4.1.2.9 System Acceptance<br />

Upon approval of the Contractor’s “System Check” report and at a time<br />

set by the Court Project Manager, demonstrate to the Court Project<br />

Manager that the final system adjustments and tests meet the<br />

performance requirements.<br />

The Contractor shall provide all labor, materials, tools, and<br />

measurement equipment necessary for these demonstrations, tests, and<br />

adjustments.<br />

The Contractor’s representatives performing these tests must be<br />

thoroughly familiar with all details of the system. The test team must<br />

include the Contractor’s Project Manager and other staff in charge<br />

during the course of the installation work.<br />

Contractor is responsible for all costs incurred to satisfy criteria<br />

requirements.<br />

System Acceptance Tests will not be performed until the Contractor’s<br />

System Check has been completed. The System Acceptance Tests will<br />

be supervised by the Court Project Manager and will consist of the<br />

following:<br />

i. A physical inventory will be taken of all equipment on site.<br />

ii. The operation of all system equipment shall be demonstrated<br />

by the Contractor.<br />

iii. Both subjective and objective tests, in accordance with the<br />

Contractor’s test plan, will be required to determine compliance<br />

with the specifications. The Contractor shall be responsible for<br />

providing test equipment for these tests.<br />

iv. All final “as-built” drawings, run sheets, manuals, and other<br />

required documents, as detailed herein, shall be on hand. Two<br />

complete sets of these documents shall be delivered to the<br />

Court Project Manager at this time. (One complete set shall have<br />

been delivered to the Court Project Manager or designee prior to<br />

the scheduling of Acceptance Tests).<br />

v. In the event further adjustment is required, or defective<br />

equipment must be repaired or replaced, tests may be<br />

suspended or continued at the option of the Court Project<br />

Manager.<br />

<strong>Island</strong> <strong>County</strong> Courts AV <strong>RFP</strong>4.doc<br />