ION-BOILER <strong>STAFOR</strong> TECHNICAL PASSPORT V 12.11.<br />

according with EN 60335 – 1, EN 60335 – 2 – 35<br />

1. The ion-<strong>boiler</strong> <strong>STAFOR</strong> (further – the <strong>boiler</strong>) is provided for installation<br />

only in buildings with one phase (1P) or three phase (3P) – depends on<br />

model of <strong>boiler</strong>, variable voltage electric current input.<br />

2. For connection to electric current there is obligatory earth connection<br />

(further – earthing).<br />

3. Heating system with the ion-<strong>boiler</strong> <strong>STAFOR</strong> must be installed according<br />

with this technical passport (further – TP).<br />

4. Filling the heating system must be done by special heat carrier<br />

STATERM EKO E40, it is prohibited to use water. Using water causes<br />

malfunction of the <strong>boiler</strong>.<br />

5. After filling of the heating system with heat carrier, it is obligatory to<br />

measure consumable voltage with amper-meter.<br />

6. Work of the <strong>boiler</strong> <strong>STAFOR</strong> is not allowed in heat carrier simmer`s<br />

regime.<br />

7. It is prohibited to strew the heat carrier STATERM EKO E40 with water<br />

or any other liquid.<br />

WARNING!<br />

Before the purchase of the ion-<strong>boiler</strong> it is necessary to make sure that<br />

there is possibility to connect it. For it is obligatory to consult with<br />

specialists about the necessary electrical capacity.<br />

The voltage of the ionic <strong>boiler</strong> is 230 V or 400V variable electric current.<br />

The maximal work capacity of the <strong>boiler</strong>s depends from the heat<br />

carrier`s measurements.<br />

The maximal work power of the ion-<strong>boiler</strong> depends from the heat<br />

carrier`s measurements.<br />

There is obligatory EARTHING.<br />

It is prohibited to connect the ion-<strong>boiler</strong> at the continuous current.<br />

1. INTRODUCTION<br />

1.1. This technical passport is provided to inform the buyers about the<br />

technical data of the ion-<strong>boiler</strong> <strong>STAFOR</strong> and contains the information<br />

about the manufacturer guarantee, indications that are necessary to<br />

be observed during assembly of the <strong>boiler</strong>.<br />

1.2. The <strong>boiler</strong> is provided for heat carrier STATERM EKO E40 heating in<br />

residential and non-residential room heating systems with the<br />

maximal heating capacity showed in table, under condition, that the<br />

rooms are well insulated.<br />

2. GENERAL GUIDELINES<br />

2.1. At the purchase moment of the ionic <strong>boiler</strong> <strong>STAFOR</strong>, in the presence<br />

of the buyer, there should be checked the complete set according with<br />

TP item 4.<br />

2.2. After the purchase of the <strong>boiler</strong> there is not accepted any claims about<br />

the completion set and outer technical damages.<br />

2.3. Before connection of the <strong>boiler</strong> it is recommended to acquaint with<br />

this TP, instructions and normative acts.<br />

3. THE TECHNICAL DATA<br />

3.1. The main technical data of the <strong>boiler</strong>, indicated in the table Nr. 1.<br />

3.2. The ion-<strong>boiler</strong> <strong>STAFOR</strong> is electrode – ionic, flow type, liquid heater.<br />

The heating of the heat carrier in the <strong>boiler</strong> is due to electric power<br />

and flow of heat carrier ions.<br />

4. PIECING<br />

4.1. In the completion set of the ion-<strong>boiler</strong> <strong>STAFOR</strong> include:<br />

4.1.1. The <strong>boiler</strong>;<br />

4.1.2. The technical passport (TP), together with <strong>user</strong> <strong>manual</strong>;<br />

4.1.3. Package.<br />

5. SAFETY MEASUREMENTS<br />

5.1. The connection of the <strong>boiler</strong> to the electric network should be done<br />

only by a specialist – electrician, according with the existing EU<br />

normative acts.<br />

5.2. During service it is obligatory to switch off the <strong>boiler</strong> from electric<br />

current.<br />

5.3. The ion-<strong>boiler</strong> must have earthing.<br />

5.4. During exploitation it is PROHIBITED:<br />

5.4.1. to use the <strong>boiler</strong> without earthing;<br />

5.4.2. to use the <strong>boiler</strong> without electric network automatic<br />

machine;<br />

5.4.3. to use the <strong>boiler</strong> in electric network without not insulated<br />

clamps;<br />

5.4.4. to install the valve on the output of the <strong>boiler</strong> before<br />

protection group;<br />

5.4.5. to pour in or to pour out heat carrier without switching off<br />

the <strong>boiler</strong>.<br />

5.5. Not to allow to get liquid on the surface of the <strong>boiler</strong>.<br />

5.6. It is not recommended to use in one system two or more of different<br />

capacity <strong>boiler</strong>s.<br />

5.7. It is PROHIBITED to exploit the heat system:<br />

5.7.1. without protection group;<br />

5.7.2. in case of leakage of heat carriers.<br />

5.8. In case of damage of electric wires they should be replaced with the<br />

help of certified electrician.<br />

6. THE ORDER OF INSTALLATION<br />

6.1. Assembly of heat system:<br />

6.1.1. The assembly of the heat system must be made by<br />

specialist – a plumber. Heat system must be pure clean,<br />

without mechanical dirt, preservatives, water or any other<br />

heat carrier. If required heating system must be rinsed.<br />

6.1.2. The installation of the ion-<strong>boiler</strong> must be done in<br />

accordance with figure 11.1 and normative acts.<br />

6.1.3. The connections of <strong>boiler</strong> threads and heating system<br />

must be hermetic. After assembly of the heating system it<br />

is necessary to check hermetism. All leakages must be<br />

avoid.<br />

6.2. The <strong>boiler</strong> must be installed in the distance of 250 mm from any<br />

combusting materials.<br />

6.3. Connection of the ion-<strong>boiler</strong> at the electric network:<br />

6.3.1. For protection of the ion-<strong>boiler</strong> there is not allowed to use<br />

B type automatic machines.<br />

6.3.2. Connection of the <strong>boiler</strong> to the electric network should be<br />

done by certified electrician according with EU normative<br />

acts and instructions.<br />

6.3.3. Control panel connection must be made in accordance<br />

with connection schema.<br />

6.3.4. The <strong>boiler</strong> has to be connected into the electric network<br />

at least with the minimum diameter of wire obligatory to<br />

the consumption of <strong>boiler</strong>. Also the earthing should be<br />

done with a cable of a proper diameter. One should<br />

consult with specialist for the proper diameter.<br />

6.3.5. WARNING! The connection of the <strong>boiler</strong> must be made<br />

according with the labels on the <strong>boiler</strong> and control panel.<br />

EARTHING – OBLIGATORY!<br />

6.3.6. Earthing device resistance must be not more than 4 Om.<br />

6.3.7. Connection cable type – T (heat resistant).<br />

7. TRANSPORTATION AND STORAGE<br />

7.1. Packaged <strong>boiler</strong> transportation is allowed by railway or vehicles, under<br />

condition that products are protected from humidity and mechanical<br />

damages according with transportation regulations.<br />

7.2. To store the <strong>boiler</strong>s in dry, heated rooms with temperature +5 to<br />

+40°C.<br />

7.3. The storage of the ion-<strong>boiler</strong>s must be provided in secure place.<br />

7.4. It is prohibited to store product without package.<br />

7.5. The admissible storage time till repacking is 10 years from<br />

manufacture.<br />

8. GUARANTEE LIABILITIES<br />

8.1. “<strong>STAFOR</strong>” Ltd gives warranty for ion-<strong>boiler</strong> - 24 month time from the<br />

date of purchase under condition that there are observed regulations<br />

stated in TP.<br />

8.2. In manufacture defect case, the <strong>user</strong> of the <strong>boiler</strong> has to turn to<br />

certified distributor or “<strong>STAFOR</strong>” Ltd.<br />

8.3. In guarantee time there will not be accepted any claims in the<br />

following cases:<br />

8.3.1. non-existence of filled document about purchase or<br />

guarantee document;<br />

8.3.2. return of not full completion set, according to 4.1. (except<br />

4.1.3.);<br />

8.3.3. in case of mechanical damages (scratch, paint peel off,<br />

pleats, etc.);<br />

8.3.4. in case of broken seal (paint on screws, holographic labels<br />

<strong>STAFOR</strong>);<br />

8.3.5. self-dependent dismantle of the <strong>boiler</strong>;<br />

8.3.6. if there are not observed <strong>user</strong>, assembly and simmer<br />

regime regulations (that can be defined by certified<br />

distributor).<br />

8.4. The guarantee document (this TP, etc.) must be taken only by<br />

“<strong>STAFOR</strong>” or certified distributor worker and only in case of <strong>boiler</strong><br />

defect.<br />

8.5. “<strong>STAFOR</strong>” ltd is responsible only for <strong>STAFOR</strong> ion-<strong>boiler</strong>, not for any<br />

other part of heating system.<br />

9. OTHER INFORMATION<br />

9.1. The <strong>boiler</strong> corresponds with the standards of EU EN 60335-1, EN<br />

60335-2-35 – test report Nr. T37D08, T25D07.<br />

9.2. <strong>Ion</strong> <strong>boiler</strong> <strong>STAFOR</strong> is internationaly patented. All rights reserved.<br />

9.3. The identification number of the ionic <strong>boiler</strong> is stated in front of TP.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!