c) Once inducted the operatives will unload & check the delivery <strong>of</strong> <strong>materials</strong>,<br />

which will be delivered by a nominated haulage company and will be stored<br />

on safely on site.<br />

d) The <strong>materials</strong> will be transferred into the work area in a safe and organized<br />

manner.<br />

e) We will check and clarify the cage / enclosure position, as detailed on the<br />

drawings, with the site manager or customer before the fence erection starts.<br />

Protective Equipment for Personal<br />

Hard hats, toe protectors and Hi-Vis jackets will be worn at all times.<br />

Goggles will be worn when drilling and cutting with electrical cutters<br />

A hot work permit will be obtained if required<br />

Hazardous Material - COSHH<br />

There will be no hazardous <strong>materials</strong> and or substances used during this project.<br />

Plant Equipment<br />

110V equipment will be used, fed by an on site transformer and onto tools via<br />

110v leads. All equipment is less than 6 months old with the relevant bills <strong>of</strong><br />

purchase. All electrical equipment over 6 months old will have a “PAT” test<br />

certificate or labels on tools.<br />

Material <strong>Storage</strong><br />

Materials will be stored near the work area in a safe and organized fashion.<br />

Special Safety Rules<br />

Site induction will be undertaken prior to commencement <strong>of</strong> work.<br />

Manual Handling