19.03.2015 Views

2013 DOE Annual Merit Review - ACCESS - Department of Energy

2013 DOE Annual Merit Review - ACCESS - Department of Energy

2013 DOE Annual Merit Review - ACCESS - Department of Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>2013</strong> <strong>DOE</strong> <strong>Annual</strong> <strong>Merit</strong> <strong>Review</strong> – <strong>ACCESS</strong><br />

Targets<br />

• Demons trate 25% fuel efficiency improvement over chosen vehicle baseline (GM HFV6 in Cadillac CTS )<br />

• Meet S ULE V emissions to demonstrate LE V3 emission capability<br />

• Key systems and controls implemented and concept is commercially viable<br />

System Complexity Technology to the Market Stringent Emissions<br />

E nabling Technology<br />

• fuel direct injection<br />

• downs izing with turbo charging<br />

• variable valve timing and pr<strong>of</strong>ile<br />

s witch<br />

• closed loop combustion control<br />

with in-cylinder pres s ure s ens ing<br />

• adaptive fuel metering<br />

• cooled high pres s ure E G R<br />

• estimated total s ys tem cos t<br />

within current market targets<br />

commercially attractive<br />

P roducts<br />

• E ngine C ontrol Unit (E C U) with<br />

combustion controls.<br />

F ully implemented advanced<br />

combus tion controls in a<br />

production level E CU meeting<br />

production A-s ample<br />

requirements by mid <strong>of</strong> P has e 3.<br />

(no rapid prototyping tools<br />

required for OE M application)<br />

• combustion pressure sensor<br />

Demons tra ting S UL E V<br />

• T he advanced combus tion<br />

concepts chos en s how the<br />

potential to meet S UL E V<br />

without expensive after<br />

treatment other than T W C .<br />

• E xhaus t after treatment s ys tem<br />

des ign (s izing and loading <strong>of</strong><br />

the TWC) was performed<br />

based on experimental dyno<br />

data and s imulation.<br />

• Implementation and vehicle<br />

emis s ion res ults will be<br />

demons trated in P has e III.<br />

technology made available meets 2025 emission goals<br />

6<br />

Gasoline S ystems | 5/17/<strong>2013</strong> | © <strong>2013</strong> R obert Bosch LLC and affiliates. All rights reserved.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!