• AIRPORT<br />
Extension of existing runway of 6000 ft. to 7500 ft. Installation of ILS and other navigational<br />
equipment, Strengthening of runway, Air conditioning of departure lounge and Erection of<br />
boundary wall.<br />
• AFFORESTATION<br />
Afforestation of 500 Ha of forest land near Ajanta caves and 237 Ha. Around Ellora Caves<br />
totaling 737 Ha. in the region has been completed.<br />
• ROADS<br />
Up gradation of 162 Kms. of road in Ajanta Ellora Region connecting <strong>Aurangabad</strong> – Ajanta,<br />
Ajanta View Point, <strong>Aurangabad</strong> – Ellora and Khultabad – Phulambri by fair road<br />
connectivity to Ajanta and Ellora Caves.<br />
• WATER SUPPLY<br />
Raising height of Tondapur Dam, Installation of filtration plants and Water Supply System at<br />
Ajanta and Ellora.<br />
• ELECTRICITY<br />
Augmentation of electric supply at Ajanta and Ellora, and provision of related supply<br />
network.<br />
• VISITOR MANAGEMENT SYSTEM (VMS)<br />
Preparation of media film, brochure, guide map, leaflets and posters in national and<br />
international languages; Signage in the project region.<br />
The above works were undertaken during Phase-I. In the meanwhile there was a balance of<br />
approximately Rs.380 million from the loan amount due to the depreciation of Rupee, after the<br />
signing of the loan agreement. The Government of India requested the Government of Japan for<br />
extending the loan agreement, which was agreed. The loan agreement has now been extended to<br />
31st March 2002 and further works are being undertaken based on the recommendations of 5th<br />
Steering Committee meeting.<br />
The Sub projects to be executed in extension Phase are shown below and summary of Additional<br />
Work Package for the extended period is given as enclosure. The proposed works are completed<br />
before February 2002.<br />
Phase I & Extended Phase Expenditure<br />
S. Sub Project Impl.<br />
No.<br />
Phase 1 Programme<br />
Agency<br />
1 Monument<br />
Conservation<br />
2 National Airport<br />
Authority<br />
Estimated<br />
Cost<br />
38<br />
Actual Exp. Reimburse<br />
ment<br />
ASI 13,230 3,440 2,821 Completed<br />
AAI 148,270 156,380 124,271 Completed<br />
In Rs. Thousand<br />
Present<br />
Status