4.1.2.9 System Acceptance<br />
Upon approval of the Contractor’s “System Check” report and at a time<br />
set by the Court Project Manager, demonstrate to the Court Project<br />
Manager that the final system adjustments and tests meet the<br />
performance requirements.<br />
The Contractor shall provide all labor, materials, tools, and<br />
measurement equipment necessary for these demonstrations, tests, and<br />
adjustments.<br />
The Contractor’s representatives performing these tests must be<br />
thoroughly familiar with all details of the system. The test team must<br />
include the Contractor’s Project Manager and other staff in charge<br />
during the course of the installation work.<br />
Contractor is responsible for all costs incurred to satisfy criteria<br />
requirements.<br />
System Acceptance Tests will not be performed until the Contractor’s<br />
System Check has been completed. The System Acceptance Tests will<br />
be supervised by the Court Project Manager and will consist of the<br />
following:<br />
i. A physical inventory will be taken of all equipment on site.<br />
ii. The operation of all system equipment shall be demonstrated<br />
by the Contractor.<br />
iii. Both subjective and objective tests, in accordance with the<br />
Contractor’s test plan, will be required to determine compliance<br />
with the specifications. The Contractor shall be responsible for<br />
providing test equipment for these tests.<br />
iv. All final “as-built” drawings, run sheets, manuals, and other<br />
required documents, as detailed herein, shall be on hand. Two<br />
complete sets of these documents shall be delivered to the<br />
Court Project Manager at this time. (One complete set shall have<br />
been delivered to the Court Project Manager or designee prior to<br />
the scheduling of Acceptance Tests).<br />
v. In the event further adjustment is required, or defective<br />
equipment must be repaired or replaced, tests may be<br />
suspended or continued at the option of the Court Project<br />
Manager.<br />