County Administration & Training Centre<br />
Cathaoirleach: Liam Mac Niallais<br />
Construction of Pitches<br />
Pitches 1, 2, 3 and 5 have been sown out and grass is becoming visible again on the site. The<br />
perimeter concrete path around Pitch 2, the fence and the foundation for the small stand on<br />
the same pitch have been completed. Pitch 4 has had lateral drains completed, soil levelled on<br />
the surface and surface drains completed. Sand has been imported onto the pitch but we will<br />
have to wait until the spring before the pitch can be sown out. Bases for ball stop uprights and<br />
goal posts are complete; catch nets and goalposts will be erected at the end of the 12 months<br />
maintenance period.<br />
Floodlighting<br />
Masts and luminaires / lights have been installed on all 5 pitches; cabling to the masts is in place;<br />
energy centre for generator, NIES etc will be completed by end of present contract – mid<br />
December. Cabling for lighting to the perimeter walk has been laid; lampposts have been<br />
erected.<br />
Ancillary work<br />
The construction of the main entrance will be configured with kerbs and a base coat will be<br />
laid by the end of this present contract. Car parking spaces will be formed and a Bus Park<br />
constructed. The perimeter walk will be reinstated and resurfaced. 2.4m perimeter fence around<br />
the site will be completed by end of current contract – mid December also.<br />
Phase 3<br />
Drawings for the Main Building have been sent to Building Control and its views are awaited.<br />
The hope at the moment is that we can go out to tender over the next 3 months with a start<br />
possible in March/April 2011. The building will take 15/18 months to complete, by which<br />
time the playing pitches should all be available. We would hope to be in a position to officially<br />
open the centre in September 2013.<br />
Funding<br />
The funding approved by Croke Park has been frontloaded towards the present Contract 2<br />
(e1.4M) with e500,000.00 remaining for Contract 3. So far we have received e250,000.00<br />
from the Strategic Investment Fund and e650,000.00 from National Infrastructure & Safety<br />
Committee; we have also been awarded £25,000.00 from Dungannon & South <strong>Tyrone</strong><br />
Borough Council. We hope for some financial support from the other District Councils to<br />
which presentations have been made by Mark Conway. Applications to DARD through ARC<br />
North West for £250,000.00 and the Heritage Lottery for £617,000.00 are well advanced.<br />
Club <strong>Tyrone</strong> funding from Garvaghey Patrons is excellent with over 100 individual Patrons and<br />
over 40 Clubs having also signed up as Garvaghey Patrons. The original Club <strong>Tyrone</strong> funding<br />
remains substantial.<br />
Thanks<br />
My thanks are due to the members of the Garvaghey subcommittee, Michael Mc Goldrick,<br />
Mark Conway, Jackie Duffy, John Mulgrew, Mary Connolly, Cathal Daly and Brian Hackett.<br />
My thanks also to County Officers, Chairperson Ciaran Mc Laughlin, Secretary Dominic Mc<br />
Caughey and Treasurer Michael Harvey who have given of their time to the subcommittee.<br />
A special word of thanks to Mark Conway, John O Neill and Cathy Gallagher who have been<br />
responsible for all of the applications made to the various funding bodies. And finally my thanks<br />
to our clubs for their generous support, to the individual supporters and companies who have<br />
either remained as members of Club <strong>Tyrone</strong> or have become Garvaghey Patrons and to those<br />
who are members of both Club <strong>Tyrone</strong> and the Garvaghey Patrons; without your support we<br />
would not have come this far but with your continuing support and generosity we will achieve<br />
our goal of providing <strong>Tyrone</strong> with a modern administration base, a cultural centre and a training<br />
centre of which we will all be proud.<br />