c) Once inducted the operatives will unload & check the delivery <strong>of</strong> <strong>materials</strong>,<br />
which will be delivered by a nominated haulage company and will be stored<br />
on safely on site.<br />
d) The <strong>materials</strong> will be transferred into the work area in a safe and organized<br />
manner.<br />
e) We will check and clarify the cage / enclosure position, as detailed on the<br />
drawings, with the site manager or customer before the fence erection starts.<br />
Protective Equipment for Personal<br />
Hard hats, toe protectors and Hi-Vis jackets will be worn at all times.<br />
Goggles will be worn when drilling and cutting with electrical cutters<br />
A hot work permit will be obtained if required<br />
Hazardous Material - COSHH<br />
There will be no hazardous <strong>materials</strong> and or substances used during this project.<br />
Plant Equipment<br />
110V equipment will be used, fed by an on site transformer and onto tools via<br />
110v leads. All equipment is less than 6 months old with the relevant bills <strong>of</strong><br />
purchase. All electrical equipment over 6 months old will have a “PAT” test<br />
certificate or labels on tools.<br />
Material <strong>Storage</strong><br />
Materials will be stored near the work area in a safe and organized fashion.<br />
Special Safety Rules<br />
Site induction will be undertaken prior to commencement <strong>of</strong> work.<br />
Manual Handling