Frigstad D80
Frigstad D80
Frigstad D80
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Frigstad</strong> Engineering<br />
The <strong>Frigstad</strong> Engineering group has provided rig designs and engineering services to the offshore drilling<br />
and production industry since 1981. With offices in Singapore, Norway and Brazil, we have established<br />
strong ties with major offshore shipyards and suppliers of drilling equipment _ and we are able to serve<br />
our clients word-wide. <strong>Frigstad</strong> Engineering operates with a deeply embedded philosophy of designing<br />
and modifying rigs according to the operational needs of the professionals who work on them and with<br />
the expectations of oil companies and investors in mind.<br />
The <strong>Frigstad</strong> <strong>D80</strong> Design<br />
<strong>Frigstad</strong> <strong>D80</strong> is a purpose-designed semi-submersible drilling unit developed by <strong>Frigstad</strong> Engineering.<br />
<strong>D80</strong> is a proprietary design with superior cost efficiency and performance _ tailor made for efficient drilling<br />
of deepwater exploration and development wells.<br />
<strong>D80</strong> SD DP3 + PSM Design _ Key Features<br />
10,000 ft water depth capacity<br />
50,000 ft drilling depth capacity<br />
Vertical racking capacity for 7,200 ft drilling riser in 100 ft stands Storage onboard<br />
for 10,000 ft of drilling riser<br />
Variable deck load capacity of more than 6,000 MT<br />
2 X 100 MT platform cranes and large deck space for handling and storage<br />
of a number of fully assembled X-mas trees<br />
Large moonpool opening of 39m x 8m<br />
Powerful DP3 system with 8 thrusters that enables the rig to stay on location even<br />
in severe weather conditions and transit by up to 8-9 knots.<br />
Anchor winches for hook-up to pre-set mooring system<br />
<strong>D80</strong> OUTLINE SPECIFICATION - <strong>D80</strong> SD DP3 + PSM<br />
REGULATORY BODY APPROVALS<br />
SOLAS 2004, MARPOL 1973/78, IMO MODU-CODE, all with latest amendments<br />
CLASSIFICATION<br />
DNV +1A1 COLUMN STABILIZED DRILLING UNIT, DYNPOS AUTRO (DP3), POSMOOR-ATA, CRANE, HELIDECK, ECO, F-AM and DRILL<br />
ENVIRONMENTAL OPERATING LIMITS<br />
Maximum Wind Velocity<br />
70 knots / 100 knots<br />
Air Gap (Operational / Survival) 9.5 / 12.5 m (31.2 / 41.0 ft)<br />
Wave Height Hs / Hmax<br />
10.0 / 17.7 m (32.8 / 58.1 ft)<br />
PRINCIPAL PARTICULARS<br />
Length of Pontoons 105.0 m (344.5 ft)<br />
Displacement (operational) 39,618 MT (38,992 LT)<br />
Width & Length, Pipe Rack Deck<br />
Displacement (survival)<br />
36,897 MT (36,314 LT)<br />
73 x 72 m (239.5 x 236.2 ft)<br />
Displacement (transit)<br />
Height to Pipe Rack Deck (ABL) 37.0 m (121.4 ft) 30,644 MT (30,160 LT)<br />
Draft (operational) 19 m (62.3 ft) Water depth (max) 10,000 ft (3,048 meters)<br />
Draft (survival) 16 m (52.5 ft) Drilling depth (max) 50,000 ft (15,240 meters)<br />
STORAGE CAPACITIES<br />
Bulk mud 327 m 3 (11,550 ft 3 )<br />
Drilling water, pontoon<br />
2,583 m 3 (16,247 bbls)*<br />
Bulk cement 327 m 3 (11,550 ft 3 ) Potable water 896 m 3 (5,636 bbls)*<br />
Sack material, upper hull 8,400 sacks<br />
Open pipe rack deck area 2,612 m 2 (28,155 ft 2 )<br />
Base oil for mud, pontoon 653 m 3 (4,107 bbls)* Variable deck load (max operational) 6,100 MT (6,724 ST)<br />
Liquid mud/brine, upper hull 1022 m 3 (6,428 bbls)* Variable deck load (max transit) 4,800 MT (5,291 ST)<br />
Liquid mud/brine, pontoon 2,138 m 3 (13,448 bbls)* Payload (max operational) 10,500 MT (11,5574 ST)<br />
Diesel FO (MDO) 3,676 m 3 (23,119 bbls)* * denote 90% capabilities<br />
ACCOMODATION / OFFICE<br />
Total capacity of 160 men in 1 and 2 men cabins with individual bathroom, ample office spaces and service facilities<br />
MATERIALS HANDLING<br />
Two (2) 100 MT revolving deck cranes with 55M boom. Capable of handling any<br />
Deck Cranes<br />
under water thruster changeout. One (1) 12 MT knuckle boom tubular handling<br />
crane<br />
MARINE SYSTEMS<br />
Eight (8) diesel engines, each with 4,800 BkW capacity. Total installed horsepower<br />
Main Power / Emergency Power<br />
is approximately 38,400 BkW (51,500 BHP)<br />
AC Power Propulsion and DP with MP+AW drives and VM system.<br />
Power Distribution<br />
11 kV AC alternators<br />
Dynamic Positioning<br />
DP class 3. Eight (8) 3.7 MW azimuth thrusters<br />
Four (4) double drum winches with eight (8) fairleads<br />
Mooring System<br />
for connection to pre-set mooring system<br />
DRILLING SYSTEMS<br />
Single Quad Derrick with 1,000 ST capicity, Set-back for 50,000 ft drill string / casing<br />
Drilling Rig<br />
in 124ft-135ft stands, equiped with offline stand building capability<br />
Rotary Table<br />
One (1) 60.5" rotary with independent drive<br />
<strong>Frigstad</strong> <strong>D80</strong><br />
Tailor Made Solutions for Efficient<br />
Deepwater Exploration & Development<br />
160 Men Accomodation Open & Unrestricted Deck Space<br />
Top Drives<br />
Riser Tensioners<br />
BOP and Riser<br />
Drill String<br />
DRILLING FLUID SYSTEMS<br />
Mud Pumps and Treatment System<br />
One (1) Aker MH top drives with 1,000 ST capacity<br />
Six (6) in line hydraulic cylinder riser tensioner mounted on skid system (DATS)<br />
3,200,000 lbs with only 4 out of 6 DATS cylinders working<br />
Two (2) 18.75" x 10,000 psi Annular preventors<br />
Six (6) 18.75" x 15,000 psi Ram preventors<br />
7,200 ft of 21" riser, 50 ft joints with c&k, booster and hydraulic lines<br />
Vertical marine riser rack for 7,200 ft (100 ft stands made up of 2 x 50 ft lengths),<br />
storage onboard for 10,000 ft of riser.<br />
5 7/8 ,, drill string with subs, drill collars, heavy weight drill pipes<br />
Four (4) Main Mud pumps, Triplex, 2200 HP, 7,500 psi wp<br />
Four (4) to Six (6) Linear Motion Shale Shakers where two (2) equipped as mud cleaners<br />
(desilter and desander), one (1) gumbo buster, two (2) Degasser Units, two (2) 60 bbls trip tanks<br />
OTHERS<br />
Helicopter Deck Capacity<br />
Designed for M18 and EH 101 helicopters<br />
Four (4) lifeboats with total capacity of 320 persons. Fourteen (14) inflatable liferafts<br />
Life Saving Equipment<br />
with capacity of 25 persons each. One (1) fast rescue boat<br />
Note: The details included in this specification may change prior to completion of the rig.<br />
Crown Mounted Compensator<br />
8 x 3.7 MW Azimuth Thrusters<br />
<strong>Frigstad</strong> Engineering Inc.<br />
C/O <strong>Frigstad</strong> Engineering (Singapore) Pte Ltd<br />
9 Temasek Boulevard Suntec Tower 2<br />
#44-02 Singapore 038989<br />
Tel : +65 6349 0082<br />
Fax : +65 6223 3906<br />
Email : fes@frigstad.com<br />
www.frigstad.com
SINGLE DERRICK<br />
Dynamic Quad Derrick with crown mounted<br />
compensator and offline stand building capability.<br />
TOP DRIVE<br />
One (1) AC Electric top drive,<br />
1,000 st SWL.<br />
RISER TENSIONERS<br />
Six (6) in line skid mounted<br />
hydraulic cylinder riser<br />
tensioners.<br />
PIPE HANDLING<br />
TEMPLATE INSTALLATION<br />
PIPE HANDLING SYSTEM<br />
Efficient pipe handling system with set-back<br />
capacity for up to 40,000 ft drill pipe, or in<br />
combination with most casing strings.<br />
RISER HANDLING SYSTEM<br />
Efficient riser handling system<br />
with a set-back capacity for<br />
7,200 ft 21'' marine riser<br />
system in 100 ft stands.<br />
THRUSTERS<br />
Eight (8) 3.7 MW<br />
azimuth thrusters.<br />
Designed for change<br />
out in the field.<br />
Off line-Stand Building Capability<br />
LIFE SAVING EQUIPMENT<br />
Four (4) lifeboats, total<br />
capacity 320 persons.<br />
Fourteen (14) inflatable lift<br />
rafts, 25 persons each<br />
One (1) fast rescue boat.<br />
HELICOPTER DECK<br />
Designed for<br />
M18 and EH101.<br />
RISER SYSTEM<br />
21'' marine riser.<br />
ACCOMODATION/OFFICES<br />
Total capacity 160 men,<br />
all in 1 and 2 men cabins w/individual<br />
bathroom. Ample office spaces<br />
and service facilities.<br />
Vertical Pipe Handling Using a<br />
Bridge Racking Crane<br />
Barge with template positioned<br />
under rig with AHV’s<br />
DECK CRANES<br />
Two (2) 100 mt main deck revolving cranes<br />
with 55m boom. Capable of handling any<br />
under water thruster change out.<br />
Horizontal Pipe & Tubular Handling<br />
Using a Knuckle Boom Crane & Catwalk Machine<br />
Template lowered into water<br />
EXTENDED DECK BOX<br />
Additional space in Deck Box on Port & Starboard<br />
sides of the Vessel, houses Mooring Winches, Reel<br />
Mounted "Bulk" Hoses, ventilation equipment and<br />
provides more deck space on Pipe Rack Deck.<br />
BOP-2 being run<br />
on drillpipe.<br />
MAIN POWER<br />
Eight (8) diesel engines<br />
with total installed<br />
power of almost 38,400<br />
BkW (51,500 BHP).<br />
MOORING SYSTEM<br />
Four (4) double drum winches with eight (8)<br />
fairleads, for connecting to pre-set mooring system.<br />
BOP-1 connected to<br />
wellhead on template.<br />
Vertical Riser Storage & Handling<br />
Landing template on seabed