<strong>Frigstad</strong> Engineering<br />

The <strong>Frigstad</strong> Engineering group has provided rig designs and engineering services to the offshore drilling<br />

and production industry since 1981. With offices in Singapore, Norway and Brazil, we have established<br />

strong ties with major offshore shipyards and suppliers of drilling equipment _ and we are able to serve<br />

our clients word-wide. <strong>Frigstad</strong> Engineering operates with a deeply embedded philosophy of designing<br />

and modifying rigs according to the operational needs of the professionals who work on them and with<br />

the expectations of oil companies and investors in mind.<br />

The <strong>Frigstad</strong> <strong>D80</strong> Design<br />

<strong>Frigstad</strong> <strong>D80</strong> is a purpose-designed semi-submersible drilling unit developed by <strong>Frigstad</strong> Engineering.<br />

<strong>D80</strong> is a proprietary design with superior cost efficiency and performance _ tailor made for efficient drilling<br />

of deepwater exploration and development wells.<br />

<strong>D80</strong> SD DP3 + PSM Design _ Key Features<br />

10,000 ft water depth capacity<br />

50,000 ft drilling depth capacity<br />

Vertical racking capacity for 7,200 ft drilling riser in 100 ft stands Storage onboard<br />

for 10,000 ft of drilling riser<br />

Variable deck load capacity of more than 6,000 MT<br />

2 X 100 MT platform cranes and large deck space for handling and storage<br />

of a number of fully assembled X-mas trees<br />

Large moonpool opening of 39m x 8m<br />

Powerful DP3 system with 8 thrusters that enables the rig to stay on location even<br />

in severe weather conditions and transit by up to 8-9 knots.<br />

Anchor winches for hook-up to pre-set mooring system<br />

<strong>D80</strong> OUTLINE SPECIFICATION - <strong>D80</strong> SD DP3 + PSM<br />

REGULATORY BODY APPROVALS<br />

SOLAS 2004, MARPOL 1973/78, IMO MODU-CODE, all with latest amendments<br />

CLASSIFICATION<br />

DNV +1A1 COLUMN STABILIZED DRILLING UNIT, DYNPOS AUTRO (DP3), POSMOOR-ATA, CRANE, HELIDECK, ECO, F-AM and DRILL<br />

ENVIRONMENTAL OPERATING LIMITS<br />

Maximum Wind Velocity<br />

70 knots / 100 knots<br />

Air Gap (Operational / Survival) 9.5 / 12.5 m (31.2 / 41.0 ft)<br />

Wave Height Hs / Hmax<br />

10.0 / 17.7 m (32.8 / 58.1 ft)<br />

PRINCIPAL PARTICULARS<br />

Length of Pontoons 105.0 m (344.5 ft)<br />

Displacement (operational) 39,618 MT (38,992 LT)<br />

Width & Length, Pipe Rack Deck<br />

Displacement (survival)<br />

36,897 MT (36,314 LT)<br />

73 x 72 m (239.5 x 236.2 ft)<br />

Displacement (transit)<br />

Height to Pipe Rack Deck (ABL) 37.0 m (121.4 ft) 30,644 MT (30,160 LT)<br />

Draft (operational) 19 m (62.3 ft) Water depth (max) 10,000 ft (3,048 meters)<br />

Draft (survival) 16 m (52.5 ft) Drilling depth (max) 50,000 ft (15,240 meters)<br />

STORAGE CAPACITIES<br />

Bulk mud 327 m 3 (11,550 ft 3 )<br />

Drilling water, pontoon<br />

2,583 m 3 (16,247 bbls)*<br />

Bulk cement 327 m 3 (11,550 ft 3 ) Potable water 896 m 3 (5,636 bbls)*<br />

Sack material, upper hull 8,400 sacks<br />

Open pipe rack deck area 2,612 m 2 (28,155 ft 2 )<br />

Base oil for mud, pontoon 653 m 3 (4,107 bbls)* Variable deck load (max operational) 6,100 MT (6,724 ST)<br />

Liquid mud/brine, upper hull 1022 m 3 (6,428 bbls)* Variable deck load (max transit) 4,800 MT (5,291 ST)<br />

Liquid mud/brine, pontoon 2,138 m 3 (13,448 bbls)* Payload (max operational) 10,500 MT (11,5574 ST)<br />

Diesel FO (MDO) 3,676 m 3 (23,119 bbls)* * denote 90% capabilities<br />

ACCOMODATION / OFFICE<br />

Total capacity of 160 men in 1 and 2 men cabins with individual bathroom, ample office spaces and service facilities<br />

MATERIALS HANDLING<br />

Two (2) 100 MT revolving deck cranes with 55M boom. Capable of handling any<br />

Deck Cranes<br />

under water thruster changeout. One (1) 12 MT knuckle boom tubular handling<br />

crane<br />

MARINE SYSTEMS<br />

Eight (8) diesel engines, each with 4,800 BkW capacity. Total installed horsepower<br />

Main Power / Emergency Power<br />

is approximately 38,400 BkW (51,500 BHP)<br />

AC Power Propulsion and DP with MP+AW drives and VM system.<br />

Power Distribution<br />

11 kV AC alternators<br />

Dynamic Positioning<br />

DP class 3. Eight (8) 3.7 MW azimuth thrusters<br />

Four (4) double drum winches with eight (8) fairleads<br />

Mooring System<br />

for connection to pre-set mooring system<br />

DRILLING SYSTEMS<br />

Single Quad Derrick with 1,000 ST capicity, Set-back for 50,000 ft drill string / casing<br />

Drilling Rig<br />

in 124ft-135ft stands, equiped with offline stand building capability<br />

Rotary Table<br />

One (1) 60.5" rotary with independent drive<br />

<strong>Frigstad</strong> <strong>D80</strong><br />

Tailor Made Solutions for Efficient<br />

Deepwater Exploration & Development<br />

160 Men Accomodation Open & Unrestricted Deck Space<br />

Top Drives<br />

Riser Tensioners<br />

BOP and Riser<br />

Drill String<br />

DRILLING FLUID SYSTEMS<br />

Mud Pumps and Treatment System<br />

One (1) Aker MH top drives with 1,000 ST capacity<br />

Six (6) in line hydraulic cylinder riser tensioner mounted on skid system (DATS)<br />

3,200,000 lbs with only 4 out of 6 DATS cylinders working<br />

Two (2) 18.75" x 10,000 psi Annular preventors<br />

Six (6) 18.75" x 15,000 psi Ram preventors<br />

7,200 ft of 21" riser, 50 ft joints with c&k, booster and hydraulic lines<br />

Vertical marine riser rack for 7,200 ft (100 ft stands made up of 2 x 50 ft lengths),<br />

storage onboard for 10,000 ft of riser.<br />

5 7/8 ,, drill string with subs, drill collars, heavy weight drill pipes<br />

Four (4) Main Mud pumps, Triplex, 2200 HP, 7,500 psi wp<br />

Four (4) to Six (6) Linear Motion Shale Shakers where two (2) equipped as mud cleaners<br />

(desilter and desander), one (1) gumbo buster, two (2) Degasser Units, two (2) 60 bbls trip tanks<br />

OTHERS<br />

Helicopter Deck Capacity<br />

Designed for M18 and EH 101 helicopters<br />

Four (4) lifeboats with total capacity of 320 persons. Fourteen (14) inflatable liferafts<br />

Life Saving Equipment<br />

with capacity of 25 persons each. One (1) fast rescue boat<br />

Note: The details included in this specification may change prior to completion of the rig.<br />

Crown Mounted Compensator<br />

8 x 3.7 MW Azimuth Thrusters<br />

<strong>Frigstad</strong> Engineering Inc.<br />

C/O <strong>Frigstad</strong> Engineering (Singapore) Pte Ltd<br />

9 Temasek Boulevard Suntec Tower 2<br />

#44-02 Singapore 038989<br />

Tel : +65 6349 0082<br />

Fax : +65 6223 3906<br />

Email : fes@frigstad.com<br />

www.frigstad.com


SINGLE DERRICK<br />

Dynamic Quad Derrick with crown mounted<br />

compensator and offline stand building capability.<br />

TOP DRIVE<br />

One (1) AC Electric top drive,<br />

1,000 st SWL.<br />

RISER TENSIONERS<br />

Six (6) in line skid mounted<br />

hydraulic cylinder riser<br />

tensioners.<br />

PIPE HANDLING<br />

TEMPLATE INSTALLATION<br />

PIPE HANDLING SYSTEM<br />

Efficient pipe handling system with set-back<br />

capacity for up to 40,000 ft drill pipe, or in<br />

combination with most casing strings.<br />

RISER HANDLING SYSTEM<br />

Efficient riser handling system<br />

with a set-back capacity for<br />

7,200 ft 21'' marine riser<br />

system in 100 ft stands.<br />

THRUSTERS<br />

Eight (8) 3.7 MW<br />

azimuth thrusters.<br />

Designed for change<br />

out in the field.<br />

Off line-Stand Building Capability<br />

LIFE SAVING EQUIPMENT<br />

Four (4) lifeboats, total<br />

capacity 320 persons.<br />

Fourteen (14) inflatable lift<br />

rafts, 25 persons each<br />

One (1) fast rescue boat.<br />

HELICOPTER DECK<br />

Designed for<br />

M18 and EH101.<br />

RISER SYSTEM<br />

21'' marine riser.<br />

ACCOMODATION/OFFICES<br />

Total capacity 160 men,<br />

all in 1 and 2 men cabins w/individual<br />

bathroom. Ample office spaces<br />

and service facilities.<br />

Vertical Pipe Handling Using a<br />

Bridge Racking Crane<br />

Barge with template positioned<br />

under rig with AHV’s<br />

DECK CRANES<br />

Two (2) 100 mt main deck revolving cranes<br />

with 55m boom. Capable of handling any<br />

under water thruster change out.<br />

Horizontal Pipe & Tubular Handling<br />

Using a Knuckle Boom Crane & Catwalk Machine<br />

Template lowered into water<br />

EXTENDED DECK BOX<br />

Additional space in Deck Box on Port & Starboard<br />

sides of the Vessel, houses Mooring Winches, Reel<br />

Mounted "Bulk" Hoses, ventilation equipment and<br />

provides more deck space on Pipe Rack Deck.<br />

BOP-2 being run<br />

on drillpipe.<br />

MAIN POWER<br />

Eight (8) diesel engines<br />

with total installed<br />

power of almost 38,400<br />

BkW (51,500 BHP).<br />

MOORING SYSTEM<br />

Four (4) double drum winches with eight (8)<br />

fairleads, for connecting to pre-set mooring system.<br />

BOP-1 connected to<br />

wellhead on template.<br />

Vertical Riser Storage & Handling<br />

Landing template on seabed