25.03.2015 Views

Heating Basics – Gas Valve Systems - Robertshaw Thermostats

Heating Basics – Gas Valve Systems - Robertshaw Thermostats

Heating Basics – Gas Valve Systems - Robertshaw Thermostats

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Intermittent Pilot Checkout Procedure<br />

• Turn on main gas supply<br />

• Turn on manual gas valve<br />

• Turn on electrical power<br />

• Set thermostat to call for heat, spark begins<br />

ROBERTSHAW 780-745<br />

IGN<br />

FLAME<br />

SENSE<br />

PV<br />

GRD<br />

TR<br />

PV/MV<br />

TH<br />

MV<br />

Ignition<br />

Control<br />

Module<br />

U<br />

<strong>Valve</strong> Operator<br />

Terminals<br />

M C P<br />

Transformer<br />

24 VAC<br />

120 VAC<br />

High<br />

Limit<br />

NC<br />

Fan Control NO<br />

• Air purged from gas line<br />

Pilot Line ⇒<br />

Pilot and<br />

Electrode /<br />

Sensor<br />

Fan<br />

Motor<br />

• Pilot Ignition - main burner ignition<br />

• Turn manual gas valve off - burner & pilot go out<br />

• Sparking begins - turn manual valve on<br />

• Pilot ignites - main burner ignites

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!