16.02.2015 Views

Saturn I Countdown Manual Volume II, SA-7 (small).pdf - Heroicrelics

Saturn I Countdown Manual Volume II, SA-7 (small).pdf - Heroicrelics

Saturn I Countdown Manual Volume II, SA-7 (small).pdf - Heroicrelics

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EMERGENCY PROCEDURE (T _4101 TO T-OI)<br />

(AFTER 8- 1 Lox T .... NKING)<br />

PREMATURE CLOSURE Of 8- 1 PREyALVES<br />

1. NOTE; THE PREVALVES MAY REMA IN CLOSEO fOR 1 0 <strong>II</strong><strong>II</strong>NUTES<br />

OURING WHICH THE Lox TANKS MUST BE PRESSURIZEO,<br />

PREVALVES OPENEO , ANO Lox BUBBLING INITIATEO.<br />

THE Lox TANKS SHOULO THEN BE VENT EO AND BUBBL I NG<br />

01 SCONT INUEO WHEN THE PUMP I NLET TEMPERATURES<br />

REACH _275 0 F .<br />

2. NOTE; U PON EXCEEDING 10 M I NUTES THE PREVALV£S MUST<br />

REMA IN CLOSEO , lox ORAINED , ANO STANOBY OBSERVED<br />

UN T IL ALL SUCTION LINE fROST I S MELTEO. THE<br />

PUMP INLET PRESSURES MUST BE MONITOREO OUR I NG<br />

TH I S PER I OO, ANO<br />

(fULL CHART SCALE) THE PREVALVES MUST BE OPENEO.<br />

If THE PRESSURE EXCEEDS 200 PSIG<br />

-<br />

-~<br />

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!