Structural Compliance Premiums for Self-Funded Renewal Projects
Structural Compliance Premiums for Self-Funded Renewal Projects
Structural Compliance Premiums for Self-Funded Renewal Projects
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Structural</strong> <strong>Compliance</strong> <strong>Premiums</strong> <strong>for</strong> <strong>Self</strong>-<br />
<strong>Funded</strong> <strong>Renewal</strong> <strong>Projects</strong><br />
Introduction<br />
In conjunction with the launch of the Long-Term Care Home <strong>Renewal</strong> Strategy the Ministry of<br />
Health and Long-Term Care is implementing an adjustment to the ministry’s previous policy on<br />
providing structural compliance premiums <strong>for</strong> self-funded long-term care home redevelopment<br />
projects under the Policy <strong>for</strong> Funding Construction Costs of Long-Term Care Facilities, April<br />
1999. Under that policy, homes originally classified as either B or C were not made eligible <strong>for</strong><br />
increased funding if they were modified or replaced to meet current standards.<br />
Effective April 1 st 2009, beds previously classified as either B or C may be eligible <strong>for</strong> a<br />
<strong>Structural</strong> <strong>Compliance</strong> Premium (SCP) of $5.00 per day per bed if the beds were redeveloped<br />
to the standards outlined in the Long-Term Care Facilities Design Manual, May 1999 (Design<br />
Manual).<br />
Eligibility<br />
To be eligible <strong>for</strong> the SCP the following conditions must be met:<br />
.<br />
o The ministry reviewed and approved plans <strong>for</strong> the redevelopment of the beds.<br />
o The ministry approved the redeveloped building <strong>for</strong> construction start prior to<br />
March 31, 2009.<br />
o No government funding was provided to the operator to support the<br />
redevelopment of the beds.<br />
o The operator of eligible beds must apply to the ministry <strong>for</strong> the SCP and receive<br />
ministry approval of the application.<br />
o The application deadline <strong>for</strong> SCP <strong>for</strong> self-funded projects is June 30, 2009 by<br />
17:00 (EST).<br />
2