20.02.2015 Views

REVISED SPECIFICATION TENDER SPECIFICATION No.:

REVISED SPECIFICATION TENDER SPECIFICATION No.:

REVISED SPECIFICATION TENDER SPECIFICATION No.:

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

V. LOAD RESISTOR<br />

The sensor is a two-wire transmitter.<br />

+ Ub<br />

GND<br />

RL<br />

The maximum allowed load resistor must be calculated using the following<br />

Formula: RL () (UL (V) – 14) X 50. (RL = 100 for UL= 24)<br />

Vi INSTALLATION<br />

Position : The sensor are fixed to the pipe nipple facing downwards.<br />

Possible installation position of the Pressure Sensor<br />

Pipe opening : A 2 mm hole.<br />

Seal : Oil : A copper washer to be used as seal<br />

Water- glycol:<br />

EPDM O-ring<br />

Fixing torque : 8Nm

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!