27.02.2015 Views

RFP for Design-Build Services at Eleven DPR Playgrounds ... - fems

RFP for Design-Build Services at Eleven DPR Playgrounds ... - fems

RFP for Design-Build Services at Eleven DPR Playgrounds ... - fems

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

13. Autom<strong>at</strong>ic locking g<strong>at</strong>es: Provide autom<strong>at</strong>ic-locking g<strong>at</strong>es programed to lock<br />

and unlock <strong>at</strong> specific times. Items should be included in the project as an add<br />

altern<strong>at</strong>e.<br />

G. Description Of Work<br />

The <strong>Design</strong>-<strong>Build</strong>er shall provide all necessary services, labor, equipment and m<strong>at</strong>erials<br />

as required to achieve the work as described in this document.<br />

1. Collection, Assessment and Verific<strong>at</strong>ion of Existing Conditions<br />

<strong>Design</strong>-<strong>Build</strong>er shall be responsible <strong>for</strong> the collection, assessment, and<br />

verific<strong>at</strong>ion of existing conditions.<br />

2. Archeological Document<strong>at</strong>ion<br />

<strong>Design</strong>-<strong>Build</strong>er shall conduct a Phase I archeological survey of the site in<br />

accordance with District of Columbia St<strong>at</strong>e Historic Preserv<strong>at</strong>ion Officer’s (DC<br />

SHPO) standards and guidelines <strong>for</strong> archaeological survey current <strong>at</strong> the time of<br />

the investig<strong>at</strong>ion the standards of DC Historic Preserv<strong>at</strong>ion Office, and present all<br />

findings in a report to DGS within thirty (30) days of NTP. <strong>Design</strong>-<strong>Build</strong>er must<br />

contact DC SHPO <strong>for</strong> guidelines.<br />

3. Geotechnical Study<br />

<strong>Design</strong>-<strong>Build</strong>er shall conduct a geotechnical study to determine soil and<br />

subsurface engineering properties and suitability <strong>for</strong> the proposed design and to<br />

make appropri<strong>at</strong>e recommend<strong>at</strong>ions to DGS. <strong>Design</strong>-<strong>Build</strong>er shall present all<br />

findings in a report to DGS within thirty (30) days of NTP.<br />

4. Site Surveys<br />

<strong>Design</strong>-<strong>Build</strong>er shall conduct a complete survey(s) of the site as required to<br />

successfully construct the play space. At a minimum, the survey(s) shall include<br />

boundary, topographical, and utility d<strong>at</strong>a.<br />

5. Meetings<br />

<strong>Design</strong>-<strong>Build</strong>er, the Project Manager, <strong>DPR</strong> and community shall meet as<br />

necessary to review <strong>Design</strong>-<strong>Build</strong>er’s work.<br />

6. Permitting<br />

<strong>Design</strong>-<strong>Build</strong>er shall obtain ALL permits necessary to construct the playground,<br />

including trade permits.<br />

7. Submittals<br />

<strong>Design</strong>-<strong>Build</strong>er shall submit to the Project Manager <strong>for</strong> review and approval all<br />

shop drawings, m<strong>at</strong>erial d<strong>at</strong>a and samples provided by <strong>Design</strong>-<strong>Build</strong>er, vendors<br />

and/or manufacturers. The Project Manager shall review and approve or reject<br />

submittals within five (5) business days of receipt.<br />

MODERNIZATION OF EMERY PLAYGROUND<br />

SCOPE OF WORK

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!