GoldLine GoldLine - Elterm
GoldLine GoldLine - Elterm
GoldLine GoldLine - Elterm
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
12<br />
ELECTRIC WATER BOILER EKW AsDC-W<br />
rok założenia<br />
1992<br />
All ELTERM boiler<br />
subassemblies come<br />
from reputable<br />
manufacturers:<br />
EKW AsDC-W boiler block circuit diagram<br />
ROOM<br />
THERMOSTAT<br />
WEATHER<br />
SENSOR<br />
P-1<br />
HOT UTILITY<br />
WATER PUMP<br />
EKW-AsDC(W) boiler with internal hot utility<br />
water storage tank – demonstration diagram<br />
safety valve<br />
ball<br />
valve<br />
CENTRAL<br />
HEATING PUMP<br />
circulating<br />
pump<br />
boiler insulation<br />
– mineral wool<br />
ROCKWOOL λ0,042W/mK<br />
PROCESSOR<br />
AUTOMATIC<br />
CONTROL SYSTEM<br />
central<br />
heating<br />
hot util.<br />
water<br />
outlet<br />
circulation<br />
cold water<br />
inflow<br />
central<br />
heating<br />
manometer<br />
membrane<br />
vessel<br />
SELFA stainless<br />
steel heaters<br />
ø 114 x 3.6 steel body<br />
long life<br />
(Polish laser cut steel)<br />
ELEMENTS INCLUDED IN THE EKW-AsD 08 W BOILER<br />
80 60 60 50 120<br />
all ¾”<br />
male threads<br />
(top view)<br />
Min. premises height (2.1m)<br />
(essential while montage)<br />
VENT<br />
MANOMETER 4 BAR<br />
CONTROL PANEL<br />
circulation<br />
ELEMENTS INSIDE THE BOILER:<br />
vent, manometer,<br />
safety valve and<br />
Flamco 8 l<br />
membrane vessel<br />
central<br />
heating<br />
hot util.<br />
water<br />
outlet<br />
cold water<br />
outlet<br />
central<br />
heating<br />
- CENTRAL HEATING PUMP<br />
- HOT UTILITY WATER PUMP<br />
- CENTRAL HEATING MEMBRANE<br />
VESSEL (8l)<br />
- 2 x NON-RETURN VALVE<br />
100 l ENAMEL HOT UTILITY<br />
WATER EXCHANGER<br />
BOILER BODY<br />
all tubes are<br />
at the same height<br />
(right side view)<br />
hot util.<br />
water<br />
central<br />
heating<br />
Grundfos pump<br />
29 kW TANK COIL<br />
29 kW TANK COIL<br />
1070<br />
galvanized sheet case<br />
(CNC pressed)<br />
MAGNESIUM ANODE<br />
Shower for max 2 people<br />
TIMEL software<br />
OMRON subassemblies<br />
9<br />
12<br />
6<br />
3<br />
100 l<br />
+<br />
1,5 kW<br />
coil<br />
100l tank<br />
heating time 3-4 h<br />
O<br />
∆t=40 C<br />
9<br />
6<br />
3<br />
100 l<br />
EKW-AsD boiler 12 kW<br />
heating time<br />
several times shorter<br />
O<br />
∆t=40 C