Faughart Lower 5 Final Report - ASI Louth
Faughart Lower 5 Final Report - ASI Louth
Faughart Lower 5 Final Report - ASI Louth
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
M1 Dundalk Western Bypass<br />
Site 132 <strong>Faughart</strong> <strong>Lower</strong> 5<br />
<strong>Final</strong> <strong>Report</strong><br />
ACKNOWLEDGEMENTS<br />
The archaeological excavation at Site 132, <strong>Faughart</strong> <strong>Lower</strong> 5, Co. <strong>Louth</strong> was carried<br />
out on behalf of <strong>Louth</strong> County Council and the National Roads Authority in advance<br />
of the construction of the M1 Dundalk Western Bypass.<br />
The author would like to thank:<br />
Sean Molony, <strong>Louth</strong> County Council<br />
David McGuill, <strong>Louth</strong> County Council<br />
Niall Roycroft, Project Archaeologist, National Roads Design Office, Navan<br />
Rob Lynch, IAC Ltd.<br />
ii<br />
Irish Archaeological Consultancy Ltd