Corrugating Roll Change - BHS Corrugated
Corrugating Roll Change - BHS Corrugated
Corrugating Roll Change - BHS Corrugated
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>BHS</strong> Life-time Service<br />
<strong>Corrugating</strong> <strong>Roll</strong>s<br />
<strong>Corrugating</strong> <strong>Roll</strong> <strong>Change</strong><br />
<strong>BHS</strong> <strong>Corrugated</strong> Maschinen- und Anlagenbau GmbH<br />
Paul-Engel-Strasse 1 I D-92729 Weiherhammer<br />
Phone: +49 9605 919-191 I Fax: +49 9605 919-192<br />
www.bhs-world.com
Single-facer groups<br />
<strong>Corrugating</strong> <strong>Roll</strong> <strong>Change</strong><br />
Our service<br />
<strong>Corrugating</strong> rolls, the heart of your corrugator line.<br />
Only perfectly installed and adjusted corrugating rolls ensure longterm,<br />
outstanding board grades (ECT, FCT) and high production<br />
quality with the best machine availability.<br />
Professional corrugating roll change by experienced<br />
<strong>BHS</strong> engineers.<br />
Inspection and adjustment of all attached parts and<br />
components, such as prisms, seals and adjusting devices.<br />
Engineers present during commissioning with subsequent<br />
commissioning and acceptance log.<br />
Appraisal of existing rolls.<br />
Customer benefits<br />
Perfect adjustment of corrugating roll parameters, such as<br />
parallelism, offset value, clearances, etc.. Thus laying the<br />
foundation for even glue application and outstanding sheet<br />
flatness.<br />
Optimum corrugating geometry shape and very good test<br />
strengths of the corrugated board.<br />
Increase the service life of <strong>BHS</strong> rolls by having them<br />
professionally installed.<br />
Increase machine availability and operational reliability.<br />
Machine allocation – Techn. requirement<br />
All <strong>BHS</strong>-corrugating rolls on all conventional single-facer groups. <strong>BHS</strong><br />
and NON-<strong>BHS</strong> machines.<br />
Implementation<br />
Total duration<br />
Machine downtime<br />
2-3 days<br />
1-2 days<br />
Carried out by 1 <strong>BHS</strong> engineer and 2 of the customer's mechanics.<br />
Fixed prices on request<br />
Technical modifications reserved I May 2010