Perdido River and Bay - Florida Department of Environmental ...
Perdido River and Bay - Florida Department of Environmental ...
Perdido River and Bay - Florida Department of Environmental ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
20 Water Quality Status Report: <strong>Perdido</strong> <strong>River</strong> <strong>and</strong> <strong>Bay</strong><br />
The Watershed Management Cycle in<br />
the <strong>Florida</strong> <strong>Department</strong> <strong>of</strong> <strong>Environmental</strong><br />
Protection’s Northwest District<br />
Figure 1.1 shows the order in which the <strong>Department</strong>’s Northwest<br />
District basin groups will be evaluated under the watershed management<br />
cycle. These groups are identified according to a U.S. Geological Survey<br />
classification system using hydrologic unit codes.<br />
Ochlockonee–St. Marks, a Group 1 basin, was the fi rst basin in the<br />
district to undergo a preliminary assessment in 2000. A preliminary<br />
assessment for the Group 2 basin, Apalachicola–Chipola, was completed<br />
in 2001 <strong>and</strong> for the Group 3 basin, Choctawhatchee–St. Andrew, in 2002.<br />
The Group 4 preliminary assessment for the Pensacola Basin was carried<br />
out in 2003. The Group 5 basin, <strong>Perdido</strong> <strong>River</strong> <strong>and</strong> <strong>Bay</strong> Basin, is the<br />
subject <strong>of</strong> this report. In 2005, the cycle resumed with the Group 1 basin,<br />
Ochlockonee–St. Marks.<br />
Figure 1.1: Schedule for Implementing the Watershed Management Cycle in the <strong>Department</strong>’s<br />
Northwest District, Basin Groups 1 through 5