Energy Continued<br />

level no. measure<br />

Gold<br />

Platinum<br />

Additional<br />

EN-05b<br />

EN-05c<br />

EN-05d<br />

EN-05e<br />

EN-05f<br />

EN-05g<br />

EN-05h<br />

EN-05i<br />

EN-06<br />

EN-07<br />

EN-08<br />

EN-09<br />

EN-10<br />

EN-11<br />

EN-12<br />

EN-13<br />

EN-14<br />

Plug Loads / Appliance Efficiency<br />

Use ENERGY STAR-rated equipment for all appliances, computers and other<br />

equipment and implement power management strategies.<br />

Supply Air Temperature Reset (VAV)<br />

VAV systems should include control capabilities to reset supply air temperature<br />

to the warmest setting that will meet the cooling load in all zones.<br />

Indirect Evaporative Cooling<br />

Incorporate indirect evaporative cooling to pre-cool outside air prior to conventional cooling.<br />

Heat Recovery<br />

Install an energy recovery ventilation (ERV) system to divert waste heat into the intake air.<br />

Night Venting<br />

Install a control system capable of implementing a night venting protocol to use<br />

outside air to pre-cool interior building mass during cool night hours.<br />

Premium Economizer Performance<br />

Add control and verification features to installed economizers.<br />

Variable Speed Control<br />

Provide variable flow capabilities for air and fluid systems served by<br />

pumps and fans with motor horsepower of 5hp or larger.<br />

Demand-Responsive Buildings (Peak Power Reduction)<br />

Interface with utility to gain real-time data that influences appropriate reponse of equipment or<br />

strategies to reduce electrical demand or with equipment able to replace electricity supply.<br />

Energy Management Plan<br />

Implement a meaningful plan to inform building operation following ENERGY STAR's<br />

<strong>Guide</strong>lines for Energy Management to manage energy performance.<br />

Operator Training and Documentation --AND/OR--<br />

Building User Training and Documentation<br />

Train building operators and/or building users in how mechanical and electrical systems<br />

are intended to operate and provide systems manuals for those operators/users.<br />

Measure and Monitor Energy use for Major Systems<br />

Install measurement devices to ensure capacity to track HVAC, lighting and plug<br />

loads. Create an evaluation plan to inform ongoing operation.<br />

Platinum Enhanced Performance Strategies<br />

Implement 4 more (8 total) Enhanced Performance Strategies OR show<br />

•<br />

32% energy savings beyond ASHRAE 90.1-2007.<br />

Fault Detection and Diagnostics<br />

Fault detection and diagnostic equipment monitors refrigerant charge,<br />

airflow, economizer operation, and cycling duration.<br />

Third Party Commissioning<br />

Engage a third-party commissioning agent to participate in design reviews during the design process<br />

and to guide the commissioning process through development of a commissioning plan.<br />

Grid Source Renewable Energy (100%, 2 years)<br />

Commit to a 2-year renewable energy contract or purchase offsets equal to the predicted building's energy use.<br />

Phantom & Unintended Load Management Plan<br />

Create a plan to reduce energy demand during non-occupied hours due to<br />

appliances that are left on or have standby power loads.<br />

Solar Ready Design<br />

Follow prescriptive requirements to ensure that building is ready for future<br />

installation of solar electric or solar thermal equipment.<br />

EN-15 Onsite Renewable Power 2%<br />

Install renewable energy systems that meet or exceed 2% of the building's energy use.<br />

EN-16 Onsite Renewable Power 5%<br />

Install renewable energy systems that meet or exceed 5% of the building's energy use.<br />

EN-17 Onsite Renewable Power 10%<br />

Install renewable energy systems that meet or exceed 10% of the building's energy use.<br />

EN-18<br />

Post-Occupancy Optimization Workshop<br />

Hold a meeting between 12 and 15 months after occupancy to review operational data<br />

and assess opportunities to improve the building's energy performance.<br />

energy targets<br />

Save Energy<br />

& Carbon<br />

Measure &<br />

Manage<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

Systems<br />

Performance<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

16 <strong>Reference</strong> <strong>Guide</strong> v2.0 EARTHADVANTAGE COMMERCIAL