16.03.2015 Views

Northeast Florida Regional Transportation Study Commission ...

Northeast Florida Regional Transportation Study Commission ...

Northeast Florida Regional Transportation Study Commission ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

8/1/2012<br />

<strong>Northeast</strong> <strong>Florida</strong><br />

<strong>Regional</strong> <strong>Transportation</strong> <strong>Study</strong> <strong>Commission</strong><br />

Presentation to <strong>Northeast</strong> <strong>Florida</strong> <strong>Regional</strong><br />

Council<br />

August 2, 2012<br />

Emerging Crisis – <strong>Regional</strong> Mobility<br />

• Growth<br />

• Commute Distance and Time<br />

• Lack of <strong>Transportation</strong> Options<br />

• Lack of Funding<br />

<strong>Regional</strong> <strong>Transportation</strong> Assessment<br />

& Gap Analysis –Key Conclusions<br />

• Fund/accelerate/construct key state road projects<br />

on regional network<br />

• Fund/construct regional projects on non‐state<br />

roads<br />

• Plan/fund/construct and operate regional transit<br />

• Coordinate regional paratransit<br />

1


8/1/2012<br />

Need for <strong>Regional</strong> Approach<br />

• Enhance our regional economic competitiveness<br />

• Connect people to work<br />

• Move freight<br />

• <strong>Regional</strong> voice to better compete for limited state,<br />

federal and private funding<br />

• Address the need for identifying a new, dedicated<br />

regional funding source<br />

<strong>Regional</strong> Representation<br />

Northwest <strong>Florida</strong> <strong>Transportation</strong><br />

Corridor Authority<br />

Tampa Bay <strong>Regional</strong><br />

<strong>Transportation</strong> Authority<br />

Southwest <strong>Florida</strong> Expressway<br />

Authority<br />

Central <strong>Florida</strong> <strong>Regional</strong><br />

<strong>Transportation</strong> Authority<br />

South <strong>Florida</strong> <strong>Regional</strong><br />

<strong>Transportation</strong> Authority<br />

<strong>Regional</strong> <strong>Transportation</strong> <strong>Study</strong> <strong>Commission</strong> (RTSC)<br />

Key Components:<br />

• 7 Counties/20 members<br />

• Structure<br />

• Planning Committee<br />

• Governance & Funding<br />

Committee<br />

• Deliverables<br />

• <strong>Regional</strong> <strong>Transportation</strong><br />

Elements Plan<br />

• Defining characteristics of<br />

projects of regional significance<br />

• Implementation Plan<br />

2


8/1/2012<br />

<strong>Regional</strong> <strong>Transportation</strong> Plan<br />

(<strong>Regional</strong> Corridors)<br />

• Economic Competitiveness<br />

• Mobility<br />

• Connectivity<br />

• Integrated Planning<br />

Outer Beltway Future<br />

<strong>Regional</strong> Corridor<br />

Waterway Corridor<br />

Preliminary <strong>Regional</strong> Network<br />

• Economic Competitiveness<br />

• Mobility<br />

• Connectivity<br />

• Integrated Planning<br />

Potential <strong>Regional</strong> Project Modes & Categories<br />

<strong>Regional</strong> Transit/Public<br />

<strong>Transportation</strong><br />

<strong>Regional</strong> Intermodal<br />

Facilities<br />

<strong>Regional</strong> Roadways<br />

<strong>Regional</strong> Bike/Pedestrian &<br />

Other Facilities<br />

3


8/1/2012<br />

<strong>Regional</strong> Funding Value<br />

• Not funded or scheduled to be funded in a timely<br />

manner;<br />

• Requires funding to leverage state, federal or private<br />

funding; or<br />

• Needs long term funding to support operations and<br />

maintenance<br />

Phased Implementation of <strong>Regional</strong> Approach<br />

Phase I: Form a <strong>Regional</strong> <strong>Transportation</strong> <strong>Commission</strong> (RTC)<br />

• Develop the <strong>Regional</strong> Plan concurrently with NFTPO<br />

Long Range Plan Update<br />

• Identify and secure a proposed funding sources<br />

• Propose an organizational framework<br />

Phase II: Establish the <strong>Regional</strong> <strong>Transportation</strong> Entity (if<br />

needed) with a Dedicated Funding Source to Implement<br />

the <strong>Regional</strong> <strong>Transportation</strong> Plan<br />

Purposes and Functions (Phase 1 RTC)<br />

<strong>Northeast</strong> <strong>Florida</strong><br />

<strong>Regional</strong> <strong>Transportation</strong> <strong>Commission</strong><br />

(RTC)<br />

Develop<br />

<strong>Regional</strong> Plan<br />

Secure New<br />

Funding for<br />

Implementation<br />

of <strong>Regional</strong> Plan<br />

Planning<br />

<strong>Regional</strong> Planners<br />

(North <strong>Florida</strong> TPO,<br />

RTC)<br />

Advocate <strong>Transportation</strong> Business Alliance Advocate<br />

Advance<br />

<strong>Regional</strong><br />

<strong>Transportation</strong><br />

Projects<br />

Implementation<br />

Coordinate<br />

<strong>Regional</strong><br />

Transit<br />

<strong>Regional</strong><br />

Implementers<br />

(Cities, Counties,<br />

FDOT, JTA, Ports)<br />

4


8/1/2012<br />

Development of <strong>Regional</strong> Plan<br />

Long Range <strong>Transportation</strong><br />

Plan (LRTP) Vision<br />

Goals & Objectives<br />

Needs Plan<br />

(funded and unfunded)<br />

<strong>Regional</strong> Needs<br />

Assessment<br />

Financial Resources<br />

Cost Feasible Plan<br />

Project Prioritization<br />

Additional Components of Phase 1 RTC<br />

Governance Structure<br />

• 7‐county 11‐member voting Board with non‐voting advisors<br />

(minimum 4 contiguous counties)<br />

Operational Structure<br />

• Minimal dedicated staff; contract with others (government<br />

agencies or private)<br />

Funding<br />

• Initial start up per capita assessment<br />

Sunset<br />

Sunset<br />

after<br />

5 Years<br />

• Must secure funding source to implement regional plan within<br />

5 years<br />

Advocacy and Business Partnership<br />

Multimodal <strong>Transportation</strong><br />

Business Alliance<br />

Generate private sector support and<br />

champions for regional<br />

transportation<br />

5


8/1/2012<br />

Next Steps<br />

Final Draft<br />

Recommendations<br />

June 2012<br />

Stakeholder/<br />

Business<br />

Outreach<br />

County Input<br />

and<br />

Workshops<br />

Prepare<br />

and Submit<br />

Final Report<br />

(Dec 2012)<br />

Thank<br />

You!<br />

More information at<br />

www.northfloridartsc.com<br />

Email us at:<br />

www.northfloridartsc@jtafla.com<br />

Process<br />

Is it in the regional<br />

network?<br />

Does it meet<br />

regional funding<br />

value criteria?<br />

Candidate projects<br />

prioritized using plan<br />

goals, objectives and<br />

measures .<br />

Identifying<br />

candidate regional<br />

projects<br />

This phase to be<br />

conducted by<br />

future regional<br />

entity (RTC)<br />

6


8/1/2012<br />

<strong>Regional</strong> <strong>Transportation</strong> Plan<br />

<strong>Regional</strong> Network<br />

• High level of inter‐county or interregional<br />

travel,<br />

• Primary connection between activity<br />

centers or municipalities,<br />

• High percentage of freight within the<br />

corridor,<br />

• Primary connection to marine,<br />

aviation or intermodal facilities,<br />

• <strong>Regional</strong> emergency evacuation<br />

route, and/or<br />

• Support for or enhancement of the<br />

functionality of another identified<br />

regional facility(s) in the corridor.<br />

Project Deliverables Diagram<br />

Components Required<br />

By Legislation<br />

1 <strong>Regional</strong><br />

<strong>Transportation</strong><br />

Elements Plan<br />

2 Defining Characteristics<br />

of <strong>Transportation</strong><br />

Elements of <strong>Regional</strong><br />

Significance<br />

Goals and<br />

Objectives<br />

<strong>Regional</strong><br />

Corridors<br />

<strong>Regional</strong><br />

Facilities<br />

Project Deliverables<br />

Preliminary<br />

<strong>Regional</strong> Network<br />

Planning<br />

Committee Report<br />

3 Implementation Plan<br />

Gap Analysis<br />

Project Modes<br />

& Categories<br />

Recommended Organizational<br />

Structure(s)<br />

Recommended Funding Scenarios<br />

Implementation<br />

(Hand off to G & F<br />

Committee)<br />

Governance &<br />

Funding Committee<br />

Report<br />

Final Report<br />

7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!