15.11.2012 Views

2006 FIFA World Cup Germany - CFMU - Eurocontrol

2006 FIFA World Cup Germany - CFMU - Eurocontrol

2006 FIFA World Cup Germany - CFMU - Eurocontrol

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Some views from the operational specialists dealing<br />

with Special Events in <strong>CFMU</strong>/OPSD<br />

Keith Crawford (ATFCM Expert – Operations Support) and Philippe Lenne (Flight<br />

Planning & Operations Specialist) were closely involved with the planning,<br />

coordination and follow-up of the <strong>CFMU</strong> participation, together with the various<br />

teams on duty.<br />

Thanks to a combined effort, the <strong>CFMU</strong> contributes to the optimisation of the<br />

ATFCM for the <strong>2006</strong> <strong>FIFA</strong> <strong>World</strong> <strong>Cup</strong> <strong>Germany</strong>.<br />

Keith, Philippe, it seems a quite challenging task to coordinate the <strong>CFMU</strong><br />

measures for this important Special Event. Which message would you like<br />

to give to our ATFCM partners? What can we learn in order to further<br />

develop the most efficient measures to assure safety, capacity and<br />

punctuality?<br />

The very essential point is close collaboration. Establishing in-depth communication<br />

between the partners and sharing of information is essential for the success of the<br />

handling of this increase in air traffic demand. It is like a kind of family.<br />

There is no clear defined process and for each event an efficient way forward needs<br />

to be elaborated according to the specificities of the event. Also awareness to<br />

other’s situations with an ability to adapt as well as a strong availability are key<br />

elements in these relationships.<br />

Following our experience in the field, after so many events we have dealt with, it is<br />

important to start early enough with the preparations, having a working model with<br />

prior preparatory meetings, and elaboration of a timely documentation. With feet<br />

on the ground and with well established professional contacts.<br />

From our side, we experience that often we have to work as a facilitator of<br />

communication and to bring in the neighbours. We had FMP meetings in March, the<br />

Summer Briefing for AOs & FMPs in April, the preparatory meeting in Langen in the<br />

month of May with all German and adjacent FMPs involved. Now we have the four<br />

special e-conferences linked with the key moments during the <strong>World</strong> <strong>Cup</strong> and of<br />

course the daily NMC briefings. In the end all effort contributes to the success.<br />

Both Philippe and I are working in a complementary way, on ATFCM and on Flight<br />

Planning. We will reinforce this for the future in order to cover the various issues<br />

behind each event.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!