23.01.2015 Views

Chaim Poran - Directrouter.com

Chaim Poran - Directrouter.com

Chaim Poran - Directrouter.com

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Europe, Asia, Pacific and<br />

Latin America (EAPLA)<br />

– Indonesia: The $600 million, November 2011 Compact includes a $333<br />

million Green Prosperity Project (GPP) focused on renewable energy. The<br />

GPP is likely to result in MCA procurements for consultancies to prepare<br />

specific projects, and then works and construction supervision.<br />

– Jordan: The $275 million Compact is in early implementation and includes a<br />

total of about $254 million in water supply network, wastewater network, and<br />

wastewater treatment plant expansion projects. MCA procurements for<br />

works is <strong>com</strong>mencing .<br />

– Moldova: The $262 million Compact is in its 2 nd implementation year and<br />

includes an irrigation systems rehabilitation activity ($73 million) for which<br />

MCA procurements for works are expected, and a road rehabilitation project<br />

($133 million).<br />

– Philippines: The $434 million Compact is at the end of its 1 st implementation<br />

year and includes a roads development project ($214 million) for which MCA<br />

procurement for works is underway.<br />

28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!