Annual Report 2012-2013 - Spring Point Homeowners Association
Annual Report 2012-2013 - Spring Point Homeowners Association
Annual Report 2012-2013 - Spring Point Homeowners Association
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Spring</strong> <strong>Point</strong> <strong>Homeowners</strong> <strong>Association</strong><br />
<strong>Annual</strong> <strong>Report</strong><br />
<strong>2012</strong>-<strong>2013</strong>
President’s <strong>Report</strong><br />
July <strong>2013</strong><br />
Dear Members,<br />
The Board of Directors is pleased to present you with our<br />
annual report for <strong>2012</strong>-<strong>2013</strong>. We have quite a bit to report,<br />
and most of it is good news. Our <strong>Association</strong> is in good shape.<br />
Over the past year we have made additional improvements at<br />
the community beach, maintained our existing roads and water<br />
system, and entered the construction phase of a new filter<br />
system for the community water works. Other changes are<br />
being made to the water system to reduce its potential fault<br />
modes and assure continued compliance with DOH standards<br />
for drinking water. Our treasury continues to be in good<br />
shape, and we are pleased to propose a budget for the coming<br />
year that is based on a continuation of current dues and water<br />
rates. The slow sand filter project is costing more than expected,<br />
and we are able to foresee a cash flow problem, similar<br />
to the problem we had with the chip seal renewal in 2011.<br />
We have borrowed money from members to be able to complete<br />
the project in the coming fall.<br />
At our last annual meeting, the members directed the<br />
Board, with the assistance of a committee of volunteers, to<br />
create a longer term plan for maintenance and development<br />
of <strong>Spring</strong> <strong>Point</strong> facilities. That plan was sent to members in<br />
June. The long term plan develops a basis for the current<br />
dues, and also examines long term maintenance and development<br />
issues. We’re happy to report that the buried water<br />
distribution piping is likely to be serviceable for another 20 to<br />
40 years. The plan develops several proposals for near term<br />
action, including beach parking, dock and float repair/<br />
replacement, and improvements to the reverse-osmosis water<br />
system. The Board believes these actions can be undertaken<br />
within the current general and water dues. We plan to propose<br />
these projects at this year’s annual meeting, and also to<br />
propose a plan to apply chip-seal paving to Oak Lane and the<br />
lower part of <strong>Spring</strong> <strong>Point</strong> Road. This road project cannot be<br />
undertaken within budgets based on current dues. If the<br />
members agree to the paving proposal, we must also develop<br />
a method for financing it. The Board will propose a special<br />
assessment.<br />
During May of this year, <strong>Spring</strong> <strong>Point</strong> and members of<br />
the larger Deer Harbor Community took part in a community<br />
fire drill. This drill included a mock fire at the McVay’s property,<br />
and a mock evacuation of <strong>Spring</strong> <strong>Point</strong> residents. Some<br />
individuals were evacuated from the community beach and<br />
dock. The drill produced a lot of valuable information – including<br />
the inability of Fire Department personnel to communicate<br />
via 2-way radio from within <strong>Spring</strong> <strong>Point</strong>. The most<br />
important lesson from this drill is that we are at significant risk<br />
in <strong>Spring</strong> <strong>Point</strong>. If a major disaster occurs, we are largely on<br />
our own, and we need to continue to do everything possible<br />
to reduce our risks – especially from fire.<br />
As occurs every year, we will ask the annual meeting<br />
attendees to approve the <strong>2013</strong>-2014 Budget, authorize carryover<br />
of funds, and to agree not to perform an audit. We will<br />
also ask the meeting for discussion and a vote on the proposals<br />
developed in the long term plan. If the meeting agrees<br />
to proceed with the paving project, and to a special assessment<br />
as the preferred funding method, we will need to have a<br />
special assessment referendum, which will probably require<br />
member voting by mail.<br />
This annual report and our website are intended to augment<br />
your knowledge of <strong>Association</strong> operations, but we still<br />
urge you to attend our annual meeting, scheduled for Saturday,<br />
August 17 (10am, at the Deer Harbor Community Club).<br />
See you there!<br />
Sincerely,<br />
Dave Dilling<br />
President, <strong>2012</strong>-<strong>2013</strong>
Director History and Nominations<br />
The following table presents the board history since 2006-2007. Heavy lines indicate the start/end of a 3 year term.<br />
Year Position 1 Position 2 Position 3 Position 4 Position 5 Position 6 Position 7<br />
2006-2007 Bedell (2) Cornelius (1) Zimlich (2) Sutherland /<br />
Conant (Note)<br />
Lundeen (2) Gossett (2) Saxe (1)<br />
2007-2008 Bedell (2) Cornelius (1) Zimlich (2) Dilling (1) Lundeen (2) Meek (1) Saxe (1)<br />
2008-2009 Vetterlein (1) Cornelius (2) Zimlich (2) Dilling (1) Aschoff (1) Meek (1) Saxe (2)<br />
2009-2010 Vetterlein (1) Cornelius /V/<br />
Gottman<br />
2010-2011 Vetterlein (1) Gottman/V/<br />
Soderquist<br />
Noesen (1) Dilling (1) Aschoff (1) Meek (1) Saxe/Wilson<br />
Noesen (1) Dilling (2) Aschoff/Polis Meek (2)/Saxe Wilson<br />
2011-<strong>2012</strong> Vetterlein* Soderquist Noesen (1) Dilling (2) Polis Saxe (1) Wilson (2)<br />
<strong>2012</strong>-<strong>2013</strong> Vetterlein Soderquist Goodhart Dilling (2) Polis Saxe (1) Wilson/<br />
Golding<br />
<strong>2013</strong>-2014 ** Soderquist Goodhart Polis Golding<br />
2014-2015 Goodhart<br />
2015-2016<br />
2016-2017<br />
Note: * Two year term, to re-establish the stagger in Board position terms.<br />
Board Positions and nominees for election at the <strong>2013</strong> annual meeting are:<br />
1. Position 1 – Nominee: Milly Vetterlein. (**Milly was elected to a two year term in August, 2011, but is willing to<br />
serve for one more year.)<br />
2. Position 4 – Nominee: Will Gossett<br />
3. Position 6 – Nominee: Andy Saxe<br />
Other nominations are welcome. Please send your desire and willingness to serve on the board to any board member.<br />
Nominations will also be solicited from the floor during the annual meeting.
Water <strong>Report</strong><br />
During the past year, the <strong>Association</strong> continued to provide<br />
treated water to eligible members. The water produced<br />
met all DOH standards, including limits on tri-halo-methanes<br />
(THMs) and other disinfection by-products. A consumer confidence<br />
report for <strong>2012</strong>, required by DOH, was completed and<br />
distributed. SPHA delivered approximately 1.9 million gallons<br />
to households connected to the system.<br />
In <strong>2012</strong>, we have been able to meet all water demands by<br />
treating water captured in Jay’s Pond. As was the case in 2011,<br />
it was not necessary to use our right to withdraw water from<br />
Clyde’s pond or to use the RO plant to meet members’ demand.<br />
The RO plant was operated intermittently during the<br />
summer to keep it in working order. Our system losses, including<br />
filter backwashing and “filter-to-waste” operation were<br />
about 10%. These losses should reduce significantly when the<br />
new slow sand filter is operational.<br />
We are now well along with the construction of a new<br />
slow sand filter. At this writing, about 80% of the concrete<br />
work is done on the new SSF building, the new raw water line<br />
has been laid, and the new pump-house/aerator-house is completed<br />
and ready for the installation of equipment. The existing<br />
water system must be kept in operation while we transition<br />
to the new system, so it has sometimes been necessary to<br />
install extra valves and pipe connections. The new filter should<br />
be fully operational by early fall, when we will enter an operating<br />
mode in which we filter pond water in the SSF, and then<br />
flow it to the existing filter. Once the new system is fully tested<br />
and accepted, we will route filtered water directly to the<br />
storage tanks, and bypass and decommission the old filter.<br />
The cost of the project was estimated last year at about<br />
$192,000. However, we have had some cost overrun, and we<br />
now project the completed cost at about $235,000. To allow<br />
this expenditure without any change in dues, we have borrowed<br />
money (from SPHA members) for a short term. We<br />
should be able to pay back these loans in 2014 and 2015. The<br />
revised cost of the SSF project and the loans obtained to finance<br />
it are reflected in the proposed annual budget included<br />
in this report.<br />
Last year, there was some concern that we should be<br />
planning for the replacement of our buried distribution piping.<br />
Research into the expected life of our piping (which is glued<br />
PVC) indicates that the piping should have a lifetime of 60 to<br />
80 years. Most of our piping was installed in the 1970s and<br />
1980s, so should have many more years of service. The long<br />
term plan, sent to members in June, reflects the expectation<br />
that it will not be necessary to start replacing piping until<br />
about 2030 or later.
Road <strong>Report</strong><br />
The chip-seal applied to the paved <strong>Spring</strong> <strong>Point</strong> Roads in<br />
2011 is holding up nicely, with no special maintenance needs.<br />
We will probably need to re-apply chip seal to paved roads<br />
(about 1.4 miles) in 2018 or 2019. The unpaved roads received<br />
their usual grading and gravel replacement in April this year,<br />
and will again receive a coating of dust-tack during the summer.<br />
This maintenance work is usually contracted to Island<br />
Excavators and costs about $10,000 per year.<br />
At our <strong>Annual</strong> Meeting in <strong>2012</strong>, the Board tabled a proposal<br />
to undertake a program to pave Oak Lane and the lower<br />
part of <strong>Spring</strong> <strong>Point</strong> Road. However, that proposal was not<br />
acted upon because the members in attendance felt that the<br />
longer term maintenance needs should be assessed, and a<br />
paving program should not be undertaken without first examining<br />
the possible need to replace our water distribution piping.<br />
The expected lifetime of the water piping was researched,<br />
and a long term plan developed and sent to the membership.<br />
That plan concludes that there is no interference between<br />
road paving and water distribution pipe replacement, and that<br />
the paving program should be re-proposed.<br />
Paving Proposal<br />
The Board believes that paving of Oak Lane and the lower<br />
part of <strong>Spring</strong> <strong>Point</strong> Road should again be placed before the<br />
annual meeting for discussion and possible action. Again, here<br />
are the key facts:<br />
<br />
<br />
<br />
<br />
We have ~1.4 miles of chip-sealed roads. Chip-seal must<br />
be re-applied every 5-8 years, and costs about $4/sq. yd –<br />
this works out to about $1600/yr for each 1000 feet of<br />
roadway.<br />
We have ~1.4 miles of “major” un-paved roads. “Major”<br />
includes Oak Lane and <strong>Spring</strong> <strong>Point</strong> Road from Hamaker’s<br />
to the North end of the lower road. It does not include<br />
Link Lane, Juniper Lane, Serendipity Lane, Headland Road,<br />
Nutchatch, Fawn, Park Place, Fisher King, or other “named<br />
driveways” . Every year we typically have the major unpaved<br />
roads graded, graveled, and have dust-tack applied.<br />
This annual maintenance work costs from $12,000 to<br />
$18,000, which (curiously) also works out to about $1600/<br />
yr per 1000 feet of road.<br />
First-time chip-sealing of our major un-paved roads would<br />
require some significant preparation including grading,<br />
laying down substantial amounts of gravel (average 4”<br />
deep) and machine-compacting. Island Excavators provided<br />
a budgetary price quotation in July of <strong>2012</strong> for this<br />
preparation that works out to about $8,000 per 1000 feet<br />
of road. This quote would need to be updated if the<br />
members directed the board to undertake a paving program.<br />
Doolittle and Company, who did our chip-seal maintenance<br />
in 2011, provided a budgetary price quotation (in<br />
July <strong>2012</strong>) of about $8/sq, yd, for first-time chip-sealing.<br />
This works out to about $12,000 per 1000 feet of road.<br />
<br />
The combined cost is therefore about $20,000 per 1000<br />
feet of road, or about $150,000, plus some mobilization<br />
costs. If we did the major roads as a single project, mobilization<br />
costs would occur only once. If we did it over several<br />
years, we would incur them each year.<br />
In some places, it will be difficult to achieve a two-lane<br />
road width. When traffic meets, it may be necessary to<br />
pull off the paved roadway which could damage the road<br />
and shorten the life of the paving job.<br />
In summary, we don’t expect paving the un-paved roads to<br />
have a significant impact on our long-term maintenance costs.<br />
A vital impact would be a substantial reduction in the mess<br />
associated with the road – mud and potholes in the winter and<br />
dust in the summer. Here are questions to be addressed by<br />
the annual meeting:<br />
<br />
<br />
<br />
Shall we develop a program to pave the major unpaved<br />
roads<br />
Should such a program be undertaken in a single project,<br />
or spread over several years<br />
Should such a program be paid for by a general assessment,<br />
or by increase in dues plus financing<br />
Within the Long Term Plan, the Board and the Assisting<br />
Committee have suggested that a paving program, if approved,<br />
should be paid for with a special assessment on all<br />
members of $750 for two successive years, after which the<br />
paving program would be implemented. At the direction of<br />
the membership, these special assessments could be in <strong>2013</strong><br />
and 2014, with the paving occurring in 2015, or later. Since a<br />
special assessment requires a referendum in which a minimum<br />
of 60% of members vote, and two thirds of those voting approve,<br />
it is likely that this referendum will be held using a mailin<br />
voting process.
Treasurer’s <strong>Report</strong><br />
General Account<br />
This fiscal year ended with Income and Expenses being<br />
within a few dollars of the total budgeted amounts. The General<br />
Account ended the year with a Checking balance surplus<br />
of $80,871.92 and with a Tidelands Reserve CD balance of<br />
$2,328.80. The Checking balance will be carried forward into<br />
fiscal year <strong>2013</strong>-2014 while the CD is a permanent requirement<br />
of the Department of Natural Resources.<br />
While the Treasurer’s <strong>Report</strong> chart shows one annual<br />
dues payment un-paid, that amount was received shortly after<br />
the start of the new fiscal year. Thanks to everyone for being<br />
prompt with their payment.<br />
The final payments on the four short-term loans, used for<br />
existing chip seal renewal, were made this last year which<br />
completes all unscheduled projects for the General Account.<br />
At this time, the Board proposes to maintain the annual dues<br />
at $600.00 which will be the eighth-year for this amount.<br />
Should the Membership decide to undertake improvement<br />
projects not included in the proposed budget: funding<br />
from the current surplus, or an increase in dues, or a general<br />
assessment, or loan financing will need to be considered.<br />
As always, the <strong>Association</strong>’s books are available for your<br />
scrutiny. Give me a call and we’ll arrange a time for you to<br />
come over to look. (For even faster service, try offering me a<br />
glass of great scotch.)<br />
Water Account<br />
The <strong>2012</strong>-<strong>2013</strong> year ended with a balance of $95,535.22<br />
in the Checking account. Income and Expenses were within<br />
tolerances throughout the year until a few weeks ago when it<br />
became obvious that the Slow Sand Filter project was going to<br />
cost more than previously thought. Costs were higher than<br />
estimated because of higher concrete and labor expenses. In<br />
addition, some of the materials required by the project’s engineers<br />
were of a larger size than anticipated which cost more.<br />
Since the project is well underway, the Board felt it important<br />
to move forward to complete it in a timely manner.<br />
To cover the near-term cash shortfall, it was decided the best<br />
alternative was to duplicate the loan program used by the<br />
General Account to fund the renewal of road chip seal. Four<br />
loans ($10,000.00 each) were secured from Water Account<br />
Members with the first payment (half the loan plus interest) to<br />
be made in October 2014 and the balance to be paid in October<br />
2015.<br />
With this cash infusion, the proposed budget chart shows<br />
a cushion in the Water Account of a little over $18,000.00 for<br />
fiscal year <strong>2013</strong>-2014. Because this is a cash flow challenge<br />
and not an affordability issue, the Board proposes to maintain<br />
the <strong>Annual</strong> Water Dues at $600.00. However, early payment<br />
of your dues is greatly appreciated. The invoices will still be<br />
mailed at the normal time but if you send your payment early,<br />
I will see that you are correctly credited.<br />
The benefits of the water system modification remain<br />
unchanged and it is still anticipated there will be significant<br />
operational cost savings once the project is complete.
GENERAL ACCOUNT—CATEGORY TITLE<br />
1 July <strong>2012</strong><br />
Beginning Balance<br />
30 June <strong>2013</strong><br />
End Balance<br />
1 July <strong>2013</strong><br />
Beginning Balance<br />
Islanders Bank – General Account Checking 68,955.00 80,871.92 80,871.92<br />
Tidelands Reserve CD Account 2,320.00 2,328.80 2,328.80<br />
INCOME <strong>2012</strong>-<strong>2013</strong> Budget <strong>2012</strong>-<strong>2013</strong> Actual <strong>2013</strong>-2014 Budget<br />
<strong>Annual</strong> Dues – General Account 67,800.00 67,200.00 67,800.00<br />
Fees – Construction Impact on Roads 2,000.00 3,300.00 2,000.00<br />
Dues – Previous Year 0.00 0.00 600.00<br />
Dues – Kayak Rack 575.00 650.00 650.00<br />
Other Income 0.00 629.80 0.00<br />
Interest – Checking Account 170.00 72.36 80.00<br />
Interest – Tidelands Reserve CD Account 10.00 9.29 10.00<br />
TOTAL INCOME 70,555.00 71,861.45 71,140.00<br />
EXPENSES <strong>2012</strong>-<strong>2013</strong> Budget <strong>2012</strong>-<strong>2013</strong> Actual <strong>2013</strong>-2014 Budget<br />
Bank Charges 0.00 100.00 0.00<br />
Dock and Tidelands Expenses 2,000.00 6,920.68 2,000.00<br />
Insurance – General Account Share 2,800.00 2,712.00 2,800.00<br />
Kayak Rack 0.00 0.00 0.00<br />
Miscellaneous 1,800.00 399.16 1,800.00<br />
Office Expenses 1,200.00 1,570.04 1,500.00<br />
Professional Services 1,500.00 760.00 1,000.00<br />
Roads – Chipping and Mowing 9,000.00 5,565.84 9,000.00<br />
Roads – Capital Costs 0.00 0.00 0.00<br />
Roads – Maintenance 20,000.00 20,279.42 20,000.00<br />
Roads – Loan - Principal and Interest 21,000.00 21,000.00 0.00<br />
Property Tax – General Account Share 300.00 135.15 200.00<br />
TOTAL EXPENSES 59,600.00 59,942.29 38,300.00<br />
WATER SYSTEM ACCOUNT—CATEGORY TITLE<br />
1 July <strong>2012</strong><br />
Beginning Balance<br />
30 June <strong>2013</strong><br />
End Balance<br />
1 July <strong>2013</strong><br />
Beginning Balance<br />
Islanders Bank – Water Account Checking 186,431.00 95,535.22 95,535.22<br />
INCOME <strong>2012</strong>-<strong>2013</strong> Budget <strong>2012</strong>-<strong>2013</strong> Actual <strong>2013</strong>-2014 Budget<br />
Prepaid Meter Fees 0.00 -143.81 0.00<br />
Water System Loan – Slow Sand Filter Project 0.00 0.00 40,000.00<br />
<strong>Annual</strong> Dues – Water Account 52,200.00 52,200.00 52,200.00<br />
Water User Meter Fees 21,000.00 20,086.72 21,000.00<br />
Other Income 0.00 100.78 0.00<br />
Interest – Checking Account 230.00 180.90 200.00<br />
TOTAL INCOME 73,430.00 72,424.59 113,400.00<br />
EXPENSES <strong>2012</strong>-<strong>2013</strong> Budget <strong>2012</strong>-<strong>2013</strong> Actual <strong>2013</strong>-2014 Budget<br />
Miscellaneous 500.00 0.00 500.00<br />
Office Expenses 250.00 65.86 250.00<br />
Operating Cost – Pond Electricity 2,500.00 2,158.12 2,500.00<br />
Operating Cost – Pond Operations and Maintenance 10,000.00 12,599.38 15,000.00<br />
Operating Cost – Pond Telephone 0.00 425.77 550.00<br />
Operating Cost – RO Plant Electricity 1,000.00 469.01 1,000.00<br />
Operating Cost – RO Plant Operations and Maintenance 5,000.00 398.73 5,000.00<br />
Operating Cost – Employee Gross Salary 20,790.00 20,790.00 20,800.00<br />
Operating Cost – SPHA Payroll Tax Obligation 5,000.00 3124.65 4,000.00<br />
Insurance – Water Account Share 2,800.00 2,712.00 2,800.00<br />
Property Tax – Water Account Share 300.00 135.15 200.00<br />
Capital Cost – Slow Sand Filter Project 150,000.00 120,832.44 138,000.00<br />
TOTAL EXPENSES 198,140.00 163,711.11 190,600.00
Board of Directors<br />
President, David Dilling, 376-4314, President@<strong>Spring</strong>pt.org<br />
Vice President, Jean S. Soderquist, 376-4190, jeanandmarv@centurytel.net<br />
Secretary, Bev Polis, 376-8808, polisassociates@yahoo.com<br />
Treasurer, Rich Goodhart, 376-1049, richandalayne@gmail.com<br />
_________________________________________________________<br />
Director, Andy Saxe, 376-5904, saxe.andy@gmail.com<br />
Director, Kevin Golding, 376-2315, krgolding@msn.com<br />
Director, Millie Vetterlein, 376-2189, mvetr@centurytel.net<br />
_________________________________________________________<br />
John Ryberg, water, 376-4871, jonwan@rockisland.com<br />
Jack Conant, roads, 376-2451, lockpickers@rockisland.com<br />
Don and Sandi McVay, water meter readers, dmcvay@peak.org<br />
Calendar of Events <strong>2012</strong>-<strong>2013</strong><br />
<strong>2012</strong> <strong>Annual</strong> Meeting 8/18/<strong>2012</strong>; 10 a.m. Deer Harbor Community Club<br />
September Board Meeting 9/18/<strong>2012</strong>; 7p.m. Polis Home<br />
October Board Meeting 10/16/<strong>2012</strong>; 7p.m. Goodhart Home<br />
November Board Meeting 11/15/<strong>2012</strong>; 7p.m. Dilling Home<br />
February Board Meeting 2/5/<strong>2013</strong>; 7 p.m. Soderquist Home<br />
March Board Meeting 3/11/<strong>2013</strong>; 3 p.m. Dilling Home<br />
April Board Meeting 4/8/<strong>2013</strong>; 3 p.m. Water Works<br />
Chipper Day 4/15/<strong>2013</strong> <strong>Spring</strong> <strong>Point</strong><br />
Fire Drill 5/15/<strong>2013</strong> <strong>Spring</strong> <strong>Point</strong><br />
May Board Meeting 5/23/<strong>2013</strong>; 3 p.m. Goodhart Home<br />
June Board Meeting 6/12/<strong>2013</strong>; 3 p.m. Dilling Home<br />
July Board Meeting 7/23/<strong>2013</strong> 7:30 p.m. Polis Home<br />
<strong>Annual</strong> Picnic 7/27/<strong>2013</strong> Hamaker’s Grove<br />
<strong>2013</strong> <strong>Annual</strong> Meeting 8/17/<strong>2013</strong> Deer Harbor Community Club<br />
Future Board Meetings 4 th Tuesday of the month TBA<br />
Planned Events for 2014<br />
2014 <strong>Annual</strong> Picnic 7/26/2014<br />
2014 <strong>Annual</strong> Meeting 8/16/2014