shall make any changes in pulleys, belts, and dampers, and/or add<br />

dampers as required for correct balancing.<br />

1.6 Approval Submittals<br />

1.6.1 Submit the name of the proposed test and balance company for the Engineer's approval within<br />

thirty (30) days after awarding of contract.<br />

1.7 Test Reports and Verification Submittals:<br />

1.7.1 Submit four (4) copies of the dated test and balance report upon completion of TAB work. The<br />

report shall include a list of instruments used for the work. The report shall be signed by the<br />

supervisor who performed the TAB work.<br />

2 PRODUCTS<br />

2.1 Patching Materials: Except as otherwise indicated, use same products as used by original<br />

Installer for patching holes in insulation, ductwork and housings which have been cut or drilled<br />

for test purposes, including access for test instruments, attaching jigs, and similar purposes.<br />

2.2 Test Instruments: Utilize test instruments and equipment of the type, precision, and capacity<br />

as recommended in the referenced standard. All instruments shall be in good condition and<br />

shall have been calibrated within the previous six (6) months (or more recently if required by<br />

standard).<br />

3 EXECUTION<br />

3.1 General:<br />

3.1.1 Examine installed work and conditions under which testing is to be done to ensure that work<br />

has been completed, cleaned and is operable. Do not proceed with TAB work until<br />

unsatisfactory conditions have been corrected in manner acceptable to Tester.<br />

3.1.2 Test, adjust and balance environmental systems and components, as indicated, in accordance<br />

with procedures outlined in applicable standards, and as modified or detailed herein.<br />

TESTING AND BALANCING OF MECHANICAL SYSTEMS 23 05 93 - 2/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

3.1.3 Test, adjust and balance systems during summer season for air conditioning systems and<br />

during winter season for heating systems, including at least a period of operation at outside<br />

conditions within 5ºF wet bulb temperature of maximum summer design condition, and within<br />

10ºF dry bulb temperature of minimum winter design condition. When seasonal operation<br />

does not permit measuring final temperatures, then take final temperature readings when<br />

seasonal operation does permit. The Contractor shall return for a change of seasons test at<br />

no additional cost to the Owner and submit the revised TAB report.<br />

3.1.4 Punch List: Prepare a deficiency (punch) list for the Contractor with a copy of the Engineer that<br />

lists all items that are incorrectly installed or are functioning improperly. Provide a retest after<br />

all items are corrected.<br />

3.1.5 Prepare TAB report of test results, including instrumentation calibration reports, in format<br />

recommended by applicable standards, modified as required to include all data listed herein.<br />

3.1.6 Patch holes in insulation, ductwork and housings, which have been cut or drilled for test<br />

purposes, in manner recommended by original Installer.<br />

3.1.7 Mark equipment settings, including damper control positions, valve indicators, fan speed<br />

control levers, and similar controls and devices, to show final settings at completion of TAB<br />

work. Provide markings with paint or other suitable permanent identification materials.<br />

3.1.8 Include in the TAB report recommendations for correcting unsatisfactory mechanical<br />

performances when system cannot be successfully balanced.<br />

3.1.9 Include an extended warranty of ninety (90) days after completion of test and balance work,<br />

during which time the Engineer, at his discretion, may request a recheck, or resetting of any<br />

component as listed in test report. The TAB company shall provide technicians and<br />

instruments and make any tests required by the Engineer during this time period.<br />

3.2 Controls<br />

3.2.1 Check all HVAC controls for proper location, calibration and sequence of operation.<br />

3.2.2 Check operation of all controllers and controlled devices to verify proper action and direction.<br />

Check the operation of all interlocks.<br />

3.3 Air Balancing<br />

3.3.1 Leakage tests on ductwork must have been completed before air balancing.<br />

3.3.2 Set dampers, volume controls and fan speeds to obtain specified air delivery with minimum<br />

noise level. Rebalance as required to accomplish this. Simulate fully loaded filters during test.<br />

3.3.3 Set grille deflections as noted on plans. Modify deflections if required to eliminate drafts or<br />

objectionable air movement.<br />

3.3.4 Record air terminal velocity after completion of balance work.<br />

3.3.5 Record final grille and register deflection settings if different from that specified on contract<br />

drawings.<br />

3.3.6 Record all fan speeds.<br />

3.4 Data Collection:<br />

TESTING AND BALANCING OF MECHANICAL SYSTEMS 23 05 93 - 3/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

3.4.1 In addition to the data required for any specified performance tests, measure and record the<br />

temperatures, pressures, flow rates, and nameplate data for all components listed herein.<br />

3.4.2 It is the intent of this section to record data on balanced systems, under normal operating or<br />

design conditions.<br />

3.4.3 Temperatures:<br />

3.4.4 Pressures:<br />

1. Outside dry and wet bulb temperatures.<br />

2. Dry bulb temperature in each room and at least one wet bulb temperature in each zone.<br />

3. Refrigerant liquid and suction temperatures.<br />

4. Inlet and outlet temperature of each heat exchange device - both fluids.<br />

1. Suction and discharge static pressure of each fan.<br />

2. Suction and discharge pressure of each pump.<br />

3. Each refrigerant suction and discharge pressure.<br />

3.4.5 Flow rates:<br />

1. Flow rate through each fan.<br />

3.4.6 Nameplate Data:<br />

1. Complete nameplate data for all equipment.<br />

2. Motor data to include horsepower, phase, voltage, RPM, full load nameplate current, fuse<br />

rating in disconnect switch, number or manufacturer's size designation, and ampere<br />

rating of overcurrent and low voltage protection devices in starters.<br />

3.5 All test openings in ductwork shall be resealed in an approved manner.<br />

END OF SECTION 23 05 93<br />

TESTING AND BALANCING OF MECHANICAL SYSTEMS 23 05 93 - 4/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 23 07 13 - EXTERIOR INSULATION FOR DUCTWORK<br />

1 GENERAL<br />

1.1 Drawings and general provisions of Contract, including General and Supplementary Conditions<br />

and Division-1 Specification sections, apply to work of this section.<br />

1.2 Division-23 Basic Mechanical Materials and Methods sections apply to work of this section.<br />

1.3 Approval Submittals:<br />

1.3.1 Product Data: Submit producer's data sheets and installation instructions on each insulation<br />

system including insulation, coverings, adhesives, sealers, protective finishes, and other<br />

material recommended by the manufacturer for applications indicated. Submit for:<br />

1.3.1.1 Flexible duct insulation<br />

1.4 O&M Data Submittals: Submit a copy of all approval submittals. Include in O&M Manual.<br />

2 PRODUCTS<br />

2.1 Acceptable Manufacturers: Subject to compliance with requirements, provide insulation<br />

products by Knauf, Owens-Corning, Johns Manville, Certainteed.<br />

2.2 Flame/Smoke Ratings: Provide composite mechanical insulation (insulation, coverings,<br />

sealers, mastic, and adhesive) with a flame spread rating of 25 or less, and a smokedeveloped<br />

rating of 50 or less as tested by ANSI/ASTM 84.<br />

2.3 Flexible Fiberglass Insulation: ASTM C553, Type I, Class B-3 (temperature less than 350ºF).<br />

Duct wrap shall be 1 pcf density with UL rated aluminum foil vapor barrier (FSK).<br />

2.4 General Purpose Mastic: Benjamin Foster 35-00 Series, Insulcoustic VIAC Mastic, Childers<br />

CP-10, or approved equal. The final selection of this product for the specific application<br />

indicated is the responsibility of the insulation supplier. The insulation system must meet the<br />

specified application.<br />

2.5 Vapor Barrier Sealant: Benjamin Foster 30-35, Insulcoustic IC-501, 3M EC-1378, Childers<br />

CP-30, or approved equal. Provide "Low Odor" type. The final selection of this product for the<br />

specific application indicated is the responsibility of the insulation supplier. The insulation<br />

system must meet the specified application.<br />

2.6 Adhesive: Benjamin Foster 85-20, Insulcoustic IC-205, 3M EC-35, Childers CP-82, Childers<br />

CP-89, or approved equal. The final selection of this product for the specific application<br />

indicated is the responsibility of the insulation supplier. The insulation system must meet the<br />

specified application.<br />

2.7 Fiber-Glas Mesh: 10x10 Mesh. Foster Mastafab or equal.<br />

3 EXECUTION<br />

3.1 Insulate all supply, return and outdoor air ductwork concealed above ceilings, in chases, or<br />

elsewhere, and the backs of all ceiling supply outlets with 2" thick fiberglass blanket insulation<br />

with vapor barrier.<br />

3.2 Installation of Flexible Insulation:<br />

EXTERIOR INSULATION FOR DUCTWORK 23 07 13-1/2


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

3.2.1 Insulate round elbows and fittings with wrap such that thickness is equal to adjoining duct<br />

covering. Clean and dry ductwork prior to insulating.<br />

3.2.2 Adhere insulation to duct with 50 percent coverage using approved insulation adhesive applied<br />

in 6-inch wide swaths with 6-inch spaces between swaths. Additionally secure insulation with<br />

perforated pins and Tuff-Bond or by self-sticking pins with a 3/8" self-tapping screw. Space on<br />

12-inch centers and 3 inches from all edges. Ducts up through 24" wide only require one row<br />

of pins. Ducts over 24" wide shall have pins spaced as described herein.<br />

3.2.3 Lap all joints 2 inches and seal joints with 4-inch wide strips of open mesh glass fabric<br />

embedded in two coats of general purpose mastic.<br />

3.2.4 Seal all punctures and breaks in aluminum vapor barrier with open mesh glass fabric and<br />

vapor barrier sealant.<br />

END OF SECTION 23 07 13<br />

EXTERIOR INSULATION FOR DUCTWORK 23 07 13-2/2


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 23 31 13 - HVAC METAL DUCTWORK<br />

1 GENERAL<br />

1.1 Drawings and general provisions of Contract, including General and Supplementary Conditions<br />

and Division-1 Specification sections, apply to work of this section.<br />

1.2 Division-23 Basic Mechanical Materials and Methods Sections apply to work of this section.<br />

1.3 Extent of HVAC metal ductwork is indicated on drawings and in schedules, and by<br />

requirements of this section.<br />

1.4 Refer to other Division-23 sections for exterior insulation of metal ductwork.<br />

1.5 Refer to other Division-23 sections for ductwork accessories.<br />

1.6 Codes and Standards:<br />

1.6.1 SMACNA Standards: Comply with SMACNA's "HVAC Duct Construction Standards, Metal<br />

and Flexible" 1985 Edition for fabrication and installation of metal ductwork, unless otherwise<br />

noted.<br />

1.6.2 NFPA 90A Compliance: Comply with NFPA 90A "Standard for the Installation of Air<br />

Conditioning and Ventilating Systems".<br />

1.7 Approval Submittals:<br />

1.7.1 Product Data: Submit manufacturer's technical product data and installation instructions for<br />

the following.<br />

Factory-fabricated ductwork<br />

Sealants<br />

1.7.2 Shop Drawings: Submit scaled layout drawings of HVAC metal ductwork and fittings including,<br />

but not limited to, duct sizes, locations, elevations, and slopes of horizontal runs, wall and floor<br />

penetrations, and connections. Show interface and spatial relationship between ductwork and<br />

proximate equipment. Show modifications of indicated requirements, made to conform to local<br />

shop practice, and how those modifications ensure that free area, materials, and rigidity are<br />

not reduced.<br />

2 PRODUCTS<br />

2.1 Ductwork Materials:<br />

2.1.1 Exposed Ductwork Materials: Where ductwork is indicated to be exposed to view in occupied<br />

spaces, provide materials which are free from visual imperfections including pitting, seam<br />

marks, roller marks, stains and discolorations, and other imperfections, including those which<br />

would impair painting.<br />

2.1.2 Galvanized Sheet Metal: Except as otherwise indicated, fabricate ductwork from galvanized<br />

HVAC METAL DUCTWORK 23 31 13 - 1/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

sheet steel complying with ASTM A 527, lockforming quality; with G 90 zinc coating in<br />

accordance with ASTM A 525; and mill phosphatized for exposed locations. Stamp gauge and<br />

manufacturer's identification on each sheet. Break sheets so that identification is exposed.<br />

2.2 Miscellaneous Ductwork Materials:<br />

2.2.1 General: Provide miscellaneous materials and products of types and sizes indicated and,<br />

where not otherwise indicated, provide type and size required to comply with ductwork system<br />

requirements including proper connection of ductwork and equipment.<br />

2.2.2 Duct Sealant: Provide non-hardening, non-migrating mastic or liquid elastic sealant, type<br />

applicable for fabrication/installation detail, as compounded and recommended by<br />

manufacturer specifically for sealing joints and seams in ductwork.<br />

2.2.3 Ductwork Support Materials: Except as otherwise indicated, provide hot-dipped galvanized<br />

steel fasteners, anchors, rods, straps, trim and angles for support of ductwork.<br />

2.2.4 Fittings: Provide radius type fittings fabricated of multiple sections with maximum 15° change<br />

of direction per section. Unless specifically detailed otherwise, use 45° laterals and 45°<br />

elbows for branch takeoff connections. Where 90° branches are indicated, provide conical<br />

type tees.<br />

2.3 Fabrication:<br />

2.3.1 Shop fabricate ductwork in 4, 8, 10 or 12-ft lengths, unless otherwise indicated or required to<br />

complete runs. Preassemble work in shop to greatest extent possible, so as to minimize field<br />

assembly of systems. Disassemble systems only to extent necessary for shipping and<br />

handling. Match-mark sections for reassembly and coordinated installation.<br />

2.3.2 Shop fabricate ductwork of gauges and reinforcement complying with SMACNA "HVAC Duct<br />

Construction Standards", except provide sealant at all joints. Supply duct from air<br />

conditioning units and all return and exhaust duct shall be minimum 2" pressure class unless<br />

otherwise noted.<br />

2.3.3 Fabricate duct fittings to match adjoining ducts, and to comply with duct requirements as<br />

applicable to fittings. Except as otherwise indicated, fabricate elbows with center-line radius<br />

equal to 1½ times associated duct width; and fabricate to include turning vanes in elbows<br />

where shorter radius is necessary. Limit angular tapers to 30° for contracting tapers and 20°<br />

for expanding tapers.<br />

2.3.4 Fabricate ductwork with accessories installed during fabrication to the greatest extent possible.<br />

Refer to Division-23 section "Ductwork Accessories" for accessory requirements.<br />

2.4 Factory-Fabricated Low Pressure Ductwork (Maximum 2" W.G.):<br />

2.4.1 Material: Galvanized sheet steel complying with ASTM A 527, lockforming quality, with ASTM<br />

A 525, G90 zinc coating, mill phosphatized.<br />

2.4.2 Gauge: 28-gauge minimum for round ducts and fittings, 4" through 8" diameter. 26-gauge<br />

minimum 9" through 14", 24-gauge minimum 15" through 26".<br />

HVAC METAL DUCTWORK 23 31 13 - 2/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

2.4.3 Elbows: One piece construction for 90° and 45° elbows 14" and smaller. Provide multiple<br />

gore construction for larger diameters with standing seam circumferential joint.<br />

2.4.4 Divided Flow Fittings: 90° tees, constructed with saddle tap spot welded and bonded to duct<br />

fitting body.<br />

2.4.5 Acceptable Manufacturers: Subject to compliance with requirements, provide factoryfabricated<br />

ductwork by Semco Mfg., Inc. or United Sheet Metal Div., United McGill Corp, or<br />

approved equal.<br />

3 EXECUTION<br />

3.1 General: Examine areas and conditions under which HVAC metal ductwork is to be installed.<br />

Do not proceed with work until unsatisfactory conditions have been corrected in manner<br />

acceptable to Installer.<br />

3.2 Installation Of Metal Ductwork:<br />

3.2.1 General: Assemble and install ductwork in accordance with recognized industry practices<br />

which will achieve air-tight (5% leakage for systems rated 3" and under; 1% for systems rated<br />

over 3") and noiseless (no objectionable noise) systems, capable of performing each indicated<br />

service. Install each run with minimum number of joints. Align ductwork accurately at<br />

connections, within 1/8" misalignment tolerance and with internal surfaces smooth. Support<br />

ducts rigidly with suitable ties, braces, hangers and anchors of type which will hold ducts trueto-shape<br />

and to prevent buckling. Support vertical ducts at every floor.<br />

3.2.2 Supports: Install concrete inserts for support of ductwork in coordination with formwork, as<br />

required to avoid delays in work. Install self-drilling screw anchors in prestressed concrete or<br />

existing work.<br />

3.2.3 Field Fabrication: Complete fabrication of work at project as necessary to match shopfabricated<br />

work and accommodate installation requirements. Seal joints in round or oval<br />

ductwork with hard cast or shrink bands, and sheet metal screws, or by welding.<br />

3.2.4 Routing: Locate ductwork runs, except as otherwise indicated, vertically and horizontally.<br />

Avoid diagonal runs wherever possible. Locate runs as indicated by diagrams, details and<br />

notations or, if not otherwise indicated, run ductwork in shortest route which does not obstruct<br />

useable space or block access for servicing building and its equipment. Hold ducts close to<br />

walls, overhead construction, columns, and other structural and permanent enclosure<br />

elements of building. Limit clearance to ½" where furring is shown for enclosure or<br />

concealment of ducts, but allow for insulation thickness, if any. Where possible, locate<br />

insulated ductwork for 1" clearance outside of insulation. In finished and occupied spaces,<br />

conceal ductwork from view by locating in mechanical shafts, hollow wall construction or above<br />

suspended ceilings, unless specifically noted as "Exposed". Do not encase horizontal runs in<br />

solid partitions, except as specifically shown. Coordinate layout with suspended ceiling and<br />

lighting layouts and similar finished work.<br />

3.2.5 Electrical Equipment Spaces: Do not route ductwork through transformer vaults or other<br />

electrical equipment spaces and enclosures.<br />

3.2.6 Penetrations: Where ducts pass through interior partitions and exterior walls, and are exposed<br />

HVAC METAL DUCTWORK 23 31 13 - 3/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

to view, conceal space between construction opening and duct or duct insulation with sheet<br />

metal flanges of same gauge as duct. Overlap opening on 4 sides by at least 1½". Fasten to<br />

duct and substrate. Where ducts pass through fire-rated floors, walls, or partitions, provide<br />

firestopping between duct and substrate.<br />

3.2.7 Coordination: Coordinate duct installations with installation of accessories, dampers, coil<br />

frames, equipment, controls and other associated work of ductwork system.<br />

3.2.8 Installation: Install metal ductwork in accordance with SMACNA HVAC Duct Construction<br />

Standards. Fan discharge outlet ducts shall be installed correctly with regard to "system<br />

effect" per AMCA Publication 201.<br />

3.3 Leakage Tests: After each duct system is completed, test for duct leakage in accordance with<br />

Sections 3 and 5 of the SMACNA HVAC Air Duct Leakage Test Manual. Test pressure shall<br />

be equal to pressure class of duct, less 0.5" static pressure. Repair leaks and repeat tests<br />

until total leakage is less than 5% of system design air flow for low pressure systems and less<br />

than 1% for systems rated over 3".<br />

3.4 Equipment Connections: Connect metal ductwork to equipment as indicated, provide flexible<br />

connection for each ductwork connection to equipment mounted on vibration isolators, and/or<br />

equipment containing rotating machinery. Provide access doors as indicated.<br />

3.5 Clean ductwork internally free of dust and debris. Clean external surfaces of foreign<br />

substances which might cause corrosive deterioration of metal or, where ductwork is to be<br />

painted, might interfere with painting or cause paint deterioration. Keep ducts closed with poly<br />

during construction to prevent contamination by construction dust and debris.<br />

3.6 Balancing: Refer to Division-23 section "Testing, Adjusting, and Balancing" for air distribution<br />

balancing of metal ductwork; not work of this section. Seal any leaks in ductwork that become<br />

apparent in balancing process.<br />

3.7 System Adjustment: Adjust the system to provide functional operation to the extent possible,<br />

and leave ready for Testing and Balancing work. It is not the intent of this section to provide<br />

final testing and balancing, but to leave the system operational with a minimum of noise.<br />

END OF SECTION 23 31 13<br />

HVAC METAL DUCTWORK 23 31 13 - 4/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 23 33 00 - DUCTWORK ACCESSORIES<br />

1 GENERAL<br />

1.1 Drawings and general provisions of Contract, including General and Supplementary Conditions<br />

and Division-1 Specification sections, apply to work of this section.<br />

1.2 Division-23 Basic Mechanical Materials and Methods sections apply to work of this section.<br />

1.3 Extent of ductwork accessories work is indicated on drawings and in schedules, and by<br />

requirements of this section.<br />

1.4 Refer to other Division-23 sections for testing, adjusting, and balancing of ductwork<br />

accessories; not work of this section.<br />

1.5 Codes and Standards:<br />

1.5.1 SMACNA Compliance: Comply with applicable portions of both SMACNA "HVAC Duct<br />

Construction Standards, Metal and Flexible" .<br />

1.5.2 NFPA Compliance: Comply with applicable provisions of NFPA 90A "Air Conditioning and<br />

Ventilating Systems" pertaining to installation of ductwork accessories.<br />

1.6 Approval Submittals:<br />

1.6.1 Product Data: Submit manufacturer's technical product data for each type of ductwork<br />

accessory, including dimensions, capacities, and materials of construction; and installation<br />

instructions as follows:<br />

Flexible connections<br />

1.6.2 O&M Data Submittals: Submit manufacturer's maintenance data including parts lists for fire<br />

dampers. Include this data, product data, and a copy of approval submittals in O&M manual.<br />

2 PRODUCTS<br />

2.1 Turning Vanes: Provide manufactured or fabricated single wall turning vanes and vane<br />

runners, constructed in accordance with SMACNA "HVAC Duct Construction Standards".<br />

2.2 Flexible Connections:<br />

2.2.1 General: Provide flexible duct connections wherever ductwork connects to vibration isolated<br />

equipment. Construct flexible connections of neoprene-coated flameproof fabric crimped into<br />

duct flanges for attachment to duct and equipment. Make airtight joint. Provide adequate joint<br />

flexibility to allow for thermal, axial, transverse, and torsional movement, and also capable of<br />

absorbing vibrations of connected equipment.<br />

2.2.2 Acceptable Manufacturers: Subject to compliance with requirments, provide products by one of<br />

the following: Duro Dyne Corp., Flexaust (The) Co., or Ventfabrics, Inc.<br />

2.3 Fire Dampers:<br />

2.3.1 Fire Dampers: Provide curtain type fire dampers, UL classified and labeled per UL 555, of<br />

types and sizes indicated. Construct casings and blades of galvanized steel. Damper shall<br />

not restrict duct free area when open. Dampers shall be rated for dynamic closure under flow<br />

and pressure. Provide sleeves and mounting angles. Provide fusible link rated at 160 to 165°<br />

DUCTWORK ACCESSORIES 23 33 00 - 1/2


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

F unless otherwise indicated. Provide damper with positive lock in closed position. All<br />

dampers shall be spring activated. Basis of design:<br />

1-1/2 HR: Ruskin IBD2 - Style B for rectangular, Style CR for round, Style CO for oval.<br />

1-1/2 HR: Ruskin IBDT for transfer grilles in narrow partitions.<br />

HR: Ruskin IBD23 - Style B for rectangular, Style CR for round, Style CO for oval.<br />

2.3.2 Acceptable Manufacturers: Subject to compliance with requirements, provide fire and smoke<br />

dampers by Air Balance, Inc., American Warning & Ventilating, Arrow Louver and Damper,<br />

Penn Ventilator Co., or Ruskin Mfg. Co.<br />

3 EXECUTION<br />

3.1 Examine areas and conditions under which ductwork accessories will be installed. Do not<br />

proceed with work until unsatisfactory conditions have been corrected in manner acceptable to<br />

Installer.<br />

3.2 Installation of Ductwork Accessories:<br />

3.2.1 Install ductwork accessories in accordance with manufacturer's installation instructions, with<br />

applicable portions of details of construction as shown in SMACNA standards, and in<br />

accordance with recognized industry practices to ensure that products serve intended function.<br />

3.2.2 Install turning vanes in square or rectangular 90º elbows in supply, return, and exhaust air<br />

systems, and elsewhere as indicated.<br />

3.2.3 Install flexible connections in ductwork such that the clear length of the connector is<br />

approximately two inches. Provide thrust restraints as required. Flexible material shall not be<br />

so slack as to take a definite concave or convex shape during fan operation.<br />

3.2.4 Install fire dampers within fire walls and floors at locations shown on the mechanical drawings.<br />

Install in strict accordance with the manufacturer's printed instructions, NFPA 90A, and UL<br />

555. Basis of design installation is detailed on the drawings.<br />

3.2.5 Coordinate with other work, including ductwork, as necessary to interface installation of<br />

ductwork accessories properly with other work.<br />

3.3 Operate installed ductwork accessories to demonstrate compliance with requirements. Test<br />

for air leakage while system is operating. Repair or replace faulty accessories as required to<br />

obtain proper operation and leakproof performance.<br />

3.4 Adjusting And Cleaning:<br />

3.4.1 Final positioning of manual dampers is specified in Division-23 section "Testing, Adjusting, and<br />

Balancing". However, the system shall be left functional with all dampers open or throttled.<br />

3.4.2 Cleaning: Clean factory-finished surfaces. Repair any marred or scratched surfaces with<br />

manufacturer's touch-up paint.<br />

3.4.3 Furnish extra fusible links to Owner, one link for every 10 installed of each temperature range;<br />

obtain receipt.<br />

END OF SECTION 23 33 00<br />

DUCTWORK ACCESSORIES 23 33 00 - 2/2


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 23 34 00 - FANS<br />

1 GENERAL<br />

1.1 Drawings and general provisions of Contract, including General and Supplementary Conditions<br />

and Division-1 Specification sections, apply to work of this section.<br />

1.2 Division-23 Basic Mechanical Materials and Methods sections apply to work of this section.<br />

1.3 Extent of fan work required by this section as indicated on drawings and schedules, and by<br />

requirements of this section.<br />

1.4 Coordination:<br />

1.4.1 Refer to Division-7 sections for installation of prefabricated roof curbs; not work of this section.<br />

Furnishing prefabricated roof curbs is part of this section’s work.<br />

1.4.2 Refer to Division-23 section "Testing, Adjusting, and Balancing" for balancing of fans.<br />

1.4.3 Refer to Division-23 HVAC control systems sections for control work required in conjunction<br />

with fans.<br />

1.4.4 Refer to Division-26 sections for power supply wiring from power source to power connection<br />

on fans. Division-26 work will include starters, disconnects, and required electrical devices,<br />

except where specified as furnished, or factory-installed, by manufacturer.<br />

1.5 Codes and Standards:<br />

1.5.1 AMCA Compliance: Provide fans which have been tested and rated in accordance with AMCA<br />

standards, and bear AMCA Certified Ratings Seal.<br />

1.5.2 UL Compliance: Provide fans which are listed by UL and have UL label affixed.<br />

1.6 Approval Submittals:<br />

1.6.1 Product Data: Submit manufacturer's technical data for fans, including specifications, capacity<br />

ratings, dimensions, weights, materials, accessories furnished, and installation instructions.<br />

Submit assembly-type drawings showing unit dimensions, construction details, methods of<br />

assembly of components, and field connection details.<br />

Fans<br />

Vibration Control<br />

1.7 O&M Data Submittals: Submit maintenance data and parts list for each type of fan, accessory,<br />

and control. Include these data, a copy of approved submittals, and wiring diagrams in O&M<br />

Manual.<br />

2 PRODUCTS<br />

2.1 General: Except as otherwise indicated, provide standard prefabricated fans of type and size<br />

indicated, modified as necessary to comply with requirements, and as required for complete<br />

installation. Provide accessories as listed in the schedule on the drawings and as described<br />

herein. Motors shall be high efficiency.<br />

2.2 Acceptable Manufacturers: Subject to compliance with requirements provide fans<br />

FANS 23 34 00 - 1/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

manufactured by Acme, Greenheck, Loren Cook, Penn or approved equal unless otherwise<br />

noted herein.<br />

2.3 Centrifugal Ceiling Exhausters:<br />

2.3.1 Fan Assembly: Provide steel housing, plastic or aluminum grille, backdraft damper, statically<br />

and dynamically balanced fan wheel, permanently lubricated motor with internal thermal<br />

overloads, vibration isolation and all required mounting hardware and brackets. Provide<br />

acoustically treated housing for all fans larger than 60 cfm. Mounting type shall be as<br />

indicated on the drawings or on the schedule.<br />

2.3.2 Connectors: Provide adaptors, connectors, and eave elbows as required to connect fan<br />

discharges to outlets.<br />

2.3.3 Outlets: Provide where shown on the drawings (or required by the installation) wall caps, vent<br />

caps, or roof jacks, each with birdscreen, to match fans and surrounding construction.<br />

2.4 In-Line Centrifugal Fans:<br />

2.4.1 Housing: Provide round aluminum or square weather tight housing constructed of steel and<br />

painted inside and out with an epoxy finish. Provide venturi type inlet.<br />

2.4.2 Fan Wheels: Provide aluminum air foil type, backward curved, statically and dynamically<br />

balanced.<br />

2.4.3 Drive: Provide direct or belt drive as scheduled with pre-lubricated, ball bearing, continuous<br />

duty type motors. Provide vibration isolation equipment for the entire drive.<br />

2.4.4 Isolation and Support: Provide spring type vibration isolators and fan support brackets.<br />

2.5 Transfer Fans: Corrosion resistant galvanized steel housing, tinnerman clips for grille<br />

mounting, Junction box, mounting flanges, speed controller, and powder coated steel grille for<br />

both sides.<br />

3 EXECUTION<br />

3.1 General: Except as otherwise indicated or specified, install fans in accordance with<br />

manufacturer's installation instructions and recognized industry practices to insure that fans<br />

serve their intended function.<br />

3.2 Coordinate fan work with work of walls and ceilings as necessary for proper interfacing.<br />

Framing of openings, caulking, and curb installation is not work of this section.<br />

3.3 Ductwork: Refer to Division-23 section "Ductwork". Connect ducts to fans in accordance with<br />

manufacturer's installation instructions. Provide flexible connections in ductwork at fans.<br />

3.4 Install fans on vibration isolation equipment as required. Set level and plumb.<br />

3.5 Electrical Wiring: Install electrical devices furnished by manufacturer but not specified to be<br />

factory-mounted. Furnish copy of manufacturer's wiring diagram submittal to electrical<br />

Installer. Verify that electrical wiring installation is in accordance with manufacturer's submittal<br />

and installation requirements of Division-26 sections. Verify proper rotation direction of fan<br />

wheels. Do not proceed with equipment start-up until wiring installation is acceptable to<br />

equipment installer.<br />

FANS 23 34 00 - 2/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

3.6 Remove shipping bolts and temporary supports within fans. Adjust dampers for free operation.<br />

3.7 Testing: After installation of fans has been completed, test each fan to demonstrate proper<br />

operation of units at performance requirements specified. When possible, field correct<br />

malfunctioning units, then retest to demonstrate compliance. Replace units which cannot be<br />

satisfactorily corrected.<br />

3.8 Cleaning: Clean factory-finished surfaces. Remove all tar and soil. Repair any marred or<br />

scratched surfaces with manufacturer's touch-up paint.<br />

END OF SECTION 23 34 00<br />

FANS 23 34 00 - 3/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

This page intentionally left blank.<br />

FANS 23 34 00 - 4/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 23 37 13 - GRILLES, REGISTERS AND CEILING DIFFUSERS<br />

1 GENERAL<br />

1.1 Drawings and general provisions of Contract, including General and Supplementary Conditions<br />

and Division-1 Specification sections, apply to work of this section.<br />

1.2 Division-23 Basic Mechanical Materials and Methods sections apply to work of this section.<br />

1.3 Extent of air outlets and inlets work is indicated by drawings and schedules, and by<br />

requirements of this section.<br />

1.4 Refer to other Division-23 sections for ductwork and duct accessories required in conjunction<br />

with air outlets and inlets and for balancing of air outlets and inlets; not work of this section.<br />

1.5 Codes and Standards:<br />

1.5.1 ADC Compliance: Test and rate air outlets and inlets in certified laboratories under<br />

requirements of ADC 1062 "Certification, Rating and Test Manual". Provide air outlets and<br />

inlets bearing ADC Certified Rating Seal.<br />

1.5.2 NFPA Compliance: Install air outlets and inlets in accordance with NFPA 90A "Standard for<br />

the Installation of Air Conditioning and Ventilating Systems".<br />

1.6 Approval Submittals:<br />

1.6.1 Product Data: Submit manufacturer's technical product data for air outlets and inlets indicating<br />

construction, finish, and mounting details.<br />

1.6.2 Performance Data: For each type of air outlet and inlet furnished, provide aspiration ability,<br />

temperature and velocity traverses, throw and drop, and noise criteria ratings. Indicate<br />

selections and data as required.<br />

1.7 O&M Data Submittals: Submit cleaning instructions for finishes and spare parts lists. Include<br />

this data and a copy of approval submittals in O&M manual.<br />

2 PRODUCTS<br />

2.1 General:<br />

2.1.1 Except as otherwise indicated, provide manufacturer's standard grilles, registers, and ceiling<br />

diffusers where shown; of size, shape, capacity and type indicated; constructed of materials<br />

and components as indicated, and as required for complete installation.<br />

2.1.2 Manufacturers not listed in the following specification will not be considered for approval unless<br />

accepted by addendum prior to bid.<br />

2.1.3 Performance: Provide grilles, registers and ceiling diffusers that have, as minimum,<br />

temperature and velocity traverses, throw and drop, and noise criteria ratings for each size<br />

device equal to the basis of design.<br />

2.1.4 Ceiling and Wall Compatibility: Provide grilles, registers and diffusers with border styles that<br />

are compatible with adjacent wall and ceiling systems, and that are specifically manufactured<br />

to fit into ceiling module or wall with accurate fit and adequate support. Refer to general<br />

construction drawings and specifications for types of ceiling systems and walls which will<br />

contain each type of ceiling diffuser, grille, or register.<br />

GRILLES, REGISTERS, AND CEILING DIFFUSERS 23 37 13 - 1/2


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

2.1.5 Appearance: All grilles and registers shall be aluminum construction and all diffusers shall be<br />

aluminum construction, unless otherwise noted, with uniform matching appearance for each<br />

type of outlet. Ceiling mounted grilles and registers shall be set to be sight tight from the<br />

predominant exposure.<br />

2.1.6 Finish: All ceiling mounted grilles, registers, and diffusers shall be finished with baked white<br />

enamel. Wall and door mounted grilles and registers shall be finished with clear anodized<br />

finish .<br />

2.2 Acceptable Manufacturers: Subject to compliance with requirements, provide products by<br />

Titus, Price, or Metal Aire.<br />

2.3 Rectangular Ceiling Diffusers: Provide rectangular face, adjustable diffuser with removable<br />

inner core, no corner joints. If square or rectangular neck is provided, provide square to round<br />

adaptor as required. Provide lay-in panel as required. Provide trim ring for diffusers in hard<br />

ceilings to allow opening to be used for access.<br />

2.4 Return Grilles : Provide return grilles with one set of 45 degree fixed louvers, parallel to the<br />

long dimension. Provide opposed blade damper, screwdriver operated from the face. Provide<br />

mounting frame for all wall and plaster ceiling installations.<br />

2.5 Ceiling Linear Diffusers (Flowbar): Provide linear supply diffusers with horizontal pattern and<br />

extruded aluminum pattern controller. Number and size of slots are shown on the drawings.<br />

Provide joining and alignment strips, end caps, mitred corners, and frame type suitable for<br />

ceiling installation. Provide 2 inch slot unless otherwise noted on the drawings. Provide<br />

insulated plenums for supply diffusers.<br />

3 EXECUTION<br />

3.1 Coordinate installation with ceiling and light fixture installation. Locate ceiling outlets as<br />

indicated on architectural Reflected Ceiling Plans. Unless otherwise indicated, locate ceiling<br />

outlets in the center of acoustical ceiling modules with sides parallel to the grid.<br />

3.2 Install air outlets and inlets in accordance with manufacturer's written instructions and in<br />

accordance with recognized industry practices to insure that products serve intended<br />

functions.<br />

3.3 Coordinate with other work, including ductwork and duct accessories, as necessary to<br />

interface installation of air outlets and inlets with other work.<br />

3.4 Set air volumes to values shown on the drawings so that the system is functional. Leave ready<br />

for test and balance contractor.<br />

3.5 Furnish to Owner three operating keys for each type of outlet and inlet that require them;<br />

obtain receipt.<br />

END OF SECTION 23 37 13<br />

GRILLES, REGISTERS, AND CEILING DIFFUSERS 23 37 13 - 2/2


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 23 37 26 - WALL LOUVERS<br />

1 GENERAL<br />

1.1 Drawings and general provisions of Contract, including General and Supplementary Conditions<br />

and Division-1 Specification sections, apply to work of this section.<br />

1.2 Division-23 Basic Mechanical Materials and Methods sections apply to work of this section.<br />

1.3 Extent of wall louver work is indicated by drawings and schedules, and by the requirements of<br />

this section.<br />

1.4 Refer to other Division-23 sections for ductwork, duct accessories and controls work.<br />

1.5 AMCA Compliance: Test and rate louvers in accordance with AMCA Standard 500. Provide<br />

AMCA certified rating seal.<br />

1.6 Approval Submittals:<br />

1.6.1 Product data: Submit manufacturer's technical product data for louvers including: model<br />

number, accessories furnished, construction, finish, mounting details, performance data.<br />

1.7 O&M Data Submittals: Submit maintenance data, including cleaning of finishes and a copy of<br />

approval submittals. Include in O&M manual.<br />

2 PRODUCTS<br />

2.1 Acceptable Manufacturers: Subject to compliance with requirements, submit products by<br />

Ruskin, Greenheck, Arrow, United Enertech, American Warming and Ventilating, or AMCA<br />

labeled approved equal.<br />

2.2 General: Except as otherwise indicated, provide manufacturer's standard louvers where<br />

shown; of size, shape, capacity and type indicated; constructed of materials and components<br />

as indicated, and as required for complete installation. Provide 50% Kynar 500 coated,<br />

corrosion resistant finish with 5 year warranty; color to be selected by the Architect.<br />

2.3 Substrate Compatibility: Provide louvers with 4 inch frame, flange and sill extension piece that<br />

are compatible with adjacent substrate, and that are specifically manufactured to fit into<br />

construction openings with accurate fit and adequate support, for weatherproof installation.<br />

Refer to general construction drawings and specifications for types of substrate which will<br />

contain each type of louver.<br />

2.4 Materials: Construct of aluminum extrusions, ASTM B 221, Alloy 6063-T5. Weld units or use<br />

stainless steel fasteners.<br />

2.5 Louver Screens: On inside face of exterior louvers, provide 1/2" square mesh anodized<br />

aluminum wire bird screens mounted in removable extruded aluminum frames.<br />

2.6 Stationary Louvers: Florida Product Approved heavy gauge extruded 6063-T5 aluminum alloy,<br />

5 in. x 0.081 in. nominal wall thickness frame with vee type horizontally arranged rain resistant<br />

blades. Blades shall be heavy gauge extruded 6063-T5 aluminum allow, 0.081 in. nominal<br />

wall thickness with 2” blade spacing. Mechanically fastened construction with formed<br />

aluminum sill pan. Ruskin Model EME520MD or equal.<br />

3 EXECUTION<br />

WALL LOUVERS 23 37 26 - 1/2


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

3.1 Install where shown on the drawings in accordance with the manufacturer's printed instruction.<br />

Exercise care to prevent scratches.<br />

3.2 Verify size of louvers shown on drawings prior to fabrication. Coordinate with wall openings.<br />

Sizes may be altered subject to approval by Engineer provided free area remains<br />

approximately the same as indicated.<br />

END OF SECTION 23 37 26<br />

WALL LOUVERS 23 37 26 - 2/2


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 23 81 43 – AIR SOURCE UNITARY HEAT PUMPS<br />

1 GENERAL<br />

1.1 Drawings and general provisions of Contract, including General and Supplementary Conditions<br />

and Division-1 Specification sections, apply to work of this section.<br />

1.2 Division-23 Basic Mechanical Materials and Methods sections apply to work of this section.<br />

1.3 Refer to other Division-23 sections for testing, adjusting, and balancing of air conditioning<br />

units.<br />

1.4 Approval Submittals:<br />

1.4.1 Product Data: Submit manufacturer's technical product data, including dimensions, ratings,<br />

electrical characteristics, weight, capacities, materials of construction, and installation<br />

instructions.<br />

Packaged Terminal Air Conditioning Units<br />

1.5 O&M Data Submittals: Submit manufacturer's maintenance data including parts lists. Include<br />

these data, a copy of approval submittals, product data, and wiring diagrams in O&M manual.<br />

2 PRODUCTS<br />

2.1 Quality Assurance:<br />

2.1.1 Provide units tested by UL, ARL or ETL.<br />

2.1.2 Test and rate split system air conditioning units in accordance with ARI Standard 210, 240 or<br />

360 as applicable, and provide certified rating seal.<br />

2.1.3 Construct refrigeration system in accordance with ASHRAE 15 (ANSI B 9.1) "Safety Code for<br />

Mechanical Refrigeration".<br />

2.1.4 Test and rate units in accordance with the applicable ARI standards and provide certified rating<br />

seal. Sound test and rate units in accordance with ARI 270.<br />

2.1.5 Provide units with an EER/SEER that meets the Florida Energy Efficiency Code and the<br />

schedules on the drawings.<br />

2.2 General Packaged Terminal Air Conditioning Units: Provide air-cooled, factory-assembled and<br />

tested, thru-the-wall, packaged air conditioning units as indicated. Provide capacities and<br />

electrical characteristics as scheduled.<br />

2.2.1 Acceptable Manufacturers: Subject to compliance with requirements, provide packaged units<br />

of GE Zoneline, McQuay, Trane, Friedrich, Carrier, or approved equal.<br />

2.2.2 Cabinet: Provide painted metal cabinet with fiberglass lining for sound attenuation. Provide<br />

wall sleeve, outside extruded aluminum architectural louver and trim pieces as required.<br />

Provide access panels as required for proper servicing of equipment. Provide adjustable linear<br />

supply air grilles.<br />

2.2.3 Refrigeration System: Provide complete refrigerant circuit and hermetic rotary compressor<br />

with vibration isolation.<br />

AIR SOURCE UNITARY HEAT PUMPS 23 81 43 - 1/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

2.2.4 Controls: Provide two-stage thermostat, heat-cool switch, high-low fan switch, and air vent<br />

control.<br />

2.2.5 Filters: Provide cleanable return air filters that can be removed without removing any panels.<br />

2.2.6 Electric Heater: Provide unit mounted auxiliary electric heater controlled by second stage of<br />

thermostat.<br />

2.2.7 Condensate Removal: Provide condensate drain and drain kit as required to remove<br />

condensate.<br />

2.2.8 Accessories: Provide sub-base with electrical separable connector or attachment plug and<br />

receptacle complying with National Electric Code 440-13 and 440-63 for all units.<br />

3 EXECUTION<br />

3.1 Installation: Install in accordance with producer's printed instructions. Brush out fins on all<br />

coils.<br />

3.2 Support: Mount units on concrete pads with manufacturer’s recommended service and<br />

operating clearance.<br />

3.3 Indoor air handling units: Mount 5 ton and smaller units on vibration isolation only. Mount units<br />

larger than 5 tons on vibration isolation and concrete housekeeping pads.<br />

3.4 Outdoor Units: Mount outdoor units with flat bottoms on concrete housekeeping pad. Units<br />

with legs or stands do not require housekeeping pads. Housekeeping pad is in addition to<br />

concrete mechanical pad.<br />

3.5 Brush out fins on all coils.<br />

3.6 Refrigerant Piping: Comply with ANSI B31.5, “Refrigerant Piping,” (except lower pressure<br />

limits below 15 psig), and ASHRAE 15 (ANSI B9.1). Make all joints carefully and neatly.<br />

Clean pipe and fittings before fluxing. Remove burrs. Braze by the sweat method using Sil<br />

Fos. Install field installed refrigerant devices and valves as required.<br />

3.7 Testing: After job erection, or modification of factory installed piping, pressure test for leaks at<br />

150 psig using a nominal amount of a suitable tracer refrigerant and dry nitrogen or a suitable<br />

refrigerant. Perform leak tests with an electronic halide leak detector having a sensitivity of at<br />

least ½ ounce R-12 per year. Refrigeration piping will not be accepted unless it is gas tight.<br />

3.8 Evacuation: After completing the successful pressure test, multiple-evacuate the system.<br />

Leave the compressor isolation valves shut and connect the vacuum pump to both the high<br />

and loq sides. Evacuate the system to an absolute pressure of 1,500 microns. Then break<br />

vacuum to 2 psig with dry nitrogen. Repeat this process. Install the proper biflow drier in the<br />

liquid line and evacuate the system to 500 microns. Leave vacuum pump running for at least<br />

two hours without interruption. Break vacuum with the refrigerant to be used and raise<br />

pressure to 2 psig. Do not operate compressors during the evacuation procedure.<br />

3.9 Charging: After completing the successful evacuation procedure, charge refrigerant directly to<br />

the system from the original containers through a filter drier. Charge to the manufacturer’s<br />

stated conditions of pressure for required temperature. Weigh the refrigerant added and<br />

record on the startup report.<br />

3.10 Filters: Provide 2" thick 30% filters in all units during construction. After construction (but prior<br />

to the test and balance being performed) install clean final filters.<br />

AIR SOURCE UNITARY HEAT PUMPS 23 81 43 - 2/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

3.11 Cleaning: Clean tar and all other soil from housing exterior. Caulk around pipe sleeves.<br />

3.12 Condensate Drain: Pipe trapped copper condensate drain (full size of unit outlet) to nearest<br />

floor drain or as shown on the drawings. Refer to Division-23 section "Insulation" for pipe<br />

insulation.<br />

3.13 Startup: Check entire assembly for correctness of installation, alignment, and control<br />

sequencing. Start all component parts in proper sequence. Make all adjustments required to<br />

insure proper smooth quiet operation.<br />

END OF SECTION 23 81 43<br />

AIR SOURCE UNITARY HEAT PUMPS 23 81 43 - 3/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

This page intentionally left blank.<br />

AIR SOURCE UNITARY HEAT PUMPS 23 81 43 - 4/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

SECTION 23 81 46 - WATER-TO-AIR HEAT PUMPS<br />

1 GENERAL<br />

1.1 Drawings and general provisions of Contract, including General and Supplementary Conditions<br />

and Division-1 Specification sections, apply to work of this section.<br />

1.2 Division 23 Basic Mechanical Materials and Methods sections apply to work of this section.<br />

1.3 Extent of water-to-air heat pump work required by this section is indicated on drawings and<br />

schedules, and by requirements of this section.<br />

1.4 Refer to Division 26 sections for electrical; not work of this section.<br />

1.5 Refer to other Division 23 sections for testing, adjusting, and balancing of air conditioning<br />

units; not work of this section.<br />

1.6 Approval Submittals:<br />

1.6.1 Product Data: Submit manufacturer's technical product data, including dimensions, ratings,<br />

electrical characteristics, weight, capacities, materials of construction, and installation<br />

instructions. Submit manufacturer's assembly-type drawings showing all piping and electrical<br />

connections and all mounting requirements. Show methods of fastening and assembly of<br />

components. Provide wiring diagrams.<br />

Water-to-air heat pump unit<br />

Vibration control<br />

Geothermal Loopfield Calculations and Piping<br />

1.6.2 O&M Data Submittals: Submit manufacturer's maintenance data including parts lists. Include<br />

these data, product data, and a copy of approval submittals in O&M manual.<br />

2 PRODUCTS<br />

2.1 Quality Assurance:<br />

2.1.1 Test and rate units in accordance with ARI Standard 240 and provide certified rating seal.<br />

2.1.2 Construct refrigeration system in accordance with ASHRAE 15 (ANSI B 9.1) "Safety Code for<br />

Mechanical Refrigeration".<br />

2.1.3 Provide units that are designed, manufactured, tested, and listed in accordance with UL<br />

requirements.<br />

2.1.4 Provide units with an SEER that meet the requirements of the Florida Energy Efficiency Code<br />

and the schedules on the drawings.<br />

2.1.5 Acceptable Manufacturers: Subject to compliance with requirements, provide units by<br />

Addison, Florida Heat Pump, Water Furnace, or approved equal.<br />

2.2 GENERAL ½ TO 6 TON UNITS: Units shall be performance certified to ISO standard 13256-1<br />

for Water Loop Heat Pump, Ground Water Heat Pump and Ground Loop Heat Pump<br />

applications. Units intended for use on ground loop applications shall have an optional<br />

extended range package installed. Units shall be Underwriter Laboratories (UL and cUL) listed<br />

for safety on all models. Each unit shall be run tested at the factory. Each unit shall be pallet<br />

mounted and stretch wrapped. The units shall be manufactured in an ISO9001:2000 certified<br />

WATER-TO-AIR HEAT PUMPS 23 81 46 - 1/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

facility. The units shall be designed to operate with entering fluid temperatures between 50˚F<br />

(10˚C) and 100˚F (38˚C) in cooling and between 50˚F (10˚C) and 80˚F (27˚C) in heating. With<br />

the optional factory installed extended range package units shall operate with entering fluid<br />

temperatures between 50˚F (10˚C) and 110˚F (43.3˚C) in cooling and between 25˚F (-3.9˚C)<br />

and 80˚F (27˚C) in heating.<br />

2.2.1 Casing & Cabinet: The cabinet shall be fabricated from heavy-gauge steel finished with<br />

Galvalume® plus, an aluminum-zinc alloy with a clear acrylic coating for additional corrosion<br />

protection. The interior shall be insulated with ½” (12.7mm) thick, multi density, coated, glass<br />

fiber. All units shall allow sufficient service access to replace the compressor without unit<br />

removal. One blower and two compressor compartment access panels shall be removable<br />

with supply and return ductwork in place. A duct collar shall be provided on the supply air<br />

opening. Units shall have a 2 inch thick throwaway 30% efficiency pleated filter. The filter rack<br />

shall incorporate a 1 inch duct flange and filter door removable without the use of tools. The<br />

units shall have an insulated divider panel between the air handling section and the<br />

compressor section to minimize the transmission of compressor noise, and to permit service<br />

testing without air bypass. Units shall have a stainless steel condensate drain pan. Units<br />

shall have a floating base pan consisting of a ½” (12 mm) thick high density rubber pad<br />

between the compressor/condenser base plate and the unit base pan.<br />

2.2.2 Refrigeration Circuits: Units shall utilize refrigerant R-410A. All units shall contain a sealed<br />

refrigerant circuit including a hermetic compressor, capillary tube metering device with strainer<br />

or balance port expansion valve, refrigerant drier, finned tube air-to-refrigerant heat<br />

exchanger, refrigerant reversing valve and service ports. Compressor shall be high efficiency,<br />

designed for heat pump duty, internally spring isolated (if reciprocating type) for maximum<br />

sound attenuation and mounted on rubber vibration isolators. Compressor motors shall be<br />

equipped with overload protection. Refrigerant reversing valves shall be pilot operated sliding<br />

piston type with replaceable encapsulated magnetic coils energized only during the cooling<br />

cycle. The finned tube coil shall be constructed of lanced aluminum fins not exceeding<br />

fourteen fins per inch bonded to rifled copper tubes in a staggered pattern not less than three<br />

rows deep and have a 600 psig (4140 Kpa) working pressure. The coil shall have aluminum<br />

end sheets. The coaxial water-to-refrigerant heat exchanger shall be constructed of a<br />

convoluted copper (optional cupronickel) inner tube and steel outer tube with a designed<br />

refrigerant working pressure of 600 psig (4140 Kpa) and designed water side working pressure<br />

of no less than 400 PSIG (2750 Kpa).<br />

2.2.3 Extended Range Package: An optional extended range package shall include a bi-flow<br />

balanced port expansion valve metering device in place of capillary tubes and insulated water<br />

to refrigerant heat exchanger.<br />

2.2.4 Fan Motor & Assembly: The fan shall be direct drive centrifugal forward curved type with a<br />

dynamically balanced wheel. The housing and wheel shall be designed for quiet low velocity<br />

operation. The fan housing shall be removable from the unit without disconnecting the supply<br />

air ductwork for servicing of the fan motor. The fan motor shall be three speed PSC type for<br />

direct drive units and single speed for belt drive units. The motor shall be permanently<br />

lubricated and have thermal overload protection.<br />

2.2.5 Electrical: Controls and safety devices will be factory wired and mounted within the unit.<br />

Controls shall include fan relay, compressor contactor, 24V transformer, reversing valve coil<br />

and solid state lockout controller (UPM) The UPM controller shall include the following<br />

features: Anti-short cycle time delay, random start, brown out/surge/power interruption<br />

protection, 120 second low pressure switch bypass timer, shutdown on high or low refrigerant<br />

pressure safety switch inputs, shutdown for the optional freezestat or high level condensate<br />

sensors, 24 VAC alarm output for remote fault indication, unit reset at thermostat or<br />

disconnect, ability to defeat time delays for servicing and automatic intelligent reset. The UPM<br />

shall automatically reset after a safety shut down and restart the unit, if the cause of the shut<br />

WATER-TO-AIR HEAT PUMPS 23 81 46 - 2/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

down no longer exists, after the anti-short cycle and random start timers expire. Should a fault<br />

re-occur within 60 minutes after reset, then a permanent lockout will occur. A light emitting<br />

diode (LED) shall annunciate the following alarms: high refrigerant pressure, low refrigerant<br />

pressure, low water temperature and a high level of condensate in the drain pan (when<br />

equipped with the optional low water temperature and high level condensate sensors). The<br />

LED will display each fault condition as soon as the fault occurs. If a permanent lockout<br />

occurs, then the fault LED will display the type of fault until the unit is reset. Safety devices<br />

include a low pressure cutout set a 40 PSIG (280kPa) for loss of charge protection (freezestat<br />

and/or high discharge gas temperature sensor is not acceptable) and a high pressure cutout<br />

control set at 600 PSIG (4125 Kpa). An optional energy management relay that allows unit<br />

control by an external source shall be factory installed. A terminal block with screw terminals<br />

shall be provided for control wiring.<br />

2.2.6 Piping: Supply, return water and condensate drain connections shall be brass female pipe<br />

thread fittings and mounted flush to cabinet exterior with stainless steel, Braided hose kit with<br />

swivel connectors.<br />

2.2.7 Hot Gas Reheat: Provide factory hot gas reheat coil for humidity control.<br />

2.3 Controls: Room thermostat shall be low voltage, remote-mounted with sub-base and<br />

thermometer for controlling heating and cooling cycles. The fan selector shall include "AUTO-<br />

ON" controls. Provide automatic changeover thermostats with fan that run continuously during<br />

occupied mode. The room thermostats shall be manually adjustable by occupants and shall<br />

indicate setting and temperature in degrees Fahrenheit. Provide humidity sensor and set point<br />

control for hot gas reheat coil.<br />

2.4 GEOTHERMAL LOOPFIELD: The contractor shall design the geothermal loop field and<br />

provide a thermal performance guarantee. The contractor shall submit a list of 10 projects of<br />

equal or larger size. Loop field piping shall be HDPE with thermally fused joints. Pipe shall<br />

comply with ASTM D3035, ASTM D2683 for socket fusion fittings, and ASTM D3261 for<br />

butt/saddle fusion fittings. Pipe shall be pressure tested at pressure recommended by<br />

manufacturer. Test shall be witnessed by the engineer or owner’s representative. Provide 50<br />

year warranty on pipe and loop assemblies.<br />

3 EXECUTION<br />

3.1 Installation: Install in accordance with producer's printed instructions. Anchor housing to<br />

building with cadmium plated self-tapping screws, lag screws, or bolts, as directed by specific<br />

construction. All mounting supports shall be provided by Division 23. Provide painted sheet<br />

metal cover to protect unit from dripping from above.<br />

3.2 Cleaning: Clean tar and all other soil from housing exterior. Leave ready for Division 7,<br />

Caulking Work. Coordinate with general construction to ensure a water-tight seal.<br />

3.3 Condensate Drain: Pipe trapped copper condensate drain to the point of disposal as shown<br />

on the drawings. Pipe shall be full size of unit outlet. Refer to Division 23 section "Insulation"<br />

for pipe insulation.<br />

3.4 Startup: Check entire assembly for correctness of installation, alignment, and control<br />

sequencing. Start all component parts in proper sequence. Make all adjustments required to<br />

insure proper smooth quiet operation.<br />

END OF SECTION 23 81 46<br />

WATER-TO-AIR HEAT PUMPS 23 81 46 - 3/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

This page intentionally left blank.<br />

WATER-TO-AIR HEAT PUMPS 23 81 46 - 4/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

SECTION 26 05 00 - ELECTRICAL GENERAL REQUIREMENTS<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

The Electrical General Requirements are supplementing and applicable to Division 26<br />

Sections and shall apply to all phases of work specified herein, shown on the<br />

Drawings, or required to provide a complete installation of electrical systems. Section<br />

26 is sub-divided for convenience only.<br />

A. This Section includes the following:<br />

1. Job Conditions<br />

2. Regulatory Requirements<br />

3. Electrical equipment coordination and installation.<br />

4. Submittals, Operating and Maintenance instructions and As-built drawings.<br />

5. Common electrical installation requirements.<br />

6. Warranty of work.<br />

1.2 JOB CONDITIONS:<br />

A. SITE INSPECTIONS: Before submitting proposals, each bidder should visit the site and<br />

fully familiarize himself with all job conditions and shall be fully informed as to the extent<br />

of his work. No consideration will be given after bid opening date for alleged<br />

misunderstanding as to the requirements of work involved in connecting to the utilities or<br />

as to requirements of materials to be furnished. The contractor shall contact the utility<br />

prior to bid and make appropriate provisions in such bid as required by the utility for the<br />

utility’s routing and connection.<br />

B. EXISTING CONDITIONS: All utilities, existing system and conditions shown on the plans<br />

as existing are approximate, and the Contractor shall verify before any work is started.<br />

C. SCHEDULED INTERRUPTIONS: Planned interruptions of utilities service, to any facility<br />

affected by this contract, shall be carefully planned and approved by Architect at least<br />

ten (10) days in advance of the requested interruption. The Contractor shall not interrupt<br />

services until the Architect has granted specific approval. The request shall indicate<br />

services to be affected, date and time of interruption and duration of outage. Request<br />

for interruption of service will not be approved until all equipment and materials required<br />

for the completion of that particular phase of work are on the job site. The work may<br />

have to be scheduled after normal working hours.<br />

D. ACCIDENTAL INTERRUPTIONS: All excavation and/or remodeling work required shall<br />

be performed with care so as not to interrupt other existing services (water, gas,<br />

electrical, sewer, sprinklers, etc.). If accidental utility interruption resulting from work<br />

performed by the Contractor occurs, service shall be immediately restored to its original<br />

condition without delay, by and at the expense of the Contractor, using skilled workmen<br />

of the trade required.<br />

ELECTRICAL GENERAL REQUIREMENTS 26 05 00 - 1/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

E. MAINTAINING SERVICE: Any existing service (or operating system) which must be<br />

interrupted for any length of time shall be supplied with a temporary service if<br />

necessary for continuation of the normal operation of this facility.<br />

Any existing system or part of an existing system currently in operation shall remain so<br />

after all additions or renovations are made and all work is completed.<br />

1.3 REGULATORY REQUIREMENTS:<br />

A. PERMITS, FEES, AND INSPECTIONS: This Contractor shall secure and pay for all<br />

permits, and inspections required on work performed under this section of the<br />

Specifications. He shall assume full responsibility for all assessments and taxes<br />

necessary for the completion and acceptance of the work.<br />

B. APPLICABLE STANDARDS AND CODES: The electrical installation shall comply with<br />

all applicable building codes; local, state, and federal ordinances; and the 2008 edition of<br />

the National Electrical Code. In case of a discrepancy among these applicable<br />

regulatory codes and ordinances, the most stringent requirement shall govern. The<br />

Contractor shall notify the Architect in writing of any such discrepancy. Should the<br />

Contractor perform any work that does not comply with the applicable regulatory codes<br />

and ordinances he shall bear all cost arising in correcting the deficiencies. Application<br />

standards and codes shall include all local ordinances, all state laws, and the applicable<br />

requirements of the following:<br />

1. American National Standards Institute - ANSI<br />

2. National Electrical Manufacturer’s Association - NEMA<br />

3. National Fire Protection Association – NFPA (latest editions)<br />

4. The Life Safety Code – NFPA 101, as adopted in Florida Edition<br />

5. The National Fire Alarm Code – NFPA 72, as adopted in Florida Edition<br />

6. Florida Building Code, latest Edition<br />

7. Underwriters’ Laboratories, Inc. – UL<br />

C. DRAWINGS AND SPECIFICATIONS: The drawings and these specifications are<br />

complementary each to the other. What is called for by one shall be as binding as if<br />

called for by both. Omissions from the drawings and specifications of details of work<br />

which are evidently necessary to carry out the intent of the drawings and specifications,<br />

or which are customarily performed, shall not relieve the Contractor from performing<br />

such work. In any case of discrepancy in the figures or catalog numbers, the matter<br />

shall be submitted to the Architect, who shall promptly make a determination in writing.<br />

Any adjustment by the Contractor shall be at the Contractor's own risk and expense.<br />

Electrical drawings are diagrammatic only. Do not scale these drawings. All equipment<br />

shall be installed in accordance with manufacturer's recommendations and any<br />

conflicting data shall be verified before bidding.<br />

D. The Contractor shall after completion of the work, furnish the Architect a certificate of<br />

final inspection and approval from the applicable local inspection department. Make<br />

necessary changes to plans and specifications to meet code standards at no additional<br />

cost to the Owner.<br />

ELECTRICAL GENERAL REQUIREMENTS 26 05 00 - 2/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

1.4 COOPERATION:<br />

A. INTERFACING WITH OTHER CRAFTS: It shall be the responsibility of the Contractor to<br />

cooperate and coordinate with all other crafts working on this project. This Contractor<br />

shall do all cutting, trenching, backfill and structural removals to permit entry of the<br />

electrical system components. The General Contractor shall do all patching and<br />

finishing.<br />

B. EQUIPMENT FURNISHED UNDER OTHER SECTIONS: This Contractor shall furnish<br />

and install, complete electrical roughing-in and connections to all equipment furnished<br />

under other sections and indicate on drawings. This includes all outlets as shown on<br />

mechanical and electrical drawings. All such equipment shall be set in place as work of<br />

other sections.<br />

C. HEATING AND AIR CONDITIONING:<br />

1. The Contractor shall furnish all branch circuit wiring to motors and control panels or<br />

centers including disconnects, receptacles, switches, and appurtenances to which<br />

the system at the units may be connected, to provide a complete system of wiring<br />

for power. Control equipment and control circuit wiring is specified in the<br />

Mechanical Section.<br />

2. Control devices to be included in the branch circuit, except those furnished integral<br />

with the equipment, will be delivered by the Heating and Air Conditioning<br />

Contractor and installed by the Electrical Contractor.<br />

1.5 WORKMANSHIP: All work shall be executed in a neat and substantial manner by<br />

skilled workman, well qualified, and regularly engaged in the type of work required.<br />

Substandard work shall be removed and replaced by the Contractor at no cost to the<br />

Owner.<br />

1.6 APPROVAL OF MATERIALS AND EQUIPMENT:<br />

A. PRIOR-SUBMITTALS: The Contractor shall base his proposal on the materials<br />

specified herein and on the drawings. Reference to a particular product by<br />

manufacturer, trade name, or catalog number establishes the quality standards of<br />

material and equipment required for this installation and is not intended to exclude<br />

products equal in quality and similar design. The Architect reserves the sole right to<br />

decide the equality of materials proposed for use in lieu of these specified. It shall be<br />

the Contractor's responsibility to furnish the information and data sufficient to establish<br />

the quality and utility of the items in question, including furnishing of samples if required.<br />

B. SUBMITTALS:<br />

1. Submittals: The Contractor shall submit a list of equipment proposed for<br />

installation. He shall submit catalog data and shop drawings on all proposed<br />

systems and their components. Where substitutions alter the design or space<br />

requirements, the Contractor shall defray all items of cost for the revised design<br />

and construction including costs to all allied trades involved. Provide six (6) copies<br />

of submittals and shop drawings as a minimum unless the General Conditions<br />

requires a greater number of copies.<br />

ELECTRICAL GENERAL REQUIREMENTS 26 05 00 - 3/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

a. Submittals Schedule: Submittals shall be submitted within thirty (30) days<br />

after the contract is awarded. It is not the responsibility of the Engineer to<br />

expedite the review of submittals if the contractor has not adequately<br />

prepared the submittals in a time efficient manner. The contractor bears all<br />

the responsibility for the added time requirements of resubmittals.<br />

b. Identification: Place a permanent label or title block on each submittal for<br />

identification. Each major section of submittals such as power equipment,<br />

lighting equipment, fire alarm, etc., shall be secured in a booklet or stapled<br />

with a covering index which lists the following information:<br />

1) Project name and date<br />

2) Name, address, and phone number of General contractor and project<br />

manager.<br />

3) Name, address, and phone number of Sub-contractor and project<br />

manager.<br />

4) Supplier of equipment with phone number and person responsible for<br />

this project.<br />

5) Index of each item covered in submittal and model number.<br />

6) Any deviation from contract documents shall be specifically noted on<br />

submittal cover index and specifically identified with highlighting,<br />

encircling, or boldly on specific submittal sheet.<br />

c. Resubmittals: Make resubmittals in same form and number of copies as<br />

initial submittal.<br />

1) Include previous submittal review comments.<br />

2) For each item being resubmitted, include previous review comment<br />

and explain how resubmitted item meets the criteria of the previous<br />

review comment.<br />

2. Electrical and Mechanical/Plumbing/Fire Protection Equipment Coordinations:<br />

The electrical power equipment submittals shall be accompanied by a<br />

letter verifying coordination of electrical services for all mechanical,<br />

plumbing, and fire protection equipment requiring power. The letter shall<br />

follow the format listed below.<br />

To: ________________________________<br />

(General Contractor)<br />

Re: ________________________________<br />

(Project name and location)<br />

We the undersigned subcontractors certify that we have coordinated the<br />

electrical requirements for mechanical, plumbing, and fire protection<br />

sprinkler equipment as evidenced by the coordination chart listed herein.<br />

ELECTRICAL GENERAL REQUIREMENTS 26 05 00 - 4/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

Item<br />

Load<br />

Full Load<br />

Amps<br />

1 Phase<br />

or<br />

3 Phase<br />

Number of<br />

Electrical<br />

Connections<br />

Maximum<br />

Overcurrent<br />

Protection<br />

Minimum<br />

Overcurrent<br />

Protection<br />

Breaker<br />

Proposed<br />

Circuit<br />

Proposed<br />

The above list details all required electrical connections for mechanical<br />

equipment.<br />

Signed: _______________________<br />

For: __________________________<br />

Mechanical Subcontractor<br />

The above list details all required electrical connections for plumbing<br />

equipment.<br />

Signed: _______________________<br />

For: __________________________<br />

Plumbing Subcontractor<br />

The above list details all required electrical and fire alarm connections for<br />

fire protection equipment.<br />

Signed: _______________________<br />

For: __________________________<br />

Fire Protection Sprinkler Subcontractor<br />

The above list of equipment has been reviewed and the required<br />

connections are being provided. (Any exceptions or request for direction<br />

shall be listed here)<br />

Signed: ________________________<br />

For: ___________________________<br />

Electrical Subcontractor<br />

1.7 PRODUCT DELIVERY, STORAGE AND HANDLING<br />

A. PROTECTION: Take necessary precautions to protect all material, equipment,<br />

apparatus and work from damage. Failure to do so to the satisfaction of the Architect<br />

will be sufficient cause for the rejection of the material, equipment or work in question.<br />

Contractor is responsible for the safety and good condition of the materials installed until<br />

final acceptance by the owner.<br />

ELECTRICAL GENERAL REQUIREMENTS 26 05 00 - 5/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

B. CLEANING: Conduit openings shall be capped or plugged during installation. Fixtures<br />

and equipment shall be tightly covered and protected against dirt, moisture, chemical<br />

and mechanical injury. At the completion of the work the fixtures, material and<br />

equipment shall be thoroughly cleaned and delivered in condition satisfactory to the<br />

Architect.<br />

1.8 TESTING AND BALANCING: Make tests that may be required by the Owner or the<br />

Architect in connection with the operation of the electrical system in the buildings.<br />

Balance all single-phase loads connected to all panelboards in the buildings to insure<br />

approximate equal divisions of these loads on the main secondary power supply serving<br />

the buildings. All tests shall be made in accordance with the latest standards of the<br />

IEEE and the NEC. The installation shall be tested for performance, grounds and<br />

insulation resistance. A "megger" type instrument shall be used. Contractor shall<br />

perform circuit continuity and operational tests on all equipment furnished or connected<br />

by Contractor. The tests shall be made in the presence of the Architect or his<br />

representative. The Contractor shall notify the Architect at least twenty-four (24) hours<br />

in advance of tests. The Contractor shall provide all testing equipment and all costs<br />

shall be borne by him. Written reports shall be made of all tests. All faults shall be<br />

corrected immediately.<br />

A letter shall be written giving the following:<br />

A. Measured amps on each phase of each panel.<br />

B. Resistance to ground of each new grounding electrode.<br />

C. Measured voltage phase to phase and phase to neutral at each panel.<br />

D. Ground continuity and polarity instrument used.<br />

1.9 OPERATING AND MAINTENANCE INSTRUCTIONS/AS BUILT DRAWINGS:<br />

A. Four (4) complete sets of instructions containing the manufacturer’s operating and<br />

maintenance instructions for each piece of equipment shall be furnished to the Owner.<br />

Each set shall be permanently bound and shall have a hard cover. One complete set<br />

shall be furnished at the time that the test procedure is submitted, and remaining sets<br />

shall be furnished before the Contract is completed. Flysheets shall be placed before<br />

instructions covering each subject. The instruction sheets shall be approximately 8-1/2”<br />

by 11” with large sheets of Drawings folded in. The instructions shall include information<br />

for major pieces of equipment and systems.<br />

B. Upon completion of the work and at the time designated, the services of one project<br />

engineer shall be provided by the Contractor to instruct the representative of the Owner<br />

in the operation and maintenance of the systems.<br />

C. This Contractor shall provide as-built Drawings at the completion of the job. Drawings<br />

shall show all significant changes in equipment, wiring, routing, location, etc. All<br />

underground conduit routing shall be accurately indicated with locations dimensioned.<br />

1.10 GUARANTEE AND SERVICE: Upon completion of all tests and acceptance, the<br />

Contractor shall furnish the Owner a written guarantee covering the electrical work done<br />

ELECTRICAL GENERAL REQUIREMENTS 26 05 00 - 6/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

for a period of one (1) year from date of acceptance. Guarantee includes equipment<br />

capacity and performance ratings specified without excessive noise levels. Upon notice<br />

from the Architect or the Owner, the Contractor shall, during the guarantee period, rectify<br />

and replace any defective material or workmanship and repair any damage caused<br />

thereby without additional cost.<br />

PART 2 - PRODUCTS<br />

PART 3 - EXECUTION<br />

3.1 COMMON REQUIREMENTS FOR ELECTRICAL INSTALLATION<br />

A. Comply with NECA 1.<br />

B. Measure indicated mounting heights to bottom of unit for suspended items and to<br />

center of unit for wall-mounting items.<br />

C. Headroom Maintenance: If mounting heights or other location criteria are not<br />

indicated, arrange and install components and equipment to provide maximum<br />

possible headroom consistent with these requirements.<br />

D. Equipment: Install to facilitate service, maintenance, and repair or replacement of<br />

components of both electrical equipment and other nearby installations. Connect in<br />

such a way as to facilitate future disconnecting with minimum interference with other<br />

items in the vicinity.<br />

E. Right of Way: Give to raceways and piping systems installed at a required slope.<br />

END OF SECTION 26 05 00<br />

ELECTRICAL GENERAL REQUIREMENTS 26 05 00 - 7/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

This page intentionally left blank.<br />

ELECTRICAL GENERAL REQUIREMENTS 26 05 00 - 8/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

SECTION 26 05 19 – LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND<br />

CABLES (600 VOLTS OR LESS)<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. This Section includes building wires and cables and associated connectors, splices,<br />

and terminations for wiring systems rated 600 V and less.<br />

1.2 SUBMITTALS<br />

A. Field quality-control test reports.<br />

1.3 QUALITY ASSURANCE<br />

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in<br />

NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction,<br />

and marked for intended use.<br />

B. Comply with NFPA 70.<br />

PART 2 - PRODUCTS<br />

2.1 MANUFACTURERS<br />

A. In other Part 2 articles where subparagraph titles below introduce lists, the following<br />

requirements apply for product selection:<br />

Available Manufacturers: Subject to compliance with requirements, manufacturers<br />

offering products that may be incorporated into the Work include, but are not limited to,<br />

the manufacturers specified.<br />

2.2 CONDUCTORS AND CABLES<br />

A. Manufacturers:<br />

1. American Insulated Wire Corp.; a Leviton Company.<br />

2. General Cable Corporation.<br />

3. Senator Wire & Cable Company.<br />

4. Southwire Company.<br />

5. Okonite<br />

B. Refer to Part 3 "Conductor and Insulation Applications" Article for insulation type, cable<br />

construction, and ratings.<br />

C. Conductor Material: Copper. Solid conductor for No. 10 AWG and smaller, stranded<br />

for No. 8 AWG and larger.<br />

LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 26 05 19 - 1/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

D. Conductor Insulation Types: THHN-THWN and SO.<br />

2.3 CONNECTORS AND SPLICES<br />

A. Manufacturers:AFC Cable Systems, Inc.<br />

1. AMP Incorporated/Tyco International.<br />

2. Hubbell/Anderson.<br />

3. O-Z/Gedney; EGS Electrical Group LLC.<br />

4. 3M Company; Electrical Products Division.<br />

B. Description: Factory-fabricated connectors and splices of size, ampacity rating,<br />

material, type, and class for application and service indicated.<br />

C. Connections from boxes to lay-in fixtures in grid ceiling may be made with MC (metal<br />

clad) cable cut to minimum length.<br />

PART 3 - EXECUTION<br />

3.1 CONDUCTOR AND INSULATION APPLICATIONS<br />

A. Service Entrance: Type THHN-THWN, single conductors in raceway.<br />

B. Exposed Feeders: Type THHN-THWN, single conductors in raceway.<br />

C. Feeders Concealed in Ceilings, Walls, and Partitions: Type THHN-THWN, single<br />

conductors in raceway.<br />

D. Feeders Concealed in Concrete, below Slabs-on-Grade, and in Crawlspaces and<br />

Chases: Type THHN-THWN, single conductors in raceway.<br />

E. Exposed Branch Circuits, including in Crawlspaces and Chases: Type THHN-THWN,<br />

single conductors in raceway.<br />

F. Branch Circuits Concealed in Ceilings, Walls, and Partitions: Type THHN-THWN,<br />

single conductors in raceway.<br />

G. Branch Circuits Concealed in Concrete and below Slabs-on-Grade: Type THHN-<br />

THWN, single conductors in raceway.<br />

H. Underground Feeders and Branch Circuits: Type THHN-THWN, single conductors in<br />

raceway.<br />

I. Cord Drops and Portable Appliance Connections: Type SO, hard service cord.<br />

J. Fire Alarm Circuits: Type THHN-THWN, in raceway.<br />

K. Class 1 Control Circuits: Type THHN-THWN, in raceway.<br />

L. Class 2 Control Circuits: Power-limited cable, concealed in building finishes.<br />

LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 26 05 19 - 2/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

3.2 INSTALLATION<br />

A. Conceal cables in finished walls, ceilings, and floors, unless otherwise indicated.<br />

B. Use manufacturer-approved pulling compound or lubricant where necessary;<br />

compound used must not deteriorate conductor or insulation. Do not exceed<br />

manufacturer's recommended maximum pulling tensions and sidewall pressure values.<br />

C. Use pulling means, including fish tape, cable, rope, and basket-weave wire/cable grips,<br />

that will not damage cables or raceway.<br />

D. Install exposed cables parallel and perpendicular to surfaces of exposed structural<br />

members, and follow surface contours where possible.<br />

E. Support cables according to Division 26 Section "Basic Electrical Materials and<br />

Methods."<br />

F. Seal around cables penetrating fire-rated elements according to Division 26 Section<br />

"Firestop Systems and Sleeves."<br />

G. Identify and color-code conductors and cables according to Division 26 Section “<br />

Electrical Identification.”<br />

H. Make splices and taps that are compatible with conductor material and that possess<br />

equivalent or better mechanical strength and insulation ratings than unspliced<br />

conductors.<br />

1. Use oxide inhibitor in each splice and tap conductor for aluminum conductors.<br />

I. Wiring at Outlets: Install conductor at each outlet, with at least 6 inches (150 mm) of<br />

slack.<br />

3.3 FIELD QUALITY CONTROL<br />

A. Testing: Perform each electrical test and visual and mechanical inspection stated in<br />

NETA ATS, Section 7.3.1. Certify compliance with test parameters.<br />

B. Test Reports: Prepare a written report to record the following:<br />

1. Test procedures used.<br />

2. Test results that comply with requirements.<br />

3. Test results that do not comply with requirements and corrective action taken to<br />

achieve compliance with requirements.<br />

END OF SECTION 26 05 19<br />

LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 26 05 19 - 3/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

This page intentionally left blank.<br />

LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 26 05 19 - 4/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

SECTION 26 05 23 – FIRESTOP SYSTEMS AND SLEEVES<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. This Section includes the following:<br />

1. Through penetration firestop systems.<br />

2. Sleeves for raceways and cables.<br />

3. Sleeve seals.<br />

1.2 PERFORMANCE REQUIREMENTS<br />

A. Rated Systems: Provide through-penetration firestop systems with the following<br />

ratings determined per UL 1479:<br />

1. F-Rated Systems: Provide through-penetration firestop systems with F-ratings<br />

indicated, but not less than that equaling or exceeding fire-resistance rating of<br />

constructions penetrated.<br />

2. T-Rated Systems: For the following conditions, provide through-penetration<br />

firestop systems with T-ratings indicated, as well as F-ratings, where systems<br />

protect penetrating items exposed to potential contact with adjacent materials in<br />

occupiable floor areas:<br />

a. Penetrations located outside wall cavities.<br />

b. Penetrations located outside fire-resistance-rated shaft enclosures.<br />

3. L-Rated Systems: Where through-penetration firestop systems are indicated in<br />

smoke barriers, provide through-penetration firestop systems with L-ratings of not<br />

more than 3.0 cfm/sq. ft (0.01524cu. m/s x sq. m) at both ambient temperatures<br />

and 400 deg F (204 deg C) .<br />

B. For through-penetration firestop systems exposed to view, traffic, moisture, and<br />

physical damage, provide products that, after curing, do not deteriorate when exposed<br />

to these conditions both during and after construction.<br />

C. For through-penetration firestop systems exposed to view, provide products with flamespread<br />

and smoke-developed indexes of less than 25 and 450, respectively, as<br />

determined per ASTM E 84.<br />

1.3 QUALITY ASSURANCE<br />

A. Installer Qualifications: A firm that has been approved by FMG according to FMG<br />

4991, "Approval of Firestop Contractors."<br />

FIRESTOP SYSTEMS AND SLEEVES 26 05 23 - 1/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

B. Installation Responsibility: Assign installation of through-penetration firestop systems<br />

and fire-resistive joint systems in Project to a single qualified installer.<br />

C. Fire-Test-Response Characteristics: Provide through-penetration firestop systems that<br />

comply with the following requirements and those specified in Part 1 "Performance<br />

Requirements" Article:<br />

1. Firestopping tests are performed by a qualified testing and inspecting agency. A<br />

qualified testing and inspecting agency is UL or another agency performing<br />

testing and follow-up inspection services for firestop systems acceptable to<br />

authorities having jurisdiction.<br />

2. Through-penetration firestop systems are identical to those tested per testing<br />

standard referenced in "Part 1 Performance Requirements" Article. Provide<br />

rated systems bearing classification marking of qualified testing and inspecting<br />

agency.<br />

D. Coordinate construction of openings and penetrating items to ensure that throughpenetration<br />

firestop systems are installed according to specified requirements.<br />

E. Do not cover up through-penetration firestop system installations that will become<br />

concealed behind other construction until each installation has been examined by<br />

building inspector, if required by authorities having jurisdiction.<br />

PART 2 - PRODUCTS<br />

2.1 MANUFACTURERS<br />

A. Products: Subject to compliance with requirements, provide one of the throughpenetration<br />

firestop systems indicated for each application that are produced by one of<br />

the following manufacturers:<br />

1. A/D Fire Protection Systems Inc.<br />

2. Hilti, Inc.<br />

3. Nelson Firestop Products.<br />

4. NUCO Inc.<br />

5. RectorSeal Corporation (The).<br />

6. Specified Technologies Inc.<br />

7. 3M; Fire Protection Products Division.<br />

8. Tremco; Sealant/Weatherproofing Division.<br />

2.2 FIRESTOPPING<br />

A. Compatibility: Provide through-penetration firestop systems that are compatible with<br />

one another; with the substrates forming openings; and with the items, if any,<br />

penetrating through-penetration firestop systems, under conditions of service and<br />

application, as demonstrated by through-penetration firestop system manufacturer<br />

based on testing and field experience.<br />

FIRESTOP SYSTEMS AND SLEEVES 26 05 23 - 2/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

B. Accessories: Provide components for each through-penetration firestop system that<br />

are needed to install fill materials and to comply with Part 1 "Performance<br />

Requirements" Article. Use only components specified by through-penetration firestop<br />

system manufacturer and approved by qualified testing and inspecting agency for<br />

firestop systems indicated.<br />

2.3 SLEEVES FOR RACEWAYS AND CABLES<br />

A. Steel Pipe Sleeves: ASTM A 53/A 53M, Type E, Grade B, Schedule 40, galvanized<br />

steel, plain ends.<br />

B. Cast-Iron Pipe Sleeves: Cast or fabricated "wall pipe," equivalent to ductile-iron<br />

pressure pipe, with plain ends and integral waterstop, unless otherwise indicated.<br />

C. Coordinate sleeve selection and application with selection and application of<br />

firestopping.<br />

2.4 SLEEVE SEALS<br />

A. Description: Modular sealing device, designed for field assembly, to fill annular space<br />

between sleeve and raceway or cable.<br />

1. Sealing Elements: EPDM interlocking links shaped to fit surface of cable or<br />

conduit. Include type and number required for material and size of raceway or<br />

cable.<br />

2. Pressure Plates: Plastic. Include two for each sealing element.<br />

3. Connecting Bolts and Nuts: Carbon steel with corrosion-resistant coating of<br />

length required to secure pressure plates to sealing elements. Include one for<br />

each sealing element.<br />

PART 3 - EXECUTION<br />

3.1 THROUGH-PENETRATION FIRESTOP SYSTEM INSTALLATION<br />

A. General: Install through-penetration firestop systems to comply with Part 1<br />

"Performance Requirements" Article and with firestop system manufacturer's written<br />

installation instructions and published drawings for products and applications indicated.<br />

B. Install forming/damming/backing materials and other accessories of types required to<br />

support fill materials during their application and in the position needed to produce<br />

cross-sectional shapes and depths required to achieve fire ratings indicated.<br />

1. After installing fill materials and allowing them to fully cure, remove combustible<br />

forming materials and other accessories not indicated as permanent components<br />

of firestop systems.<br />

C. Install fill materials for firestop systems by proven techniques to produce the following<br />

results:<br />

FIRESTOP SYSTEMS AND SLEEVES 26 05 23 - 3/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

1. Fill voids and cavities formed by openings, forming materials, accessories, and<br />

penetrating items as required to achieve fire-resistance ratings indicated.<br />

2. Apply materials so they contact and adhere to substrates formed by openings<br />

and penetrating items.<br />

3. For fill materials that will remain exposed after completing Work, finish to produce<br />

smooth, uniform surfaces that are flush with adjoining finishes.<br />

D. Identification: Identify through-penetration firestop systems with preprinted metal or<br />

plastic labels. Attach labels permanently to surfaces adjacent to and within 6 inches<br />

(150 mm) of edge of the firestop systems so that labels will be visible to anyone<br />

seeking to remove penetrating items or firestop systems. Use mechanical fasteners for<br />

metal labels. Include the following information on labels:<br />

1. The words "Warning - Through-Penetration Firestop System - Do Not Disturb.<br />

Notify Building Management of Any Damage."<br />

2. Contractor's name, address, and phone number.<br />

3. Through-penetration firestop system designation of applicable testing and<br />

inspecting agency.<br />

4. Date of installation.<br />

5. Through-penetration firestop system manufacturer's name.<br />

6. Installer's name.<br />

3.2 FIELD QUALITY CONTROL<br />

A. Inspecting Agency: Owner will engage an independent inspecting agency to inspect<br />

through-penetration firestops. Independent inspecting agency shall comply with<br />

ASTM E 2174 requirements including those related to qualifications, conducting<br />

inspections, and preparing test reports.<br />

B. Where deficiencies are found, repair or replace through-penetration firestop systems<br />

so they comply with requirements.<br />

C. Proceed with enclosing through-penetration firestop systems with other construction<br />

only after inspection reports are issued and firestop installations comply with<br />

requirements.<br />

3.3 SLEEVE INSTALLATION FOR ELECTRICAL PENETRATIONS<br />

A. Electrical penetrations occur when raceways, cables, wireways, cable trays, or<br />

busways penetrate concrete slabs, concrete or masonry walls, or fire-rated floor and<br />

wall assemblies.<br />

B. Coordinate sleeve selection and application with selection and application of<br />

firestopping.<br />

C. Concrete Slabs and Walls: Install sleeves for penetrations unless core-drilled holes or<br />

formed openings are used. Install sleeves during erection of slabs and walls.<br />

FIRESTOP SYSTEMS AND SLEEVES 26 05 23 - 4/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

D. Fire-Rated Assemblies: Install sleeves for penetrations of fire-rated floor and wall<br />

assemblies unless openings compatible with firestop system used are fabricated<br />

during construction of floor or wall.<br />

E. Cut sleeves to length for mounting flush with both surfaces of walls.<br />

F. Extend sleeves installed in floors 2 inches (50 mm) above finished floor level.<br />

G. Size pipe sleeves to provide 1/4-inch (6.4-mm) annular clear space between sleeve<br />

and raceway or cable unless sleeve seal is to be installed.<br />

H. Seal space outside of sleeves with grout for penetrations of concrete and masonry and<br />

with approved joint compound for gypsum board assemblies.<br />

I. Interior Penetrations of Non-Fire-Rated Walls and Floors: Seal annular space<br />

between sleeve and raceway or cable, using joint sealant appropriate for size, depth,<br />

and location of joint.<br />

J. Fire-Rated-Assembly Penetrations: Maintain indicated fire rating of walls, partitions,<br />

ceilings, and floors at raceway and cable penetrations. Install sleeves and seal<br />

raceway and cable penetration sleeves with firestop materials.<br />

K. Roof-Penetration Sleeves: Seal penetration of individual raceways and cables with<br />

flexible boot-type flashing units applied in coordination with roofing work.<br />

L. Aboveground, Exterior-Wall Penetrations: Seal penetrations using sleeves and<br />

mechanical sleeve seals. Select sleeve size to allow for 1-inch (25-mm) annular clear<br />

space between pipe and sleeve for installing mechanical sleeve seals.<br />

M. Underground, Exterior-Wall Penetrations: Install "wall pipes" for sleeves. Size sleeves<br />

to allow for 1-inch (25-mm) annular clear space between raceway or cable and sleeve<br />

for installing mechanical sleeve seals.<br />

END OF SECTION 26 05 23<br />

FIRESTOP SYSTEMS AND SLEEVES 26 05 23 - 5/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

This page intentionally left blank.<br />

FIRESTOP SYSTEMS AND SLEEVES 26 05 23 - 6/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

SECTION 26 05 26 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. This Section includes methods and materials for grounding systems and equipment.<br />

1.2 SUBMITTALS<br />

A. Product Data: For each type of product indicated.<br />

B. Field quality-control test reports.<br />

1.3 QUALITY ASSURANCE<br />

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in<br />

NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction,<br />

and marked for intended use.<br />

B. Comply with UL 467 for grounding and bonding materials and equipment.<br />

PART 2 - PRODUCTS<br />

2.1 CONDUCTORS<br />

A. Insulated Conductors: Copper wire or cable insulated for 600 V unless otherwise<br />

required by applicable Code or authorities having jurisdiction.<br />

B. Bare Copper Conductors:<br />

1. Solid Conductors: ASTM B 3.<br />

2. Stranded Conductors: ASTM B 8.<br />

3. Tinned Conductors: ASTM B 33.<br />

4. Bonding Cable: 28 kcmil, 14 strands of No. 17 AWG conductor, 1/4 inch (6 mm)<br />

in diameter.<br />

5. Bonding Conductor: No. 4 or No. 6 AWG, stranded conductor.<br />

6. Bonding Jumper: Copper tape, braided conductors, terminated with copper<br />

ferrules; 1-5/8 inches (41 mm) wide and 1/16 inch (1.6 mm) thick.<br />

7. Tinned Bonding Jumper: Tinned-copper tape, braided conductors, terminated<br />

with copper ferrules; 1-5/8 inches (41 mm) wide and 1/16 inch (1.6 mm) thick.<br />

GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 26 05 26 - 1/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

2.2 CONNECTORS<br />

A. Listed and labeled by a nationally recognized testing laboratory acceptable to<br />

authorities having jurisdiction for applications in which used, and for specific types,<br />

sizes, and combinations of conductors and other items connected.<br />

B. Bolted Connectors for Conductors and Pipes: Copper or copper alloy, bolted pressuretype,<br />

with at least two bolts.<br />

1. Pipe Connectors: Clamp type, sized for pipe.<br />

C. Welded Connectors: Exothermic-welding kits of types recommended by kit<br />

manufacturer for materials being joined and installation conditions.<br />

2.3 GROUNDING ELECTRODES<br />

A. Ground Rods: Copper-clad steel, sectional type; 3/4 inch in diameter by 16 feet long<br />

(19 mm by 3 m) .<br />

PART 3 - EXECUTION<br />

3.1 APPLICATIONS<br />

A. Conductors: Install solid conductor for No. 8 AWG and smaller, and stranded<br />

conductors for No. 6 AWG and larger, unless otherwise indicated.<br />

B. Underground Grounding Conductors: Install insulated copper conductor, No. 2/0 AWG<br />

minimum. Bury at least 24 inches (600 mm) below grade.<br />

C. Isolated Grounding Conductors: Green-colored insulation with continuous yellow<br />

stripe. On feeders with isolated ground, identify grounding conductor where visible to<br />

normal inspection, with alternating bands of green and yellow tape, with at least three<br />

bands of green and two bands of yellow.<br />

D. Conductor Terminations and Connections:<br />

1. Pipe and Equipment Grounding Conductor Terminations: Bolted connectors.<br />

2. Underground Connections: Welded connectors, except at test wells and as<br />

otherwise indicated.<br />

3. Connections to Ground Rods at Test Wells: Bolted connectors.<br />

4. Connections to Structural Steel: Welded connectors.<br />

3.2 EQUIPMENT GROUNDING<br />

A. Install insulated equipment grounding conductors with the following items, in addition to<br />

those required by NFPA 70:<br />

GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 26 05 26 - 2/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

1. Feeders and branch circuits.<br />

2. Lighting circuits.<br />

3. Receptacle circuits.<br />

4. Single-phase motor and appliance branch circuits.<br />

5. Three-phase motor and appliance branch circuits.<br />

6. Flexible raceway runs.<br />

7. Computer and Rack-Mounted Electronic Equipment Circuits: Install insulated<br />

equipment grounding conductor in branch-circuit runs from equipment-area<br />

power panels and power-distribution units.<br />

B. Air-Duct Equipment Circuits: Install insulated equipment grounding conductor to ductmounted<br />

electrical devices operating at 120 V and more, including air cleaners,<br />

heaters, dampers, humidifiers, and other duct electrical equipment. Bond conductor to<br />

each unit and to air duct and connected metallic piping.<br />

C. Water Heater and Heat-Tracing Cables: Install a separate insulated equipment<br />

grounding conductor to each electric water heater and heat-tracing cable. Bond<br />

conductor to heater units, piping, connected equipment, and components.<br />

D. Isolated Equipment Enclosure Circuits: For designated equipment supplied by a<br />

branch circuit or feeder, isolate equipment enclosure from supply circuit raceway with a<br />

nonmetallic raceway fitting listed for the purpose. Install fitting where raceway enters<br />

enclosure, and install a separate insulated equipment grounding conductor. Isolate<br />

conductor from raceway and from panelboard grounding terminals. Terminate at<br />

equipment grounding conductor terminal of the applicable derived system or service,<br />

unless otherwise indicated.<br />

E. Signal and Communication Equipment: For telephone, alarm, voice and data, and<br />

other communication equipment, provide No. 4 AWG minimum insulated grounding<br />

conductor in raceway from grounding electrode system to each service location,<br />

terminal cabinet, wiring closet, and central equipment location.<br />

1. Terminal Cabinets: Terminate grounding conductor on cabinet grounding<br />

terminal.<br />

F. Metal Poles Supporting Outdoor Lighting Fixtures: Install grounding electrode and a<br />

separate insulated equipment grounding conductor in addition to grounding conductor<br />

installed with branch-circuit conductors.<br />

3.3 INSTALLATION<br />

A. Grounding Conductors: Route along shortest and straightest paths possible, unless<br />

otherwise indicated or required by Code. Avoid obstructing access or placing<br />

conductors where they may be subjected to strain, impact, or damage.<br />

B. Ground Rods: Drive rods until tops are 2 inches (50 mm) below finished floor or final<br />

grade, unless otherwise indicated.<br />

GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 26 05 26 - 3/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

1. Interconnect ground rods with grounding electrode conductor below grade and as<br />

otherwise indicated. Make connections without exposing steel or damaging<br />

coating, if any.<br />

2. For grounding electrode system, install at least two rods spaced at least one-rod<br />

length from each other and located at least the same distance from other<br />

grounding electrodes, and connect to the service grounding electrode conductor.<br />

C. Bonding Straps and Jumpers: Install in locations accessible for inspection and<br />

maintenance, except where routed through short lengths of conduit.<br />

1. Bonding to Structure: Bond straps directly to basic structure, taking care not to<br />

penetrate any adjacent parts.<br />

2. Bonding to Equipment Mounted on Vibration Isolation Hangers and Supports:<br />

Install so vibration is not transmitted to rigidly mounted equipment.<br />

3. Use exothermic-welded connectors for outdoor locations, but if a disconnect-type<br />

connection is required, use a bolted clamp.<br />

D. Grounding and Bonding for Piping: Provide grounding for all new metal pipes.<br />

E. Bonding Interior Metal Ducts: Bond metal air ducts to equipment grounding conductors<br />

of associated fans, blowers, electric heaters, and air cleaners. Install bonding jumper to<br />

bond across flexible duct connections to achieve continuity.<br />

3.4 FIELD QUALITY CONTROL<br />

A. Perform the following tests and inspections and prepare test reports:<br />

1. After installing new grounding electrode systems but before permanent electrical<br />

circuits have been energized, test for compliance with requirements.<br />

2. Test completed grounding system at each location where a maximum groundresistance<br />

level is specified, at service disconnect enclosure grounding terminal,<br />

and at ground test wells.<br />

a. Measure ground resistance not less than two full days after last trace of<br />

precipitation and without soil being moistened by any means other than<br />

natural drainage or seepage and without chemical treatment or other<br />

artificial means of reducing natural ground resistance.<br />

b. Perform tests by fall-of-potential method according to IEEE 81.<br />

B. Report measured ground resistances that exceed 5 ohms.<br />

END OF SECTION 26 05 26<br />

GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 26 05 26 - 4/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

SECTION 26 05 33 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. This Section includes raceways, fittings, boxes, enclosures, and cabinets for electrical<br />

wiring.<br />

B. See Division 26 Section "Through-Penetration Firestop Systems" for firestopping<br />

materials and installation at penetrations through walls, ceilings, and other fire-rated<br />

elements.<br />

C. See Division 26 Section "Basic Electrical Materials and Methods" for supports,<br />

anchors, and identification products.<br />

D. See Division 26 Section “Electrical Supports” for bracing of raceways, boxes,<br />

enclosures, and cabinets.<br />

E. See Division 26 Section "Wiring Devices" for devices installed in boxes and for floorbox<br />

service fittings.<br />

1.2 SUBMITTALS<br />

A. Product Data: For surface raceways, wireways and fittings, floor boxes, hinged-cover<br />

enclosures, and cabinets indicated.<br />

B. Shop Drawings: Show fabrication and installation details of components for raceways,<br />

fittings, boxes, enclosures, and cabinets.<br />

1.3 QUALITY ASSURANCE<br />

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in<br />

NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction,<br />

and marked for intended use.<br />

B. Comply with NFPA 70.<br />

PART 2 - PRODUCTS<br />

2.1 MANUFACTURERS<br />

A. In other Part 2 articles where subparagraph titles below introduce lists, the following<br />

requirements apply for product selection:<br />

RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 26 05 33 - 1/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

Available Manufacturers: Subject to compliance with requirements, manufacturers<br />

offering products that may be incorporated into the Work include, but are not limited to,<br />

the manufacturers specified.<br />

2.2 METAL CONDUIT AND TUBING<br />

A. Manufacturers:<br />

1. AFC Cable Systems, Inc.<br />

2. Alflex Inc.<br />

3. Anamet Electrical, Inc.; Anaconda Metal Hose.<br />

4. Electri-Flex Co.<br />

5. Grinnell Co./Tyco International; Allied Tube and Conduit Div.<br />

6. LTV Steel Tubular Products Company.<br />

7. Manhattan/CDT/Cole-Flex.<br />

8. O-Z Gedney; Unit of General Signal.<br />

9. Wheatland Tube Co.<br />

B. Rigid Steel Conduit: ANSI C80.1.<br />

C. Aluminum Rigid Conduit: ANSI C80.5.<br />

D. IMC: ANSI C80.6.<br />

E. EMT and Fittings: ANSI C80.3.<br />

1. Fittings: Steel, Set-screw or compression type. Not die-cast.<br />

F. LFMC: Flexible steel conduit with PVC jacket.<br />

G. Fittings: NEMA FB 1; compatible with conduit and tubing materials.<br />

2.3 NONMETALLIC CONDUIT AND TUBING<br />

A. Manufacturers:<br />

1. American International.<br />

2. Anamet Electrical, Inc.; Anaconda Metal Hose.<br />

3. Arnco Corp.<br />

4. Cantex Inc.<br />

5. Certainteed Corp.; Pipe & Plastics Group.<br />

6. Condux International.<br />

7. ElecSYS, Inc.<br />

8. Electri-Flex Co.<br />

9. Lamson & Sessions; Carlon Electrical Products.<br />

10. Manhattan/CDT/Cole-Flex.<br />

11. RACO; Division of Hubbell, Inc.<br />

12. Spiralduct, Inc./AFC Cable Systems, Inc.<br />

13. Thomas & Betts Corporation.<br />

RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 26 05 33 - 2/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

B. RNC: NEMA TC 2, Schedule 40 and Schedule 80 PVC.<br />

C. RNC Fittings: NEMA TC 3; match to conduit or tubing type and material.<br />

2.4 METAL WIREWAYS<br />

A. Manufacturers:<br />

1. Hoffman.<br />

2. Square D.<br />

B. Material and Construction: Sheet metal sized and shaped as indicated.<br />

C. Fittings and Accessories: Include couplings, offsets, elbows, expansion joints,<br />

adapters, hold-down straps, end caps, and other fittings to match and mate with<br />

wireways as required for complete system.<br />

D. Select features, unless otherwise indicated, as required to complete wiring system and<br />

to comply with NFPA 70.<br />

E. Wireway Covers: Screw-cover type.<br />

F. Finish: Manufacturer's standard enamel finish.<br />

2.5 BOXES, ENCLOSURES, AND CABINETS<br />

A. Manufacturers:<br />

1. Cooper Crouse-Hinds; Div. of Cooper Industries, Inc.<br />

2. Emerson/General Signal; Appleton Electric Company.<br />

3. Erickson Electrical Equipment Co.<br />

4. Hoffman.<br />

5. Hubbell, Inc.; Killark Electric Manufacturing Co.<br />

6. O-Z/Gedney; Unit of General Signal.<br />

7. RACO; Division of Hubbell, Inc.<br />

8. Thomas & Betts Corporation.<br />

9. Walker Systems, Inc.; Wiremold Company (The).<br />

B. Sheet Metal Outlet and Device Boxes: NEMA OS 1.<br />

C. Cast-Metal Outlet and Device Boxes: NEMA FB 1, Type FD, with gasketed cover.<br />

D. Nonmetallic Outlet and Device Boxes (where specified): NEMA OS 2.<br />

E. Small Sheet Metal Pull and Junction Boxes: NEMA OS 1.<br />

F. Cast-Metal Pull and Junction Boxes: NEMA FB 1, cast aluminum with gasketed cover.<br />

G. Hinged-Cover Enclosures: NEMA 250, Type 1, with continuous hinge cover and flush<br />

latch.<br />

RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 26 05 33 - 3/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

1. Metal Enclosures: Steel, finished inside and out with manufacturer's standard<br />

enamel.<br />

2. Nonmetallic Enclosures: Plastic, finished inside with radio-frequency-resistant<br />

paint.<br />

H. Cabinets: NEMA 250, Type 1, galvanized steel box with removable interior panel and<br />

removable front, finished inside and out with manufacturer's standard enamel. Hinged<br />

door in front cover with flush latch and concealed hinge. Key latch to match<br />

panelboards. Include metal barriers to separate wiring of different systems and voltage<br />

and include accessory feet where required for freestanding equipment.<br />

2.6 FACTORY FINISHES<br />

A. Finish: For raceway, enclosure, or cabinet components, provide manufacturer's<br />

standard paint applied to factory-assembled surface raceways, enclosures, and<br />

cabinets before shipping.<br />

PART 3 - EXECUTION<br />

3.1 RACEWAY APPLICATION<br />

A. Outdoors:<br />

1. Exposed: Rigid steel or IMC.<br />

2. Concealed: Rigid steel or IMC.<br />

3. Underground, Single Run: SCH 40 PVC.<br />

4. Underground, Grouped: SCH 40 PVC.<br />

5. Connection to Vibrating Equipment (Including Transformers and Hydraulic,<br />

Pneumatic, Electric Solenoid, or Motor-Driven Equipment): LFMC.<br />

6. Boxes and Enclosures: NEMA 250, Type 3R.<br />

B. Indoors:<br />

1. Exposed: IMC – wet locations; EMT – dry locations<br />

2. Concealed: EMT.<br />

3. Connection to Vibrating Equipment (Including Transformers and Hydraulic,<br />

Pneumatic, Electric Solenoid, or Motor-Driven Equipment): FMC; except use<br />

LFMC in damp or wet locations or where exposed to view (not concealed).<br />

4. Damp or Wet Locations: Rigid steel conduit.<br />

5. Boxes and Enclosures: NEMA 250, Type 1, except as follows:<br />

a. Damp or Wet Locations: NEMA 250, Type 4, nonmetallic are permitted.<br />

6. Flexible metal conduit: Where applications are not concealed by the building<br />

construction, liquid tight flexible conduit and grounding type fittings shall be used<br />

and system shall be fully bonded.<br />

C. Minimum Raceway Size: 1/2-inch trade size (DN 16), except underground shall be ¾”<br />

minimum.<br />

RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 26 05 33 - 4/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

D. Raceway Fittings: Compatible with raceways and suitable for use and location.<br />

1. Intermediate Steel Conduit: Use threaded rigid steel conduit fittings, unless<br />

otherwise indicated.<br />

2. PVC Externally Coated, Rigid Steel Conduits: Use only fittings approved for use<br />

with that material. Patch all nicks and scrapes in PVC coating after installing<br />

conduits.<br />

3.2 INSTALLATION<br />

A. Keep raceways at least 6 inches (150 mm) away from parallel runs of flues and steam<br />

or hot-water pipes. Install horizontal raceway runs above water and steam piping.<br />

B. Complete raceway installation before starting conductor installation.<br />

C. Support raceways as specified in Division 26 Section "Electrical Supports."<br />

D. Install temporary closures to prevent foreign matter from entering raceways.<br />

E. Protect stub-ups from damage where conduits rise through floor slabs. Arrange so<br />

curved portions of bends are not visible above finished slab.<br />

F. Make bends and offsets so ID is not reduced. Keep legs of bends in same plane and<br />

keep straight legs of offsets parallel, unless otherwise indicated.<br />

G. Conceal conduit and EMT within finished walls, ceilings, and floors, unless otherwise<br />

indicated.<br />

1. Install concealed raceways with a minimum of bends in shortest practical<br />

distance, considering type of building construction and obstructions, unless<br />

otherwise indicated.<br />

H. Raceways Embedded in Slabs: Install in middle 1/3 of slab thickness where practical<br />

and leave at least 2 inches (50 mm) of concrete cover.<br />

1. Secure raceways to reinforcing rods to prevent sagging or shifting during<br />

concrete placement.<br />

2. Space raceways laterally to prevent voids in concrete.<br />

3. Run conduit larger than 1-inch trade size (DN 27) parallel or at right angles to<br />

main reinforcement. Where at right angles to reinforcement, place conduit close<br />

to slab support.<br />

4. Change from nonmetallic tubing to Schedule 80 nonmetallic conduit, rigid steel<br />

conduit, or IMC before rising above floor, except PVC branch circuits may rise<br />

concealed in walls to first box maximum 48” AFF.<br />

I. Install exposed raceways parallel or at right angles to nearby surfaces or structural<br />

members and follow surface contours as much as possible.<br />

1. Run parallel or banked raceways together on common supports.<br />

RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 26 05 33 - 5/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

2. Make parallel bends in parallel or banked runs. Use factory elbows only where<br />

elbows can be installed parallel; otherwise, provide field bends for parallel<br />

raceways.<br />

J. Join raceways with fittings designed and approved for that purpose and make joints<br />

tight.<br />

1. Use insulating bushings to protect conductors.<br />

K. Tighten set screws of threadless fittings with suitable tools.<br />

L. Terminations:<br />

1. Where raceways are terminated with locknuts and bushings, align raceways to<br />

enter squarely and install locknuts with dished part against box. Use two<br />

locknuts, one inside and one outside box.<br />

2. Where raceways are terminated with threaded hubs, screw raceways or fittings<br />

tightly into hub so end bears against wire protection shoulder. Where chase<br />

nipples are used, align raceways so coupling is square to box; tighten chase<br />

nipple so no threads are exposed.<br />

M. Install pull cords in empty raceways. Use polypropylene or monofilament plastic line<br />

with not less than 200-lb (90-kg) tensile strength. Leave at least 12 inches (300 mm) of<br />

slack at each end of pull cord.<br />

N. Install raceway sealing fittings at suitable, approved, and accessible locations and fill<br />

them with UL-listed sealing compound. For concealed raceways, install each fitting in<br />

a flush steel box with a blank cover plate having a finish similar to that of adjacent<br />

plates or surfaces. Install raceway sealing fittings at the following points:<br />

1. Where conduits pass from warm to cold locations, such as boundaries of<br />

refrigerated spaces.<br />

2. Where otherwise required by NFPA 70.<br />

O. Stub-up Connections: Extend conduits through concrete floor for connection to<br />

freestanding equipment. Install with an adjustable top or coupling threaded inside for<br />

plugs set flush with finished floor. Extend conductors to equipment with rigid steel<br />

conduit; FMC may be used 6 inches (150 mm) above the floor. Install screwdriveroperated,<br />

threaded plugs flush with floor for future equipment connections.<br />

P. Flexible Connections: Use maximum of 72 inches (1830 mm) of flexible conduit for<br />

recessed and semirecessed lighting fixtures; for equipment subject to vibration, noise<br />

transmission, or movement; and for all motors. Use LFMC in damp or wet locations or<br />

where exposed to view (not concealed). Install separate ground conductor across<br />

flexible connections.<br />

Q. Surface Raceways: Install a separate, green, ground conductor in raceways from<br />

junction box supplying raceways to receptacle or fixture ground terminals.<br />

R. Install hinged-cover enclosures and cabinets plumb. Support at each corner.<br />

RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 26 05 33 - 6/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

3.3 PROTECTION<br />

A. Provide final protection and maintain conditions that ensure coatings, finishes, and<br />

cabinets are without damage or deterioration at time of Substantial Completion.<br />

1. Repair damage to galvanized finishes with zinc-rich paint recommended by<br />

manufacturer.<br />

2. Repair damage to PVC or paint finishes with matching touchup coating<br />

recommended by manufacturer.<br />

END OF SECTION 26 05 33<br />

RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 26 05 33 - 7/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

This page intentionally left blank.<br />

RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 26 05 33 - 8/8


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

SECTION 26 05 53 – IDENTIFICATION FOR ELECTRICAL SYSTEMS<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. This Section includes the following:<br />

1. Identification for conductors and communication and control cable.<br />

2. Warning labels and signs.<br />

3. Equipment identification labels.<br />

1.2 SUBMITTALS<br />

A. Product Data: For each electrical identification product indicated.<br />

1.3 QUALITY ASSURANCE<br />

A. Comply with ANSI A13.1.<br />

1.4 COORDINATION<br />

A. Coordinate identification names, abbreviations, colors, and other features with<br />

requirements in the Contract Documents, Shop Drawings, manufacturer's wiring<br />

diagrams, and the Operation and Maintenance Manual, and with those required by<br />

codes, standards, and <strong>29</strong> CFR 1910.145. Use consistent designations throughout<br />

Project.<br />

PART 2 - PRODUCTS<br />

2.1 CONDUCTOR AND COMMUNICATION- AND CONTROL-CABLE IDENTIFICATION<br />

MATERIALS<br />

A. Marker Tape: Vinyl or vinyl -cloth, self-adhesive wraparound type, with circuit<br />

identification legend machine printed by thermal transfer or equivalent process.<br />

2.2 WARNING LABELS AND SIGNS<br />

A. Comply with NFPA 70 and <strong>29</strong> CFR 1910.145.<br />

B. Self-Adhesive Warning Labels: Factory printed, multicolor, pressure-sensitive<br />

adhesive labels, configured for display on front cover, door, or other access to<br />

equipment, unless otherwise indicated.<br />

IDENTIFICATION FOR ELECTRICAL SYSTEMS 26 05 53 - 1/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

C. Baked-Enamel Warning Signs: Preprinted aluminum signs, punched or drilled for<br />

fasteners, with colors, legend, and size required for application. 1/4-inch (6.4-mm)<br />

grommets in corners for mounting. Nominal size, 7 by 10 inches (180 by 250 mm) .<br />

D. Fasteners for Signs: Self-tapping, stainless-steel screws or stainless-steel machine<br />

screws with nuts and flat and lock washers.<br />

E. Warning label and sign shall include, but are not limited to, the following legends:<br />

1. Multiple Power Source Warning: "DANGER - ELECTRICAL SHOCK HAZARD -<br />

EQUIPMENT HAS MULTIPLE POWER SOURCES."<br />

2. Workspace Clearance Warning: "WARNING - OSHA REGULATION - AREA IN<br />

FRONT OF ELECTRICAL EQUIPMENT MUST BE KEPT CLEAR FOR 36<br />

INCHES (915 mm) ."<br />

2.3 EQUIPMENT IDENTIFICATION LABELS<br />

A. Adhesive Film Label with Clear Protective Overlay: Machine printed, in black, by<br />

thermal transfer or equivalent process. Minimum letter height shall be 3/8 inch (10<br />

mm) . Overlay shall provide a weatherproof and ultraviolet-resistant seal for label.<br />

B. Self-Adhesive, Engraved, Laminated Acrylic or Melamine Label: Adhesive backed,<br />

with white letters on a dark-gray background. Minimum letter height shall be 3/8 inch<br />

(10 mm) .<br />

PART 3 - EXECUTION<br />

3.1 APPLICATION<br />

A. Auxiliary Electrical Systems Conductor and Cable Identification: Use marker tape to<br />

identify field-installed alarm, control, signal, sound, intercommunications, voice, and<br />

data wiring connections.<br />

1. Identify conductors, cables, and terminals in enclosures and at junctions,<br />

terminals, and cable pull points. Identify by system and circuit designation.<br />

2. Use system of designations that is uniform and consistent with system used by<br />

manufacturer for factory-installed connections.<br />

B. Warning Labels for Indoor Cabinets, Boxes, and Enclosures for Power and Lighting:<br />

Comply with <strong>29</strong> CFR 1910.145 and apply baked-enamel warning signs. Identify<br />

system voltage with black letters on an orange background. Apply to exterior of door,<br />

cover, or other access.<br />

1. Equipment with Multiple Power or Control Sources: Apply to door or cover of<br />

equipment including, but not limited to, the following:<br />

a. Power transfer switches.<br />

b. Controls with external control power connections.<br />

IDENTIFICATION FOR ELECTRICAL SYSTEMS 26 05 53 - 2/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

2. Equipment Requiring Workspace Clearance According to NFPA 70: Unless<br />

otherwise indicated, apply to door or cover of equipment but not on flush<br />

panelboards and similar equipment in finished spaces.<br />

C. Equipment Identification Labels: On each unit of equipment, install unique designation<br />

label that is consistent with wiring diagrams, schedules, and Operation and<br />

Maintenance Manual. Apply labels to disconnect switches and protection equipment,<br />

central or master units, control panels, control stations, terminal cabinets, and racks of<br />

each system. Systems include power, lighting, control, communication, signal,<br />

monitoring, and alarm systems unless equipment is provided with its own identification.<br />

1. Labeling Instructions:<br />

a. Indoor Equipment: Self-adhesive, engraved, laminated acrylic or melamine<br />

label. Unless otherwise indicated, provide a single line of text with 1/2-<br />

inch- (13-mm-) high letters on 1-1/2-inch- (38-mm-) high label; where 2<br />

lines of text are required, use labels 2 inches (50 mm) high.<br />

b. Outdoor Equipment: Engraved, laminated acrylic or melamine label, drilled<br />

for screw attachment.<br />

c. Elevated Components: Increase sizes of labels and legend to those<br />

appropriate for viewing from the floor.<br />

2. Equipment to Be Labeled:<br />

a. Panelboards, electrical cabinets, and enclosures.<br />

b. Electrical switchgear and switchboards.<br />

c. Disconnect switches.<br />

d. Enclosed circuit breakers.<br />

e. Motor starters.<br />

f. Push-button stations.<br />

g. Power transfer equipment.<br />

h. Contactors.<br />

3.2 INSTALLATION<br />

A. Verify identity of each item before installing identification products.<br />

B. Location: Install identification materials and devices at locations for most convenient<br />

viewing without interference with operation and maintenance of equipment.<br />

C. Apply identification devices to surfaces that require finish after completing finish work.<br />

D. Self-Adhesive Identification Products: Clean surfaces before application, using<br />

materials and methods recommended by manufacturer of identification device.<br />

E. Attach non-adhesive signs and plastic labels with screws and auxiliary hardware<br />

appropriate to the location and substrate.<br />

F. Color-Coding for Phase and Voltage Level Identification, 600 V and Less: Use the<br />

colors listed below for ungrounded service, feeder, and branch-circuit conductors.<br />

IDENTIFICATION FOR ELECTRICAL SYSTEMS 26 05 53 - 3/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

1. Color shall be factory applied.<br />

2. Colors for 208/120-V Circuits: (unless existing color code is different)<br />

a. Phase A: Black.<br />

b. Phase B: Red.<br />

c. Phase C: Blue.<br />

d. Neutral: White.<br />

END OF SECTION 26 05 53<br />

IDENTIFICATION FOR ELECTRICAL SYSTEMS 26 05 53 - 4/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

SECTION 26 09 33 - CENTRAL DIMMING CONTROLS<br />

PART 1– GENERAL<br />

1.1 SUMMARY<br />

A. Section Includes:<br />

1. Central dimming control systems.<br />

B. Related Sections:<br />

1. Section 262726 - Wiring Devices<br />

2. Section 265100 - Interior Lighting<br />

1.2 REFERENCES<br />

A. American National Standards Institute/Institute of Electrical and Electronic Engineers<br />

(ANSI/IEEE)<br />

1. C62.41-1991 – Recommended Practice for Surge Voltages in Low-Voltage AC<br />

Power Circuits.<br />

B. ASTM International (ASTM) (www.astm.org)<br />

1. D4674 -02a Standard Test Method for Accelerated Testing for Color Stability of<br />

Plastics Exposed to Indoor Fluorescent Lighting and Window-Filtered Daylight.<br />

C. International Organization for Standardization (ISO)<br />

1. 9001:2000 – Quality Management Systems.<br />

D. National Electrical Manufacturers Association (NEMA)<br />

1. WD1 (R2005) - General Color Requirements for Wiring Devices.<br />

E. Underwriters Laboratories, Inc. (UL) (www.ul.com):<br />

1. 489 (2002) - Molded-Case Circuit Breakers, Molded-Case Switches, and Circuit-<br />

Breaker Enclosures.<br />

2. 508 (1999) - Standard for Industrial Control Equipment.<br />

3. 1472 (1996) - Solid-State Dimming Controls.<br />

4. 924 (2003) - Emergency Lighting and Power Equipment<br />

1.3 SYSTEM DESCRIPTION<br />

A. Central dimming control system<br />

1. Factory assembled dimming and switching panels and interfaces and modules.<br />

2. Low voltage wall stations and control interfaces and sensors.<br />

3. Solid-state high frequency fluorescent dimming ballasts.<br />

1.4 SUBMITTALS<br />

A. Submit under provisions of Section 013300.<br />

CENTRAL DIMMING CONTROLS 26 09 23 - 1/12


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

B. Specification Conformance Document: Indicate whether the submitted equipment<br />

either:<br />

1. Meets specification exactly as stated.<br />

2. Meets specification via an alternate means and indicate the specific methodology<br />

used.<br />

C. Shop Drawings; include:<br />

1. Load schedule indicating actual connected load, load type, and voltage per circuit,<br />

circuits and their respective control zones, circuits that are on emergency, and<br />

capacity, phase, and corresponding circuit numbers.<br />

2. Schematic of system.<br />

D. Product Data: Catalog cut sheets with performance specifications demonstrating<br />

compliance with specified requirements.<br />

1.5 QUALITY ASSURANCE<br />

A. Manufacturer: Minimum 10 years experience in manufacture of architectural lighting<br />

controls.<br />

B. Manufacturer’s Quality System: Registered to ISO 9001:2000 Quality Standard,<br />

including in-house engineering for product design activities.<br />

C. Central dimming control system:<br />

1. Listed by UL specifically for the required loads. Provide evidence of compliance<br />

upon request.<br />

1.6 <strong>PROJECT</strong> CONDITIONS<br />

A. Do not install equipment until following conditions can be maintained in spaces to<br />

receive equipment:<br />

1. Ambient temperature: 0 degrees to 40 degrees C (32 degrees to 104 degrees F).<br />

2. Relative humidity: Maximum 90 percent, non-condensing.<br />

3. Lighting control system must be protected from dust during installation.<br />

1.7 WARRANTY<br />

A. Provide Manufacturer’s Warranty:<br />

1. Standard 2-year warranty, Includes:<br />

a. 100 Percent Replacement Parts for Manufacturer Lighting System<br />

Components<br />

b. 100 Percent Manufacturer Labor Coverage to Troubleshoot and Diagnose a<br />

Lighting Issue<br />

c. First–Available Onsite or Remote Response Time<br />

d. 24 Hours Per Day, 7 Days Per Week Telephone Technical Support,<br />

Excluding Manufacturer Holidays<br />

e. Remote Diagnostics for Applicable Systems<br />

CENTRAL DIMMING CONTROLS 26 09 23 - 2/12


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

1.8 MAINTENANCE<br />

A. Make ordering of new equipment for expansions, replacements, and spare parts<br />

available to end user.<br />

B. Make new replacement parts available for minimum of ten years from date of<br />

manufacture.<br />

PART 2 - PRODUCTS<br />

2.1 MANUFACTURERS<br />

A. Acceptable Manufacturer: Lutron Electronics Co., Inc. – System: Lutron LCP128<br />

B. Basis of design product: Lutron LCP128 or subject to compliance and prior approval<br />

with specified requirements of this section, one of the following:<br />

1. Lutron LCP128<br />

2. LCD<br />

3. WattStopper<br />

4. Cooper<br />

5. Sensor Switch<br />

C. Substitutions:<br />

1. All proposed substitutions (clearly delineated as such) must be submitted in<br />

writing for approval by the design professional a minimum of 10 working days prior<br />

to the bid date and must be made available to all bidders.<br />

2. Proposed substitutes must be accompanied by a review of the specification noting<br />

compliance on a line-by-line basis.<br />

3. By using pre-approved substitutions, the contractor accepts responsibility and<br />

associated costs for all required modifications to circuitry, devices, and wiring.<br />

4. Provide complete engineered shop drawings (including power wiring) with<br />

deviations for the original design highlighted in an alternate color to the engineer<br />

for review and approval prior to rough-in.<br />

2.2 GENERAL<br />

A. Provide hardware that is designed, tested, manufactured, and warranted by a single<br />

manufacturer.<br />

B. Architectural Lighting Controls: Ten-year operational life while operating continually at<br />

any temperature in an ambient temperature range of 0 degrees C (32 degrees F) to 40<br />

degrees C (104 degrees F) and 90 percent non-condensing relative humidity.<br />

C. Designed and tested to withstand electrostatic discharges up to 15,000 V without<br />

impairmentper IEC 801-2.<br />

CENTRAL DIMMING CONTROLS 26 09 23 - 3/12


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

2.3 DIMMING / RELAY PERFORMANCE REQUIREMENTS<br />

A. Electrolytic capacitors to operate at least 20 degrees C below the component<br />

manufacturer's maximum temperature rating when device is under fully-loaded<br />

conditions in 40 degrees C (104 degrees F) ambient temperature.<br />

B. Load Handling Thyristors (SCRs and triacs), Field Effect Transistors (FETs), and<br />

Isolated Gate Bipolar Transistors (IGBTs): The component’s maximum current rating<br />

to be at least two times the dimmer’s/relay’s rated operating current.<br />

C. Capable of withstanding repetitive inrush current of 50 times operating current without<br />

impacting lifetime of dimmer/relay.<br />

D. Design and test dimmers/relays to withstand line-side surges without impairment to<br />

performance.<br />

1. Panels: Withstand surges without impairment of performance when subjected to<br />

surges of 6,000 volts, 3,000 amps per ANSI/IEEE C62.41.<br />

E. Utilize air gap off, activated when user selects “off” at any control to disconnect the<br />

load from line supply.<br />

F. Power failure memory and dimmer/relay recovery:<br />

1. When power is interrupted and subsequently returned, within 3 seconds lights will<br />

automatically return to same levels (dimmed setting, full on, or off) prior to power<br />

interruption.<br />

G. Dimmers:<br />

1. Provide real-time cycle-by-cycle compensation for incoming line voltage variations<br />

including changes in RMS voltage (plus or minus 2 percent change in RMS<br />

voltage/cycle), frequency shifts (plus or minus 2 Hz change in frequency/second),<br />

dynamic harmonics, and line noise.<br />

2. Systems not providing cycle-by-cycle compensation to include external power<br />

conditioning equipment as part of dimming system.<br />

3. Each dimmer to incorporate electronic "soft-start" default at initial turn-on that<br />

smoothly ramps lights up to the appropriate levels within 0.5 seconds.<br />

4. Control all light sources in smooth and continuous manor. Dimmers with visible<br />

steps are not acceptable.<br />

5. Each dimmer to be assigned a load type that will provide a proper dimming curve<br />

for the specific light source.<br />

6. Possess ability to have load types assigned per circuit, configured in field.<br />

7. Minimum and maximum light levels user adjustable on output-by-output basis.<br />

8. Line Voltage Dimmers; Meet following load-specific requirements:<br />

a. Magnetic Low Voltage (MLV) transformer:<br />

1) Contain circuitry designed to control and provide a symmetrical AC<br />

waveform to input of magnetic low voltage transformers per UL 1472,<br />

Section 5.11.<br />

2) Dimmers using unipolar load current devices (such as FETs or SCRs)<br />

to include DC current protection in the event of a single device failure.<br />

CENTRAL DIMMING CONTROLS 26 09 23 - 4/12


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

b. Electronic Low Voltage (ELV) transformer:<br />

1) Dimmer to operate electronic low voltage transformers via reverse<br />

phase control. Alternately, forward phase control dimming may be<br />

used if dimming equipment manufacturer has recommended specific<br />

ELV transformers being provided.<br />

c. Neon and cold cathode transformers:<br />

1) Magnetic transformers: UL listed for use with normal (low) power factor<br />

magnetic transformers.Electronic transformers: Must be supported by<br />

the ballast equipment manufacturer for control of specific ballasts<br />

being provided.<br />

d. Fluorescent electronic dimming ballast: Refer to Section 265113 for dimming<br />

ballast specifications and performance.<br />

9. Low Voltage Dimming Modules; Meet following requirements:<br />

a. Coordination between low voltage dimming module and line voltage relay:<br />

Capable of being electronically linked to single zone.<br />

b. Single low voltage dimming module; capable of controlling following light<br />

sources:<br />

1) 0-10V analog voltage signal.<br />

a) Provide Class 2 isolated 0-10V output signal conforming to IEC<br />

609<strong>29</strong>.<br />

b) Sink current via IEC 609<strong>29</strong>.<br />

c) Source current.<br />

2) 10-0V reverse analog voltage signal.<br />

3) DSI digital communication.<br />

4) DALI broadcast communication IEC 609<strong>29</strong>:<br />

a) Logarithmic intensity values in compliance with IEC 609<strong>29</strong>.<br />

b) Linear intensity values for use with LED color intensity control.<br />

5) PWM IEC 609<strong>29</strong>.<br />

H. Non-dim circuits to meet the following requirements:<br />

1. Rated life of relay at full load: Minimum 1,000,000 cycles.<br />

2. Load switched in manner that prevents arcing at mechanical contacts when power<br />

is applied to and removed from load circuits.<br />

3. Fully rated output continuous duty for inductive, capacitive, and resistive loads.<br />

2.4 POWER PANELS<br />

A. Product: LCP128 Standard Series.<br />

B. Mechanical:<br />

1. Listed to UL 508 as industrial control equipment. CSA certified, or NOM approved<br />

as applicable.<br />

2. Delivered and installed as a UL listed factory assembled panel.<br />

3. Field wiring accessible from front of panel without need to remove dimmer<br />

assemblies or other components.<br />

4. Panels passively cooled via free-convection, unaided by fans or other means.<br />

5. Ship panels with each dimmer in mechanical bypass position by means of jumper<br />

bar inserted between input and load terminals. Jumpers to carry full rated load<br />

current and be reusable at any time. Mechanical bypass device to allow for<br />

CENTRAL DIMMING CONTROLS 26 09 23 - 5/12


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

switching operation of connected load with dimmer removed by means of circuit<br />

breaker.<br />

C. Electrical:<br />

1. Panels contain branch circuit protection for each input circuit unless the panel is a<br />

dedicated feed-through type panel or otherwise indicated on the drawings.<br />

2. Branch circuit breakers; meet following performance requirements:<br />

a. Listed to UL 489 as molded case circuit breaker for use on lighting circuits.<br />

b. Contain visual trip indicator; rated at 10,000 AIC, 120 V Dimming.<br />

c. Thermal-magnetic construction for overload, short-circuit, and overtemperature<br />

protection. Use of breakers without thermal protection requires<br />

dimmers/relays to have integral thermal protection to prevent failures when<br />

overloaded or ambient temperature is above rating of panel.<br />

d. Accept tag-out/lock-out devices to secure circuit breakers in off position<br />

when servicing loads.<br />

e. Replaceable without moving or replacing dimmer/relay assemblies or other<br />

components in panel. UL listed as switch duty (SWD) so that loads can be<br />

switched on and off by breakers.<br />

3. Minimum UL listed Short Circuit Current Rating (SCCR) of 25,000A.<br />

D. Lutron LCP128 Panel:<br />

1. Surface mounted.<br />

2. Utilize multiple load type 16A feed continuous-use UL listed dimming/switching<br />

modules.<br />

3. For switching only circuits, utilize 1,000,000 cycle relay.<br />

4. Utilize multiple load type low voltage dimming module.<br />

E. LCD Panel Processor:<br />

1. Separate password protection for installer and end user system settings.<br />

2. Language selection: English.<br />

3. Integral contact closure inputs.<br />

4. Programming and system operation:<br />

a. Control stations, control interfaces, and contact closure devices:<br />

1) Assign functionality of each control station button, infrared interface,<br />

key switch, or contact closure input:<br />

a) Raise/lower one, some, or all lighting zones<br />

b) Raise/stop/lower one, some, or all motorized zones<br />

c) Toggle one, some, or all lighting zones<br />

d) Select/Toggle scene<br />

e) Raise/Lower scene<br />

f) Enable/Disable time clock<br />

g) Initiate delay to off<br />

2) AV rack mounted interface: Ethernet interface.<br />

3) Contact closure output: Momentary, maintained, or toggle.<br />

b. Time clock<br />

1) Integral astronomical time clock<br />

a) Selectable geographic location (city or latitude/longitude).<br />

b) Selectable time zone.<br />

c) Selectable date and time format.<br />

d) Adjustable starting and ending of daylight savings time.<br />

CENTRAL DIMMING CONTROLS 26 09 23 - 6/12


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

e) Schedule adjustable to add, copy, modify, view, and delete<br />

events.<br />

2) Assign functionality to time clock events:<br />

a) Select global scene<br />

b) Select customized scene<br />

c) Enable/Disable all control stations (keypads)<br />

d) Initiate delay to off<br />

e) Enable/disable after hours mode<br />

c. Emergency Mode<br />

1) Automatic activation of predefined output intensities.<br />

2) Disable control stations and time clock events.<br />

3) Restore previous output intensities, enable control stations, and enable<br />

time clock events after deactivation of emergency mode.<br />

d. After-hours Mode<br />

1) User defined sequence is initiated by a time clock event to<br />

automatically turn specified outputs off:<br />

a) 5 minutes before switching off, system to flash dimmed/switched<br />

outputs 3 times to warn occupants.<br />

b) Shut off sequence can be delayed by button press or occupancy<br />

sensor override for 30 minutes.<br />

c) Repeat shut off sequence after the delay period.<br />

e. Global Scene: Set and recall scene programming for multiple wall station<br />

locations.<br />

f. Overrides:<br />

1) Set output levels to On, Off, 0-100 percent, or Flash<br />

2) Select global scenes<br />

3) Enable/disable time clock<br />

4) Enable/disable all control stations<br />

5) Enable/disable after-hours<br />

F. Diagnostics and Service:<br />

1. Replacing dimmer/relay does not require re-programming of system or processor.<br />

2. Dimmers/relays: Include diagnostic LED’s to verify proper operation and assist in<br />

system troubleshooting.<br />

3. Dimming/relay panels: Include tiered control scheme for dealing with component<br />

failure that minimizes loss of control for occupant.<br />

a. If lighting control system fails, lights to remain at current level. Panel<br />

processor provides local control of lights until system is repaired.<br />

b. If panel processor fails, lights to remain at current level. Circuit breakers can<br />

be used to turn lights off or to full light output, allowing non-dim control of<br />

lights until panel processor is repaired.<br />

c. If dimmer fails, factory-installed mechanical bypass jumpers to allow each<br />

dimmer to be mechanically bypassed. Mechanical bypass device to allow for<br />

switching operation of connected load with dimmer removed by means of<br />

circuit breaker.<br />

CENTRAL DIMMING CONTROLS 26 09 23 - 7/12


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

2.5 POWER INTERFACES<br />

A. Product: PHPM-PA-DV, PHPM-PA-120, PHPM-3F-DV, PHPM-3F-120, PHPM-SW-DV,<br />

NGRX-PB, GRX-FDBI, ELVI-1000, GRX-TVI, GRX-PWM, HP-2, HP-4, HP-6 as<br />

specified.<br />

B. Electrical:<br />

1. Phase independent of control input.<br />

2. Dimmer to meet limited short circuit test as defined in UL 508.<br />

C. Diagnostics and Service: Replacing power interface does not require re-programming<br />

of system or processor.<br />

2.6 LOW-VOLTAGE WALL STATIONS<br />

A. Product: seeTouch, Single Button, Architectural, European, Slim Button, Large Button,<br />

Architrave, Key Switch as specified.<br />

B. Electronics:<br />

1. Use RS485 wiring for low voltage communication.<br />

C. Functionality:<br />

1. Upon button press, LEDs to immediately illuminate.<br />

2. LEDs to reflect the true system status. LEDs to remain illuminated if the button<br />

press was properly processed or the LEDs turn off if the button press was not<br />

processed.<br />

3. Allow for easy reprogramming without replacing unit.<br />

4. Replacement of units does not require reprogramming.<br />

D. Color:<br />

1. Color selected by architect.<br />

2. Visible parts: Exhibit ultraviolet color stability when tested with multiple actinic light<br />

sources as defined in ASTM D4674. Provide proof of testing upon request.<br />

E. Provide faceplates with concealed mounting hardware.<br />

F. Engrave wall stations in English with appropriate button, zone, and scene engraving<br />

descriptions furnished prior to fabrication.<br />

G. Silk-screened borders, logos, and graduations to use graphic process that chemically<br />

bonds graphics to faceplate, resistant to removal by scratching and cleaning.<br />

2.7 LOW VOLTAGE CONTROL INTERFACES<br />

A. Contact Closure Interfaces.<br />

1. The contact closure input device will accept both momentary and maintained<br />

contact closures.<br />

2. The contact closure output device can be configured for maintained or momentary<br />

outputs.<br />

CENTRAL DIMMING CONTROLS 26 09 23 - 8/12


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

B. Contact Closure Input Interface.<br />

1. The contact closure input device will accept both momentary and maintained<br />

contact closures.<br />

C. Contact Closure Output Interface.<br />

1. The contact closure output device can be configured for maintained or momentary<br />

outputs.<br />

D. Ethernet Interfaces.<br />

1. Provide ability to communicate by means of user-supplied PC or digital<br />

audiovisual equipment.<br />

2. Provide access to:<br />

a. Scene selections.<br />

b. Fade dimmed output to a level.<br />

c. Ability to flash output levels.<br />

d. Enable/disable time clock.<br />

e. Enable/disable individual wall station.<br />

f. Simulate wall station button press.<br />

g. Fine tuning of light levels with individual output raise/lower.<br />

h. Setting of time and date.<br />

3. Provide status monitoring through button feedback and scene-status updates.<br />

2.8 SENSORS<br />

A. Ceiling-Mounted Infrared Receiver.<br />

1. Ceiling-Mounted Infrared Receivers have 360 degree reception of wireless<br />

infrared remote controls.<br />

B. Exterior Daylight Sensors:<br />

1. Calibrated with independent turn-on and turn-off thresholds; minimum 2 footcandles<br />

difference between the turn-on and turn-off thresholds.<br />

2. Enclosed in weatherproof housing with shading and lens protection visor.<br />

C. Infrared Partition Sensor.<br />

1. Provide contact closure based on status of sensor.<br />

D. Ceiling and Wall Mount Occupancy/Vacancy Sensors<br />

1. Sensing mechanism:<br />

a. Infrared: Utilize multiple segmented lens, with internal grooves to eliminate<br />

dust and residue build-up.<br />

b. Ultrasonic: Utilize an operating frequency of 32kHz or 40kHz that shall be<br />

crystal controlled to operate within plus or minus 0.005 percent tolerance.<br />

c. Dual technology:<br />

1) Utilize multiple segmented lens, with internal grooves to eliminate dust<br />

and residue build-up.<br />

2) Utilize an operating frequency of 32kHz or 40kHz that shall be crystal<br />

controlled to operate within plus or minus 0.005 percent tolerance.<br />

2. Sensors shall turn off or reduce lighting automatically after reasonable time delay<br />

when a room or area is vacated by the last person to occupy the space<br />

CENTRAL DIMMING CONTROLS 26 09 23 - 9/12


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

3. Sensor shall accommodate all conditions of space utilization and all irregular work<br />

hours and habits.<br />

4. Sensors shall be UL listed (as appropriate)<br />

5. Sensors shall be fully adaptive and adjust their sensitivity and timing to ensure<br />

optimal lighting control for any use of the space<br />

6. Sensors shall have field adjustable controls for time delay and sensitivity to<br />

override any adaptive features.<br />

7. Power failure memory:<br />

a. Controls incorporate non-volatile memory. Should power be interrupted and<br />

subsequently restored, settings and learned parameters saved in protected<br />

memory shall not be lost.<br />

8. Provide all necessary mounting hardware and instructions.<br />

9. Sensors shall be Class 2 devices.<br />

10. Indicate viewing directions on mounting bracket for all Ceiling mount sensors.<br />

11. Provide customizable mask to block off unwanted viewing areas for all ceiling<br />

mounted sensors using infrared technology.<br />

12. Provide swivel mount base for all wall mount sensors.<br />

13. Provide an internal additional isolated relay with Normally Open, Normally Closed<br />

and Common outputs for use with HVAC control, Data Logging and other control<br />

options.<br />

E. Sensor Power Packs<br />

1. For ease of mounting, installation and future service, power pack(s) shall be able<br />

to mount through a 1/2" knock-out in a standard electrical enclosure and be an<br />

integrated, self-contained unit consisting internally of an isolated load switching<br />

control relay and a transformer to provide low-voltage power. Transformer shall<br />

provide power to a minimum of three (3) sensors.<br />

2. Power pack shall be plenum rated<br />

3. Control wiring between sensors and control units shall be Class 2, 18-24 AWG,<br />

stranded U.L. Classified, PVC insulated or TEFLON jacketed cable suitable for<br />

use in plenums, where applicable<br />

2.9 ACCESSORIES<br />

A. Tamper Proof Covers:<br />

1. Locking covers for preset control units and wall stations: Reversible to allow lock<br />

to be located on either side of control.<br />

2. Compatible with IR controls.<br />

3. Does not reduce specified IR range by more than 50 percent of its original<br />

specification.<br />

B. Infrared Transmitters:<br />

1. Provide wireless remote control.<br />

2. Designed for use in conjunction with compatible infrared receiver and lighting<br />

control; compatibility dependent on that receiver, not transmitter.<br />

3. Operate up to 15 meters (50 feet) within line-of-sight to that receiver.<br />

4. “Learnable” by other variable frequency remote controls.<br />

CENTRAL DIMMING CONTROLS 26 09 23 - 10/12


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

2.10 SOURCE QUALITY CONTROL<br />

A. Perform full-function testing on 100 percent of all system components and panel<br />

assemblies at the factory.<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION<br />

A. Install equipment in accordance with manufacturer’s installation instructions.<br />

B. Provide complete installation of system in accordance with Contract Documents.<br />

C. Define each dimmer's/relay’s load type, assign each load to a zone, and set control<br />

functions.<br />

D. Provide equipment at locations and in quantities indicated on drawings. Provide any<br />

additional equipment required to provide control intent.<br />

E. Mount daylight sensors to point due north with constant view of daylight.<br />

3.2 SERVICE AND SUPPORT<br />

A. Startup and Programming<br />

1. Provide telephone startup assistance to Electrical Contractor or End User<br />

Representative (when available, in accordance with manufacturer’s guidelines.<br />

Otherwise, onsite startup will be utilized.)<br />

a. Provides access to a Factory Certified Telephone Startup Technician<br />

during normal business hours.<br />

b. Provides telephone instruction and guidance for a complete system<br />

functional test.<br />

c. With phone startup completion and End User Registration, the 1-year<br />

parts-only warranty will be upgraded to the Standard 2-year Warranty.<br />

END OF SECTION 26 09 33<br />

CENTRAL DIMMING CONTROLS 26 09 23 - 11/12


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

This page intentionally left blank.<br />

CENTRAL DIMMING CONTROLS 26 09 23 - 12/12


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

SECTION 26 24 16 - PANELBOARDS<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. This Section includes distribution panelboards and lighting and appliance branch-circuit<br />

panelboards.<br />

1.2 SUBMITTALS<br />

A. Product Data: For each type of panelboard, overcurrent protective device, accessory,<br />

and component indicated. Include dimensions and manufacturers' technical data on<br />

features, performance, electrical characteristics, ratings, and finishes.<br />

B. Shop Drawings: For each panelboard and related equipment.<br />

1. Dimensioned plans, elevations, sections, and details. Show tabulations of<br />

installed devices, equipment features, and ratings. Include the following:<br />

a. Enclosure types and details for types other than NEMA 250, Type 1.<br />

b. Bus configuration, current, and voltage ratings.<br />

c. Short-circuit current rating of panelboards and overcurrent protective<br />

devices.<br />

d. UL listing for series rating of installed devices.<br />

e. Features, characteristics, ratings, and factory settings of individual<br />

overcurrent protective devices and auxiliary components.<br />

2. Wiring Diagrams: Power, signal, and control wiring.<br />

3. Field quality-control test reports.<br />

4. Operation and maintenance data.<br />

1.3 QUALITY ASSURANCE<br />

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in<br />

NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction,<br />

and marked for intended use.<br />

B. Comply with NEMA PB 1.<br />

C. Comply with NFPA 70.<br />

PANELBOARDS 26 24 16 - 1/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

PART 2 - PRODUCTS<br />

2.1 MANUFACTURERS<br />

Subject to compliance with requirements, manufacturers offering products that may be<br />

incorporated into the Work include, but are not limited to, the following:<br />

1. Panelboards, Overcurrent Protective Devices, Controllers, Contactors, and<br />

Accessories:<br />

a. Eaton Corporation; Cutler-Hammer Products<br />

b. Siemens Energy & Automation, Inc<br />

c. Square D<br />

d. General Electric<br />

2.2 MANUFACTURED UNITS<br />

A. Enclosures: Flush- and surface-mounted cabinets. NEMA PB 1, Type 1.<br />

1. Rated for environmental conditions at installed location.<br />

a. Outdoor Locations: NEMA 250, Type 3R.<br />

b. Other Wet or Damp Indoor Locations: NEMA 250, Type 3R.<br />

c. Hazardous Areas Indicated on Drawings: NEMA 250, Type 7C.<br />

2. Front: Secured to box with concealed trim clamps. For surface-mounted fronts,<br />

match box dimensions; for flush-mounted fronts, overlap box.<br />

3. Hinged Front Cover: Entire front trim hinged to box and with standard door within<br />

hinged trim cover.<br />

B. Phase and Ground Buses: Tin-plated Copper or Aluminum.<br />

C. Conductor Connectors: Suitable for use with conductor material.<br />

1. Ground Lugs and Bus Configured Terminators: Compression type.<br />

D. Service Equipment Label: UL labeled for use as service equipment for panelboards<br />

with main service disconnect switches.<br />

E. Future Devices: Mounting brackets, bus connections, and necessary appurtenances<br />

required for future installation of devices.<br />

F. Panelboard Short-Circuit Rating:<br />

1. UL label indicating series-connected rating with integral or remote upstream<br />

overcurrent protective devices. Include size and type of upstream device<br />

allowable, branch devices allowable, and UL series-connected short-circuit<br />

rating.<br />

2. Fully rated to interrupt symmetrical short-circuit current available at terminals.<br />

PANELBOARDS 26 24 16 - 2/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

2.3 LIGHTING AND APPLIANCE BRANCH-CIRCUIT PANELBOARDS<br />

A. Branch Overcurrent Protective Devices: Bolt-on circuit breakers, replaceable without<br />

disturbing adjacent units.<br />

B. Doors: Concealed hinges; secured with flush latch with tumbler lock; keyed alike.<br />

2.4 OVERCURRENT PROTECTIVE DEVICES<br />

A. Molded-Case Circuit Breaker: UL 489, with interrupting capacity to meet available fault<br />

currents.<br />

1. Thermal-Magnetic Circuit Breakers: Inverse time-current element for low-level<br />

overloads, and instantaneous magnetic trip element for short circuits. Adjustable<br />

magnetic trip setting for circuit-breaker frame sizes 250 A and larger.<br />

2. GFCI Circuit Breakers: Single- and two-pole configurations with 30-mA trip<br />

sensitivity.<br />

3. Molded-Case Circuit-Breaker Features and Accessories: Standard frame sizes,<br />

trip ratings, and number of poles.<br />

a. Lugs: Mechanical style, suitable for number, size, trip ratings, and<br />

conductor materials.<br />

b. Application Listing: Appropriate for application; Type SWD for switching<br />

fluorescent lighting loads; Type HID for switching high intensity discharge<br />

lighting loads; Type HACR for heating, air-conditioning, and refrigerating<br />

equipment.<br />

c. Shunt Trip: 120-V trip coil energized from separate circuit.<br />

2.5 ACCESSORY COMPONENTS AND FEATURES<br />

A. Furnish accessory set including tools and miscellaneous items required for overcurrent<br />

protective device test, inspection, maintenance, and operation.<br />

B. Furnish portable test set to test functions of solid-state trip devices without removal<br />

from panelboard.<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION<br />

A. Install panelboards and accessories according to NEMA PB 1.1.<br />

B. Comply with mounting and anchoring requirements specified in Division 26 Section<br />

"Electrical Supports."<br />

C. Mount top of trim 74 inches (1880 mm) above finished floor, unless otherwise<br />

indicated.<br />

PANELBOARDS 26 24 16 - 3/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

D. Mount plumb and rigid without distortion of box. Mount recessed panelboards with<br />

fronts uniformly flush with wall finish.<br />

E. Install overcurrent protective devices and controllers.<br />

1. Set field-adjustable switches and circuit-breaker trip ranges.<br />

F. Install filler plates in unused spaces.<br />

G. Stub four 1-inch (27-GRC) empty conduits from panelboard into accessible ceiling<br />

space or space designated to be ceiling space in the future. Stub four 1-inch (27-GRC)<br />

empty conduits out below slab to exterior and cap both ends.<br />

H. Identify field-installed conductors, interconnecting wiring, and components; provide<br />

warning signs as specified in Division 26 Section "Electrical Identification."<br />

I. Panelboard Nameplates: Label each panelboard with engraved metal or laminatedplastic<br />

nameplate mounted with corrosion-resistant screws.<br />

J. Ground equipment according to Division 26 Section "Grounding and Bonding."<br />

K. Connect wiring according to Division 26 Section "Conductors and Cables."<br />

3.2 FIELD QUALITY CONTROL<br />

A. Prepare for acceptance tests as follows:<br />

1. Test insulation resistance for each panelboard bus, component, connecting<br />

supply, feeder, and control circuit.<br />

2. Test continuity of each circuit.<br />

B. Perform the following field tests and inspections and prepare test reports:<br />

1. Perform each electrical test and visual and mechanical inspection stated in<br />

NETA ATS, Section 7.5 for switches and Section 7.6 for molded-case circuit<br />

breakers. Certify compliance with test parameters.<br />

2. Correct malfunctioning units on-site, where possible, and retest to demonstrate<br />

compliance; otherwise, replace with new units and retest.<br />

END OF SECTION 26 24 16<br />

PANELBOARDS 26 24 16 - 4/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

SECTION 26 27 26 - WIRING DEVICES<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. This Section includes the following:<br />

1. Single and duplex receptacles, ground-fault circuit interrupters, and integral<br />

surge suppression units.<br />

2. Single- and double-pole snap switches and dimmer switches.<br />

3. Device wall plates.<br />

1.2 SUBMITTALS<br />

A. Product Data: For each type of product indicated.<br />

B. Shop Drawings: List of legends and description of materials and process used for<br />

premarking wall plates.<br />

C. Samples: One for each type of device and wall plate specified, in each color specified.<br />

D. Field quality-control test reports.<br />

1.3 QUALITY ASSURANCE<br />

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in<br />

NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction,<br />

and marked for intended use.<br />

B. Comply with NFPA 70.<br />

PART 2 - PRODUCTS<br />

2.1 MANUFACTURERS<br />

Subject to compliance with requirements, manufacturers offering products that may be<br />

incorporated into the Work include, but are not limited to, the following:<br />

1. Wiring Devices:<br />

a. Bryant Electric, Inc./Hubbell Subsidiary.<br />

b. Hubbell Incorporated; Wiring Device-Kellems.<br />

c. Leviton Mfg. Company Inc.<br />

d. Pass & Seymour/Legrand; Wiring Devices Div.<br />

WIRING DEVICES 26 27 26 - 1/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

2. Multioutlet Assemblies:<br />

a. Hubbell Incorporated; Wiring Device-Kellems.<br />

b. Wiremold Company (The).<br />

2.2 RECEPTACLES<br />

A. Straight-Blade-Type Receptacles: Comply with NEMA WD 1, NEMA WD 6, DSCC W-<br />

C-596G, and UL 498.<br />

B. Straight-Blade and Locking Receptacles: Heavy-Duty grade.<br />

C. Straight-Blade Receptacles: Hospital grade.<br />

D. GFCI Receptacles: Straight blade, feed-through type, Heavy-Duty grade, with integral<br />

NEMA WD 6, Configuration 5-20R duplex receptacle; complying with UL 498 and<br />

UL 943. Design units for installation in a 2-3/4-inch- (70-mm-) deep outlet box without<br />

an adapter.<br />

2.3 PENDANT CORD/CONNECTOR DEVICES<br />

A. Description: Matching, locking-type plug and receptacle body connector, NEMA WD 6,<br />

Configurations L5-20P and L5-20R, Heavy-Duty grade.<br />

1. Body: Nylon with screw-open cable-gripping jaws and provision for attaching<br />

external cable grip.<br />

2. External Cable Grip: Woven wire-mesh type made of high-strength galvanizedsteel<br />

wire strand, matched to cable diameter, and with attachment provision<br />

designed for corresponding connector.<br />

2.4 SWITCHES<br />

A. Single- and Double-Pole Switches: Comply with DSCC W-C-896F and UL 20.<br />

B. Snap Switches: Heavy-Duty grade, quiet type.<br />

C. Combination Switch and Receptacle: Both devices in a single gang unit with plaster<br />

ears and removable tab connector that permit separate or common feed connection.<br />

1. Switch: 20 A, 120/277-V ac.<br />

2. Receptacle: NEMA WD 6, Configuration 5-20R.<br />

D. Dimmer Switches: Modular, full-wave, solid-state units with integral, quiet on/off<br />

switches and audible frequency and EMI/RFI filters.<br />

1. Control: Continuously adjustable slider; with single-pole or three-way switching<br />

to suit connections.<br />

2. Incandescent Lamp Dimmers: Modular, 120 V, 60 Hz with continuously<br />

adjustable rotary knob, toggle switch, or slider; single pole with soft tap or other<br />

WIRING DEVICES 26 27 26 - 2/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

quiet switch; EMI/RFI filter to eliminate interference; and 5-inch (130-mm) wire<br />

connecting leads.<br />

3. Fluorescent Lamp Dimmer Switches: Modular; compatible with dimmer ballasts;<br />

trim potentiometer to adjust low-end dimming; dimmer-ballast combination<br />

capable of consistent dimming with low end not greater than 20 percent of full<br />

brightness.<br />

2.5 WALL PLATES<br />

A. Single and combination types to match corresponding wiring devices.<br />

1. Plate-Securing Screws: Metal with head color to match plate finish.<br />

2. Material for Finished Spaces: Smooth Metal 302/304 stainless steel with satin<br />

finish.<br />

3. Material for Unfinished Spaces (not exposed to view): Galvanized steel.<br />

4. Material for Wet Locations: Cast aluminum with spring-loaded lift cover, and<br />

listed and labeled for use in "wet locations."<br />

2.6 FINISHES<br />

A. Color:<br />

1. Wiring Devices: Selected by Architect.<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION<br />

A. Install devices and assemblies level, plumb, and square with building lines.<br />

B. Install wall dimmers to achieve indicated rating after derating for ganging.<br />

C. Install unshared neutral conductors on line and load side of dimmers.<br />

D. Arrangement of Devices: Unless otherwise indicated, mount flush, with long dimension<br />

vertical, and with grounding terminal of receptacles on top. Group adjacent switches<br />

under single, multigang wall plates.<br />

E. Remove wall plates and protect devices and assemblies during painting.<br />

3.2 IDENTIFICATION<br />

A. Comply with Division 26 Section "Electrical Identification."<br />

WIRING DEVICES 26 27 26 - 3/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

3.3 CONNECTIONS<br />

A. Ground equipment according to Division 26 Section "Grounding and Bonding."<br />

B. Connect wiring according to Division 26 Section "Conductors and Cables."<br />

3.4 FIELD QUALITY CONTROL<br />

A. Perform the following field tests and inspections and prepare test reports:<br />

1. After installing wiring devices and after electrical circuitry has been energized,<br />

test every outlet for proper polarity, ground continuity, and compliance with<br />

requirements.<br />

2. Test GFCI operation with both local and remote fault simulations according to<br />

manufacturer's written instructions.<br />

B. Remove malfunctioning units, replace with new units, and retest as specified above.<br />

END OF SECTION 26 27 26<br />

WIRING DEVICES 26 27 26 - 4/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

SECTION 26 28 16 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. This Section includes the following individually mounted, enclosed switches and circuit<br />

breakers:<br />

1. Fusible switches.<br />

2. Nonfusible switches.<br />

3. Molded-case circuit breakers.<br />

4. Enclosures.<br />

1.2 SUBMITTALS<br />

A. Product Data: For each type of enclosed switch, circuit breaker, accessory, and<br />

component indicated.<br />

B. Shop Drawings: Diagram power, signal, and control wiring.<br />

C. Field quality-control test reports.<br />

D. Operation and maintenance data.<br />

1.3 QUALITY ASSURANCE<br />

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in<br />

NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction,<br />

and marked for intended use.<br />

B. Comply with NFPA 70.<br />

PART 2 - PRODUCTS<br />

2.1 MANUFACTURERS<br />

A. In other Part 2 articles where titles below introduce lists, the following requirements<br />

apply to product selection:<br />

Available Manufacturers: Subject to compliance with requirements, manufacturers<br />

offering products that may be incorporated into the Work include, but are not limited to,<br />

the manufacturers specified.<br />

ENCLOSED SWITCHES AND CIRCUIT BREAKERS 26 28 16 - 1/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

2.2 FUSIBLE AND NONFUSIBLE SWITCHES<br />

A. Manufacturers:<br />

1. Eaton Corporation; Cutler-Hammer Products<br />

2. Siemens Energy & Automation, Inc.<br />

3. Square D/Group Schneider<br />

4. General Electric<br />

B. Fusible Switch, 600 A and Smaller: NEMA KS 1, Type HD, with clips or bolt pads to<br />

accommodate specified fuses, lockable handle with capability to accept two padlocks,<br />

and interlocked with cover in closed position.<br />

C. Nonfusible Switch, 600 A and Smaller: NEMA KS 1, Type HD, lockable handle with<br />

capability to accept two padlocks, and interlocked with cover in closed position.<br />

D. Accessories:<br />

1. Equipment Ground Kit: Internally mounted and labeled for copper and aluminum<br />

ground conductors.<br />

2. Neutral Kit: Internally mounted; insulated, capable of being grounded, and<br />

bonded; and labeled for copper and aluminum neutral conductors.<br />

3. Auxiliary Contact Kit: Auxiliary set of contacts arranged to open before switch<br />

blades open.<br />

2.3 MOLDED-CASE CIRCUIT BREAKERS AND SWITCHES<br />

A. Manufacturers:<br />

1. Eaton Corporation; Cutler-Hammer Products<br />

2. Siemens Energy & Automation, Inc.<br />

3. Square D/Group Schneider<br />

4. General Electric<br />

B. Molded-Case Circuit Breaker: NEMA AB 1, with interrupting capacity to meet available<br />

fault currents.<br />

1. Thermal-Magnetic Circuit Breakers: Inverse time-current element for low-level<br />

overloads and instantaneous magnetic trip element for short circuits. Adjustable<br />

magnetic trip setting for circuit-breaker frame sizes 250 A and larger.<br />

2. Adjustable Instantaneous-Trip Circuit Breakers: Magnetic trip element with frontmounted,<br />

field-adjustable trip setting.<br />

3. Current-Limiting Circuit Breakers: Frame sizes 400 A and smaller and letthrough<br />

ratings less than NEMA FU 1, RK-5.<br />

4. GFCI Circuit Breakers: Single- and two-pole configurations with 5-mA trip<br />

sensitivity.<br />

C. Molded-Case Circuit-Breaker Features and Accessories:<br />

1. Standard frame sizes, trip ratings, and number of poles.<br />

ENCLOSED SWITCHES AND CIRCUIT BREAKERS 26 28 16 - 2/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

2. Lugs: Mechanical style suitable for number, size, trip ratings, and conductor<br />

material.<br />

3. Application Listing: Type SWD for switching fluorescent lighting loads;<br />

Type HACR for heating, air-conditioning, and refrigerating equipment.<br />

4. Ground-Fault Protection: Integrally mounted relay and trip unit with adjustable<br />

pickup and time-delay settings, push-to-test feature, and ground-fault indicator.<br />

5. Shunt Trip: 120-V trip coil energized from separate circuit, set to trip at 55<br />

percent of rated voltage.<br />

2.4 ENCLOSURES<br />

A. NEMA AB 1 and NEMA KS 1 to meet environmental conditions of installed location.<br />

1. Outdoor Locations: NEMA 250, Type 3R.<br />

2. Kitchen and Pool Areas: NEMA 250, Type 4X.<br />

3. Other Wet or Damp Indoor Locations: NEMA 250, Type 4.<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION<br />

A. Comply with applicable portions of NECA 1, NEMA PB 1.1, and NEMA PB 2.1 for<br />

installation of enclosed switches and circuit breakers.<br />

B. Mount individual wall-mounting switches and circuit breakers with tops at uniform<br />

height, unless otherwise indicated.<br />

C. Comply with mounting and anchoring requirements specified in Division 26 Section<br />

"Electrical Supports."<br />

D. Identify field-installed conductors, interconnecting wiring, and components; provide<br />

warning signs as specified in Division 26 Section "Electrical Identification."<br />

3.2 FIELD QUALITY CONTROL<br />

A. Prepare for acceptance testing as follows:<br />

1. Inspect mechanical and electrical connections.<br />

2. Verify switch and relay type and labeling verification.<br />

3. Verify rating of installed fuses.<br />

B. Perform the following field tests and inspections and prepare test reports:<br />

1. Perform each electrical test and visual and mechanical inspection stated in<br />

NETA ATS, Section 7.5 for switches and Section 7.6 for molded-case circuit<br />

breakers. Certify compliance with test parameters.<br />

ENCLOSED SWITCHES AND CIRCUIT BREAKERS 26 28 16 - 3/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

2. Correct malfunctioning units on-site, where possible, and retest to demonstrate<br />

compliance; otherwise, replace with new units and retest.<br />

END OF SECTION 26 28 16<br />

ENCLOSED SWITCHES AND CIRCUIT BREAKERS 26 28 16 - 4/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

SECTION 26 43 13 - TRANSIENT VOLTAGE SUPPRESSION FOR LOW-VOLTAGE<br />

ELECTRICAL POWER CIRCUITS<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. This Section includes TVSSs for low-voltage power equipment.<br />

1.2 SUBMITTALS<br />

A. Product Data: For each type of product indicated. Include rated capacities, operating<br />

weights, operating characteristics, furnished specialties, and accessories.<br />

B. Field quality-control test reports.<br />

C. Operation and Maintenance Data.<br />

1.3 QUALITY ASSURANCE<br />

A. Source Limitations: Obtain suppression devices and accessories through one source<br />

from a single manufacturer.<br />

B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in<br />

NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction,<br />

and marked for intended use.<br />

C. Comply with IEEE C62.41, "IEEE Guide for Surge Voltages in Low Voltage AC Power<br />

Circuits," and test devices according to IEEE C62.45, "IEEE Guide on Surge Testing<br />

for Equipment Connected to Low-Voltage AC Power Circuits."<br />

D. Comply with NEMA LS 1, "Low Voltage Surge Protection Devices."<br />

E. Comply with UL 1283, "Electromagnetic Interference Filters," and UL 1449, "Transient<br />

Voltage Surge Suppressors."<br />

1.4 <strong>PROJECT</strong> CONDITIONS<br />

A. Service Conditions: Rate surge protection devices for continuous operation under the<br />

following conditions, unless otherwise indicated:<br />

1. Maximum Continuous Operating Voltage: Not less than 115 percent of nominal<br />

system operating voltage.<br />

2. Operating Temperature: 30 to 120 deg F (0 to 50 deg C) .<br />

3. Humidity: 0 to 85 percent, noncondensing.<br />

4. Altitude: Less than 20,000 feet (6090 m) above sea level.<br />

TRANSIENT VOLTAGE SUPPRESSION 26 43 13 - 1/4<br />

FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

PART 2 - PRODUCTS<br />

2.1 MANUFACTURERS<br />

Subject to compliance with requirements, provide products by one of the following:<br />

1. Advanced Protection Technologies, Inc.<br />

2. Cutler-Hammer, Inc.; Eaton Corporation.<br />

3. Intermatic, Inc.<br />

4. Liebert Corporation; a division of Emerson.<br />

5. Siemens Energy & Automation, Inc.<br />

6. Square D; Schneider Electric.<br />

7. Surge Suppression Incorporated.<br />

2.2 SERVICE ENTRANCE SUPPRESSORS<br />

A. Surge Protection Device Description: Non-modular, sine-wave-tracking type with the<br />

following features and accessories:<br />

1. LED indicator lights for power and protection status.<br />

2. Audible alarm, with silencing switch, to indicate when protection has failed.<br />

3. Fuses, rated at 200-kA interrupting capacity.<br />

4. Integral disconnect switch.<br />

5. Redundant suppression circuits.<br />

6. Surge-event operations counter.<br />

B. Peak Single-Impulse Surge Current Rating: 160 kA per phase.<br />

C. Connection Means: Permanently wired.<br />

D. Protection modes and UL 1449 suppressed voltage rating for grounded wye circuits<br />

with voltages of 480Y/277 or 208Y/120, 3-phase, 4-wire circuits shall be as follows:<br />

1. Line to Neutral: 800 V for 480Y/277 or 400 V for 208Y/120.<br />

2. Line to Ground: 800 V for 480Y/277 or 400 V for 208Y/120.<br />

3. Neutral to Ground: 800 V for 480Y/277 or 400 V for 208Y/120.<br />

2.3 PANELBOARD SUPPRESSORS<br />

A. Surge Protection Device Description: Non-modular, sine-wave-tracking type with the<br />

following features and accessories:<br />

1. LED indicator lights for power and protection status.<br />

2. Audible alarm, with silencing switch, to indicate when protection has failed.<br />

3. Fuses, rated at 200-kA interrupting capacity.<br />

4. Integral disconnect switch.<br />

5. Redundant suppression circuits.<br />

6. Surge-event operations counter.<br />

TRANSIENT VOLTAGE SUPPRESSION 26 43 13 - 2/4<br />

FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

B. Peak Single-Impulse Surge Current Rating: 80 kA per phase.<br />

C. Protection modes and UL 1449 suppressed voltage rating for grounded wye circuits<br />

with voltages of 480Y/277 or 208Y/120, 3-phase, 4-wire circuits shall be as follows:<br />

1. Line to Neutral: 800 V for 480Y/277 or 400 V for 208Y/120.<br />

2. Line to Ground: 800 V for 480Y/277 or 400 V for 208Y/120.<br />

3. Neutral to Ground: 800 V for 480Y/277 or 400 V for 208Y/120.<br />

2.4 ENCLOSURES<br />

A. NEMA 250, with type matching the enclosure of panel or device being protected.<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION OF SURGE PROTECTION DEVICES<br />

A. Install devices at service entrance on load side, with ground lead bonded to service<br />

entrance ground.<br />

B. Install devices for panelboard and auxiliary panels with conductors or buses between<br />

suppressor and points of attachment as short and straight as possible. Do not exceed<br />

manufacturer's recommended lead length. Do not bond neutral and ground.<br />

1. Provide multipole, 30-A circuit breaker as a dedicated disconnect for suppressor,<br />

unless otherwise indicated.<br />

3.2 PLACING SYSTEM INTO SERVICE<br />

A. Do not energize or connect service entrance equipment or panelboards to their<br />

sources until surge protection devices are installed and connected.<br />

3.3 FIELD QUALITY CONTROL<br />

A. Testing: Engage a qualified independent testing and inspecting agency to perform field<br />

tests and inspections and prepare test reports:<br />

B. Testing: Perform the following field tests and inspections and prepare test reports:<br />

1. Complete startup checks according to manufacturer's written instructions.<br />

2. Perform each visual and mechanical inspection and electrical test stated in NETA<br />

ATS, "Surge Arresters, Low-Voltage Surge Protection Devices" Section. Certify<br />

compliance with test parameters.<br />

END OF SECTION 26 43 13<br />

TRANSIENT VOLTAGE SUPPRESSION 26 43 13 - 3/4<br />

FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

This page intentionally left blank.<br />

TRANSIENT VOLTAGE SUPPRESSION 26 43 13 - 4/4<br />

FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

SECTION 26 51 00 - INTERIOR LIGHTING<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. This Section includes the following:<br />

1. Interior lighting fixtures, lamps, and ballasts.<br />

2. Emergency lighting units.<br />

3. Exit signs.<br />

4. Lighting fixture supports.<br />

B. See Division 13 Section "Lighting Controls" for manual or programmable control<br />

systems employing low-voltage control wiring or data communication circuits.<br />

C. See Division 16 Section "Wiring Devices" for manual wall-box dimmers for<br />

incandescent lamps.<br />

D. See Division 16 Section "Central Dimming Controls" for automatic control of lighting,<br />

including time switches, photoelectric relays, occupancy sensors, and multipole<br />

lighting relays and contactors.<br />

1.2 SUBMITTALS<br />

A. Product Data: For each type of lighting fixture, arranged in order of fixture<br />

designation. Include data on features, accessories, finishes.<br />

B. Shop Drawings: Show details of nonstandard or custom lighting fixtures. Indicate<br />

dimensions, weights, methods of field assembly, components, features, and<br />

accessories.<br />

C. Product Certificates: For each type of ballast for bi-level and dimmer-controlled<br />

fixtures, signed by product manufacturer.<br />

D. Field quality-control test reports.<br />

1.3 QUALITY ASSURANCE<br />

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in<br />

NFPA 70, Article 100, by a testing agency acceptable to authorities having<br />

jurisdiction, and marked for intended use.<br />

B. Comply with NFPA 70.<br />

INTERIOR LIGHTING 26 51 00 - 1/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

PART 2 – PRODUCTS<br />

2.1 MANUFACTURERS<br />

A. In Interior Lighting Fixture Schedule where titles below are column or row headings<br />

that introduce lists, the following requirements apply to product selection:<br />

1. Available Manufacturers: Subject to compliance with requirements,<br />

manufacturers offering products that may be incorporated into the Work<br />

include, but are not limited to, manufacturers specified.<br />

2. Manufacturers: Subject to compliance with requirements, provide products by<br />

one of the manufacturers specified.<br />

3. Basis-of-Design Product: The design for each lighting fixture is based on the<br />

product named. Subject to compliance with requirements, provide either the<br />

named product or a comparable product by one of the other manufacturers<br />

specified.<br />

2.2 LIGHTING FIXTURES AND COMPONENTS, GENERAL REQUIREMENTS<br />

A. Recessed Fixtures: Comply with NEMA LE 4 for ceiling compatibility for recessed<br />

fixtures.<br />

B. Fluorescent Fixtures: Comply with UL 1598. Where LER is specified, test according<br />

to NEMA LE 5 and NEMA LE 5A as applicable.<br />

C. Metal Parts: Free of burrs and sharp corners and edges.<br />

D. Sheet Metal Components: Steel, unless otherwise indicated. Form and support to<br />

prevent warping and sagging.<br />

E. Doors, Frames, and Other Internal Access: Smooth operating, free of light leakage<br />

under operating conditions, and designed to permit relamping without use of tools.<br />

Designed to prevent doors, frames, lenses, diffusers, and other components from<br />

falling accidentally during relamping and when secured in operating position.<br />

F. Reflecting surfaces shall have minimum reflectance as follows, unless otherwise<br />

indicated:<br />

1. White Surfaces: 85 percent.<br />

2. Specular Surfaces: 83 percent.<br />

3. Diffusing Specular Surfaces: 75 percent.<br />

4. Laminated Silver Metallized Film: 90 percent.<br />

INTERIOR LIGHTING 26 51 00 - 2/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

G. Plastic Diffusers, Covers, and Globes:<br />

1. Acrylic Lighting Diffusers: 100 percent virgin acrylic plastic. High resistance to<br />

yellowing and other changes due to aging, exposure to heat, and UV radiation.<br />

a. Lens Thickness: At least 0.125 inch minimum unless different thickness is<br />

indicated.<br />

b. UV stabilized.<br />

2.3 BALLASTS<br />

A. Electronic Ballasts for Linear Fluorescent Lamps: Comply with ANSI C82.11;<br />

programmed rapid-start type, unless otherwise indicated, and designed for type and<br />

quantity of lamps served. Ballasts shall be designed for full light output unless<br />

dimmer or bi-level control is indicated.<br />

1. Sound Rating: A.<br />

2. Total Harmonic Distortion Rating: Less than 10 percent.<br />

3. Transient Voltage Protection: IEEE C62.41, Category A or better.<br />

4. Operating Frequency: 20 kHz or higher.<br />

5. Lamp Current Crest Factor: 1.7 or less.<br />

6. BF: 0.85 or higher.<br />

7. Power Factor: 0.95 or higher.<br />

B. Ballasts for Dimmer-Controlled Lighting Fixtures with Linear Fluorescent Lamps:<br />

Electronic type.<br />

1. Dimming Range: 100 to 5 percent of rated lamp lumens.<br />

2. Ballast Input Watts: Can be reduced to 20 percent of normal.<br />

3. Compatibility: Certified by manufacturer for use with specific dimming control<br />

system and lamp type indicated.<br />

C. Ballasts for Compact Fluorescent Lamps: Electronic programmed rapid-start type,<br />

complying with ANSI C 82.12, designed for type and quantity of lamps indicated.<br />

Ballast shall be designed for full light output unless dimmer or bi-level control is<br />

indicated:<br />

1. Lamp end-of-life detection and shutdown circuit.<br />

2. Automatic lamp starting after lamp replacement.<br />

3. Sound Rating: A.<br />

INTERIOR LIGHTING 26 51 00 - 3/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

4. Total Harmonic Distortion Rating: Less than 20 percent.<br />

5. Transient Voltage Protection: IEEE C62.41, Category A or better.<br />

6. Operating Frequency: 20 kHz or higher.<br />

7. Lamp Current Crest Factor: 1.7 or less.<br />

8. BF: 0.95 or higher, unless otherwise indicated.<br />

9. Power Factor: 0.95 or higher.<br />

10. Interference: Comply with 47 CFR, Chapter 1, Part 18, Subpart C, for<br />

limitations on electromagnetic and radio-frequency interference for<br />

nonconsumer equipment.<br />

11. Ballast Case Temperature: 75 deg C, maximum.<br />

D. Ballasts for Dimmer-Controlled Lighting Fixtures with Compact Fluorescent Lamps:<br />

Electronic type.<br />

1. Dimming Range: 100 to 5 percent of rated lamp lumens.<br />

2. Ballast Input Watts: Can be reduced to 20 percent of normal.<br />

3. Compatibility: Certified by manufacturer for use with specific dimming control<br />

system and lamp type indicated.<br />

E. Internal-Type Emergency Fluorescent Power Unit: Self-contained, modular, batteryinverter<br />

unit, factory mounted within lighting fixture body and compatible with ballast.<br />

Comply with UL 924.<br />

1. Emergency Connection: Operate 1 fluorescent lamp continuously at an output<br />

of 1100 lumens. Connect unswitched circuit to battery-inverter unit and<br />

switched circuit to fixture ballast.<br />

2. Test Push Button and Indicator Light: Visible and accessible without opening<br />

fixture or entering ceiling space.<br />

a. Push Button: Push-to-test type, in unit housing, simulates loss of normal<br />

power and demonstrates unit operability.<br />

b. Indicator Light: LED indicates normal power on. Normal glow indicates<br />

trickle charge; bright glow indicates charging at end of discharge cycle.<br />

3. Battery: Sealed, maintenance-free, nickel-cadmium type.<br />

4. Charger: Fully automatic, solid-state, constant-current type with sealed power<br />

transfer relay.<br />

INTERIOR LIGHTING 26 51 00 - 4/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

2.4 EXIT SIGNS<br />

A. Internally Lighted Signs: Comply with UL 924; for sign colors, visibility, luminance,<br />

and lettering size, comply with authorities having jurisdiction.<br />

1. Lamps for AC Operation: LEDs, 70,000 hours minimum rated lamp life.<br />

2.5 LAMPS<br />

A. Low-Mercury Fluorescent Lamps: Comply with EPA's toxicity characteristic leaching<br />

procedure test; shall yield less than 0.2 mg of mercury per liter when tested<br />

according to NEMA C78.LL.<br />

B. T8 Rapid-Start low-mercury Fluorescent Lamps: Rated 32 W maximum, nominal<br />

length 48 inches, 3000 initial lumens (minimum), CRI 85 (minimum), color<br />

temperature 4100 K, and average rated life 20,000 hours, unless otherwise<br />

indicated.<br />

C. Compact Fluorescent Lamps: 4-Pin, low mercury, CRI 85 (minimum), color<br />

temperature 4100 K, average rated life of 10,000 hours at 3 hours operation per<br />

start, and suitable for use with dimming ballasts, unless otherwise indicated.<br />

1. 13 W: T4, double or triple tube, rated 900 initial lumens (minimum).<br />

2. 32 W: T4, triple tube, rated 2400 initial lumens (minimum).<br />

3. 42 W: T4, triple tube, rated 3200 initial lumens (minimum).<br />

2.6 LIGHTING FIXTURE SUPPORT COMPONENTS<br />

A. Comply with Division 16 Section "Electrical Supports and Seismic Restraints" for<br />

channel- and angle-iron supports and nonmetallic channel and angle supports.<br />

B. Wires: ASTM A 641/A 641M, Class 3, soft temper, zinc-coated steel, 12 gauge.<br />

C. Wires for Humid Spaces: ASTM A 580/A 580M, Composition 302 or 304, annealed<br />

stainless steel, 12 gauge.<br />

D. Hook Hangers: Integrated assembly matched to fixture and line voltage and<br />

equipped with threaded attachment, cord, and locking-type plug.<br />

PART 3 – EXECUTION<br />

3.1 INSTALLATION<br />

A. Lighting fixtures: Set level, plumb, and square with ceilings and walls. Install lamps<br />

in each fixture.<br />

INTERIOR LIGHTING 26 51 00 - 5/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

B. Comply with NFPA 70 for minimum fixture supports.<br />

C. Suspended Lighting Fixture Support:<br />

1. Continuous Rows: Use tubing or stem for wiring at one point and tubing or rod<br />

for suspension for each unit length of fixture chassis, including one at each end.<br />

D. Connect wiring according to Division 16 Section "Conductors and Cables."<br />

3.2 FIELD QUALITY CONTROL<br />

A. Test for Emergency Lighting: Interrupt power supply to demonstrate proper<br />

operation. Verify transfer from normal power to battery and retransfer to normal.<br />

B. Prepare a written report of tests, inspections, observations, and verifications<br />

indicating and interpreting results. If adjustments are made to lighting system, retest<br />

to demonstrate compliance with standards.<br />

END OF SECTION 26 51 00<br />

INTERIOR LIGHTING 26 51 00 - 6/6


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

SECTION 26 56 00 – EXTERIOR LIGHTING<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. This Section includes the following:<br />

1. Exterior luminaires with lamps and ballasts.<br />

2. Luminaire-mounted photoelectric relays.<br />

3. Poles and accessories.<br />

B. See Division 16 Section "Interior Lighting" for exterior luminaires normally mounted<br />

on exterior surfaces of buildings.<br />

1.2 SUBMITTALS<br />

A. Product Data: For each luminaire and support component, arranged in order of<br />

lighting unit designation. Include data on features, accessories, and finishes.<br />

1.3 QUALITY ASSURANCE<br />

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in<br />

NFPA 70, Article 100, by a testing agency acceptable to authorities having<br />

jurisdiction, and marked for intended use.<br />

B. Comply with IEEE C2, "National Electrical Safety Code."<br />

C. Comply with NFPA 70.<br />

PART 2 – PRODUCTS<br />

2.1 MANUFACTURERS<br />

A. In Exterior Lighting Device Schedule where titles below are column or row headings<br />

that introduce lists, the following requirements apply to product selection:<br />

1. Available Manufacturers: Subject to compliance with requirements,<br />

manufacturers offering products that may be incorporated into the Work include,<br />

but are not limited to, manufacturers specified.<br />

2. Manufacturers: Subject to compliance with requirements, provide products by<br />

one of the manufacturers specified.<br />

EXTERIOR LIGHTING 26 56 00 - 1/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

3. Basis of Design Product: The design of each item of exterior luminaire and its<br />

support is based on the product named. Subject to compliance with<br />

requirements, provide either the named product or a comparable product by one<br />

of the other manufacturers specified.<br />

2.2 LUMINAIRES, GENERAL REQUIREMENTS<br />

A. Luminaires shall comply with UL 1598 and be listed and labeled for installation in wet<br />

locations by an NRTL acceptable to authorities having jurisdiction.<br />

B. Comply with IESNA RP-8 for parameters of lateral light distribution patterns indicated<br />

for luminaires.<br />

C. Metal Parts: Free of burrs and sharp corners and edges.<br />

D. Sheet Metal Components: Corrosion-resistant aluminum, unless otherwise<br />

indicated. Form and support to prevent warping and sagging.<br />

E. Housings: Rigidly formed, weather- and light-tight enclosures that will not warp, sag,<br />

or deform in use. Provide filter/breather for enclosed luminaires.<br />

F. Doors, Frames, and Other Internal Access: Smooth operating, free of light leakage<br />

under operating conditions, and designed to permit relamping without use of tools.<br />

Designed to prevent doors, frames, lenses, diffusers, and other components from<br />

falling accidentally during relamping and when secured in operating position. Doors<br />

shall be removable for cleaning or replacing lenses. Designed to disconnect ballast<br />

when door opens.<br />

G. Exposed Hardware Material: Stainless steel.<br />

H. Plastic Parts: High resistance to yellowing and other changes due to aging,<br />

exposure to heat, and UV radiation.<br />

I. Light Shields: Metal baffles, factory installed and field adjustable, arranged to block<br />

light distribution to indicated portion of normally illuminated area or field.<br />

J. Reflecting surfaces shall have minimum reflectance as follows, unless otherwise<br />

indicated:<br />

1. White Surfaces: 85 percent.<br />

2. Specular Surfaces: 83 percent.<br />

3. Diffusing Specular Surfaces: 75 percent.<br />

K. Lenses and Refractors Gaskets: Use heat- and aging-resistant resilient gaskets to<br />

seal and cushion lenses and refractors in luminaire doors.<br />

EXTERIOR LIGHTING 26 56 00 - 2/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

L. Luminaire Finish: Manufacturer's standard paint applied to factory-assembled and -<br />

tested luminaire before shipping. Where indicated, match finish process and color of<br />

pole or support materials.<br />

M. Factory-Applied Finish for Steel Luminaires: Color as selected by Architect. Comply<br />

with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for<br />

recommendations for applying and designating finishes.<br />

N. Factory-Applied Finish for Aluminum Luminaires: Color shall be dark bronze and<br />

white as specified on drawings. Comply with NAAMM's "Metal Finishes Manual for<br />

Architectural and Metal Products" for recommendations for applying and designating<br />

finishes.<br />

2.3 BALLASTS FOR HID LAMPS<br />

A. Comply with ANSI C82.4 and UL 10<strong>29</strong> and capable of open-circuit operation without<br />

reduction average life. Include the following features, unless otherwise indicated:<br />

1. Ballast Circuit: Constant-wattage autotransformer or regulating high-powerfactor<br />

type.<br />

2. Minimum Starting Temperature: Minus 22 deg F (Minus 30 deg C).<br />

3. Normal Ambient Operating Temperature: 104 deg F (40 deg C).<br />

4. Ballast Fuses: One in each ungrounded power supply conductor. Voltage and<br />

current ratings as recommended by ballast manufacturer.<br />

B. High-Pressure Sodium Ballasts: Electromagnetic type with solid-state igniter/starter<br />

and capable of open-circuit operation without reduction of average lamp life.<br />

Igniter/starter shall have an average life in pulsing mode of 10,000 hours at an<br />

igniter/starter-case temperature of 90 deg C.<br />

1. Instant-Restrike Device: Integral with ballast, or solid-state potted module,<br />

factory installed within fixture and compatible with lamps, ballasts, and mogul<br />

sockets up to 150 W.<br />

a. Restrike Range: 105- to 130-V ac.<br />

b. Maximum Voltage: 250-V peak or 150-V ac RMS.<br />

2. Minimum Starting Temperature: Minus 40 deg F (Minus 40 deg C) .<br />

2.4 HID LAMPS<br />

A. Metal-Halide Lamps: ANSI C78.1372, with a minimum CRI 92, and color<br />

temperature 4000 K.<br />

B. Pulse-Start, Metal-Halide Lamps: Minimum CRI 92, and color temperature 4000 K.<br />

EXTERIOR LIGHTING 26 56 00 - 3/4


DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

2.5 SUPPORT COMPONENTS AND GENERAL REQUIREMENTS<br />

A. Luminaire Attachment Provisions: Comply with luminaire manufacturers' mounting<br />

requirements. Use stainless-steel fasteners and mounting bolts, unless otherwise<br />

indicated.<br />

B. Mountings, Fasteners, and Appurtenances: Corrosion-resistant items compatible<br />

with support components.<br />

1. Materials: Shall not cause galvanic action at contact points.<br />

2. Anchor Bolts, Leveling Nuts, Bolt Caps, and Washers: Hot-dip galvanized after<br />

fabrication, unless stainless-steel items are indicated.<br />

3. Anchor-Bolt Template: Plywood or steel.<br />

PART 3 - EXECUTION<br />

3.1 LUMINAIRE INSTALLATION<br />

A. Install lamps in each luminaire.<br />

B. Fasten luminaire to indicated structural supports.<br />

1. Use fastening methods and materials selected to resist seismic forces defined<br />

for the application and approved by manufacturer.<br />

3.2 CORROSION PREVENTION<br />

A. Aluminum: Do not use in contact with earth or concrete. When in direct contact with<br />

a dissimilar metal, protect aluminum by insulating fittings or treatment.<br />

B. Steel Conduits: Comply with Division 16 Section "Raceways and Boxes." In<br />

concrete foundations, wrap conduit with 0.010-inch thick, pipe-wrapping plastic tape<br />

applied with a 50 percent overlap.<br />

END OF SECTION 26 56 00<br />

EXTERIOR LIGHTING 26 56 00 - 4/4


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

SECTION 313116 - TERMITE CONTROL<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section Includes:<br />

1. Soil treatment with termiticide..<br />

1.2 ACTION SUBMITTALS<br />

A. Product Data: For each type of product indicated. Include the EPA-Registered Label for termiticide<br />

products.<br />

1.3 INFORMATIONAL SUBMITTALS<br />

A. Product certificates.<br />

B. Soil Treatment Application Report: Include the following:<br />

1. Date and time of application.<br />

2. Moisture content of soil before application.<br />

3. Termiticide brand name and manufacturer.<br />

4. Quantity of undiluted termiticide used.<br />

5. Dilutions, methods, volumes used, and rates of application.<br />

6. Areas of application.<br />

7. Water source for application.<br />

C. Warranties: Sample of special warranties.<br />

1.4 QUALITY ASSURANCE<br />

A. Installer Qualifications: A specialist who is licensed according to regulations of authorities having<br />

jurisdiction to apply termite control treatment and products in jurisdiction where Project is located and<br />

who employs workers trained and approved by manufacturer to install manufacturer's products.<br />

B. Regulatory Requirements: Formulate and apply termiticides and termiticide devices according to the<br />

EPA-Registered Label.<br />

1.5 <strong>PROJECT</strong> CONDITIONS<br />

A. Environmental Limitations: To ensure penetration, do not treat soil that is water saturated or frozen. Do<br />

not treat soil while precipitation is occurring. Comply with requirements of the EPA-Registered Label<br />

and requirements of authorities having jurisdiction.<br />

B. Coordinate soil treatment application with excavating, filling, grading, and concreting operations. Treat<br />

soil under footings, grade beams, and ground-supported slabs before construction.<br />

TERMITE CONTROL 313116 - 1


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

1.6 WARRANTY<br />

A. Soil Treatment Special Warranty: Manufacturer's standard form, signed by Applicator and Contractor,<br />

certifying that termite control work, consisting of applied soil termiticide treatment, will prevent<br />

infestation of subterranean termites. If subterranean termite activity or damage is discovered during<br />

warranty period, re-treat soil and repair or replace damage caused by termite infestation.<br />

1. Warranty Period: Three years from date of Substantial Completion.<br />

1.7 MAINTENANCE SERVICE<br />

A. Continuing Service: Beginning at Substantial Completion, provide 12 months'continuing service<br />

including monitoring, inspection, and re-treatment for occurrences of termite activity. Provide a standard<br />

continuing service agreement. State services, obligations, conditions, terms for agreement period, and<br />

terms for future renewal options.<br />

PART 2 - PRODUCTS<br />

2.1 SOIL TREATMENT<br />

A. Termiticide: Provide an Registered termiticide, complying with requirements of authorities having<br />

jurisdiction,including the FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER<br />

SERVICES in compliance with Florida Statues, Chapter 487, in an aqueous solution formulated to<br />

prevent termite infestation. Provide quantity required for application at the label volume and rate for the<br />

maximum termiticide concentration allowed for each specific use, according to product's EPA-Registered<br />

Label.<br />

1. Products: As listed on the Florida Department of Agriculture and Consumer Services<br />

website.<br />

http://www.flaes.org/<strong>pdf</strong>/termiticidesregisteredinflorida.<strong>pdf</strong><br />

2. Service Life of Treatment: Soil treatment termiticide that is effective for not less than three years<br />

against infestation of subterranean termites.<br />

PART 3 - EXECUTION<br />

3.1 APPLICATION, GENERAL<br />

A. General: Comply with the most stringent requirements of authorities having jurisdiction and with<br />

manufacturer's EPA-Registered Label for products.<br />

3.2 APPLYING SOIL TREATMENT<br />

A. Examine substrates, areas, and conditions, with Applicator present, for compliance with requirements<br />

for[ moisture content of soil per termiticide label requirements,] interfaces with earthwork, slab and<br />

foundation work, landscaping, utility installation, and other conditions affecting performance of termite<br />

control.<br />

TERMITE CONTROL 313116 - 2


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

B. Proceed with application only after unsatisfactory conditions have been corrected.<br />

C. Soil Treatment Preparation: Remove foreign matter and impermeable soil materials that could decrease<br />

treatment effectiveness on areas to be treated. Loosen, rake, and level soil to be treated except previously<br />

compacted areas under slabs and footings. Termiticides may be applied before placing compacted fill<br />

under slabs if recommended in writing by termiticide manufacturer.<br />

1. Fit filling hose connected to water source at the site with a backflow preventer, complying with<br />

requirements of authorities having jurisdiction.<br />

D. Application: Mix soil treatment termiticide solution to a uniform consistency. Provide quantity required<br />

for application at the label volume and rate for the maximum specified concentration of termiticide,<br />

according to manufacturer's EPA-Registered Label, to the following so that a continuous horizontal and<br />

vertical termiticidal barrier or treated zone is established around and under building construction.<br />

Distribute treatment evenly.<br />

1. Slabs-on-Grade and Basement Slabs: Under ground-supported slab construction, including<br />

footings, building slabs, and attached slabs as an overall treatment. Treat soil materials before<br />

concrete footings and slabs are placed.<br />

2. Foundations: Adjacent soil, including soil along the entire inside perimeter of foundation walls;<br />

along both sides of interior partition walls; around plumbing pipes and electric conduit penetrating<br />

the slab; around interior column footers, piers, and chimney bases; and along the entire outside<br />

perimeter, from grade to bottom of footing. Avoid soil washout around footings.<br />

3. Masonry: Treat voids.<br />

4. Penetrations: At expansion joints, control joints, and areas where slabs will be penetrated.<br />

E. Avoid disturbance of treated soil after application. Keep off treated areas until completely dry.<br />

F. Protect termiticide solution, dispersed in treated soils and fills, from being diluted until ground-supported<br />

slabs are installed. Use waterproof barrier according to EPA-Registered Label instructions.<br />

G. Post warning signs in areas of application.<br />

H. Reapply soil treatment solution to areas disturbed by subsequent excavation, grading, landscaping, or<br />

other construction activities following application.<br />

END OF SECTION 313116<br />

TERMITE CONTROL 313116 - 3


DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>,FL<br />

THIS PAGE LEFT INTENTIONALLY BLANK<br />

TERMITE CONTROL 313116 - 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!