12.04.2015 Views

Investor Day 2012 - Ausenco

Investor Day 2012 - Ausenco

Investor Day 2012 - Ausenco

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Investor</strong> <strong>Day</strong> <strong>2012</strong><br />

Zimi Meka - Chief Executive Officer<br />

1 May <strong>2012</strong>


Safety moment<br />

<strong>Investor</strong> <strong>Day</strong> | 1 May <strong>2012</strong> | 2


Strategy – delivering results<br />

<strong>Investor</strong> <strong>Day</strong> | 1 May <strong>2012</strong> | 3


Our offering<br />

Minerals<br />

& Metals<br />

Process<br />

Infrastructure<br />

Environment<br />

& Sustainability<br />

Energy<br />

Program<br />

Management<br />

•Precious metals<br />

• Coal<br />

• Iron ore<br />

•Base metals<br />

• Industrial<br />

minerals<br />

• Mineral sands<br />

• Uranium<br />

• Phosphates<br />

• Fertilisers<br />

• Potash<br />

• Ports, marine<br />

• Civil & geotechnical<br />

and offshore<br />

engineering<br />

• Long Pre-feasibility, distance<br />

feasibility • Waste and treatment,<br />

conceptual design gas<br />

services<br />

• Conventional gas<br />

• Non-conventional<br />

slurry and liquid<br />

processing and • Gas conversion<br />

pipelines<br />

storage<br />

• Renewable energy<br />

• Paste and tailings • Mine waste<br />

• Bio fuels<br />

disposal systems management<br />

• Oil and gas<br />

• Materials handling • Environmental and pipelines<br />

•Rail<br />

Front end engineering sustainability<br />

and design service (FEED) • Power generation<br />

• Commercial and<br />

services<br />

and transmission<br />

industrial buildings • Permitting and • Coal gasification<br />

• Pulp and paper<br />

licensing<br />

• Off gas treatment<br />

• Supply chain<br />

• Water resource • Carbon storage<br />

simulations Engineering, and<br />

Procurement, management<br />

Construction Management • Oil sands<br />

(EPCM) and<br />

optimisation<br />

Engineering Procurement • Landfill Construction design and<br />

(EPC) • Oil contracts shale<br />

• Control systems<br />

gas recovery<br />

• Waste water<br />

• Laboratory & field<br />

treatment<br />

services<br />

• Infrastructure<br />

Onsite engineering and operations and maintenance support services<br />

• Program<br />

and project<br />

management<br />

• Procurement<br />

• Logistics<br />

• Construction<br />

management<br />

• Stakeholder<br />

relations<br />

management<br />

• Statutory approvals<br />

management<br />

Evaluate<br />

Innovate<br />

Create<br />

Optimise<br />

<strong>Investor</strong> <strong>Day</strong> | 1 May <strong>2012</strong> | 4


Our management team<br />

Zimi Meka<br />

Chief Executive Officer<br />

Frank Mellish<br />

Chief Marketing Officer<br />

Neil Trembath<br />

Chief People &<br />

Sustainability Officer<br />

Paul Young<br />

Chief Information Officer<br />

Jean Kowalski<br />

Chief Commercial<br />

Officer<br />

Nick Bell<br />

Chief Operating Officer<br />

Craig Allen<br />

Chief Financial Officer<br />

Scott Elfen<br />

President<br />

<strong>Ausenco</strong> Vector<br />

Dwane Stone<br />

President<br />

Energy<br />

Ed Meka<br />

President<br />

Process Infrastructure<br />

Dave Lawson<br />

President<br />

Minerals & Metals<br />

Simon Cmrlec<br />

President<br />

Program Management<br />

<strong>Investor</strong> <strong>Day</strong> | 1 May <strong>2012</strong> | 5


<strong>2012</strong> progress to date<br />

• We are a global engineering business with flexibility, experience and resilience to<br />

handle projects of all sizes<br />

• We are now over 3,180 people, up over 20%, from the same time last year to<br />

service our growing project list<br />

• We are the preferred provider on 6 major projects of over $1 billion installed<br />

capital value each, to deliver engineering or program management solutions<br />

• We are delivering Create phase EPCM solutions on $4.1 billion of work under<br />

management, improving our visibility of and outlook into <strong>2012</strong> and 2013<br />

• In <strong>2012</strong>, we have been awarded $130 million of new revenue across more than 50<br />

projects<br />

• Reaffirm guidance for <strong>2012</strong> of $40 million NPAT, half year earnings expected to<br />

be 50% of full year<br />

<strong>Investor</strong> <strong>Day</strong> | 1 May <strong>2012</strong> | 6


<strong>Investor</strong> <strong>Day</strong> <strong>2012</strong><br />

Nick Bell - Chief Operational Officer<br />

1 May <strong>2012</strong>


Agenda<br />

• Our Business lines<br />

• Our phases and our growth<br />

• Our key differentiators<br />

• Risk Management<br />

• Global footprint<br />

• Market trends<br />

• Summary<br />

<strong>Investor</strong> <strong>Day</strong> | 1 May <strong>2012</strong> | 8


Our Business lines<br />

All business lines are forecasting growth in <strong>2012</strong> and beyond<br />

Minerals<br />

and Metals<br />

56%<br />

Process<br />

Infrastructure<br />

28%<br />

Environment and<br />

Sustainability<br />

7%<br />

Program<br />

Management<br />

9%<br />

Energy<br />


Our Phases<br />

$m<br />

700<br />

Revenue by solutions phase<br />

600<br />

500<br />

400<br />

300<br />

200<br />

100<br />

0<br />

2007 2008 2009 2010 2011<br />

Evaluate Innovate Create Optimise<br />

<strong>Investor</strong> <strong>Day</strong> | 1 May <strong>2012</strong> | 10


Our business in 2007<br />

Minerals<br />

Processing<br />

= 10 - 30% of<br />

total project<br />

ICV<br />

Minerals &<br />

Metals<br />

52 assignments in 2007<br />

<strong>Investor</strong> <strong>Day</strong> | 1 May <strong>2012</strong> | 11


Our business in <strong>2012</strong><br />

Minerals<br />

Processing<br />

= 10 - 30% of<br />

total project<br />

ICV<br />

Energy<br />

Environment &<br />

Sustainability<br />

Minerals &<br />

Metals<br />

Process<br />

Infrastructure<br />

Program<br />

Management<br />

650 assignments in 2011<br />

<strong>Investor</strong> <strong>Day</strong> | 1 May <strong>2012</strong> | 12


Revenue growth opportunity<br />

2011<br />

Larger<br />

projects<br />

Larger<br />

client base<br />

Larger client<br />

base<br />

Revenue growth<br />

opportunity<br />

Service sectors<br />

more<br />

Create work<br />

Service sectors<br />

more<br />

Create work<br />

Service sectors<br />

more<br />

Create work<br />

New service<br />

sectors<br />

(E&S, Rail, Port,<br />

Pipelines)<br />

New service<br />

sectors<br />

(E&S, Rail, Port,<br />

Pipelines)<br />

New service<br />

sectors<br />

(E&S, Rail, Port,<br />

Pipelines)<br />

New service<br />

sectors<br />

(E&S, Rail, Port,<br />

Pipelines)<br />

North/South<br />

America New<br />

Geography<br />

North/South<br />

America New<br />

Geography<br />

North/South<br />

America New<br />

Geography<br />

North/South<br />

America New<br />

Geography<br />

North/South<br />

America New<br />

Geography<br />

2007<br />

M&M Business<br />

2007<br />

(Process Plants:<br />

Africa, Australia,<br />

Asia)<br />

M&M Business<br />

2007<br />

M&M Business<br />

2007<br />

M&M Business<br />

2007<br />

M&M Business<br />

2007<br />

M&M Business<br />

2007<br />

<strong>Investor</strong> <strong>Day</strong> | 1 May <strong>2012</strong> | 13


Our key differentiators/competitive advantage<br />

• We offer smart, innovative solutions – we engage more engineers<br />

than any of our competitors<br />

• Reducing costs associated with the installed plant (capital and<br />

operating) is part of our culture<br />

• Our process plants always achieve the maximum throughput capacity<br />

eg PanAust – lowest unit cost, delivered in a rising market, on time<br />

and increase throughput.<br />

• Our solutions in process infrastructure (pipelines, ports, marine,<br />

materials handling) are best in class<br />

• We have a reputation for delivering on our promises – building strong<br />

relationships with clients<br />

<strong>Investor</strong> <strong>Day</strong> | 1 May <strong>2012</strong> | 14


Project phases – extending the project lifecycle offering<br />

Capital Expenditure<br />

Detailed Engineering<br />

Project Management<br />

Construction Management<br />

FEED Engineering<br />

Exploration<br />

Feasibility<br />

Study<br />

Illustrative <strong>Ausenco</strong> revenue share<br />

of total project Installed Capital<br />

Value (ICV)<br />

Time<br />

0.5 to 1% 1 to 1.5% 1.5 to 3.5% 6.5 to 12.5% 2 to 4%<br />

Evaluate<br />

$153.2m<br />

Innovate<br />

$112.2m<br />

Create<br />

$244.2m<br />

Optimise<br />

$38.3m<br />

<strong>Investor</strong> <strong>Day</strong> | 1 May <strong>2012</strong> | 15


Balanced, sustainable returns across<br />

the full project lifecycle<br />

Phase Evaluate Innovate Create Optimise<br />

Activities<br />

Pre-feasibility,<br />

feasibility and<br />

conceptual design<br />

services<br />

Front end<br />

engineering and<br />

design services<br />

(FEED)<br />

Engineering, Procurement,<br />

Construction Management<br />

(EPCM) and Engineering<br />

Procurement Construction<br />

(EPC) contracts<br />

Onsite engineering,<br />

operations<br />

and maintenance<br />

support services<br />

Typical contract<br />

duration<br />

3-12 mths 6-18 mths 2-4 years 4-5 years<br />

FY 2011<br />

Revenues $m<br />

153.2 112.2 244.2 38.3<br />

CAPEX $bn 18.2 2.0 4.1* -<br />

• Evaluate and Innovate - Over $265 million in baseline revenues from client pre construction phases<br />

• Create phase project delivery revenues provide medium term visibility and expected to grow as client capital<br />

commitments firm<br />

• Strategic focus on cross-selling and broadening service capacity and increasing Create phase EPCM / EPC revenues<br />

• Optimise revenue growing strongly and providing a stable recurring revenue stream<br />

<strong>Investor</strong> <strong>Day</strong> | 1 May <strong>2012</strong> | 16


People<br />

Predictability of revenue<br />

Total installed cost ($’millions)<br />

Number of<br />

people deployed<br />

100 1000 Multi 1000<br />

High<br />

Optimise 100/annum >300/annum<br />

Create 30-50 250-750 1000+<br />

Time<br />

Innovate 20-40 50-100 200<br />

Low<br />

Evaluate 5-25 30-60 100<br />

Size of project<br />

<strong>Investor</strong> <strong>Day</strong> | 1 May <strong>2012</strong> | 17


Risk management<br />

Business – Balanced Portfolio<br />

• Diversified portfolio is key to both balanced<br />

operations and financial risk management<br />

• Diversification across geographical footprint,<br />

commodities and services lines ensures<br />

balanced but sustainable growth<br />

• Our client base is exponentially larger than<br />

at any time in our history<br />

• Cross selling our services to expanded client<br />

base is much easier than selling services to<br />

a new client<br />

Commercial<br />

• Consulting and EPCM environment – risks<br />

largely limited to re-performance of services<br />

that are deemed defective<br />

• All our current revenue is services based<br />

• Where we do entertain lump sum EPC<br />

contracts our method of conversion on the<br />

back of initially completing FEED is proven<br />

as a means of mitigating risks of cost<br />

overruns for AAX and our clients<br />

• Robust Risk assessment through Active Risk<br />

Management software and rigorous<br />

evaluation<br />

• Clients typically listed with strong balance<br />

sheet<br />

<strong>Investor</strong> <strong>Day</strong> | 1 May <strong>2012</strong> | 18


Build long-term inspiring client relationships<br />

• Diversity strategy has delivered broader and deeper globally<br />

diverse client base<br />

• Over 75% of revenue now received from globally diverse<br />

and major resource companies<br />

• Clients seeking full phase solution delivery provide repeat,<br />

ongoing project opportunities<br />

• Enhanced client understandings provides cross selling<br />

opportunities across our solution offerings<br />

• Our increased number of strategic alliance framework<br />

agreements providing greater alignment and visibility<br />

• Our full solution offering to clients from pre-development<br />

Evaluate phase, through Create phase development to<br />

include Optimise phase recurring revenues<br />

Service revenue by client type<br />

2011<br />

Globally<br />

diversified<br />

25%<br />

Major<br />

50%<br />

Emerging<br />

25%<br />

2006<br />

Emerging<br />

63%<br />

<strong>Investor</strong> <strong>Day</strong> | 1 May <strong>2012</strong> | 19


Global footprint –<br />

29 offices across 19 countries<br />

8<br />

%<br />

Offices<br />

Brisbane<br />

Corporate Office<br />

Asia<br />

Bangkok, Thailand<br />

Beijing, China<br />

Jakarta, Indonesia<br />

Mumbai, India<br />

Australia/South Pacific<br />

Adelaide, Australia<br />

Apia, Samoa<br />

Brisbane, Australia<br />

Honiara, Solomon Islands<br />

Nuku’alofa, Tonga<br />

Perth, Australia<br />

Port Moresby, Papua New<br />

Guinea Port Vila, Vanuatu<br />

Suva, Fiji<br />

Middle East<br />

Jeddah, Saudi Arabia<br />

North America<br />

Burlington, Canada<br />

Calgary, Canada<br />

Concord, USA<br />

Denver, USA<br />

Houston, USA<br />

Montréal, Canada<br />

Reno, USA<br />

Toronto, Canada<br />

Vancouver, Canada<br />

South America<br />

Belo Horizonte, Brazil<br />

Bogotá, Colombia<br />

Lima, Peru<br />

Mendoza, Argentina<br />

Rio de Janeiro, Brazil<br />

Santiago, Chile<br />

<strong>Investor</strong> <strong>Day</strong> | 1 May <strong>2012</strong> | 20


Record exploration spending - $16bn in 2011<br />

Office<br />

Russia<br />

4% 19%<br />

Canada<br />

China<br />

4%<br />

8%<br />

United<br />

States<br />

Africa<br />

13% 7%<br />

South East<br />

Asia/Pacific<br />

Mexico6%<br />

6%<br />

5%<br />

Other<br />

Latin America<br />

Australia<br />

12%<br />

Peru<br />

5%<br />

3%<br />

Brazil<br />

$bn<br />

25<br />

Global exploration expenditure<br />

Chile<br />

5%<br />

3%<br />

Argentina<br />

20<br />

15<br />

10<br />

5<br />

0<br />

2005 2006 2007 2008 2009 2010 2011 <strong>2012</strong>f 2013f<br />

Source: Metals Economics Group, McKinsey<br />

Other Countries: 6%<br />

<strong>Investor</strong> <strong>Day</strong> | 1 May <strong>2012</strong> | 21


Mining capital expenditure forecast to increase<br />

Office<br />

Canada<br />

$137bn<br />

$10bn<br />

Mongolia<br />

$65bn<br />

Sub<br />

Saharan<br />

African<br />

West Africa<br />

$5bn<br />

Australia<br />

$90bn<br />

$18bn PNG<br />

8%<br />

Peru<br />

$56bn<br />

Colombia<br />

$22bn<br />

Brazil<br />

$43bn<br />

$bn<br />

160<br />

Global mining resources capex<br />

Chile<br />

$75bn<br />

$10bn<br />

Argentina<br />

120<br />

80<br />

40<br />

0<br />

2005 2006 2007 2008 2009 2010 2011 <strong>2012</strong>f 2013f<br />

Source: Citibank, ANZ Economic Research, Business News America,<br />

Mining Association of Canada, Company reports<br />

<strong>Investor</strong> <strong>Day</strong> | 1 May <strong>2012</strong> | 22


Our acquisitions give us global capability<br />

with local knowledge.<br />

Santiago Lima Calgary Belo Horizonte Vancouver<br />

10 years<br />

356 Chileans<br />

20 years<br />

297 Peruvians<br />

20 years<br />

21 Canadians<br />

12 years<br />

275 Brazilians<br />

60 years<br />

546 Canadians<br />

• Strong client<br />

base – Anglo,<br />

BHP, Codelco<br />

• EPCM growth<br />

within M&M<br />

• Constancia to<br />

provide next<br />

wave of growth<br />

• New client<br />

base<br />

• Oil sands<br />

capability a<br />

new product<br />

line for the<br />

group<br />

• Strong client<br />

base and<br />

history with<br />

Pipeline and<br />

Port work<br />

• Established<br />

business<br />

• Growth in coal<br />

• Energy<br />

opportunities<br />

CSG and wind<br />

• Growth in<br />

Value Chain<br />

(Create)<br />

<strong>Investor</strong> <strong>Day</strong> | 1 May <strong>2012</strong> | 23


Summary<br />

• Well positioned through entire project pipeline<br />

• Broader client base with regular repeat business<br />

• Unique ‘pit to port’ coverage in current markets<br />

• Strong market position in Canada and South America – fundamental to our strategy<br />

• Committed team in place at the right time, in the right places<br />

Work on hand<br />

Future Project Pipeline<br />

19 Countries, 29 Offices<br />

$450<br />

Million<br />

$20.2<br />

Billion<br />

3,180<br />

People<br />

<strong>Investor</strong> <strong>Day</strong> | 1 May <strong>2012</strong> | 24


<strong>Investor</strong> <strong>Day</strong> <strong>2012</strong><br />

Simon Cmrlec – President, Program Management<br />

1 May <strong>2012</strong>


Agenda<br />

• What is Program Management?<br />

• Optimise phase – operations and maintenance services<br />

• New industry sector<br />

• Our Projects<br />

• Direction <strong>2012</strong><br />

• Summary<br />

<strong>Investor</strong> <strong>Day</strong> - Program Management | 1 May <strong>2012</strong> | 26


What is Program Management?<br />

<strong>Investor</strong> <strong>Day</strong> - Program Management | 1 May <strong>2012</strong> | 27


What is Program Management?<br />

Exploration &<br />

resource<br />

management<br />

Study<br />

management<br />

Permitting &<br />

approvals<br />

Industrial &<br />

community<br />

relations<br />

Financing<br />

support<br />

Engineering &<br />

procurement<br />

Construction<br />

management<br />

Start up &<br />

ramp up<br />

Continuous<br />

improvement<br />

Management Personnel, Process, Standards, Systems<br />

<strong>Investor</strong> <strong>Day</strong> - Program Management | 1 May <strong>2012</strong> | 28


Optimise phase – operations and<br />

maintenance services<br />

Production<br />

Operational Readiness<br />

Operations Support<br />

Continuous Improvement<br />

Steady state<br />

Start up &<br />

Ramp up<br />

Construction &<br />

Commissioning<br />

Timeframe<br />

<strong>Investor</strong> <strong>Day</strong> - Program Management | 1 May <strong>2012</strong> | 29


Diversification – Coal Seam Gas Water Treatment<br />

Market<br />

Huge – Treat 1 “sydharb” every 2 years<br />

Position<br />

Joint venture with world leading water treatment specialist<br />

Partner<br />

Proxa – 25 years proven track record<br />

Services<br />

Full lifecycle including O&M<br />

<strong>Ausenco</strong> Proxa – A complete service offering<br />

<strong>Investor</strong> <strong>Day</strong> - Program Management | 1 May <strong>2012</strong> | 30


Alpha Coal Project<br />

Client GVK / Hancock Coal Location Queensland, Australia Service Evaluate (PMC) in JV with Worley Parsons Timing Current<br />

<strong>Investor</strong> <strong>Day</strong> - Program Management | 1 May <strong>2012</strong> | 31


As Suq & Ad Duwayhi Gold<br />

Projects<br />

Client Ma’aden Location Saudi Arabia Project Create (PMC) Timing Current<br />

<strong>Investor</strong> <strong>Day</strong> - Program Management | 1 May <strong>2012</strong> | 32


Marampa Iron Ore Project<br />

Client London Mining Location Sierra Leone Project Optimise (Operations readiness) Timing Current<br />

<strong>Investor</strong> <strong>Day</strong> - Program Management | 1 May <strong>2012</strong> | 33


Hidden Valley Gold Project<br />

Client Newcrest & Harmony Location Papua New Guinea Project Optimise (Continuous improvement) Timing 2010-2011<br />

<strong>Investor</strong> <strong>Day</strong> - Program Management | 1 May <strong>2012</strong> | 34


Isaac Plains Coal<br />

Handling & Preparation Plant<br />

An excellent safety record – over 2 years<br />

operated LTI free<br />

Client Isaac Plains Coal Management Ltd Location Queensland, Australia Project Optimise (Contract Operations) Timing Current<br />

<strong>Investor</strong> <strong>Day</strong> - Program Management | 1 May <strong>2012</strong> | 35


Direction <strong>2012</strong><br />

Deliver<br />

Further growth<br />

Expand<br />

MENA & West Africa presence in gold and iron ore<br />

Grow<br />

Asset Management Services<br />

Diversify<br />

CSG Water treatment<br />

<strong>Investor</strong> <strong>Day</strong> - Program Management | 1 May <strong>2012</strong> | 36


Summary<br />

• Achieved strong growth in 2011<br />

• Moved into new geographies<br />

• Expanded Operations & Maintenance services<br />

• Grow current service offering + move into new sectors<br />

EBITDA Margin (2011)<br />

9.6%<br />

Revenue (2011)<br />

$48M<br />

Target complementary sectors<br />

Water, CSG<br />

& Power<br />

<strong>Investor</strong> <strong>Day</strong> - Program Management | 1 May <strong>2012</strong> | 37


Thank you<br />

Questions?<br />

<strong>Investor</strong> <strong>Day</strong> - Program Management | 1 May <strong>2012</strong> | 38


<strong>Investor</strong> <strong>Day</strong> <strong>2012</strong><br />

Dave Lawson – President, Minerals & Metals<br />

1 May <strong>2012</strong>


Agenda<br />

• What is Minerals & Metals?<br />

• What we do<br />

• Our people<br />

• Where do we do it<br />

• Project examples<br />

• Direction <strong>2012</strong><br />

• Summary<br />

<strong>Investor</strong> <strong>Day</strong> - Minerals & Metals | 1 May <strong>2012</strong> | 40


What is Minerals & Metals?<br />

<strong>Investor</strong> <strong>Day</strong> - Minerals & Metals | 1 May <strong>2012</strong> | 41


What is Minerals & Metals?<br />

Minerals<br />

processing plants<br />

Ingenious<br />

technical<br />

solutions<br />

Engineering and<br />

process<br />

Project<br />

management<br />

and delivery<br />

Construction<br />

Management<br />

Global<br />

procurement<br />

<strong>Investor</strong> <strong>Day</strong> - Minerals & Metals | 1 May <strong>2012</strong> | 42


What do we do?<br />

Copper<br />

Gold<br />

Concentrating<br />

•Crushing<br />

•Milling<br />

•Flotation<br />

•Filtration<br />

Silver<br />

Nickel<br />

Hydrometallurgy<br />

• Leaching and heap leaching<br />

• High pressure and acid leaching<br />

• Pressure oxidisation<br />

• Solvent extraction<br />

• Electro winning<br />

• Bio-oxidation<br />

• Cyanidation<br />

Zinc<br />

Uranium<br />

Smelting<br />

•Roasting<br />

•Electro-refining<br />

Potash<br />

Iron ore<br />

Coal<br />

Mineral<br />

sands<br />

Metals recovery<br />

Material handling<br />

•Gold/silver recovery<br />

•Ferrous and Non-ferrous metals<br />

•Cyanide recovery/destruction<br />

•Uranium recovery<br />

•Conveying<br />

•Stockpiling<br />

<strong>Investor</strong> <strong>Day</strong> - Minerals & Metals | 1 May <strong>2012</strong> | 43


Our people<br />

Workforce<br />

1300 people globally, 100% growth above 2010 numbers<br />

Specialists<br />

World class technical group, 100+ process engineers<br />

Ingenuity<br />

Recognised leader in cost effective plant design<br />

Local<br />

presence<br />

Local workforce utilising global expertise<br />

<strong>Investor</strong> <strong>Day</strong> - Program Management | 1 May <strong>2012</strong> | 44


Global footprint –<br />

29 offices across 19 countries<br />

8%<br />

<strong>Investor</strong> <strong>Day</strong> - Minerals & Metals | 1 May <strong>2012</strong> | 45


Constancia Copper<br />

Project, Peru<br />

High altitude<br />

Client Hudbay Minerals<br />

Location Peru Service Create (EPCM) Timing Current ICV US$920 million<br />

<strong>Investor</strong> <strong>Day</strong> - Minerals & Metals | 1 May <strong>2012</strong> | 46


Kestrel Coal Mine<br />

Expansion,<br />

Australia<br />

Underground and<br />

surface facilities<br />

Client Rio Tinto Location Queensland, Australia Service Create (PMC) Timing Current ICV AU$1.3 billion<br />

<strong>Investor</strong> <strong>Day</strong> - Minerals & Metals | 1 May <strong>2012</strong> | 47


Goldstrike Project, USA<br />

Innovative technology<br />

Client Barrick Location Nevada, USA Project Create (EPCM) Timing Current ICV US$250 million<br />

<strong>Investor</strong> <strong>Day</strong> - Minerals & Metals | 1 May <strong>2012</strong> | 48


Minas-Rio Iron Ore<br />

Project, Brazil<br />

Pit to port solution<br />

Client Anglo Ferrous Brazil Location Brazil Service Evaluate Timing Current ICV US multi billion<br />

<strong>Investor</strong> <strong>Day</strong> - Minerals & Metals | 2 May <strong>2012</strong> | 49


Wafi-Golpu Copper/gold<br />

Project, PNG<br />

Client Newcrest/Harmony Location PNG Project Evaluate Timing Current ICV TBD<br />

<strong>Investor</strong> <strong>Day</strong> - Minerals & Metals | 1 May <strong>2012</strong> | 50


Gibraltar Copper Project,<br />

Canada<br />

Cold climate<br />

Molybdenum plant<br />

Client Tsaeko Location Canada Project Create (EPCM) Timing Current ICV CAD$225 million<br />

<strong>Investor</strong> <strong>Day</strong> - Minerals & Metals | 1 May <strong>2012</strong> | 51


Bozshakol Copper Project,<br />

Kazakhstan<br />

Cold climate<br />

Client Kazakhmys plc<br />

Service Create (EP) Timing Current ICV US$1.3 billion<br />

<strong>Investor</strong> <strong>Day</strong> - Minerals & Metals | 2 May <strong>2012</strong> | 52


Kwale Mineral Sands Project,<br />

Kenya<br />

Industrial minerals<br />

Client Kwale<br />

Location Kenya Project Create (EPCM) Timing Current ICV US$200 million<br />

<strong>Investor</strong> <strong>Day</strong> - Minerals & Metals | 1 May <strong>2012</strong> | 53


Chatree Gold Project,<br />

Thailand<br />

Repeat business<br />

Client Kingsgate Location Thailand Project Create (EPCM) Timing Complete ICV AUS$100 million<br />

<strong>Investor</strong> <strong>Day</strong> - Minerals & Metals | 1 May <strong>2012</strong> | 54


Direction <strong>2012</strong><br />

Projects<br />

Execute current projects well<br />

Geography<br />

Broaden our global footprint, focus on the Americas.<br />

Commodity<br />

Expand our service offering, based on process expertise<br />

Clients<br />

Continue building long term inspiring relationships<br />

Revenue<br />

Expand our recurring revenue portfolio<br />

<strong>Investor</strong> <strong>Day</strong> - Program Management | 1 May <strong>2012</strong> | 55


Summary<br />

• Full service capability to deliver world class projects<br />

• Strong technical workforce<br />

• Strong EBITDA performance in 2011<br />

• Doubled headcount<br />

• Multiple large projects under management/execution<br />

• Strong pipeline of prospects (multi-billion dollar) for globally diversified clients (commodity diversified)<br />

• Balanced geographical and commodity portfolio of projects<br />

• Growth in longer term client relationships<br />

EBITDA<br />

16.2%<br />

2011<br />

Revenue<br />

$310m<br />

2011<br />

Increase<br />

Innovate and<br />

create phase<br />

projects<br />

<strong>Investor</strong> <strong>Day</strong> - Minerals & Metals | 1 May <strong>2012</strong> | 56


Thank you<br />

Questions?<br />

<strong>Investor</strong> <strong>Day</strong> - Minerals & Metals | 1 May <strong>2012</strong> | 57


<strong>Investor</strong> <strong>Day</strong> <strong>2012</strong><br />

Ed Meka – President, Process Infrastructure<br />

1 May <strong>2012</strong>


Agenda<br />

• What is Process Infrastructure?<br />

• Overview<br />

• Services Offering<br />

• Projects<br />

• Direction <strong>2012</strong><br />

• Questions<br />

<strong>Investor</strong> <strong>Day</strong> – Process Infrastructure | 1 May <strong>2012</strong> | 59


What is Process Infrastructure?<br />

<strong>Investor</strong> <strong>Day</strong> – Process Infrastructure | 1 May <strong>2012</strong> | 60


What is Process Infrastructure?<br />

Ports and<br />

Marine<br />

Costal<br />

engineering and<br />

dredging<br />

Arctic offshore<br />

structures<br />

Mining and<br />

bulk terminals<br />

Bulk materials<br />

handling<br />

Rail and<br />

transportation<br />

systems<br />

Simulation<br />

modelling<br />

Infrastructure<br />

Seismic<br />

Process<br />

Pipeline<br />

systems<br />

Control<br />

systems<br />

<strong>Investor</strong> <strong>Day</strong> – Process Infrastructure | 1 May <strong>2012</strong> | 61


Our Services<br />

• Ports & Marine<br />

– Bulk terminals, containers, oil, lng and lpg<br />

– Site selection<br />

– Pre-project planning – site investigations<br />

– Preliminary – detailed design<br />

– Container terminal operations<br />

– EPC and EPCM<br />

• Coastal Engineering and Dredging<br />

– Metocean conditions and ship motion analysis<br />

– Foreshore restoration and breakwaters<br />

– Numerical and physical modeling<br />

• Arctic and Offshore Structures<br />

– Offshore platforms and islands<br />

– Ice structures<br />

<strong>Investor</strong> <strong>Day</strong> – Process Infrastructure | 1 May <strong>2012</strong> | 62


Bulk Materials Handling Capabilities<br />

• Ship and barge loading / unloading<br />

• Conveyors, feeders, and transfer systems<br />

• Dynamic analysis of conveyors<br />

• Stockpile storage and reclaim<br />

<strong>Investor</strong> <strong>Day</strong> – Process Infrastructure | 1 May <strong>2012</strong> | 63


Bulk Materials Handling Capabilities<br />

• Rail car and truck loading / unloading<br />

• Overland conveyor systems<br />

• Environmental systems for noise, spillage, and dust<br />

• Equipment inspection and maintenance<br />

<strong>Investor</strong> <strong>Day</strong> – Process Infrastructure | 1 May <strong>2012</strong> | 64


Railway and Transportation Systems<br />

• Railway engineering design<br />

• Bridges and structures<br />

• Operations planning and analysis<br />

• Train control technology<br />

• Tariff setting - economic studies<br />

• Operations and Maintenance<br />

• Procurement and Construction Management<br />

<strong>Investor</strong> <strong>Day</strong> – Process Infrastructure | 1 May <strong>2012</strong> | 65


Simulation Modelling Capabilities<br />

• Mine to Port supply chain logistics<br />

• Port to Port supply chain logistics<br />

• Modeling of Port Terminals for bulk products<br />

• Modeling of pipelines for crude oil and refined products<br />

Gros Cacouna<br />

Import Terminal<br />

Ballasted<br />

LNG Carrier<br />

Loaded<br />

LNG Carrier<br />

Ust Luga<br />

Export Terminal<br />

Baltic<br />

Ice Edge<br />

• Modeling of slurry pipeline transportation<br />

• Modeling of heavy haul railways<br />

St. Lawrence<br />

Ice Edge<br />

• River barging supply chains<br />

• Arctic transportation for ice breaking ships<br />

• In pit mine haul transportation<br />

<strong>Investor</strong> <strong>Day</strong> – Process Infrastructure | 1 May <strong>2012</strong> | 66


Infrastructure<br />

• Municipal<br />

• Buildings<br />

• Bridges<br />

• Tunnels<br />

• Light Rail<br />

• Civil/Structural<br />

<strong>Investor</strong> <strong>Day</strong> – Process Infrastructure | 1 May <strong>2012</strong> | 67


Pipeline capabilities<br />

• Pipeline systems<br />

– Long-distance slurry<br />

– Oil, gas, & products<br />

– Ethanol & alternative fuels<br />

– Water delivery & reclaim<br />

– Tailings management<br />

• Control systems<br />

– Electrical engineering<br />

– I&C engineering<br />

– Industrial IT<br />

– Control panels<br />

– System integration<br />

– Data management & analysis<br />

– Testing & validation<br />

– Field services<br />

<strong>Investor</strong> <strong>Day</strong> – Process Infrastructure | 1 May <strong>2012</strong> | 68


Pipeline systems engineering<br />

Applying multi-level expertise and experience<br />

• Laboratory testing<br />

• Conceptual & feasibility studies<br />

• Basic & detailed engineering<br />

• Procurement<br />

• Construction QA/QC<br />

• Risk assessment<br />

• Commissioning & start-up<br />

• Operations & maintenance support<br />

• SCADA & telecommunications<br />

• Pipeline operating software solutions<br />

<strong>Investor</strong> <strong>Day</strong> – Process Infrastructure | 1 May <strong>2012</strong> | 69


Control systems design and integration<br />

Complete solutions from concept to delivery<br />

• Overall system configuration<br />

• Detailed control system engineering<br />

• PLC, DCS, HMI programming<br />

• SCADA & telecommunications design &<br />

implementation<br />

• Data management & analysis<br />

• Control panel design & fabrication<br />

• Commissioning & start-up services<br />

• Operator training & field support<br />

<strong>Investor</strong> <strong>Day</strong> – Process Infrastructure | 1 May <strong>2012</strong> | 70


Projects<br />

<strong>Investor</strong> <strong>Day</strong> – Process Infrastructure | 1 May <strong>2012</strong> | 71


Quintette<br />

Coal Project<br />

Client Teck Resources Limited Location Canada Service Create (EPCM) Timing Current<br />

<strong>Investor</strong> <strong>Day</strong> – Process Infrastructure | 1 May <strong>2012</strong> | 72


Los Bronces<br />

Thickened Copper Ore Pipeline<br />

Client Anglo American Sur Location Chile Service Design, engineering and field engineering Timing Current<br />

<strong>Investor</strong> <strong>Day</strong> – Process Infrastructure | 1 May <strong>2012</strong> | 73


Grande Côte Mineral<br />

Sands Project<br />

Client Mineral Deposits Location Senegal Project Create (EPCM) Timing Current<br />

<strong>Investor</strong> <strong>Day</strong> – Process Infrastructure | 1 May <strong>2012</strong> | 74


Cytec<br />

Phosphine Plant Expansion<br />

Client Cytec Location Canada Project EPCM Timing Current<br />

<strong>Investor</strong> <strong>Day</strong> – Process Infrastructure | 1 May <strong>2012</strong> | 75


Samarco<br />

Pipeline Expansion<br />

Client Samarco<br />

Location Brazil Project Engineering services Timing Current<br />

<strong>Investor</strong> <strong>Day</strong> – Process Infrastructure | 1 May <strong>2012</strong> | 76


Quebrada Blanca<br />

Copper Project<br />

Client Teck<br />

Location Chile Project Engineering Services Timing Current<br />

<strong>Investor</strong> <strong>Day</strong> – Process Infrastructure | 1 May <strong>2012</strong> | 77


Direction <strong>2012</strong><br />

• Diversify pipelines capability<br />

• Capability – seawater<br />

• Deliver current Create projects<br />

• Quintette<br />

• Cytec<br />

• MDL<br />

• Rio Tinto Kitimat<br />

• Continue to build EPCM capability<br />

• Port and Terminal<br />

• Pipelines<br />

• Infrastructure<br />

<strong>Investor</strong> <strong>Day</strong> – Process Infrastructure | 1 May <strong>2012</strong> | 78


Direction <strong>2012</strong><br />

• Expand Global Presence<br />

• Australia – ports and slurry pipelines<br />

• South America – Chile, Colombia – ports and terminals<br />

• Broaden technical capability<br />

• Heavy haul rail<br />

• Simulation<br />

<strong>Investor</strong> <strong>Day</strong> – Process Infrastructure | 1 May <strong>2012</strong> | 79


Summary<br />

• Expect revenue and margin growth to continue:<br />

– Strong relationships with Tier 1 and 2 clients:<br />

• Rio Tinto, Teck, Anglo, Xstrata<br />

– Complimented by geographic diversification<br />

• Australia – ports & pipelines<br />

• Chile – ports<br />

• India – pipelines<br />

• West Africa – ports, rail infrastructure<br />

– Deliver EPCM Projects<br />

• Cytec, Rio Tinto, MDL, Cytec<br />

EBITDA<br />

11%<br />

2011<br />

Revenue<br />

$144.9m<br />

2011<br />

Future<br />

Realise<br />

Potential<br />

<strong>Investor</strong> <strong>Day</strong> – Process Infrastructure | 1 May <strong>2012</strong> | 80


Thank you<br />

Questions?<br />

<strong>Investor</strong> <strong>Day</strong> – Process Infrastructure | 1 May <strong>2012</strong> | 81


<strong>Investor</strong> <strong>Day</strong> <strong>2012</strong><br />

Nick Bell - Chief Operational Officer<br />

1 May <strong>2012</strong>


Revenue growth opportunity<br />

Larger<br />

projects<br />

Larger<br />

client base<br />

Larger client<br />

base<br />

Quintette<br />

Quebrada Blanca<br />

Goldstrike<br />

Constancia<br />

Gibraltar<br />

New service<br />

sectors<br />

(E&S, Rail, Port,<br />

Pipelines)<br />

Service sectors<br />

more<br />

Create work<br />

New service<br />

sectors<br />

(E&S, Rail, Port,<br />

Pipelines)<br />

Service sectors<br />

more<br />

Create work<br />

New service<br />

sectors<br />

(E&S, Rail, Port,<br />

Pipelines)<br />

Service sectors<br />

more<br />

Create work<br />

New service<br />

sectors<br />

(E&S, Rail, Port,<br />

Pipelines)<br />

North/South<br />

America New<br />

Geography<br />

North/South<br />

America New<br />

Geography<br />

North/South<br />

America New<br />

Geography<br />

North/South<br />

America New<br />

Geography<br />

North/South<br />

America New<br />

Geography<br />

2007<br />

M&M Business<br />

2007<br />

(Process Plants:<br />

Africa, Australia,<br />

Asia)<br />

M&M Business<br />

2007<br />

M&M Business<br />

2007<br />

M&M Business<br />

2007<br />

M&M Business<br />

2007<br />

M&M Business<br />

2007<br />

<strong>Investor</strong> <strong>Day</strong> | 1 May <strong>2012</strong> | 83


Revenue growth opportunity<br />

Larger<br />

projects<br />

Ports<br />

Pipelines<br />

Rail<br />

Water<br />

Operations etc<br />

Service sectors<br />

more<br />

Create work<br />

Larger<br />

client base<br />

Service sectors<br />

more<br />

Create work<br />

Larger client<br />

base<br />

Service sectors<br />

more<br />

Create work<br />

New service<br />

sectors<br />

(E&S, Rail, Port,<br />

Pipelines)<br />

New service<br />

sectors<br />

(E&S, Rail, Port,<br />

Pipelines)<br />

New service<br />

sectors<br />

(E&S, Rail, Port,<br />

Pipelines)<br />

New service<br />

sectors<br />

(E&S, Rail, Port,<br />

Pipelines)<br />

North/South<br />

America New<br />

Geography<br />

North/South<br />

America New<br />

Geography<br />

North/South<br />

America New<br />

Geography<br />

North/South<br />

America New<br />

Geography<br />

North/South<br />

America New<br />

Geography<br />

2007<br />

M&M Business<br />

2007<br />

(Process Plants:<br />

Africa, Australia,<br />

Asia)<br />

M&M Business<br />

2007<br />

M&M Business<br />

2007<br />

M&M Business<br />

2007<br />

M&M Business<br />

2007<br />

M&M Business<br />

2007<br />

<strong>Investor</strong> <strong>Day</strong> | 1 May <strong>2012</strong> | 84


Revenue growth opportunity<br />

Cytec<br />

MDL<br />

Quintette<br />

Kestrel<br />

Larger<br />

projects<br />

Larger<br />

client base<br />

Larger client<br />

base<br />

Service sectors<br />

more<br />

Create work<br />

Service sectors<br />

more<br />

Create work<br />

Service sectors<br />

more<br />

Create work<br />

New service<br />

sectors<br />

(E&S, Rail, Port,<br />

Pipelines)<br />

New service<br />

sectors<br />

(E&S, Rail, Port,<br />

Pipelines)<br />

New service<br />

sectors<br />

(E&S, Rail, Port,<br />

Pipelines)<br />

New service<br />

sectors<br />

(E&S, Rail, Port,<br />

Pipelines)<br />

North/South<br />

America New<br />

Geography<br />

North/South<br />

America New<br />

Geography<br />

North/South<br />

America New<br />

Geography<br />

North/South<br />

America New<br />

Geography<br />

North/South<br />

America New<br />

Geography<br />

2007<br />

M&M Business<br />

2007<br />

(Process Plants:<br />

Africa, Australia,<br />

Asia)<br />

M&M Business<br />

2007<br />

M&M Business<br />

2007<br />

M&M Business<br />

2007<br />

M&M Business<br />

2007<br />

M&M Business<br />

2007<br />

<strong>Investor</strong> <strong>Day</strong> | 1 May <strong>2012</strong> | 85


Revenue growth opportunity<br />

Vale<br />

Codelco<br />

Rio Tinto<br />

Ma´aden<br />

Anglo<br />

Teck<br />

Larger<br />

projects<br />

Larger<br />

client base<br />

Larger client<br />

base<br />

Service sectors<br />

more<br />

Create work<br />

Service sectors<br />

more<br />

Create work<br />

Service sectors<br />

more<br />

Create work<br />

New service<br />

sectors<br />

(E&S, Rail, Port,<br />

Pipelines)<br />

New service<br />

sectors<br />

(E&S, Rail, Port,<br />

Pipelines)<br />

New service<br />

sectors<br />

(E&S, Rail, Port,<br />

Pipelines)<br />

New service<br />

sectors<br />

(E&S, Rail, Port,<br />

Pipelines)<br />

North/South<br />

America New<br />

Geography<br />

North/South<br />

America New<br />

Geography<br />

North/South<br />

America New<br />

Geography<br />

North/South<br />

America New<br />

Geography<br />

North/South<br />

America New<br />

Geography<br />

2007<br />

M&M Business<br />

2007<br />

(Process Plants:<br />

Africa, Australia,<br />

Asia)<br />

M&M Business<br />

2007<br />

M&M Business<br />

2007<br />

M&M Business<br />

2007<br />

M&M Business<br />

2007<br />

M&M Business<br />

2007<br />

<strong>Investor</strong> <strong>Day</strong> | 1 May <strong>2012</strong> | 86


Revenue growth opportunity<br />

Alpha<br />

Constancia<br />

Minas Rio<br />

Wafi<br />

Kazakhmys<br />

Larger<br />

projects<br />

Larger<br />

client base<br />

Larger client<br />

base<br />

Service sectors<br />

more<br />

Create work<br />

Service sectors<br />

more<br />

Create work<br />

Service sectors<br />

more<br />

Create work<br />

New service<br />

sectors<br />

(E&S, Rail, Port,<br />

Pipelines)<br />

New service<br />

sectors<br />

(E&S, Rail, Port,<br />

Pipelines)<br />

New service<br />

sectors<br />

(E&S, Rail, Port,<br />

Pipelines)<br />

New service<br />

sectors<br />

(E&S, Rail, Port,<br />

Pipelines)<br />

North/South<br />

America New<br />

Geography<br />

North/South<br />

America New<br />

Geography<br />

North/South<br />

America New<br />

Geography<br />

North/South<br />

America New<br />

Geography<br />

North/South<br />

America New<br />

Geography<br />

2007<br />

M&M Business<br />

2007<br />

(Process Plants:<br />

Africa, Australia,<br />

Asia)<br />

M&M Business<br />

2007<br />

M&M Business<br />

2007<br />

M&M Business<br />

2007<br />

M&M Business<br />

2007<br />

M&M Business<br />

2007<br />

<strong>Investor</strong> <strong>Day</strong> | 1 May <strong>2012</strong> | 87


Summary<br />

• Well positioned through entire project pipeline<br />

• Broader client base with regular repeat business<br />

• Unique ‘pit to port’ coverage in current markets<br />

• Strong market position in Canada and South America – fundamental to our strategy<br />

• Committed team in place at the right time, in the right places<br />

Work on hand<br />

Future Project Pipeline<br />

19 Countries, 29 Offices<br />

$450<br />

Million<br />

$20.2<br />

Billion<br />

3,180<br />

People<br />

<strong>Investor</strong> <strong>Day</strong> | 1 May <strong>2012</strong> | 88

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!