snto - Santos
snto - Santos
snto - Santos
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Review of Performance<br />
Production<br />
<strong>Santos</strong>’ production grew by 11.0% in 1998 reflecting the commencement of<br />
production from new areas of interest, in the Carnarvon Basin, Timor Gap,<br />
Papua New Guinea and the supply of gas to Mt Isa.<br />
Production increased by 4.5 million boe to a record<br />
45.6 million boe in 1998.<br />
This reflected completion of a number of major<br />
projects during the year, which are described on page<br />
16 of this report. A full year’s production from each of<br />
these projects will contribute to a further increase in<br />
production in 1999.<br />
Group Production<br />
1998 1997<br />
Sales Gas and Ethane (PJ) 184.9 172.2<br />
Crude Oil (million barrels) 8.5 6.9<br />
Condensate (million barrels) 3.1 2.5<br />
LPG (‘000 tonnes) 285.7 263.6<br />
Total (million boe) 45.6 41.1<br />
Just over half of this increase was associated with oil<br />
and liquids production (2.3 million boe increase). The<br />
remainder (2.2 million boe) reflected increased sales<br />
gas and ethane production. Production increased in<br />
all Business Units except for <strong>Santos</strong> USA. (A table<br />
detailing Group production is located on page 29).<br />
<strong>Santos</strong>’ production has increased from 36.3 million<br />
boe per annum in 1993 to 45.6 million boe during<br />
1998.<br />
<strong>Santos</strong>’ Production Growth<br />
MMboe<br />
46<br />
44<br />
42<br />
40<br />
38<br />
36<br />
34<br />
32<br />
30<br />
1993 1994 1995 1996 1997 1998<br />
Major Oil Projects Profile<br />
Stag Development Project<br />
Elang/Kakatua/Kakatua North<br />
Development Project<br />
SE Gobe Development Project<br />
Project: Oil field development.<br />
Floating storage and offloading<br />
facility.<br />
Project: Oil field development.<br />
Floating production, storage<br />
and offloading facility.<br />
Project: Oil field development.<br />
Location: Papua New Guinea<br />
20<br />
Location: Carnarvon Basin<br />
<strong>Santos</strong> interest: 54.17%<br />
Production: Commenced May 1998<br />
Location: Timor Gap<br />
<strong>Santos</strong> interest: 21.43%<br />
Production: Commenced July 1998<br />
<strong>Santos</strong> interest: 6.975%<br />
Production: Commenced April 1998