INSTALLATION OF ANTI-COLLAPSE MESH Storage of materials ...

INSTALLATION OF ANTI-COLLAPSE MESH Storage of materials ...

INSTALLATION OF ANTI-COLLAPSE MESH Storage of materials ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Storage</strong> <strong>of</strong> <strong>materials</strong><br />

<strong>INSTALLATION</strong> <strong>OF</strong> <strong>ANTI</strong>-<strong>COLLAPSE</strong> <strong>MESH</strong><br />

The area required for laydown <strong>of</strong> <strong>materials</strong> will be contained, either within the<br />

areas <strong>of</strong> installation <strong>of</strong> <strong>materials</strong>, or within a cordoned <strong>of</strong>f area within the ground<br />

floor stores.<br />

Personal Protective Equipment<br />

It is acknowledged that it is mandatory for all installers to wear Safety Helmets,<br />

safety footwear (no rigger boots) and orange Hi Visibility vest.<br />

Additional Personal Protective Equipment, which will be required<br />

Riggers gloves.<br />

Safety goggles.<br />

Work wear.<br />

Safety harness.<br />

Scope <strong>of</strong> Work<br />

Supply <strong>of</strong> Delivery Transport, Labour, Materials and Fixings to install:<br />

Troax Musca Anti-Collapse Mesh<br />

One <strong>of</strong>f screen measuring 5,400mm high, nominally 18,420mm in length. The<br />

screen will stand <strong>of</strong>f 150mm from 8 uprights and Troax Ultima stand <strong>of</strong>f brackets<br />

will be utilised.<br />

One <strong>of</strong>f screen measuring 2,200mm high, nominally 15,980mm in length. The<br />

screen will stand <strong>of</strong>f 50mm from 7 uprights.<br />

Method <strong>of</strong> Work- General<br />

a) Site supervisor will make himself known to the site supervisor or customer<br />

upon arrival at site.<br />

b) Site supervisor and operatives will attend a site induction upon arrival to site<br />

which should last a maximum <strong>of</strong> 30 minutes, special inductions beyond that<br />

time will require pre work completion.


c) Once inducted the operatives will unload & check the delivery <strong>of</strong> <strong>materials</strong>,<br />

which will be delivered by a nominated haulage company and will be stored<br />

on safely on site.<br />

d) The <strong>materials</strong> will be transferred into the work area in a safe and organized<br />

manner.<br />

e) We will check and clarify the cage / enclosure position, as detailed on the<br />

drawings, with the site manager or customer before the fence erection starts.<br />

Protective Equipment for Personal<br />

Hard hats, toe protectors and Hi-Vis jackets will be worn at all times.<br />

Goggles will be worn when drilling and cutting with electrical cutters<br />

A hot work permit will be obtained if required<br />

Hazardous Material - COSHH<br />

There will be no hazardous <strong>materials</strong> and or substances used during this project.<br />

Plant Equipment<br />

110V equipment will be used, fed by an on site transformer and onto tools via<br />

110v leads. All equipment is less than 6 months old with the relevant bills <strong>of</strong><br />

purchase. All electrical equipment over 6 months old will have a “PAT” test<br />

certificate or labels on tools.<br />

Material <strong>Storage</strong><br />

Materials will be stored near the work area in a safe and organized fashion.<br />

Special Safety Rules<br />

Site induction will be undertaken prior to commencement <strong>of</strong> work.<br />

Manual Handling


All <strong>materials</strong> and tools will be manually handled carefully to the work area in<br />

accordance with our health and safety policy. This process will require the<br />

method <strong>of</strong> lifting the panels and tying knots in ropes, a recognized safety knot<br />

will be used and limitation to weights will be adhered to.<br />

Noise and Environmental Pollution<br />

This will be minimal i.e. Drilling steel and cutting steel, all dust and swarf will be<br />

cleared up and disposed <strong>of</strong> by Installers into rubbish skips on site.<br />

The drilling will cause a short minimal noise level per hole, whilst we take<br />

measures to ensure that our installers are locally protected against dust and noise<br />

the precaution <strong>of</strong> “further transmitted noise” cannot be avoided during this<br />

installation.<br />

Drilling and Cutting<br />

The above items all require the drilling <strong>of</strong> holes in to concrete, these holes will<br />

drilled with a “Hilti Type Drill” powered from a on site 110volt Transformer<br />

Disposal <strong>of</strong> Materials<br />

Removed <strong>materials</strong> will be disposed <strong>of</strong> under the control <strong>of</strong> a “Waste<br />

Management System”, any excess debris will be placed in the skips, origin to be<br />

confirmed.<br />

Product specific build details<br />

Method <strong>of</strong> Work – Troax Musca all Mesh<br />

f) Generally the Musca will be built with panels in brick type build fashion.<br />

g) The panels are bolted together using m8 x 55mm bolts on the horizontal joints<br />

and a clamp (35700001) on the vertical joints <strong>of</strong> the first and top row <strong>of</strong> panels<br />

only, refer to the supplied drawings and follow me assembly instructions.<br />

h) The screen will be built by bolting a row <strong>of</strong> level brackets directly to the<br />

racking frames at the required start height generally as close to the floor as<br />

possible and at panel dimensions <strong>of</strong> 1500, 1200 or 700mm there after.


i) The brackets will be bolted to the racking using m10 x 20mm bolts, washers<br />

and m10 nuts, these fixings will be tightened using 17mm spanners or<br />

sockets.<br />

j) The panels will be built by joining two panels together with the clamps as in<br />

(b) and lifting them into the pre-fitted brackets (first and top row only).<br />

k) This will continue until the entire first row is fitted, the last panel will require<br />

cutting to length to achieve the overall required length.<br />

l) Further lifts can be and will be fitted in the same manner expect the clamps<br />

up to 3m high.<br />

m) Panel rows between first and last are only bolted in the horizontal join, the<br />

brick pattern holds the panels together on all other,<br />

n) After 2m high two operatives working from within the racking and using<br />

harnesses will complete the process as described in (h).<br />

o) This process will be continued by the two operatives until the screen is<br />

complete.<br />

p) Once the screen is built the final cut panel will fitted with a capping strip or<br />

finishing kit.<br />

q) After 3m high two operatives working from within a scissor lift will continue<br />

the process as described in (h).<br />

r) They will place a desired amount <strong>of</strong> panels in the scissor lift cage, but not to<br />

exceed the lifting capacity, they be lifted to the required height and the panels<br />

will be manually lifted into the brackets as described in (e)<br />

s) The fence once complete will need to be checked and signed <strong>of</strong>f for<br />

completion and acceptance.<br />

Please note the racking and the aisle next to the screen must be clear for this<br />

process <strong>of</strong> Installation.