PROJECT H SR-91 Between SR-57 and I-5<br />
Status:<br />
Construction to Start Soon<br />
Contact:<br />
Rose Casey, Capital Projects<br />
(714) 560-5729<br />
Summary: The project will add a new westbound general purpose lane through the cities of Anaheim and<br />
Fullerton. <strong>OC</strong>TA and Caltrans approved the final design and the project will be advertised in<br />
October 2012 for construction. Construction will begin in late 2012/early 2013, and <strong>OC</strong>TA and<br />
Caltrans will conduct pre-construction public outreach.<br />
PROJECT I<br />
SR-91 Between SR-57 and SR-55<br />
Status: SR-91 Between SR-55 and Tustin Avenue Interchange —<br />
Final Design and Right-of-Way Activities in Progress<br />
Contact:<br />
Rose Casey, Capital Projects<br />
(714) 560-5729<br />
Summary: Caltrans is finalizing the design to improve traffic flow at the SR-55/SR-91 interchange. Caltrans<br />
right-of-way staff is proceeding with temporary construction easement acquisition efforts for<br />
19 parcels. Both final design and right-of-way phases are expected to conclude in early 2013<br />
with construction advertised and awarded in mid 2014.<br />
Status:<br />
SR-91 Between SR-57 to SR-55 — PSR in Progress<br />
Contact:<br />
Rose Casey, Capital Projects<br />
(714) 560-5729<br />
Summary: The project adds an additional eastbound lane from SR-57 to the SR-55. The project will<br />
improve freeway-to-freeway interchange operations between the SR-91/SR-57 and<br />
SR-91/SR-55. The project will reduce congestion and delay in the area. The PSR is expected to<br />
be complete in early 2013.