28.02.2015 Views

D&L Trail Construction Update By H. Scott Everett, D&L Trail ...

D&L Trail Construction Update By H. Scott Everett, D&L Trail ...

D&L Trail Construction Update By H. Scott Everett, D&L Trail ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NORTHAMPTON COUNTY<br />

D&L <strong>Trail</strong> – Freemansburg Towpath – this project is scheduled to go out for bid through<br />

PennDOT in early 2013 and should be completed by the fall. The project will install the trail on<br />

the towpath on the 1.5 mile Freemansburg section.<br />

D&L <strong>Trail</strong> – Freemansburg Pedestrian Bridge – bridge to be redecked and upgraded to be ADA<br />

accessible.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!