Energy Continued<br />
level no. measure<br />
Gold<br />
Platinum<br />
Additional<br />
EN-05b<br />
EN-05c<br />
EN-05d<br />
EN-05e<br />
EN-05f<br />
EN-05g<br />
EN-05h<br />
EN-05i<br />
EN-06<br />
EN-07<br />
EN-08<br />
EN-09<br />
EN-10<br />
EN-11<br />
EN-12<br />
EN-13<br />
EN-14<br />
Plug Loads / Appliance Efficiency<br />
Use ENERGY STAR-rated equipment for all appliances, computers and other<br />
equipment and implement power management strategies.<br />
Supply Air Temperature Reset (VAV)<br />
VAV systems should include control capabilities to reset supply air temperature<br />
to the warmest setting that will meet the cooling load in all zones.<br />
Indirect Evaporative Cooling<br />
Incorporate indirect evaporative cooling to pre-cool outside air prior to conventional cooling.<br />
Heat Recovery<br />
Install an energy recovery ventilation (ERV) system to divert waste heat into the intake air.<br />
Night Venting<br />
Install a control system capable of implementing a night venting protocol to use<br />
outside air to pre-cool interior building mass during cool night hours.<br />
Premium Economizer Performance<br />
Add control and verification features to installed economizers.<br />
Variable Speed Control<br />
Provide variable flow capabilities for air and fluid systems served by<br />
pumps and fans with motor horsepower of 5hp or larger.<br />
Demand-Responsive Buildings (Peak Power Reduction)<br />
Interface with utility to gain real-time data that influences appropriate reponse of equipment or<br />
strategies to reduce electrical demand or with equipment able to replace electricity supply.<br />
Energy Management Plan<br />
Implement a meaningful plan to inform building operation following ENERGY STAR's<br />
<strong>Guide</strong>lines for Energy Management to manage energy performance.<br />
Operator Training and Documentation --AND/OR--<br />
Building User Training and Documentation<br />
Train building operators and/or building users in how mechanical and electrical systems<br />
are intended to operate and provide systems manuals for those operators/users.<br />
Measure and Monitor Energy use for Major Systems<br />
Install measurement devices to ensure capacity to track HVAC, lighting and plug<br />
loads. Create an evaluation plan to inform ongoing operation.<br />
Platinum Enhanced Performance Strategies<br />
Implement 4 more (8 total) Enhanced Performance Strategies OR show<br />
•<br />
32% energy savings beyond ASHRAE 90.1-2007.<br />
Fault Detection and Diagnostics<br />
Fault detection and diagnostic equipment monitors refrigerant charge,<br />
airflow, economizer operation, and cycling duration.<br />
Third Party Commissioning<br />
Engage a third-party commissioning agent to participate in design reviews during the design process<br />
and to guide the commissioning process through development of a commissioning plan.<br />
Grid Source Renewable Energy (100%, 2 years)<br />
Commit to a 2-year renewable energy contract or purchase offsets equal to the predicted building's energy use.<br />
Phantom & Unintended Load Management Plan<br />
Create a plan to reduce energy demand during non-occupied hours due to<br />
appliances that are left on or have standby power loads.<br />
Solar Ready Design<br />
Follow prescriptive requirements to ensure that building is ready for future<br />
installation of solar electric or solar thermal equipment.<br />
EN-15 Onsite Renewable Power 2%<br />
Install renewable energy systems that meet or exceed 2% of the building's energy use.<br />
EN-16 Onsite Renewable Power 5%<br />
Install renewable energy systems that meet or exceed 5% of the building's energy use.<br />
EN-17 Onsite Renewable Power 10%<br />
Install renewable energy systems that meet or exceed 10% of the building's energy use.<br />
EN-18<br />
Post-Occupancy Optimization Workshop<br />
Hold a meeting between 12 and 15 months after occupancy to review operational data<br />
and assess opportunities to improve the building's energy performance.<br />
energy targets<br />
Save Energy<br />
& Carbon<br />
Measure &<br />
Manage<br />
•<br />
•<br />
•<br />
•<br />
•<br />
•<br />
•<br />
•<br />
Systems<br />
Performance<br />
•<br />
•<br />
•<br />
•<br />
•<br />
•<br />
•<br />
•<br />
•<br />
•<br />
•<br />
•<br />
16 <strong>Reference</strong> <strong>Guide</strong> v2.0 EARTHADVANTAGE COMMERCIAL