• AIRPORT<br />

Extension of existing runway of 6000 ft. to 7500 ft. Installation of ILS and other navigational<br />

equipment, Strengthening of runway, Air conditioning of departure lounge and Erection of<br />

boundary wall.<br />

• AFFORESTATION<br />

Afforestation of 500 Ha of forest land near Ajanta caves and 237 Ha. Around Ellora Caves<br />

totaling 737 Ha. in the region has been completed.<br />

• ROADS<br />

Up gradation of 162 Kms. of road in Ajanta Ellora Region connecting <strong>Aurangabad</strong> – Ajanta,<br />

Ajanta View Point, <strong>Aurangabad</strong> – Ellora and Khultabad – Phulambri by fair road<br />

connectivity to Ajanta and Ellora Caves.<br />

• WATER SUPPLY<br />

Raising height of Tondapur Dam, Installation of filtration plants and Water Supply System at<br />

Ajanta and Ellora.<br />

• ELECTRICITY<br />

Augmentation of electric supply at Ajanta and Ellora, and provision of related supply<br />

network.<br />

• VISITOR MANAGEMENT SYSTEM (VMS)<br />

Preparation of media film, brochure, guide map, leaflets and posters in national and<br />

international languages; Signage in the project region.<br />

The above works were undertaken during Phase-I. In the meanwhile there was a balance of<br />

approximately Rs.380 million from the loan amount due to the depreciation of Rupee, after the<br />

signing of the loan agreement. The Government of India requested the Government of Japan for<br />

extending the loan agreement, which was agreed. The loan agreement has now been extended to<br />

31st March 2002 and further works are being undertaken based on the recommendations of 5th<br />

Steering Committee meeting.<br />

The Sub projects to be executed in extension Phase are shown below and summary of Additional<br />

Work Package for the extended period is given as enclosure. The proposed works are completed<br />

before February 2002.<br />

Phase I & Extended Phase Expenditure<br />

S. Sub Project Impl.<br />

No.<br />

Phase 1 Programme<br />

Agency<br />

1 Monument<br />

Conservation<br />

2 National Airport<br />

Authority<br />

Estimated<br />

Cost<br />

38<br />

Actual Exp. Reimburse<br />

ment<br />

ASI 13,230 3,440 2,821 Completed<br />

AAI 148,270 156,380 124,271 Completed<br />

In Rs. Thousand<br />

Present<br />

Status