GENERIC METHOD STATEMENT AND RISK ASSESSEMENT FOR ...
GENERIC METHOD STATEMENT AND RISK ASSESSEMENT FOR ...
GENERIC METHOD STATEMENT AND RISK ASSESSEMENT FOR ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>GENERIC</strong> <strong>METHOD</strong> <strong>STATEMENT</strong> <strong>AND</strong> <strong>RISK</strong> <strong>ASSESSEMENT</strong> <strong>FOR</strong> THE<br />
INSTALLATION OF EURO SHELVING<br />
AT<br />
Distribution:<br />
DATE<br />
1. (x1)<br />
2. Installation (x1) Controlled document Ref:<br />
3. File (x1)<br />
CONTENTS
SECTION I<br />
INTRODUCTION, PROGRAMME OF WORKS <strong>AND</strong> GENERAL<br />
GUIDELINES <strong>FOR</strong> INSTALLATION SITES<br />
SECTION II<br />
<strong>METHOD</strong> <strong>STATEMENT</strong><br />
SECTION III<br />
<strong>RISK</strong> ASSESSMENT<br />
SECTION IV<br />
PLANT OPERATIVE CERTIFICATION<br />
PERSONNEL ON SITE <strong>AND</strong> RESPONSIBILITIES<br />
FIRE MARSHALL<br />
FIRST AIDERS <strong>AND</strong> FIRST AID KITS<br />
SECTION V<br />
COMPANY HEALTH <strong>AND</strong> SAFETY POLICY<br />
COMPANY INSURANCE
SECTION 1<br />
INTRODUCTION, PROGRAMME OF WORKS<br />
<strong>AND</strong><br />
GENERAL GUIDELINES <strong>FOR</strong> INSTALLATION SITES<br />
1. PROJECT SAFETY POLICY<br />
It is the policy of (You’re company name), in the undertaking of its business, to<br />
fully comply with the requirements of the Health & Safety at Work Act 1974, the<br />
Factories Act 1969 and the Construction Design and Management Regulations<br />
1994. (You’re company name), is committed to providing, so far as it is
easonably practicable a site that is safe for our employees, the employees of<br />
other companies and the general public.<br />
2. MANAGEMENT STRUCTURE<br />
Contract Manager<br />
Installation Safety Office<br />
Installation Manager<br />
Site Supervisor<br />
Site Foremen<br />
3. SAFETY ARRANGEMENT <strong>AND</strong> CO-ORDINATION<br />
It is the responsibility of the Installation Safety Officer to make sure that all<br />
installation employees have the experience and training necessary to carry out<br />
the works safely. The Site Foreman/Installation Safety Office/Installation<br />
Manager/Supervisor and/or our Contract Manager will if necessary review the<br />
contract performance in terms of safety and execution, take action as necessary<br />
and advise all parties of any changes to the works which may affect Health and<br />
Safety. This information will be conveyed either verbally or in writing.<br />
IMMEDIATE ACTION will be taken, if necessary to make the site safe.<br />
4. INTRODUCTION <strong>AND</strong> SCHEME SPECIFICATION<br />
Our reference number –<br />
Customer Order Number –<br />
The installation comprises of the supply, delivery and installation of the following<br />
Euro Shelving to (Site Address).
Shelving Specification<br />
Please see attached order acknowledgement<br />
5. PROGRAMME<br />
Commencement On-Site :<br />
Duration :
6. DELIVERIES SCHEDULED TO SITE<br />
Deliveries will be made on<br />
7. PLANT <strong>AND</strong> EQUIPMENT ON SITE<br />
a. Hand Pallet Trucks (if applicable)<br />
b. Hand Tools (if applicable)<br />
c. FLT (if applicable)<br />
8. VEHICLE OFF-LOADING <strong>AND</strong> DISTRIBUTION TO THE WORKFACE<br />
Delivery vehicles will be driven to the unloading dock and off loaded by hand.<br />
Materials will be distributed to the Build Area via the goods lift or stairs.<br />
9. RESTRICTIONS APPLICABLE TO INSTALLATION PERSONNEL <strong>AND</strong> THEIR<br />
VEHICLES, PLANT <strong>AND</strong> MATERIALS.<br />
a. Installation personnel shall wear at all times standard protective equipment (hard<br />
hats, toe protective footwear and high visibility jerkins). When circumstances<br />
dictate harnesses, ear protection and eye protection shall be worn.<br />
Installation personnel shall report to Mr _________ for a site safety briefing (if<br />
applicable) prior to commencement of works and shall comply with the site safety<br />
rules at all times. The installation foreman will if required be available for periodic<br />
site safety meetings.<br />
Installation personnel shall be made aware of this document and briefed in its<br />
contents.<br />
b. Delivery vehicles shall be off loaded at the agreed location only.<br />
c. Plant if used shall conform to current legislation. All operators will be suitably<br />
trained and certified.<br />
Plant if used shall only be stored in the areas designated by The Client and Link<br />
(You’re company name). Diesel equipment, if used, shall be filled with DERV<br />
from jerry cans each morning. Propane gas will be carried on the plant.<br />
d. Materials will be marshalled, stored and assembled within the area designated by<br />
The Client and (You’re company name).<br />
10. COSHH – Control of Substances Hazardous to Health<br />
If applicable to this contract.<br />
11. WORKING AT HEIGHT<br />
Step ladders will be used for shelf installation.<br />
Any person working at 2.0 metres or above will wear a full body harness clipped<br />
to a secure point via one lanyard.<br />
13. NOISE<br />
Access towers if used, will be erected and verified by the tower provider.
Noise on site will be kept to the lowest level, reasonably practicable. Where this<br />
is not possible, noise levels will be measured and control measures discussed<br />
with the site safety Co-Ordinator.<br />
14. WASTE DISPOSAL<br />
Dry non hazardous industrial waste will be removed from our work site daily to<br />
skips provided by The Client. Waste will not be allowed to accumulate, waste of<br />
a hazardous nature will be generated by our works. Concrete dust generated by<br />
floor drilling will be vacuumed up as drilling progresses.<br />
15. WELFARE ARRANGEMENTS<br />
The Client to provide toilets, washing and messing facilities on a shared welfare<br />
basis.<br />
16. PORTABLE TOOLS<br />
All portable tools will be 110 volt, and will be kept and maintained in good<br />
condition. 240 volt tools, if used will be operated through a RCCB.<br />
17. POWER SOCKETS<br />
Socket outlets and task lighting will be required in all of the work locations.<br />
Temporary distribution boards supplied by the Client for our use shall be used on<br />
the basis that such equipment has been tested by a competent person and that<br />
the test results are available.<br />
18. HOT WORKING.<br />
Hot working, if necessary, shall be covered by a permit to work, issued by the<br />
Principal Contractor.
SECTION II<br />
INSTALLATION<br />
<strong>METHOD</strong> <strong>STATEMENT</strong><br />
<strong>FOR</strong><br />
EURO SHELVING
INSTALLATION SPECIFICATION<br />
The shelving system will be designed and manufactured and installed under quality<br />
management systems conforming to International Quality Standards BSEN ISO<br />
9002:1994 and Quality Assessment Schedules (QAS) 2000 Category A, for Pallet<br />
Racking and Shelving. On going checks of installation tolerance will be made for all<br />
shelving installed and on completion a certificate of compliance will be issued.<br />
NOTE : The following Method Statement is a guide to safely installing the shelving<br />
media for (Clients name).<br />
We reserve the right to alter or amend all or any part of this Method Statement should we<br />
feel that improvements to working safety could be made. Should we do so we will<br />
confirm the amendment in writing to the site safety Co-Ordinator.<br />
BUILDING ENVELOPE SURVEY<br />
All areas will be surveyed to validate the shelving layout.<br />
POSITIONING <strong>AND</strong> FIXING<br />
All elements of the installation will be datumed and set up to the dimensions detailed on<br />
the above drawing.<br />
All shelving within a height (top shelf) to depth ratio of 4:1 will be free standing. Shelving<br />
outside this ratio will be floor fixed using M6 expansion fixings.
EURO SHELVING INSTALLATION <strong>METHOD</strong>OLOGY<br />
Euro shelving is a modular system, which clips together. It is supplied on this contract<br />
with solid frames, open and mesh backs.<br />
To commence installation a pair of frames will be selected, foot plates fixed, and shelf<br />
clips locked into the slots in uprights at the pitch to suit shelf positions.<br />
Rear bracing will be fixed as necessary. Frame and rear mesh will be fitted and<br />
accessories as applicable. SEMA load signs will be fitted to selective bays.<br />
See Appendix 1 for detail text and illustrations
SECTION III<br />
<strong>RISK</strong> ASSESSMENT
SECTION IV<br />
PERSONNEL ON SITE <strong>AND</strong> RESPONSIBILITIES<br />
PLANT OPERATIVES CERTIFICATION<br />
FIRE MARSHALL<br />
FIRST AIDERS <strong>AND</strong> FIRST AID KIT
1. Personnel on Site<br />
The contract will be manned with * men led by a foreman able to take and act<br />
upon any instruction which may be issued.<br />
The Foreman is:<br />
The Area Site Manager is :<br />
The Contract Manager is :<br />
All the above have a visiting brief, excluding the site foreman, who will be site<br />
based.<br />
12. Plant Operatives Certification<br />
Not applicable to this contract.<br />
13. Fire Marshalling<br />
Fire marshalling duties will be carried out by our foreman.<br />
14. First Aiders<br />
(You’re company name). would propose to use The Clients First Aid Facilities.
SECTION V<br />
COMPANY INSURANCE<br />
HEALTH & SAFETY<br />
<strong>AND</strong><br />
QUALITY POLICY