A: Sheet 15 incorrectly identified this as Item 524. This note pertains to the Vertical<br />

Circulator Structure, which is Item No. 9015 on the bid tab (Form 025). <strong>The</strong> $250,000<br />

has already been included for Item 9015 on Form 025 and Sheet 15 will be corrected in<br />

<strong>Addendum</strong> No. 3.<br />

6. Q: On sheet number 20 <strong>of</strong> the plans, the section at the bottom that has the line items<br />

that begin with 104 (removals), some quantities do not match the amounts given on the<br />

Unit Pricing form (Form 025). Could you please clarify<br />

A: Some <strong>of</strong> these differences were corrected on <strong>Addendum</strong> No. 2 and others will be<br />

corrected on <strong>Addendum</strong> No. 3.<br />

7. Q: Could you please provide a schedule for the Temporary Suspension <strong>of</strong> Work (Item<br />

9002) that is found in the Specs manual<br />

A: Temporary Suspension <strong>of</strong> Work shall be determined at the discretion <strong>of</strong> the <strong>City</strong> at<br />

times when work activities may interfere with major events in the Downtown area. A<br />

schedule <strong>of</strong> currently known major events that could result in temporary suspensions <strong>of</strong><br />

work is shown in Note 15 on Sheet 15 <strong>of</strong> <strong>Addendum</strong> No. 2.<br />

8. Q: <strong>The</strong> quantities for the stormwater planters on Sheet 21 <strong>of</strong> the plans are different<br />

than the ones on the Unit Pricing Form. <strong>The</strong> sizes <strong>of</strong> the planters do not match either.<br />

Also, the Plan and Pr<strong>of</strong>ile (sheets 170-171) and Cross Sections (sheets 230-231) for<br />

Market Street show stormwater planters at stations 11+08 and 14+50, but no planters<br />

in between, while the Landscape plans (sheets 701-702) show continuous planters.<br />

Could you please clarify<br />

A: <strong>The</strong> stormwater planters shown on these sheets should have been shown to be<br />

continuous. <strong>The</strong> Plan and Pr<strong>of</strong>ile sheets, Cross Section sheets, and quantities will be<br />

corrected and included in <strong>Addendum</strong> No. 3. In addition, the stormwater planters will be<br />

removed entirely from the south side <strong>of</strong> Market Street. This change will be included in<br />

<strong>Addendum</strong> No. 3.<br />

9. Q: What is the time frame we have to do our work CPS Energy, AT&T, Time Warner and<br />

COSA IT<br />

A: <strong>The</strong> time frame for completing these facilities will be dictated by Milestone Dates for<br />

completing the work for which these facilities are incidental and need to be completed<br />

first in accordance with the construction phasing plans shown on the Traffic Control<br />

Plans (sheets 35-37). See the Milestone Dates and descriptions <strong>of</strong> work to be completed