Your Home: From first to last<br />

• No obligation site visit.<br />

• Project Discussion<br />

• Planning application placed with<br />

local planning department.<br />

• Prepare draft engineering drawings<br />

• Sample tour to German factory for a<br />

minimum of 2 days to discuss specifications<br />

and costs<br />

• Prepare detailed construction drawings,<br />

structural calculations, design of foundations<br />

and floor slab and Building Regulations details<br />

Day<br />

1<br />

Planning<br />

& Design<br />

Month 1 Month 2 Month 3<br />

Month 4<br />

Manufacture<br />

Cashflow<br />

No Cost<br />

10% due upon<br />

signing of contract<br />

Fixed price agreed<br />

bank guarantee in place<br />

18