18.02.2015 Views

bg4kk_f

bg4kk_f

bg4kk_f

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sponsor –<br />

Program<br />

MEA – Regulated<br />

Sustainable Energy<br />

Contract Program<br />

AFV Infrastructure<br />

Financing<br />

Pepco & BGE –<br />

Small Business<br />

Energy Advance<br />

Solar Firms – Solar<br />

financing<br />

DGS – Energy<br />

Performance<br />

Contracting<br />

Program<br />

MEA – Energy<br />

Performance<br />

Contracting<br />

Assistance Program<br />

Years Active<br />

2013 state<br />

authorization<br />

2014 RFP for<br />

initial<br />

program<br />

research<br />

Pepco: 2013<br />

to present<br />

(pilot)<br />

BGE: 2014 to<br />

present (pilot)<br />

1998 (first<br />

residential<br />

system<br />

installed)<br />

2007 to<br />

present<br />

2014 to<br />

present (pilot)<br />

Eligible<br />

Participants<br />

Residential property<br />

owners<br />

Undetermined<br />

Target<br />

Technologi<br />

es<br />

Energy<br />

efficiency;<br />

renewable<br />

energy<br />

Alternative<br />

fuel vehicles<br />

Utility Clean Energy Finance Programs<br />

Small businesses<br />

Energy<br />

efficiency<br />

Private-Sector Financing Programs<br />

Residential and<br />

commercial<br />

property owners<br />

State government<br />

agencies and local<br />

governments with<br />

aligned<br />

procurement<br />

processes<br />

Local governments<br />

and public housing<br />

authorities<br />

Rooftop<br />

solar<br />

systems<br />

Energy<br />

efficiency<br />

Energy<br />

efficiency<br />

Financing<br />

Products<br />

Contracts are<br />

billable<br />

directly to<br />

property<br />

owners<br />

Undetermine<br />

d<br />

On-bill<br />

financing<br />

Loans; leases<br />

Energy<br />

performance<br />

contracts<br />

Energy<br />

performance<br />

contracts<br />

Status<br />

Pilot projects are<br />

not yet<br />

implemented<br />

Initial RFP work is<br />

to be concluded in<br />

2014<br />

Pepco: 264<br />

customers and<br />

over $1 million in<br />

funds committed<br />

Unknown<br />

21 projects<br />

$21.3 million in<br />

annual energy<br />

savings; $310<br />

million in lifetime<br />

energy savings<br />

No contracts are<br />

yet finalized<br />

Table 4 shows program results in terms of the number of projects and the total amount financed to<br />

date. However, the total amounts financed are not easily compared between programs because some<br />

programs have operated much longer than others. Figure 2 adjusts for this disparity by dividing the total<br />

amount each program has financed by the number of years the program has been in operation. Figure 3<br />

presents the same information grouped by market sector.<br />

40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!