GENERIC METHOD STATEMENT AND RISK ASSESSEMENT FOR ...
GENERIC METHOD STATEMENT AND RISK ASSESSEMENT FOR ...
GENERIC METHOD STATEMENT AND RISK ASSESSEMENT FOR ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
6. DELIVERIES SCHEDULED TO SITE<br />
Deliveries will be made on<br />
7. PLANT <strong>AND</strong> EQUIPMENT ON SITE<br />
a. Hand Pallet Trucks (if applicable)<br />
b. Hand Tools (if applicable)<br />
c. FLT (if applicable)<br />
8. VEHICLE OFF-LOADING <strong>AND</strong> DISTRIBUTION TO THE WORKFACE<br />
Delivery vehicles will be driven to the unloading dock and off loaded by hand.<br />
Materials will be distributed to the Build Area via the goods lift or stairs.<br />
9. RESTRICTIONS APPLICABLE TO INSTALLATION PERSONNEL <strong>AND</strong> THEIR<br />
VEHICLES, PLANT <strong>AND</strong> MATERIALS.<br />
a. Installation personnel shall wear at all times standard protective equipment (hard<br />
hats, toe protective footwear and high visibility jerkins). When circumstances<br />
dictate harnesses, ear protection and eye protection shall be worn.<br />
Installation personnel shall report to Mr _________ for a site safety briefing (if<br />
applicable) prior to commencement of works and shall comply with the site safety<br />
rules at all times. The installation foreman will if required be available for periodic<br />
site safety meetings.<br />
Installation personnel shall be made aware of this document and briefed in its<br />
contents.<br />
b. Delivery vehicles shall be off loaded at the agreed location only.<br />
c. Plant if used shall conform to current legislation. All operators will be suitably<br />
trained and certified.<br />
Plant if used shall only be stored in the areas designated by The Client and Link<br />
(You’re company name). Diesel equipment, if used, shall be filled with DERV<br />
from jerry cans each morning. Propane gas will be carried on the plant.<br />
d. Materials will be marshalled, stored and assembled within the area designated by<br />
The Client and (You’re company name).<br />
10. COSHH – Control of Substances Hazardous to Health<br />
If applicable to this contract.<br />
11. WORKING AT HEIGHT<br />
Step ladders will be used for shelf installation.<br />
Any person working at 2.0 metres or above will wear a full body harness clipped<br />
to a secure point via one lanyard.<br />
13. NOISE<br />
Access towers if used, will be erected and verified by the tower provider.