+Agenda Item 5<br />
Requested Action: Approval<br />
June 14, 2012<br />
TO:<br />
FROM:<br />
<strong>Denver</strong> <strong>Public</strong> <strong>Library</strong> Commission<br />
Ron Miller, Director of Finance<br />
Subject: <strong>2013</strong> <strong>Denver</strong> <strong>Public</strong> <strong>Library</strong> <strong>Budget</strong><br />
The budget was reviewed at the May 31 st Finance Committee meeting and accepted for<br />
distribution to the Commission for review and approval.<br />
The packet includes the following material:<br />
• Cover <strong>Memo</strong><br />
• <strong>Budget</strong> Timeline<br />
• DPL Organization Chart<br />
• General Fund <strong>Budget</strong><br />
• Replacement Capital Equipment<br />
• Service Expansion Requests<br />
• <strong>Budget</strong> Reduction Proposals<br />
• The Commission white paper.<br />
1. <strong>2013</strong> <strong>Budget</strong> Process<br />
The <strong>Library</strong> developed a Strategic <strong>Budget</strong> for <strong>2013</strong> that supports the goals of the <strong>Library</strong>’s<br />
Strategic Plan and the citywide Strategic Framework.<br />
<strong>Budget</strong> data will be submitted to the City in two phases this year. (A budget development<br />
timeline is attached.) The first phase was due on May 21 st and included the base budget.<br />
The base budget is comprised of supplies and services costs plus personnel costs directly<br />
controlled by DPL including overtime, shift differential, bilingual pay, and on-call staff. The<br />
base budget does not include capital equipment or base salary costs and related costs such as<br />
payroll taxes and insurance. The City again expects a shortfall of revenues to anticipated<br />
expenditures. Agencies were directed to submit a flat zero-growth base budget that maintains<br />
current-year (2012) levels of service.<br />
The second phase was due on June 4 th and includes decision packages. A decision package is<br />
detailed information for any potential change in total resources that will be allocated to DPL.<br />
The <strong>2013</strong> decision packages include the Westside service expansion, savings from remodeling<br />
Hadley or Barnum, and three cost reduction proposals that eliminate staffing at various<br />
branches to achieve a budget reduction of $2.4 million.<br />
2. General Fund <strong>Budget</strong><br />
The <strong>2013</strong> base budget is the estimate for what is needed to maintain programs and services at<br />
their current 2012 level. The personnel budget reflects the City’s estimates for increases in<br />
employee benefits such as medical, dental, life and disability insurance. It does not include a<br />
merit increase. If merit increases are approved, a budget supplement will be executed in<br />
<strong>2013</strong>.
3. Service Expansions<br />
This year, expansion proposals are again limited to mandatory items or critical items as<br />
determined by each agency. An expansion request will be submitted for the Westside Branch<br />
<strong>Library</strong> scheduled to open in mid-<strong>2013</strong>. DPL will be authorized to hire new staff a few months<br />
prior to opening. This request is considered by the City to be a mandatory item.<br />
4. Reduction Proposals<br />
DPL was directed to submit General Fund reduction options totaling $2.4 Million; a 7.5%<br />
reduction from 2012. DPL developed three reduction scenarios to measure the impact of the<br />
reduction.<br />
• Increase 32-hour branch libraries to 40-hours per week. Determine the number of<br />
branches that would need to be closed to keep the remainder of the system operating<br />
at 40-hours after the $2.4M reduction.<br />
• Operate all branches at 32-hours per week. Reduce the hours of the four 48-hour<br />
branches and one 44-hour branch to 32 hours. Determine the number of branches<br />
that need to be closed to keep the remainder of the system operating at 32-hours<br />
after the $2.4M reduction.<br />
• Reduce all branches to 24-hours per week and close Central one day per week.<br />
Determine the additional savings required to meet the $2.4M reduction without closing<br />
any branches.<br />
5. Replacement Capital Equipment<br />
Replacement capital equipment requests are submitted separately from the base budget<br />
request. The City has a separate budget to fund replacement capital equipment. This year’s<br />
request for replacement equipment totals $266,711.<br />
Please contact me if you have any questions or comments. My contact information is:<br />
Phone: 720-865-2020<br />
E-Mail: rmiller@denverlibrary.org