2K’S BUILDING REPORT<br />
The new building now has the roof on it and the roof is made out of metal. The building has a frame<br />
made out of wood.<br />
By Xavier<br />
On a Monday afternoon, I looked out of the window. I saw that the builders have built a roof. The<br />
roof is protecting the concrete area from getting wet. The bricks are ready to put on and some parts<br />
already have bricks put up there! The frame of the building is wood. There is already insulation in the<br />
roof.<br />
The new building has really progressed since the start of the year and it will make a lovely building<br />
when it is finished. The workers have been working very hard to reach their goal and give us a<br />
wonderful building.<br />
By Angel<br />
On Monday, we looked out of the classroom window at the new building. On the building frame we<br />
can see where the windows will be and the doors too. The roof is on and it is made of metal. The<br />
builders have put bricks all around the building site.<br />
By Rachel<br />
If you go into 2K and look out of the back window, what do you see? Wooden frames that look like<br />
pine wood and a tin roof that has something special on it that won’t get it rusty. There are bricks<br />
stacked up ready to be used for the building.<br />
By David