<strong>Lot</strong> <strong>No</strong>. ................<br />

<strong>Irrigation</strong> <strong>Construction</strong> <strong>Division</strong>, <strong>Varanasi</strong><br />

SCHEDULE-A<br />

ame of Work : <strong>Construction</strong> of <strong>Division</strong> Office building above I.C.C. <strong>Varanasi</strong><br />

building 2nd floor in Sigra Canal Colony.<br />

S.. Item of work Unit Qty.<br />

1. Ist class brick work in 1:4 C.M. with<br />

coarse sand including cost of all<br />

material, labour T&P etc. M 3 71.00<br />

2. Centering and shuttering for R.C.C.<br />

work in slab, beam, sunshade etc. with<br />

cost of all material, T&P and labour etc. M 2 219.00<br />

3. R.C.C. work in 1:2:4 C.M. in slab,<br />

beam, sunshade etc with coarse sand<br />

including cost of all material labour,<br />

T&P etc. M 3 30.00<br />

4. P/F box type fan hooks including cost<br />

of all material, labour T&P etc. <strong>No</strong>. 09<br />

5. P/F 100mm dia P.V.C. A.C. down pipe<br />

including cost of all material, labour<br />

T&P etc. R.M. 50.00<br />

6. Cutting, bending, binding and placing in<br />

position of steel reinforcement<br />

including cost of all material, labour<br />

T&P etc. MT 2.80<br />

7. Cement Plaster 12.5mm thick in 1:4<br />

C.M. with coarse sand including cost of<br />

all material, labour, T&P etc. M 2 915.00<br />

8. S/F 3mm thick 32mm wide in joint of<br />

floor at the time of laying floor with<br />

floor level including cost of all material,<br />

labour T&P etc. R.M. 109.00<br />

9. P/F in position of colapsiable steel gate<br />

shutter including cost of all material<br />

labour T&P etc. M 2 5.25<br />

10. Fabrication and providing and fixing in<br />

position of M.S. equal angle door frame<br />

40x40x6mm size including cost of all<br />

material labour, T&P etc. kg. 270.00<br />

11. Fabrication, supplying and fixing in<br />

position of window size 1.85x1.35 with<br />

2,4 and T-Section with grill 10 mm<br />

square bar spacing 50mm c/c including<br />

cost of all material, labour T&P etc. M 2 20.00<br />

12. Providing and fixing steel ventilator<br />

100x1.80m 2 and stair case also with<br />

T.C. and 4 section frame etc. including<br />

cost of all material, labour T&P etc. M 2 2.70<br />

In<br />

Figure<br />

Rate<br />

In Words


13. Providing, Fabrication and fixing<br />

mosquito proof G.I. Jali with Sheesam<br />

wood batten including cost of all<br />

material, labour T&P etc. M 2 22.90<br />

14. Providing and fixing door shutter of<br />

32mm thick plywood including all<br />

fittings with cost of all material labour<br />

T&P etc. M 2 26.00<br />

15. Providing and fixing of glass pans in<br />

window and ventilator frame T&Z<br />

section including cost of all material,<br />

labour T&P etc. M 2 21.00<br />

16. Providing and fixing white china glazed<br />

or of directed 6 mm thick colour tiles in<br />

floor & wall laid1:3C.M. and approved<br />

coarse sand mortar finished with white<br />

cement slurry joining and polishing<br />

complete including supply of all<br />

material, labour T&P etc. M 2 333.00<br />

17. Providing and fixing GI 50 mm dia pipe<br />

on railing including cost of all material,<br />

labour T&P etc. R.M. 45.00<br />

18. Providing and fixing 12mm squre Rod<br />

railling with flat patti top and bottom<br />

including cost of all material, labour<br />

T&P etc. Kg. 675.00<br />

19. P.O.P work on wall and ceiling with<br />

cornishing, moulding and making ring<br />

etc. complete including cost of all<br />

material T&P labour etc. M 2 191.00<br />

20. Anodised alluminium door partition<br />

2mm thick section including cost of all<br />

material, labour & T&P etc. M 2 16.00<br />

21. Painting Two coat with synthetic<br />

enamel paint on door and window<br />

including cost of all material, labour<br />

T&P etc. M 2 205.00<br />

22. Preparation of surface for apex exterior<br />

emulsion paint free from bulg and<br />

preparation by sand papering and<br />

applying putty etc. for proper<br />

completion of work and finishing wall<br />

with apex exterior emulsion paint of<br />

approved make and make quality on<br />

prepared surface with two coat to give<br />

an even shade and surface including<br />

supply of all material labour, T&P<br />

complete M 2 173.00<br />

2


3<br />

23. Preparation of surface for premium<br />

emulson paint or enterior painting free<br />

from bulg & preparation by sand<br />

papering and applying putty etc. for<br />

proper completion of work and<br />

finishing wall with two coat of premium<br />

emulsion of approved make and make<br />

quality and prepared surface above one<br />

coat of primer to given even shade and<br />

surface including supply of all material,<br />

labour T&P etc. M 2 741.00<br />

24. Making drop coarse in sun shade and<br />

slab including cost of all material,<br />

labour T&P etc. RM 72.00<br />

25. Cement plaster 20mm thick in 1:2 C.M.<br />

with coarse sand in dado with neat coat<br />

of cement slurry incluidng cost of all<br />

material labour T&P etc. M 2 12.00<br />

26. Electric work in all respect of <strong>Division</strong><br />

office building above I.C.C. <strong>Varanasi</strong><br />

building 2nd floor in Sigra Canal<br />

Colony including cost of all material<br />

labour T&P etc. Job 01<br />

27. Water supply, sanitary and drainage<br />

work in division office building above<br />

I.C.C. <strong>Varanasi</strong> building 2nd floor in<br />

Sigra Canal Colony including cost of all<br />

material, labour T&P etc. Job 01<br />

Signature of Contractor