24.02.2015 Views

2010 Newsletter 26 - Doncaster Primary School

2010 Newsletter 26 - Doncaster Primary School

2010 Newsletter 26 - Doncaster Primary School

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

‘The Bulletin’<br />

Page 9<br />

2K’S BUILDING REPORT<br />

The new building now has the roof on it and the roof is made out of metal. The building has a frame<br />

made out of wood.<br />

By Xavier<br />

On a Monday afternoon, I looked out of the window. I saw that the builders have built a roof. The<br />

roof is protecting the concrete area from getting wet. The bricks are ready to put on and some parts<br />

already have bricks put up there! The frame of the building is wood. There is already insulation in the<br />

roof.<br />

The new building has really progressed since the start of the year and it will make a lovely building<br />

when it is finished. The workers have been working very hard to reach their goal and give us a<br />

wonderful building.<br />

By Angel<br />

On Monday, we looked out of the classroom window at the new building. On the building frame we<br />

can see where the windows will be and the doors too. The roof is on and it is made of metal. The<br />

builders have put bricks all around the building site.<br />

By Rachel<br />

If you go into 2K and look out of the back window, what do you see? Wooden frames that look like<br />

pine wood and a tin roof that has something special on it that won’t get it rusty. There are bricks<br />

stacked up ready to be used for the building.<br />

By David

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!